.aarsleff.com .aarsleff.com Hitachi kh 180 GLS Piling rig no. 180-3 - 42303 Large capacity piling rig The Hitachi 180-3 is a fully hydraulic large capacity piling rig. It has extendable tracks which result in a very stable rig. The leader is constructed as a framed structure and is assembled of several parts. The rig is suitable for driving or vibrating large and long piles either vertically or with forward/backward inclination. The rig is equipped with support legs to the rear enabling piling with a back- ward inclination. Mounted with a vibrator fixed directly to the leader, the rig is also able to extract sheet piles or steel piles. Please note that the rig is rather heavy with a relatively big ground pressure, hence a stable platform is imperative. Steel plates or mattresses are obligatory. Mob/demob of the rig equipped with hydraulic hammer takes 3 to 4 hours. A crane is required when mounting/dismounting the counter- weight. As standard the piling rig is equipped with a hydraulic hammer, type Junttan HHK-9A (9-ton drop weight). The drop weight is raised to the preset drop height by a hydraulic cylinder and is accelerated down- wards on the cylinder. The drop weight may be accelerated up to 5-8%. The hydraulic cylinder is situated centrally above the drop weight to which it is also connected. The kinetic energy of the drop weight just before it hits the pile is displayed on the control panel of the hammer. Furthermore, a driving log can be printed out. The hammer works with a variable blow fre- quency and can employ a single stroke. Further- more, it works with free variable drop height. 05.01.17-M05UK-rev.2 Contact Per Aarsleff A/S Ground Engineering info@aarsleff.com Tlf. +45 8744 2222 Aarsleff’s Piling division is one of Europe’s leading piling contractors, and we undertake a wide variety of piling, drilling and foundation projects in Denmark and abroad. We have offices in Poland, Sweden, Germany and the UK. Our extensive fleet ranges from mini piling rigs to large specialised machines and covers fully hydraulic piling and drilling rigs as well as cranes and vibrators.

Upload: others

Post on 26-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hitachi kh 180 GLS - Technologies Aarsleff Group · 2018-05-29 · Mob/demob of the rig equipped with hydraulic hammer takes 3 to 4 hours. A crane is required when mounting/dismounting

www.aarsleff.comwww.aarsleff.com

Hitachi kh 180 GLS Piling rig no. 180-3 - 42303

Large capacity piling rigThe Hitachi 180-3 is a fully hydraulic large capacity piling rig. It has extendable tracks which result in a very stable rig. The leader is constructed as a framed structure and is assembled of several parts. The rig is suitable for driving or vibrating large and long piles either vertically or with forward/backward inclination. The rig is equipped with support legs to the rear enabling piling with a back-ward inclination.

Mounted with a vibrator fixed directly to the leader, the rig is also able to extract sheet piles or steel piles. Please note that the rig is rather heavy with a relatively big ground pressure, hence a stable platform is imperative. Steel plates or mattresses are obligatory.

Mob/demob of the rig equipped with hydraulic hammer takes 3 to 4 hours. A crane is required when mounting/dismounting the counter-weight.

As standard the piling rig is equipped with a hydraulic hammer, type Junttan HHK-9A (9-ton drop weight).

The drop weight is raised to the preset drop height by a hydraulic cylinder and is accelerated down-wards on the cylinder. The drop weight may be accelerated up to 5-8%.

The hydraulic cylinder is situated centrally above the drop weight to which it is also connected.

The kinetic energy of the drop weight just before it hits the pile is displayed on the control panel of the hammer. Furthermore, a driving log can be printed out. The hammer works with a variable blow fre-quency and can employ a single stroke. Further-more, it works with free variable drop height.

05.01.17-M05UK-rev.2

ContactPer Aarsleff A/SGround [email protected]. +45 8744 2222

Aarsleff ’s Piling division is one of Europe’s leading piling contractors, and we undertake a wide variety of piling, drilling and foundation projects in Denmark and abroad. We have offices in Poland, Sweden, Germany and the UK.

Our extensive fleet ranges from mini piling rigs to large specialised machines and covers fully hydraulic piling and drilling rigs as well as cranes and vibrators.

Page 2: Hitachi kh 180 GLS - Technologies Aarsleff Group · 2018-05-29 · Mob/demob of the rig equipped with hydraulic hammer takes 3 to 4 hours. A crane is required when mounting/dismounting

• The rig is placed on level, firm and stable platform.• Driving with forward inclination: The leader foot stands on a horizontal and stable platform.• Driving with backward inclination: The support legs stands on a horizontal and stable platform with bracket cylinders fully

extended.• Tracks extended.• Turning more than 360° with minimum extension of bracket cylinders (0.50m) and leader slightly backwards.

Specifications

Model Hitachi KH180 GLSLeader length 27 m or 35.9 mMax forward inclination 18.5° (3:1)Max backward inclination 18.5° (3:1)Max lateral inclination 2.5° (20:1)Max pile length 28 mHammers etc.: • Junttan HHK-9A hydraulic hammer (standard) • Uddcomb • Diesel hammer • Vibrator • Auger motor, max 60 kNmMax drop height 1.10 m (Junttan HHK-9A)Blow frequency 40-100 bl./min. dependent on drop height (Junttan HHK-9A)Winches: • Two 11.4-ton hoisting winches with free fall function • One 5-ton hoisting winchWeight of rig in transport mode 67.9 tons incl. leader top, without ballastLoose ballast 3.7 tons + 4 tonsWeight and measurements of: • Leader foot 350 kg L×W×H: 0.35×1.10×1.00m • Foot section 600 kg L×W×H: 1.35×1.10×1.00m • Leader section Three, 2,300 kg/section L×W×H: 8.89×1.10×1.00mWeight of rig in operational mode without hammer: • 82,150 kg with 27 m leader • 84,450 kg with 35.9 m leaderGround pressure: • 1.28 kg/cm² (base machine without hammer, in total 84,450 kg) • 3.72 kg/cm² (base machine incl. pile and hammer, in total 113,000 kg)

Standard equipment

• Driving helmets for precast concrete piles 30 × 30 cm, 35 × 35 cm and 40 × 40 cm

• 600 mm diameter tubular driving helmet• Hydraulic outlet for auger motor• Auger leader mounted on the side of main leader• 10" equipment container• 10" container for crew’s accommodation• Diesel tank• 5 steel plates (2 × 6 m).

Additional equipment

• Driving helmets for sheet piles• Carrier for power pack unit• Predrilling equipment to be mounted on the side of

the main leader.

3

1

3

1

5.52 m

7.20 mMin 4.68 m 1.7

0 m

7.00

m

Max 5.68 m4.32 m

2.5˚

18.25 m*11.95 m6.30 m

3.45

m

*The length is increased by approx. 2 metres if the lead-er top is mounted during transport

Capacity chart

Leader length(m) 35.9 35.9 27.0 27.0

Max pile length(m) 28.0 22.0 20.0 17.0

Leader inclination Forward Backward Forward Backward Forward Backward Forward Backward

Maximum allowed pile weight tonsType O = 13.5 tons Type A = 11.4 tons Type B = 10.5 tons Type C = 9 tons Type D = 7.5 tons

O - 5.0 10.0 - 11.4A - 9.0 11.4 - 11.4

3 : 1 (18.5°) B - 5.0 - 11.4 - 11.4 2.0 11.4C - 8.5 - 11.4 3.0 11.4 5.0 11.4D - 11.4 - 11.4 6.0 11.4 8.0 11.4

O - 5.5 - 11.4 - 11.4 3.0 11.4A - 10.5 - 11.4 5.0 11.4 8.0 11.4

4 : 1 (14.0°) B - 11.4 - 11.4 7.0 11.4 10.0 11.4C - 11.4 2.0 11.4 10.0 11.4 11.4 11.4D 2.0 11.4 5.0 11.4 11.4 11.4 11.4 11.4

O - 5.5 - 11.4 6.0 11.4 9.0 11.4A 1.0 10.5 7.0 11.4 10.0 11.4 11.4 11.4

5 : 1 (11.5°) B 2.5 11.4 9.0 11.4 11.4 11.4 11.4 11.4C 5.0 11.4 11.4 11.4 11.4 11.4 11.4 11.4D 7.5 11.4 11.4 11.4 11.4 11.4 11.4 11.4

O - 5.5 11.0 11.4 11.4 11.4 11.4 11.4A 6.0 10.5 11.4 11.4 11.4 11.4 11.4 11.4

6 : 1 (9.5°) B 7.5 11.4 11.4 11.4 11.4 11.4 11.4 11.4C 9.5 11.4 11.4 11.4 11.4 11.4 11.4 11.4D 11.4 11.4 11.4 11.4 11.4 11.4 11.4 11.4

O 5.5 5.5 11.4 11.4 11.4 11.4 11.4 11.4A 10.5 10.5 11.4 11.4 11.4 11.4 11.4 11.4

Vertical B 11.4 11.4 11.4 11.4 11.4 11.4 11.4 11.4C 11.4 11.4 11.4 11.4 11.4 11.4 11.4 11.4D 11.4 11.4 11.4 11.4 11.4 11.4 11.4 11.4

4.35m tracks extended3.35m tracks retracted0.81m track width