hirarc.ppt

26
Hera,USM HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL By Hera Singh Scientific Officer Pusat Pengajian Sains Kesihatan

Upload: john-kalvin

Post on 29-Sep-2015

40 views

Category:

Documents


5 download

TRANSCRIPT

  • HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROLByHera SinghScientific OfficerPusat Pengajian Sains Kesihatan

    Hera,USM

  • OBJECTIVETo identify types of Hazard in work areaTo make Risk AssessmentsTo suggest Risk Controls to OrganizationTo implementing Risk ControlsTo review Risk Controls

  • HIRARCLEGALACCIDENT &NEAR MISSESFEEDBACK &COMPLAININSPECTION& AUDITSOPINTERNAL AUDITPOLICYSAFETYCOMMITTEETRANINGERPMANAGEMENT PROGRAMHIRARC -Planning & Implementation

  • OSH-MS (MS 1722:2003)PolicyOrganizingPlanning And ImplementationMeasuring PerformanceAction for ImprovementKey Elements

  • Why We Need OSH-MSOur Organization to be No. 1Increase Return of Investment- employees, money , time..Safe work place

  • How To StartOrganization should have visionCommitment from management- right people- resource - time

  • Should have internal auditManagement committee to review reportsExternal auditSpecific organization policy- hazard specificEmployees participation - meeting, trainingSafety as basic trainingHow To Start

  • Introduction to HIRARCPrinciples used in workplace to manage safety and health.Section 15 (2)(a) of OSHA 1994:which reads the provision and maintenance of plants and systems of work that are,so far as is practicable, safe and without risks to health

  • DefinitionHazardA source or a situation with a potential for harm to humans, property and damage of environment or a combination of these.DangerRelative exposure to hazard.RiskA combination of likelihood of occurrence and severity of injury or damage.

  • Overview Of HIRARCDefinition of HazardsClassification of HazardsPotential sources of HazardsBasic components of Risk Management

  • The Process of Risk ManagementClassify Activities(Work, Product, Services)

    Identify Hazard

    Assess The Risk

    Risk Control

    Review Risk Control

  • Classification & Potential Sources of Hazards Classification Example of HazardsMechanical - Sharp points & edges, overload.Electrical - Insulation damaged or cover brokenBiological - Exposed, airborne/blood borne microorganism. Chemical - Expose to carcinogens chemicalErgonomics - Expose to unnatural posturesPsychological- Stress or violent at workplace.

  • Hazard IdentificationTo keep workplace safe and healthy.-employers should make sure there are no hazards to which employees could be exposed.Employers should look for hazards in advanceas part of their risk management plan to prevent potential hazards.

  • Actions & RecommendationsAll related statements should be madeWith no cost restrainsShould be reviewed every 4 monthsNeed management support

  • Risk AssessmentIs the process of evaluating the risk to safety & health from hazards at work

    TypesQualitativeSemi-quantitativeQuantitative

  • How To Assess Risk1) Look for the Hazards2) Decide who might be harmed & how3) Evaluate the risk and check what is done to prevent it from happening4) Record finding5) Review assessment and revise it if necessary

  • Types of Risk AssessmentQualitative - (Use Risk Matrix)-table scales for likelihood and severityFatalityMajor injuriesMinor injuriesFirst aid or near misses

  • Types of Risk AssessmentBased on statisticLikelihoodVery likelyLikelyUnlikelyHighly Unlikely

  • Qualitative Risk Table

  • Semi-Quantitative Risk AssessmentSeverity Categories1. First Aid2. Less than 4 days M/C3. More than 4 days M/C4. Fatality & Permanent Disability

  • Semi-Quantitative Risk AssessmentLikelihood Occurrence

    1. Yearly2. Monthly3. Weekly4. Daily

  • Semi-Quantitative Risk Table

  • Quantitative Risk AssessmentIn cases where hazards are numerous and complex eg; Chemical process plantShould have Job Safety Analysis (JSA)describe job in less than 10 stepsList things that can go wrongeg; Changing a Car Wheel

  • Actions & RecommendationsEL-EliminateSL-SubstituteIS-IsolationEC-Engineering ControlAC -Administration ControlPPE- Personal Protection Equipment

  • Actions & RecommendationsEg;EL - stop work, cover hazardSL - use other route, other material..IS - put up temporary barrier,EC - construct permanent wall,..AC - put up notice, job rotation,PPE - gloves, respirator,

  • Thank YouHera SinghScientific OfficerPusat Pengajian Sains Kesihatan