(hindi version will follow.)

26
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RAILWAY BOARD No. 2013/RSF/649/2/RP-11/RWF New Delhi, dt. i g .07.13 The Chief Mechanical Engineer, Rail Wheel Factory, Bangalore — 560 064. The Controller of Stores, All India Railways & P/Units. Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period 11/2013-14 (July - September, 2013). Minutes of quarterly WTA meeting for the period II/2013-14 (July - September, 2013) held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on 11.07.13 has been uploaded on Indian Railway's website www.indianrailways.gov.in . To access the Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on "Conferences / Meetings" to open the page containing the minutes of the meeting. Please ensure that the statement of requirements of WTA items for the Quarter III/2013- 14 (October - December, 2013) should reach this office latest by 15.09.13 positively. The exact date and venue of the meeting would be advised later on. (Hindi version will follow.) Encl.:- As above. ( Sa isra ) Director, Railway Stores (F) Railway Board. Copy of the Minutes of the meeting together with allocation statement is forwarded for information and necessary action please. 1. The Chief Mechanical Engineers, All India Railways and Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. M/s Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata — 700 028. 4. M/s Bharat Earth Movers Ltd., "BEML SOUDHA", 23/1, 4 th Main, S.R. Nagar, Bangalore-560 027. 5. M/s Titagarh Wagons Ltd.,113, Park Street, Kolkata — 700 016. 6. M/s Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office Complex, Lodhi Road, New Delhi-110 003. 7. Adv.(RS), AM(ME), AM(PU), Adv(L)/RS, EDRS(C ), EDRS(P), EDME(Chg.), EDME(W), EDME (Tr.), EDEE(RS), DME(PU), DME(P)-1, DEE/G, DRS(W), DRS(M), DF(S)-1 and RS(WTA) Branches of Railway Board. 8. CWM, Eastern Railway, Kancharapara.

Upload: lamdieu

Post on 10-Feb-2017

231 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: (Hindi version will follow.)

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS

RAILWAY BOARD

No. 2013/RSF/649/2/RP-11/RWF New Delhi, dt. i g .07.13

The Chief Mechanical Engineer, Rail Wheel Factory, Bangalore — 560 064.

The Controller of Stores, All India Railways & P/Units.

Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period 11/2013-14 (July - September, 2013).

Minutes of quarterly WTA meeting for the period II/2013-14 (July - September, 2013) held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on 11.07.13 has been uploaded on Indian Railway's website www.indianrailways.gov.in . To access the Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on "Conferences / Meetings" to open the page containing the minutes of the meeting.

Please ensure that the statement of requirements of WTA items for the Quarter III/2013-14 (October - December, 2013) should reach this office latest by 15.09.13 positively. The exact date and venue of the meeting would be advised later on.

(Hindi version will follow.) Encl.:- As above.

( Sa isra ) Director, Railway Stores (F)

Railway Board.

Copy of the Minutes of the meeting together with allocation statement is forwarded for information and necessary action please.

1. The Chief Mechanical Engineers, All India Railways and Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. M/s Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata — 700 028. 4. M/s Bharat Earth Movers Ltd., "BEML SOUDHA", 23/1, 4 th Main, S.R. Nagar,

Bangalore-560 027. 5. M/s Titagarh Wagons Ltd.,113, Park Street, Kolkata — 700 016. 6. M/s Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office

Complex, Lodhi Road, New Delhi-110 003. 7. Adv.(RS), AM(ME), AM(PU), Adv(L)/RS, EDRS(C ), EDRS(P), EDME(Chg.),

EDME(W), EDME (Tr.), EDEE(RS), DME(PU), DME(P)-1, DEE/G, DRS(W), DRS(M), DF(S)-1 and RS(WTA) Branches of Railway Board.

8. CWM, Eastern Railway, Kancharapara.

Page 2: (Hindi version will follow.)

WTA Meeting 2 nd quarter -11 `h July, 2013/RWF

Present :

Railway Board : AM/PU, Adv/RS, Adv.RS(P), EDME(PU), EDRS(C), EDRS(S), DRS(F), DME(PU), DME/P-I

Plants : CME & COS/RWF, Bangalore, DGM/SAIL/DSP. No representation from RWP/Bela

Railway Units : COSs/CMMs/JAGs Officers of Zonal Railway & Production Units, CWEs & other Officers of Mechanical Department of Zonal Railways & Production Units.

RWF/Banalore

• In 1 st quarter of 2013-14, RWF supplied 50342 wheels (including wheels for wheelsets), 16261 wheelsets and 22,232 axles (including axles for wheelsets).

• RWF has started reconciliation of pending purchase orders. Oldest purchase order should be closed first and details uploaded on the net so that Zonal Railways/PUs can reconcile their position..

• Supply of WTA items are to be regulated as per the Purchase orders placed by Railway Board. CME/RWF requested for the placement of Purchase orders for some of the items so that quantity supplied can be regularised.

SAIL/DSP

• SAIL/DSP supplied 12023 wheels and 1982 axles in last quarter. SAIL/DSP was reminded about their commitment to fully switch over from plate type loco wheels to S-type loco wheels from 2014-15.

• WAG-9 loco wheel is being developed by SAIL/DSP. Forging of 10 wheels has been completed. SAIL/DSP has been requested to expedite the supply of ordered quantity of 500 nos. in 2nd quarter.

• SAIL/DSP is developing LHB wheels also. Out of the above two wheels priority for development should be of WAG-9 wheels.

• DGM/SAIL stated that in 2013-14 SAIL/DSP will be in a position to supply 50,000 wheels(approx) and 8000 axles.

RWP/Bela

• AM/PU stated production of wheels at RWP/Bela Plant has started on 27 th May and plant could be operated satisfactorily for 3 weeks. AM/PU stated that RWP/Bela will not only meet the target of 10000 wheels in 2013-14 but also exceed the same. Adequate availability of scrap for RWP/Bela is to be ensured for continuous &.enhanced level of production at RWP/Bela.

Submission of Indents.

• Due date of submission of Indents for 2015-16 for WTA items is 31/07/2013. Provision of Buffer stock of 6 months for imported items and 3 months for indigenous items is to be ensured while assessing the requirement.

Page 3: (Hindi version will follow.)

WTA Meeting 2 nd quarter -11 th July, 2013/RWF

EMU Wheels • Railway units were advised again to ensure judicious use of EMU wheels (Forged & Cast). For

Trailor Coaches, cast wheels are to be utilized and use of forged wheels should be restricted for Motor Coaches. Supply for forged wheels through import is not expected in near future.

The position regarding supplies made by RWF during the previous quarter i.e. April - June, 2013 was discussed. The same is tabulated as under:-

SUPPLIES DURING APRIL - JUNE, 2013

No. Item Quantity Planned (April -

June., 2013)

Actual Supplies (April - June, 2013)

Variation (+) excess (-) shortfall

Total Supplies from April, 2013 to June, 2013

A LOOSE WHEELS (i) BOX 'N' Wheels

W/WL-4764/R 6600 4940 -1660

(ii) MG Chg. Wheels MG/T-0.-1-004 (W/WL-770/R)

(WAP-W-031)

0 0 0

(iii) BG Chg. Wheels W/WL-1660/R

11900 11293 -607

(iv) BG Loco Wheels W/WL-4984/R

0 0 0

(v) 840 mm dia wheels for BLC Wagons

1948 1587 -361

(vi) EMU/DMU Wheels to Drg. No. K-4004

0 0 0

(vii) Wheels for BVZC Wagons to Drg. No. W/WL-4747

0 0 0

TOTAL WHEELS 20448 17820 -2628 B LOOSE AXLES (i) Nos. 6040 5971 -69 (ii) Equated Box 'N' Units 7800 7661 -139 C WHEELSETS (i) 16T BG Chg. Wheelsets 450 432 -18 (ii) Wheelsets for BCN 0 0 0 (iii) BOX 'N' W/sets including

Wagon Builders & BLC Wagons

15750 15829 -79

(iv) EMU W/sets for Trailer Coaches

0 0 0

TOTALWHEELSETS 16200 16261 -61

The detailed supply position (Railway wise/Consignee wise) is given in the enclosed Annexure-l.

The item-wise planning for July - September, 2013 is shown in Annexure - II.

Page 4: (Hindi version will follow.)

2nd quarter, 2013-14/RWF

I I I IANNEXURE - I ' I Position regarding quantities planned vis a - vis actua supplies made by RWF/Bangaiore during the 1st Quarter (April - June, 2013).

S.NOS. DRAWING & DESCRIPTION

RLYJCONSIGNEE QTY. PLANNED (APRIL -

,JUNE.13)

QTY. SUPPLIED (APRIL -

_JUNE.131

VARIATION (+) EXCESS (-1 SHORTFALL

WHEELS 1 Wheel disc. BOX 'N'

Type to Drg. No. W/WL-4764IR (WAP/SK/M-155)

'CR/OR 100 93 -7 ER/AAP 300 209 -91 NR/JUDW 800 700 -100 NCR/JHS 1200 1002 -198 NFR/NBO 300 86 -214 SCR/RYPS 1200 1093 -107 SER/KGP 700 487 -213 SECRIRWSS 800 477 -323 SWR/UBUAP 100 100 0 wR/OHD 600 345 -255 WCIA/CWM/KTT 500 348. -152 Total 6600 4940 -1660

2 BG Chg. Wheels to Drg. No.W/WL- 1660/R

CR/MTN/PR 700 713 1 3 EFt/LLH 700 604 -96 ECR/Hamaut Workshop 150 46 -104

Eco.RIMCS 400 356 -44 NR/AMV/JUDW 800 772 -28 NR/CWM/ASR 100 62 -38 NER/GKP/IZN 400 366 -34 NFFUDBRT/NBO 200 193 -7 NWR/AII/JU 400 433 33 SR/CW/PER/GOC 800 755 -45 SCRJTPTY/LGD 800 798 -2 SeRiKGP 500 424 -76 8ECR/RWSS 50 37 -13 SWR/UBL/AP 500 431 -69 SWR/CWM/UBL 200 200 0 WR/PUBVP 300 297 -3 WR/CWM/PL 600 555 -45 WCR/BPL 300 309 9 ICF 2000 1942 -58 RCF 2000 2000 0 Total 11900 11293 -607

3 840 dia wheel for BLC wagon

CR/PR 90 90 0 ER/JMP 60 57 -3 NR/JUDW 1000 709 -291 NCR/JHS 300 361 61 SCR/RYPS 148 125 -23 SWR/AP 100 70 -30 WFt/DHD 150 117 -33

WCR/KTT 100 58 -42 Total 1948 1587 -361

TOTAL WHEELS 20448 17820 -2628 AXLES

1 BG DSL Loco axle to Drg. No.W/VVL- 4973/R

ER/KPA 32 32 0 SR/LW/PER/GOC 65 50 -15 Total 97 82 -15

Page 5: (Hindi version will follow.)

2nd quarter, 2013-14/RWF

2 Axle for WDG-2 A (Axle RT (with light wt. 5002 FZ) to Drg. No. TPL-5868 Aft 'b' part No.11231622

NR/CB 50... 50

NER/GKP 9 9 0 DMW 143, ' 143 0 Total 202 202 0

3 Axle rough turned for WAP-4 loco to Drg. No.03/2/11/55 Alt. 1

CLW 53 59 6

Total 53 59 6

4 Axle rough for WDS- 6 to Drg. No. TPL- 2585

DLW 110 96 -14

'Total 110 96 -14

5 Axle driving rough turned for WDM-3A Locos to Drg. No.D/WL-5058/R Alt. NIL

DMW 263 263 0 CR/PR 18 19 NER/GKP 5 5 0 Total 286 287 1

6 Axle rough machined for WDG- 2 & WAG-7 to DRg. No.06/2/11/2

CR/BSL 52 52 ER/KPA 41 43 2 NR/CNB 6 0 -6 SCR/ELS/BZA 20 0 -20 SER/KGP 30 36 0 WR/DHD 3 3 0 CLW 1 80 193 13

BHEUJHS 100 104 4 Total 432 425 -7

7 Axles for WAG-9 & WAP-7 (Rough machined) to CLW s Dig. No.1209-01- 011-002 Alt

CLW 218 217 -1

CR/BSL 127 123 -4

Total 345 340 -5

8 Axle rough GM Loco to EMD Pt. No. 40077315 (Geared) & DLW Pt. No. 17230019

NR/CB 6 6 0

SWR/AP 6 6 0

Total 12 12 0

9 Axle (3 Phase) for WAP-5 Loco to CLW Drg. No. 1210- 01-311-025

CR/BSL 16 16 0 WR/DHD 4 4 0 cm 46 21 -25 Total 66 41 -25

Page 6: (Hindi version will follow.)

2nd quarter, 2013-14/RWF

10 Axle rough GM Loco to EMD Pt. No.40076350 & DLW Pt. No.17230011

NWR/All 3 0 -3

SCR/Sr.DME/DSU GOOTY

6 0 -6

Total 9 0 -9

11 Axle rough machined for TAO- 659 Hitachi type wheelset to Drg. No. SKEL-4516

CR/BSL 58 58 0

ER/KPA 2 2 0

SER/KGP 100 78 -22

BHEL/JHS loo' 109 §'

Total 260 247 -13

12 Axle RT Steam loco XE 3634

NR/ASR 0 6 6

Total 0 6 6

TOTAL AXLES (1) TO (12) IN NOS.

1872 1797 -75

TOTAL AXLES IN EQUATED NOS. (X by 1.91=

3557 3414 -143

13 BG EMU Motor Coach Axles to Drg. No.DC/EMU-M-0-1- 005

CR/MTN 42 39 -3 NR/CB 25 25 0 SER/KGP 24 24 0 Total 91 88 -3

14 Axle for AC Motor Coach to Drg. No.EMU/MC-1-025

ER/KPA 133 133 0

BEMLJSWR/MYSS 48 48 0

Total 181 181 0

15 Axle for MEMU/DMC to Drg. No. EMU/M-0-1-025

RCF 64 64 0

SCR/LGD 10 10 0

Total 74 74 0

16 EMU Axles For Motor Coaches to Drg. No.AC/DC/EMU/B-02-002 Alt. A/2 item 1 (WAP's Drg. No. WAP-A-087)

NR/GZB 16 6 -10

SR/LW/PER 12 12 0

Total 28 18 -10

TOTAL EMU AXLES IN NOS.

374 361 -13

TOTAL EMU AXLES IN EQUATED NOS. (X by 1.2)=

449 433 -15.6

17 BG EMU Axles to Drg. No. W/VVL- 4784/R

SR/CW/PER 40 40 0

Total 40 40 0

Page 7: (Hindi version will follow.)

2nd quarter, 2013-14/RWF

18 EMU Axles for BEMUSWR/MYSS 96 96 0

Trailor Coaches to SR/CW/PER 26 26 0

Drg. No. AC/DC/EMU/02/204-001 00/RWF-A-157

Total 122 122 0

19 BG MEMU TC Axles to Drg. No. WTAC3- 0-2-303 AIt.F

RCF 230 230 0 EFt/KPA 12 12 0 NR/GZB 25 0 -25 SCR/ELS/BZA 4 0 -4

Total 271 242 -29

20 Axle for BOX 'N'/BCN Wagon to Drg. No. WD- 92039/S-1 Item-1 Alt.-2

NR/JUDW 20 28 8

SWR/AP 48 25 -23

WR/DHD 50 0 50

Total 118 103 -15

21 Axles for BOX'N' to Drg. No.W/WL- 4901/R (WD-89025/SL-2)

CR/PR 44 44 0

ER/HLR/JMP 101 94 -7

NR/ASR 20 20 0

NCR/JHS 30 39 9

NFR/NBQ 60 64 4

SR/CW/PER 70 70 0

SCFt/RYPS 100 100 0

SECR/RWSS 100 102 2

SWR/UBL 12 12 0

WCR/KTT 25 25 0

Total 562 570 8

22 Axles for LI413 coaches to Drg. No.LW 021049

ER/LLH 79 79 0

Eco.R/MCS 30 30 0

SER/KGP 12 12 0

SWR/AP 20 20 0

WR/PL 40 41 1

RCF 400 400 0

Total 581 582 1

23 16 T BG Coaching Axles to Drg. No. CG-K 6015

ER/HLR/LLH 200 200 0

ECR/Hamaut Workshop 50 53 3

Eco.R/MCS 50 72 22

NR/CWM/ASR 100 107 7

NER/GKP 100 76 -24

NFR/NBQ 50 50 0

SR/GOC/LW/PER 150 154 4

SCR/TPTY 100 97 -3

SER/KGP 50 50 0

WR/BVP 50 55 5

WR/CWM/PL 300 305 5

ICI= 400 404 4

RCF 500 531 31

Total 2100 2154 54

Page 8: (Hindi version will follow.)

2nd quarter, 2013-14/RWF

TOTAL AXLES S.NOS. 17 to 23 IN NOS.

3794 3813 19

GRAND TOTAL AXLES IN NOS.=

6040 5971 -69

GRAND TOTAL AXLES IN EQUATED UNITS =

7800 7661 -139.1

WHEELSETS

1 16T BG CHG.Wheelsets

NFR/NBQ 50 36 -14

BEML 400 396 -4 Total 450 432 -18

2 BOX 'ft Wheelsets Wagon Builders 15200 15675 475

ECR/SPJ 50 0 -50

NFR/NBQ 50 47 -3

Total 15300 15722 422

3 Wheelsets for Cast Steel Bogie of BLC Wagon to Drg. No. CONTR-9404-S/12 Alt.3

ER/Naihati 0 20 20

WCR/CWM/KTT 50 36 -14

CONCOR 400 51 -349

Total 450 107 -343

TOTAL WHEELSETS

16200 16261 61

Page 9: (Hindi version will follow.)

2nd quarter, 2013-14/RWF

I I I I ANNEXURE - III Allocation sheet for supply of WTA Items for the lind quarter i.e. July - September, 2013 on

RWF/Bangalore.

S.NOS. DRAWING & DESCRIPTION

RLYS./PUs QTY. PLANNED (JULY-

SEPTEMBER, 2013

Consignee Remarks

WHEELS 1 Wheel disc. BOX 'N'

Type to Drg. No. W/WL-4764/R (WAP/SK/M-155)

CR 100 PR

ER 1100 450-HLR 450-JMP 200-LLH

700-BELA

NR 1100 JUDW NCR 1800 JHS NFR 300 NBQ SCR 1400 RYPS SER 900 KGP SECR 1000 RWSS SWR 250 150-UBL

100-AP WR 400 DHD Total 8350

2 BG Coaching Wheels to Drg. No.W/WL-1660/R

CR 1000 800-MTN 200-PR

ER 900 200-HLR 700-LLH

Eco.R 500 MCS NR 1600 450-JUDW

100-ASR 1050-AMV

200 CWM/ASR Against RSP NER 500 50-IZN

450-GKP NFR 400 250-DBRT

150-NBQ NWR 600 400-All

200-JU SR 900 CW/PER SCR 800 400-LGD

400-TPTY SER 800 KGP SECR 150 RWSS SWR 500 300-UBL

200-AP 200 CWM/UBL Against RSP

WR 300 250-PL 50-BVP

300 CWM/PL Against RSP WCR 300 BPL ICF 2300 RCF 2300 Total 14550

Page 10: (Hindi version will follow.)

2nd quarter, 2013-14/RWF

3 840 dia wheel for BLC CR 80 PR wagon ER 60 LLH

NR 1000 JUDW NCR 300 JHS SR 84 CW/PER SCR 99 CWM/RYPS SWR 80 AP WR 50 DHD Total 1753

4 EMU/DEMU Wheels to Drg. No. K-4004

CR 404 MTN, ER 900 HLR NR 313 250-GZB

63-CB SR 500 CW/PER SCR 100 LGD SER 250 KGP WR 100 DHD RCF 100 BEML 282 CWM/MYSS/SWR. Texmaco 16 KPA/ER Total 2965

TOTAL WHEELS 27618

AXLES

1 BG DSL Loco axle to Drg. No.D/WL-4973/R (WAP/SK/MA-245)

ER 55 KPA

SR 66 LW/PER

Total 121

2 Axle for WDG-2 A (Axle RT (with light wt. 5002 FZ) to Drg. No. TPL-5868 Alt. 'b' part No. 11231622

DMW 300

Total 300

3 Axle rough turned for WAP-4 Loco to Drg. No.03/2/11/55

CLW 47 Total 47

4 Axle driving rough turned for WDM-3A Locos to Drg. No. D/WL-5058/R Alt. NIL

DMW 200 SMM/D Ph-II, DMW

Total 200

Page 11: (Hindi version will follow.)

2nd quarter, 2013-14/RWF

5 Axle rough machined for WDG-2. WDG-3A, WDM-

NFR 10 NBQ

3D Locos to Drg. No. TPL-6292

Total 10

6 Axle rough machined for WDG-2 & WAG-7 to Drg.

CR 19 BSL

No.06/2/11/2 ER 48 KPA NR 6 CNB SCR 20 10-ELS/BZA

10-ELS/KZJ BHEL 125 JHS

Total 218

7 Axle rouh GM Loco to EMD Pt. No.40077315 (Geared) & DLW Pt. No.17230019

DLW 300

Total 300

8 Axles for WAG-9 & WAP- 7 (Rough machined) to CLW's Drg. No. 1209-01- 011-002 Alt.

CLW 350

CR 38 BSL ER 42 KPA

SER 6 KGP

Total 436

9 Axle rough GM Loco to EMD Pt. No.40076350 & DLW Part No.17230011

SCR 6 Sr. DME/DSL/ Gooty

Total 6

10 Axle (3 Phase) for WAP- 5 Loco to CLW Drg. No.1210-01-311-025

CLW 53

Total 53

11 Axle rough machined for TAO-659 Hitachi type wheelset to Drg. No. SKEL-4516

CR 25 BSL WR 30 DHD BHEL 100 JHS

Total 155 TOTAL AXLES (1) TO (11) IN NOS.

1846

TOTAL AXLES IN EQUATED NOS.

3507

12 BG EMU MTR Coach Axles to Drg. No. DC/EMU-M-0-1-005

NR 25 CB Total 25

13 Axle for AC Motor Coach to Drg. No.EMU/MC-1- n7.5

ER 108 KPA

Total 108

Page 12: (Hindi version will follow.)

2nd quarter, 2013-14/RWF

14 EMU Axles for Motor NR 10 CB Coaches to Drg. No. AC/DC/EMU/B-02-002 Alt. A/2 item 1 (WAP-A-087)

Total 10

15 Axle for MEMU/DMC to RCF 52 DRg. No. EMU/M-0-1- 025

Total 52

16 Axle rough turned for MEMU Motor Coach to Drg. No. EMU/M-8-1-025

SCR 10 LGD

Total 10

TOTAL EMU AXLES IN NOS.

205

TOTAL EMU AXLES IN EQUATED NOS. (X by 1.21=

246

17 BG MEMU TC Axles to Drg. No. WTAC3-0-2-303 AIt.F

ER 10 HLR

NR 15 GZB

SCR 4 LGD

Total 29

18 Axle for BOX 'N'/BCN Wagon to Drg. No.WD- 92039/S-1 Item-1, Alt.-2

SWR 48 AP WR 150 DHD WCR 78 BPL Total 276

19 BOX 'N' Axles to Drg. No. W/WL-4901/R (WD- 89025/SL-2)

ER 71 JMP

NR 240 JUDW

NFR 110 NBQ

SCR 100 RYPS

SECR 150 RWSS

SWR 12 UBL

Total 683

20 20T powered axles for DHMU/DPC as per ICF's Drg. No.DHMU/DPC/0-2- 001 item KPC 733-804-01-50 alt (A)

SCR 26 LGD

Total 26

Page 13: (Hindi version will follow.)

2nd quarter, 2013-14/RWF

21 Finish turned axle for DHMU/DPC power axle to Drg. No. DHMU/DPC-0• 20991 Alt. b 2

SCR 8 LGD Total 8

22 Axles for LHB Coaches to Drg. No.LW 021049

RCF 500 ER 150 LLH Total 650

23 16 T BG Coaching Axles to Drg. No. CG-K 6015

CR 100 MTN

ER 400 250-HLR 150-LLH

NR 100 AMV 150 CWM/ASR Against RSP

NER 50 GKP NFR 110 NBQ SR 100 CW/PER

SWR 50 AP

200 UBL For BVZI

WR 66 PL

150 CWM/PL For BEML Wheelsets

WCR 150 BPL

ICF 1000

RCF 1000

Total 3626

TOTAL AXLES S.NOS. 17 to 23 IN NOS.

5298

GRAND TOTAL AXLES IN NOS.=

7349

GRAND TOTAL AXLES IN EQUATED UNITS =

9051

WHEELSETS

1 16T BG Coaching W/sets BEML 600 Will be sent to Hubli for machining.

NFR 50 NBQ Total 650

Page 14: (Hindi version will follow.)

2nd quarter, 2013-14/RWF

2 BOX 'N' Wheelsets Wagon Builders

10000 Consignee to be advised by DRS(W)

NR 100 CWM/ASR NFR 50 NBQ Total 10150

3 Wheelsets for Cast Steel Bogie of BLC Wagon to Drg. No.CONTR-9404- S/12 Alt.3

CONCOR 600 NR

66 JUDW Total 666

TOTAL WHEELSETS 11466

Page 15: (Hindi version will follow.)

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS

RAILWAY BOARD No. 2013/RSF/649/2/RP-II/DSP New Delhi, dt )Z.07.13

1. M/s Steel Authority of India Ltd., Central Marketing Organisation, S&RM Division, Ispat Bhawan, 40-Jawahar Lal Nehru Marg, Kolkata — 700 071.

2 The Controller of Stores, All India Railways & P/Units.

Sub:- Minutes of the Quarterly WTA Meeting for the planning of WTA items for the period 11/2013-14 (July - September, 2013).

Minutes of quarterly WTA meeting for the period II/2013-14 (July - September, 2013) held with the representatives of DSP in Rail Bhawan, New Delhi on 11.07.13 has been uploaded on Indian Railway's website www.indianrailways.gov.in . To access the Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on "Conferences / Meetings" to open the page containing the minutes of the meeting.

Please ensure that the statement of requirements of WTA items for the Quarter 111/2013-14 (October - December, 2013) should reach this office latest by 15.09.13 positively. The exact date and venue of the meeting would be advised later on.

d-1 (1-'3-aljee\TI---vlisra )

Director, Railway Stores (F) Railway Board.

Copy to: 1. The Chief Mechanical Engineers, All Indian Railways/Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. GM (BBM & WAP), M/s SAIL/DSP, Durgapur — 713203. 4. The DGM I/C, WAP, M/s SAIL/DSP, Durgapur — 713203. 5. The Chief Marketing Manager, M/s SAIL/DSP, SCOPE MINAR (17th floor), North Block,

Laxmi Nagar District Centre, Delhi — 110 092. 6. Shri Vinay Kumar, Dy.GM, M/s SAIL/DSP, SCOPE MINAR (20th floor), North Block,

Laxmi Nagar District Centre, Delhi — 110 092. 7. GM(1), M/s RITES (ER), Quality Assurance Division, Central Station Building (Metro), 56,

CR Avenue, 3"I Floor, Kolkata — 700 012. 8. S.I.E(M) Incharge, Inspection Wing, M/s RITES c/o DSP, Durgapur-713203. 9. M/s Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata — 700 028. 10.M/s Titagarh Wagons Ltd., 113, Park Street, Kolkata — 700 016. 11.M/s Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office

Complex, Lodhi Road, New Delhi-110 003 12.Adv./RS, AM/ME, AM/PU, Adv(L)RS, Adv.RS(P), EDRS ( C), EDME(W), EDEE(RS),

DME(PU), DME(P)-I, DRS(W), DRS(M) & RS(WTA) Branch.

(Hindi version will follow.)

Page 16: (Hindi version will follow.)

WTA Meeting 2 nd quarter - 11 th July, 2013 (SAIL/DSP)

Present :

Railway Board : AM/PU, Adv/RS, Adv.RS(P), EDME(PU), EDRS(C), EDRS(S), DRS(F), DME(PU), DME/P-I

Plants

Railway Units

RWF/Ban2lore

CME & COS/RWF, Bangalore, DGM/SAIL/DSP. No representation from RWP/Bela

COSs/CMMs/JAGs Officers of Zonal Railway & Production Units, CWEs & other Officers of Mechanical Department of Zonal Railways & Production Units.

• In 1 st quarter of 2013-14, RWF supplied 50342 wheels (including wheels for wheelsets), 16261 wheelsets and 22,232 axles (including axles for wheelsets).

• RWF has started reconciliation of pending purchase orders. Oldest purchase order should be closed first and details uploaded on the net so that Zonal Railways/PUs can reconcile their position..

• Supply of WTA items are to be regulated as per the Purchase orders placed by Railway Board. CME/RWF requested for the placement of Purchase orders for some of the items so that quantity supplied can be regularised.

SAIL/DSP

• SAIL/DSP supplied 12023 wheels and 1982 axles in last quarter. SAIL/DSP was reminded about their commitment to fully switch over from plate type loco wheels to S-type loco wheels from 2014-15.

• WAG-9 loco wheel is being developed by SAIL/DSP. Forging of 10 wheels has been completed. SAIL/DSP has been requested to expedite the supply of ordered quantity of 500 nos. in 2 nd quarter.

• SAIL/DSP is developing LHB wheels also. Out of the above two wheels priority for development should be of WAG-9 wheels.

• DGM/SAIL stated that in 2013-14 SAIL/DSP will be in a position to supply 50,000 wheels(approx) and 8000 axles.

RWP/Bela

• AM/PU stated production of wheels at RWP/Bela Plant has started on 27 th May and plant could be operated satisfactorily for 3 weeks. AM/PU stated that RWP/Bela will not only meet the target of 10000 wheels in 2013-14 but also exceed the same. Adequate availability of scrap for RWP/Bela is to be ensured for continuous &.enhanced level of production at RWP/Bela.

Submission of Indents • Due date of submission of Indents for 2015-16 for WTA items is 31/07/2013. Provision of Buffer

stock of 6 months for imported items and 3 months for in, igenous items is to be ensured while assessing the requirement.

oil

Page 17: (Hindi version will follow.)

WTA Meeting 2 nd quarter - 11 t July, 2013 (SAIL/DSP)

EMU Wheels

• Railway units were advised again to ensure judicious use of EMU wheels (Forged & Cast). For Trailor Coaches, cast wheels are to be utilized and use of forged wheels should be restricted for Motor Coaches. Supply for forged wheels through import is not expected in near future.

The position regarding supplies made by M/s SAIL/DSP during the previous quarter i.e. April- June, 2013 was discussed. The same is tabulated as under:-

SUPPLIES DURING APRIL - JUNE, 2013

S.Nos. Item Quantity Planned (April -

June, 2013)

Actual Supplies

(April - June, 2013)

Variation (+) excess (-) shortfall

Total Supplies from April, 2013 —

A ASSEMBLED WHEELSETS

(i) 16T BG Coaching Wheelsets

300 0 -300 0

B LOOSE WHEELS

(i) BG Chg. Wheels W/WL-1660/R

7880 4980 -2900 4980

(ii) BG Loco Wheels W/WL-4948/R

6005 5029 -976 5029

(iii) BG Loco Wheels "S" Shaped

2300 1450 -850 1450

WAG-9 Loco wheels

500 0 -500 0

(iv) MG Loco Wheels W/WL-4955/R

703 564 -139 564

(v) EMU/DEMU Wheels to Drg. No.K-4004

0 0 0 0

TOTAL WHEELS

17388 12023 -5365 12023

C LOOSE AXLES (i) 16T BG Coaching

Axles CG-K-6015 2487 1982 -505 1982

(ii) Axles forgings (heat treated and tempered but without machining)

0 0 0 0

TOTAL AXLES 2487 1982 -505 1982

The detailed supply position (Railway wise/Consignee wise) is given in the enclosed Ann - ure-1.

The item-wise planning for July - September, 2013 is shown in Annexure - II.

Page 18: (Hindi version will follow.)

2nd quarter, 2013-14 (SAIUDSP)

I I I IANNEXURE - I 1 Position regarding quantities planned vis a - vis actua supplies made by M/s SAIL/DSP during the 1st Quarter (April - June, 2013). S.NOS. DRAWING &

DESCRIPTION RLY./CONSIGNEE QTY. PLANNED

(APRIL - JUNE, 13)

QTY. SUPPLIED (APRIL - JUNE, 13)

VARIATION (+) EXCESS (-) SHORTFALL

AXLES 1 BG Chg. Axles to

Drg. No. WTAC-3- 02-303

CR/MTN 27 0 -27 ER/LLH 250 250 0 Eco.R/MCS 75 72 NR/CWM/ASR 145 129 -16 NER/GKP 125 97 -28 SR/CW/PER 250 250 0 SCR/LGD 125 43 -82 SER/KGP 50 43 -7 SECR/RWSS 60 43 -17 WR/PL 100 103 3 ICF 600 400 -200 RCF 680 552 -128 TOTAL 2487 1982 -505

TOTAL AXLES 2487 1982 -505 WHEELS

1 BG Chg. Wheels to Drg. No.W/WL- 1660/R

CR/MTN 800 672 -128 ER/LLH/HLR 700 557 -143 Eco.R/MCS 300 211 -89 NR/AMV/JUDW 500 440 -60 NER/GKP/IZN 400 154 -246 NFR/DBRT/NBQ 200 70 -130 NWR/JU/AII 400 322 -78 SR/CW/PER 900 475 -425 SCR/TPTY/LGD 500 373 -127 SER/KGP 600 300 -300 SECR/RWSS 80 40 -40 SWR/UBL 300 170 -130 WR/PL 300 150 -150 WCR/BPL 300 297 -3 ICF 800 489 -311 RCF 800 260 -540 TOTAL 7880 4980 -2900

2 BG Loco Wheels /DSL Mono Block Rough machined WDM2, WDM3 and WAG5 to Drg. No. D/WL-4948/R

CR/BSUPR/KALYAN 900 728 -172 ER/KPA 150 150 0

Eco.RNSKP 120 115 -5

NR/CB/ASR 700 698 -2 NCR/CNB 135 114 -21 NER/GKP 50 0 -50 NWR/All 150 140 -10 SR/GOC/LW/PER 500 371 -129 SCR/TPTY/RYPS/ELS/B ZA/LGD

450 360 -90

SER/TATANAGAR/KGP 700 500 -200

SECR/RWSS 150 100 -50

Page 19: (Hindi version will follow.)

2nd quarter, 2013-14 (SAIL/DSP)

SWR/AP 100 0 -100 WR/DHD 300 280 -20 ,CLW 700 641 -59 DMW 600 575 -25 BHEL/JHS 300 257 -43 TOTAL 6005 5029 -976

3 BG Loco Wheels "S" Shaped to Drg. No. D/WL- 5060/R

NER/GKP 50 0 -50 SR/LW/PER/GOC 300 202 -98 SER/KGP 500 403 -97 WR/DHD 150 95 -55 DLW 300 212 -88 DMW 400 284 -116 TOTAL 1700 1196 -504

4 BG Loco Wheel "S" Shaped to DLW's Drg. No. 17230251'C'

SWR/UBL 100 74 -26 DLW 500 180 -320 TOTAL 600 254 -346

5 WAG-9 Loco Wheels to Drg. No.1203.0.111.00 3

CLW 500 0 -500

TOTAL 500 0 -500

5 MG Loco Wheels to Drg. No.W/WL- 4955/R

NER/IZN 250 164 -86 NFR/NBQ 100 100 0 NWR/AII 50 0 -50 SR/GOC 53 53 0 WR/SBI 250 247 -3 TOTAL 703 564 -139 TOTAL WHEELS 17388 12023 -5365

WHEELSETS 1 Complete

wheelset (Forged) RCF 300 0 -300 TOTAL 300 0 -300

Page 20: (Hindi version will follow.)

2nd quarter, 2013-14 (SAIUDSP)

I I I IANNEXURE - II Allocation sheet for supply of WTA items for the Ilnd quarter i.e. July - September, 2013 on M/s SAIUDSP.

S.NOS. DRAWING & DESCRIPTION

RLYS./PUs QTY. PLANNED (JULY -

SEPTEMBER, 20131

Consignee Remarks

AXLES 1 BG Chg. Axles to Drg. No.

WTAC-3-02-303 CR 100 MTN ER 300 LLH NR 150 CWM/ASR Against RSP SR 150 CW/PER SECR 60 RWSS ICF 800 RCF 800 TOTAL 2360

WHEELS 1 BG Chg. Wheels to Drg.

No.WNVL-1660/R CR 500 MTN ER 600 500-LLH

100-H LR Eco.R 300 MCS NR 600 300-AMV

250-JUDW 50-ASR

NER 400 50-IZN 350-GKP

NFR 200 100-DBRT 100-NBQ

NWR 500 300-All 200-JU

SR 900 400-CW/PER 500-GOC

SCR 600 300-TPTY 300-LGD

SER 400 KGP

SWR 300 100-UBL 200-AP

WR 100 50-BVP 50-PL

WCR 300 BPL ICE 600 RCF 600 TOTAL 6900

2 BG Loco Wheels /DSL Mono Block Rough machined WDM2, WDM3 and WAG5 to Drg. No. W/WL-4948/R

CR 1000 600-BSL 400-PR

ER 500 300-JMP 150-KPA

NR 1200 700-CB 500-ASR

NCR 150 CNB NFR 50 NBQ NWR 75 All

SR 1100 500-GOC 600-LW/PER

Page 21: (Hindi version will follow.)

2nd quarter, 2013-14 (SAIUDSP)

SCR 500 100-GTPL 100-CRSfTPTY

100-ELS/BZA 200-LGD

SER 360 TATA SECR 160 RWSS SWR 100 AP CLW 1100 DMW 500 BHEL 300 TOTAL 7095

4 BG Loco Wheels "S" Shaped to Drg. No. D/WL-5060/R

CR 100 PR

NER 60 GKP WR 300 DHD

122 DHD Against RSP DLW 204 DMW 400 TOTAL 1186

5 BG Loco Wheel "S" Shaped to DLW's Drg. No. 17230251 'C'

NR 48 CB

SCR 50 GTPL

SWR 100 UBP

DLW 450

TOTAL 648 6 WAG-9 Loco Wheels to

Drg. No. 1209.0.111.003 CLW 500

TOTAL 500 TOTAL WHEELS 16329

Page 22: (Hindi version will follow.)

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS

RAIL WAY BOARD

No. 2013/RSF/649/2/RP-11/BELA New Delhi, dt. 3'.07.13

The CAO/WP, Ministry of Railways, CHAMBER BHAWAN, 1 st Floor, J.C. Road, Patna-800 001

Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period 11/2013-14 (July — September, 2013).

Minutes of quarterly WTA meeting for the period II/2013-14 (July — September, 2013) held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on .11.07.13 has been uploaded on Indian Railway's website www.indianrailways.gov.in . To access the Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on "Conferences / Meetings" to open the page containing the minutes of the meeting.

Please ensure that the statement of requirements of WTA items for the Quarter 111/2013-14 (October - December, 13) should reach this office latest by 15.09.13 positively. The exact date and venue of the meeting would be advised later on.

Encl.:- As above.

(Hindi version will follow.)

( Sa Misra ) Direct r, Railway Stores (F)

Railway Board. 1. The Chief Mechanical Engineers, ER, NR, NCR & SCR. 2. The Controller of Stores, ER, NR, NCR & SCR. 3. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 4. AM(ME), Adv.(RS), Adv(L)/RS, EDRS(C ), Adv.RS(P), EDME(Chg.), EDME(W), EDME (Tr.),

EDEE(RS), DME(PU), DME(P)-1, DEE/G, DRS(W), DRS(M), DF(S)-1 and RS(WTA) Branches of Railway Board.

Page 23: (Hindi version will follow.)

Present :

Railway Board

Plants

Railway Units

WTA Meeting 2nd quarter -11 th July, 2013/BELA

: AM/PU, Adv/RS, Adv.RS(P), EDME(PU), EDRS(C), EDRS(S), DRS(F), DME(PU), DME/P-I

CME & COS/RWF, Bangalore, DGM/SAIL/DSP. No representation from RWP/Bela

COSs/CMMs/JAGs Officers of Zonal Railway & Production Units, CWEs & other Officers of Mechanical Department of Zonal Railways & Production Units.

RWF/Banalore

• In 1 st quarter of 2013-14, RWF supplied 50342 wheels (including wheels for wheelsets), 16261 wheelsets and 22,232 axles (including axles for wheelsets).

• RWF has started reconciliation of pending purchase orders. Oldest purchase order should be closed first and details uploaded on the net so that Zonal Railways/PUs can reconcile their position..

• Supply of WTA items are to be regulated as per the Purchase orders placed by Railway Board. CME/RWF requested for the placement of Purchase orders for some of the items so that quantity supplied can be regularised.

SAIL/DSP

• SAIL/DSP supplied 12033 wheels and 1982 axles in last quarter. SAIL/DSP was reminded about their commitment to fully switch over from plate type loco wheels to S- type loco wheels from 2014-15.

• WAG-9 loco wheel is being developed by SAIL/DSP. Forging of 10 wheels has been completed. SAIL/DSP has been requested to expedite the supply of ordered quantity of 500 nos. in 2"d quarter.

• SAIL/DSP is developing LHB wheels also. Out of the above two wheels priority for development should be of WAG-9 wheels.

• DGM/SAIL stated that in 2013-14 SAIL/DSP will be in a position to supply 50,000 wheels(approx) and 8000 axles.

RWP/Bela

• AM/PU stated production of wheels at RWP/Bela Plant has started on 27 th May and plant could be operated satisfactorily for 3 weeks. AM/PU stated that RWP/Bela will not only meet the target of 10000 wheels in 2013-14 but also exceed the same. Adequate

Page 24: (Hindi version will follow.)

WTA Meeting 2 nd quarter -11 th July, 2013/BELA

availability of scrap for RWP/Bela is to be ensured for continuous &.enhanced level of production at RWP/Bela.

Submission of Indents.

• Due date of submission of Indents for 2015-16 for WTA items is 31/07/2013. Provision of Buffer stock of 6 months for imported items and 3 months for indigenous items is to be ensured while assessing the requirement.

EMU Wheels

• Railway units were advised again to ensure judicious use of EMU wheels (Forged & Cast). For Trailor Coaches, cast wheels are to be utilized and use of forged wheels should be restricted for Motor Coaches. Supply for forged wheels through import is not expected in near future.

The detailed supply position (Railway wise/Consignee wise) is given in the enclosed Annexure-I.

The item-wise planning for July - September, 2013 is shown in Annexure - II.

Page 25: (Hindi version will follow.)

2nd quarter, 2013-14 (SAIL/DSP)

I I I LANNEXURE I I Position regarding quantities planned vis a - vls actual supplies made by RWF/Beia during the IST Quarter (April- June, 2013).

S.NO. DRAWING & DESCRIPTION

RLYS./PUs QTY. PLANNED (April - June, 13)

QTY. SUPPLIED (April -June, 13)

VARIATION (+) EXCESS (-1 SHORTFALL

1 BOX 'N' Wheels to Drg. No. W/VVL- 4764/R

ER/HLR 700. 0 -700 NR/JUDW 600 0 -600 NCR/JHS 600 0 -600 SCR/RYPS 600 0 -600 TOTAL 2500

-2500

Page 26: (Hindi version will follow.)

2nd quarter, 2013-14 (SAIUDSP)

I 1 I 1ANNEXURE II F Allocation sheet for supply of WTA items for the 2nd quarter i.e. July - September, 2013 on RWP/BELA.

S.NO. DRAWING & DESCRIPTION

RLYS./PUs QTY. PLANNED (July -

September, 201.31

Consignee Remarks

1 BOX 'N' Wheels to Drg. No. W/WL-4764/R

ER 700 HLR NR 600 JUDW NCR 600 JHS SCR 600 RYPS TOTAL 2500