high school site 80-h-sw-4

23
100% Design /Construction kick off Community Meeting Please sign in on your mobile device: http://communitymeeting.ocps.net/ September 12, 2019 1 High School Site 80-H-SW-4

Upload: others

Post on 18-Nov-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

100% Design /Construction kick off Community Meeting

Please sign in on your mobile device: http://communitymeeting.ocps.net/

September 12, 2019

11

High School Site 80-H-SW-4

High School Site 80-H-SW-4Meeting AgendaSeptember 12, 2019, 6:00 PM

• Welcome – School Board Member: Pam Gould

• Introductions – Lauren Roth/ Facilities Communications

• Project Update – David Torbert, AIA, NCARBRichard Rodriguez-

• Questions and Answers

• Adjournment

1

Site Location 80-H-SW-4

2

Parkside

Sand Lake

Dr. Phillips Community Park

Villas of Grand

Cypress

S.AP

OPK

A VI

NEL

AND

ROAD

Lake Ruby

Lake Willis

Hilton Grand

Vacations

Jewish Community

Center

New Connector

Road (By County)

north

SEAWORLD

ORANGE COUNTY CONVENTION

CENTER

DR. PHILLIPS HS

FREEDOM HS

SITE 80NEW HIGH

SCHOOL

BEACHLINE

S.JO

HN Y

OU

NG

PAR

KWAY

STAT

E RO

AD 4

41

WIN

TER

GAR

DEN

VIN

ELAN

D RO

AD

Site Aerial 80-H-SW-4

3

Dr. Phillips Community

Park

Park Soleil

Lake Ruby

New Connector Road

(By County)

FENTON ROAD

High School Site 80-H-W-4

(+/-50 Acres)

north

Jewish Community

Center

Lake Willis

Sand Lake

S.AP

OPK

A VI

NEL

AND

ROAD

Site Plan 80-H-SW-4

4

Bus Loop &Staff Parking

north0’ 200’

StudentParking

Stadium Track

& Field

Courtyard

Practice Field

Baseball

Softball Practice Field

Tennis Basketball

Future Expansion

Retention

FRONT DOOR

Full Median Opening

Parent DropVisitorParking

Bus D

rop

Student Stations = 2,776

Parking = 777 spacesCar Stacking = up to 300 cars

On-site Bus Stacking = 60 buses

Bike Racks

ServiceFencing

Retention

Cafeteria3-Story Academics

Auditorium MusicAdmin.

Media Gym

Shadehouse & Greenhouse

Daryl Carter Parkway

Field House

Project Basis – OCPS Prototype High School 80-H-SW-4

5

OCPS PROTOTYPE HIGH SCHOOLSWindermere High SchoolOak Ridge High SchoolEvans High SchoolApopka High SchoolWest Orange High SchoolWekiva High SchoolOcoee High SchoolLake Nona High SchoolEast River High SchoolFreedom High SchoolTimber Creek High SchoolOlympia High School

Oak Ridge High School

Project Basis – OCPS Prototype High School 80-H-SW-4

6

UPGRADES INCLUDED PROTOTYPEEducational• 21st Century Collaborative Learning Hubs

Technology• Interactive Touchscreen Smart TV’s• WiFi access points throughout

Energy Efficiency• LED lighting campus wide (interior, exterior,

site and athletic fields)• High efficiency chillers and variable

pumping scheme• Low flow plumbing fixtures• Commissioning of MEP systems• ASHRAE 90.1 compliance for lighting and

power metering

Security• Full security access control and cameras for

the school• 2-way emergency radio system• Voice evacuation fire alarm system• Permanent generator and life safety lighting

Windermere High School

Renderings 80-H-SW-4

7

north

Renderings 80-H –SW-4

8

north

Renderings 80-H-SW-4

9

north

Renderings 80-H-SW-4

10

north

Building Program

15

AdministrationMedia CenterCafeteriaClassroom Buildings

• Classrooms• Science Labs• Computer Labs• CTE Labs

Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab

Gymnasium • Locker Rooms• Weight Room• Gymnastics/Dance• Wrestling

80-H-SW-4Students: 2,776Buildings: +/-350,000 Square Feet

Campus Program

CAFETERIA

MEDIA CENTER

Building Program

16

Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings

• Classrooms• Science Labs• Computer Labs• CTE Labs

Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab

Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling

80-H-SW-4Students: 2,776Buildings: +/-350,000 Square Feet

SCIENCE LAB

COMPUTER LAB

17

GYMNASIUM

AUDITORIUM

Building Program

Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings

• Classrooms• Science Labs• Computer Labs• CTE Labs

Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab

Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling

80-H-SW-4Students: 2,776Buildings: +/-350,000 Square Feet

Site Program

18

Cars and BusesStudent and Faculty parking

(+/-777 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)

80-H-SW-4Site: +/-50 Acres

STADIUM/TRACK & FIELD

GREENHOUSE

Site AmenitiesGreenhouse and Shade houseAthletics

• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions

• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts

Site Program

19

Site AmenitiesGreenhouse and Shade houseAthletics

• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions

• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts

Cars and BusesStudent and Faculty parking

(+/-777 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)

80-H-SW-4Site: +/-50 Acres

SOFTBALL

BASEBALL

Site Program

20

Site AmenitiesGreenhouse and Shade houseAthletics

• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions

• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts

Cars and BusesStudent and Faculty parking

(+/-777 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)

80-H-SW-4Site: +/-50 Acres

OUTDOOR BASKETBALL

TENNIS

Additional Features 80-H-SW-4

21

Safety & Security• Secure Courtyard Design• Single Secure Entry Point• Security System & Cameras• Card Reader Entrance Controls

Educational Technology• 70” Touch Screen “Smart” Monitors• Audio Enhancement• WiFi Connectivity

CLASSROOM TECHNOLOGY

SECURE ENTRY POINT

Audio Enhancement

System

70” Touchscreen

Wireless Access Point

Sustainability 80-H-SW-4

22

Building• 10% more energy efficient than ASHRAE

90.1 standard• High Efficiency Chillers (15% energy

reduction)• Light colored roof to reduce heat gain and

improves energy performance• Energy Efficient LED Lighting• Energy Star rated equipment• Water saving toilets, faucets, and fixtures• All classrooms have daylighting• Over 75% of ALL spaces have daylighting• Thermal efficient windows/glazing

Site• Native/low water plants – reduce water

consumption• Low Impact Design (LID) stormwater design

What to Expect

Work Hours*Monday – Saturday 6:00am –6:00pm* Early morning concrete pours will be necessary and will be in strict accordance with the Orange County noise ordinance

DeliveriesMonday – Friday 6:00am – 6:00pmAll construction deliveries to enter the jobsite from Fenton Rd.

• Import of over 350,000 CY of Fill = 22,000 trucks

• Concurrent Construction of Darryl Carter Parkway Extension

• No impact to the surrounding community

• Work alongside local law enforcement to ensure the safe driving along Apopka Vineland.

23

Site Logistic Plan

25

Planned Schedule

Main Campus Construction

June 2021

April2019

September2019

Move-In

August2021

Design, Permitting,and Bidding

EarlySitePackage

January2020

25

Questions & Answers