Page 1: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

1

High Power Tests in the S1-Global Cryomodule

Page 2: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

2

A. Bosotti, C. Pagani, R. Paparella, P. Pierini, INFN (Italy)

K. Jensch, D. Kostin, L. Lilje, A. Matheisen, W.-D. Moeller, M. Schmoekel, P. Schilling, H. Weise,

DESY (Germany)

T. Arkan, S. Barbanotti, M. Battistoni, H. Carter, M. Champion, A. Hocker, R. Kephart, J. Kerby, D. Mitchell,

Y. Pischalnikov, T.J. Peterson, M. Ross, W. Schappert, B. Smith, FNAL (USA)

C. Adolphsen, C. Nantista, SLAC (USA)

M. Akemoto, S. Fukuda, K. Hara, H. Hayano, N. Higashi, E. Kako, H. Katagiri, Y. Kojima, Y. Kondo, T. Matsumoto, S. Michizono, T. Miura, H. Nakai, H. Nakajima, K. Nakanishi, S. Noguchi, N. Ohuchi, T. Saeki,

M. Satoh, T. Shishido, T. Shidara, T. Takenaka, A. Terashima,N. Toge, K. Tsuchiya, K. Watanabe, S. Yamaguchi,

A. Yamamoto, Y. Yamamoto, K. Yokoya, KEK (Japan)

International Team for S1-Global

Page 3: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

3

Collaborative work for Cryomodule Assembly

Cavity string assembly (2010, Jan.)

Tuner assembly (2010, Feb.)

Coupler assembly (2010, Mar.)

KEK Cavity string assembly (2010, Mar.)

Page 4: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

4

Collaboration for Cryomodule Tests

Tuner performance tests (2010, July)

Cavity processing (2010, Sept.)

Lorentz detuning tests (2010, Oct.) Dynamic loss meas. (2010, Nov.)

Page 5: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

5

Outline• Cavity performance• Dynamic loss measurements• Lorentz detuning & Mechanical vibration• 7-cavity operation by one Klystron

Page 6: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

6

Blade Tuner (FNAL) Saclay Tuner (DESY)

Slide-Jack Tuner (KEK)

TTF-III Coupler (DESY/FNAL) STF-II Coupler (KEK)

TESLA Cavity (DESY/FNAL)Tesla-like Cavity (KEK)

Cavities, Tuners, Couplers in S1-G Cryomodule

Comparisonof

Performance

Page 7: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

7

2 cavities from FNAL 2 cavities from DESY

8 Cavities for S1-Global (ave. 30 MV/m)4 cavities from KEK

Vertical Test Results of 8 Cavities

Page 8: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

8

MHI-09MHI-07

MHI-06MHI-05AES004 ACC011 Z108 Z109

FNAL DESY KEK

Comparison of cavity performance ave. Eacc,max VT : 30 MV/m1 cav : 27 MV/m7 cav : 26 MV/m

D

C

D : DetuneC : Coupler

D

Page 9: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

9

UX-ray

Cryomodule - C Cryomodule - A

DX-ray

MX-ray

C1 C2 C3 C4 A1 A2 A3 A4

Degradationof Eacc,max

TunerTroubleTuner

Trouble

CouplerVacuum

Up-stream Down-stream

Comparison of cavity performance

Page 10: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

10

Comparison of cavity performanceDegradationof Eacc,max

C2

C3

C4

C1

A1 A2

A3A4

at 25MV/m

at 25MV/m

Page 11: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

11

Qo values measured by dynamic loss

Dynamic loss at input coupler

(Detuning at 32 MV/m)TTF-III : 0.5 W / 4 couplersSTF-II : 4.6 W / 4 couplers

C1 A3

A2

A2

C4

4 cav.

7 cav.

Page 12: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

12

Frequency shift due to Lorentz detuning

C4/Z109 (29MV/m) A2/MHI-06 (38MV/m)

FB/on, Piezo/off FB/on, Piezo/off

Pre-detuningby motor tuner& piezo tunerwith DC voltage

Compensationby piezo tuner inpulsed operation

Flat TopFlat Top

Rise Time Rise Time

200~500 Hz 2~3 kHz

Page 13: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

13

Cryomodule-C Cryomodule-A

Total : f = -0.90, -0.83 (Eacc)2

Rise Time : f = -0.46, -0.31 (Eacc)2

Flat Top : f = -0.43, -0.51 (Eacc)2

TESLA cavity + Blade tuner Tesla-like cavity + Slide-jack tuner

Total : f = -0.70, -0.66 (Eacc)2

Rise Time : f = -0.56, -0.49 (Eacc)2

Flat Top : f = -0.14, -0.17 (Eacc)2

Frequency shift due to Lorentz detuning

Page 14: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

14

Frequency shift due to Lorentz detuning

Cryomodule-C Cryomodule-ATESLA cavity + Saclay tuner Tesla-like cavity + Slide-jack tuner

Total : f = -1.22, -1.00 (Eacc)2

Rise Time : f = -0.49, -0.41 (Eacc)2

Flat Top : f = -0.73, -0.59 (Eacc)2

Total : f = -0.69, -0.79 (Eacc)2

Rise Time : f = -0.55, -0.50 (Eacc)2

Flat Top : f = -0.14, -0.29 (Eacc)2

Page 15: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

15

Comparison of Detuning Frequency by LFD

MHI-09MHI-07

MHI-06MHI-05AES004

ACC011Z108 Z109

FNAL DESY KEK

TESLA cavityBlade tuner

TESLA cavitySaclay tuner

Tesla-like cavitySlide-jack tuner

Page 16: High Power Tests in the S1-Global Cryomodule

A2/MHI-06

A3/MHI-07 A4/MHI-09

Mechanical Vibration Modes by Piezo Sensors

A1/MHI-05

20 MV/m

18 MV/m33 MV/m

33 MV/m

1.5 ms,5 Hz,operation

E. KAKO (KEK) 2011' Feb 28

16TTC meeting, Milano Global Design Effort

Page 17: High Power Tests in the S1-Global Cryomodule

4-Cavity Operation in Cryomodule-AFB/on, Piezo/off, ave. Eacc = 28.4 MV/m

A1/MHI-05 A2/MHI-06 A3/MHI-07 A4/MHI-09

23.7 MV/m 25.6 MV/m 31.1 MV/m 23.0 MV/m

540Hz 220Hz 325Hz 210Hz

Dominant mechanical vibration mode

Eacc =

E. KAKO (KEK) 2011' Feb 28

17TTC meeting, Milano Global Design Effort

Page 18: High Power Tests in the S1-Global Cryomodule

345Hz179Hz

509Hz356Hz

204Hz

Vpiezo = +40V, 1 kHz (1 pulse)

260Hz

322Hz

448Hz

245, 252Hz

313Hz436Hz

C1/AES004 C2/ACC011

C3/Z108 C4/Z109

Mechanical Vibration Modes kicked by Piezo tuner

(Low RF Power meas.)

E. KAKO (KEK) 2011' Feb 28

18TTC meeting, Milano Global Design Effort

Page 19: High Power Tests in the S1-Global Cryomodule

4-Cavity Operation in Cryomodule-CFB/on, Piezo/off, ave. Eacc = 22.5 MV/m

C1/AES004 C2/ACC011 C3/Z108 C4/Z109

24.6 MV/m 21.3 MV/m 16.8 MV/m 27.0 MV/m

179Hz 204Hz 260Hz 245Hz

Dominant mechanical vibration mode

Eacc =

E. KAKO (KEK) 2011' Feb 28

19TTC meeting, Milano Global Design Effort

Page 20: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

20

Required rf power for 8-cav. operation

MHI-09MHI-07

MHI-06MHI-05AES004 ACC011 Z108 Z109

FNAL DESY KEK

26 MV/m

24 MV/m

18 MV/m

29 MV/m

20 MV/m

38 MV/m

33 MV/m

23 MV/m

Stable operating Eacc (individual cavity) Calc. ave. EaccC : 25 MV/mA : 29 MV/mC&A : 27 MV/m

Page 21: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

21

7-cavity operation in Cryomodule-C&A

A1 : 16 MV/m A2 : 39 MV/m A3 : 34 MV/m A4 : 22 MV/m

C1 : 26 MV/m

C3 : 18 MV/m

C4 : 30 MV/m

C : ave. 25 MV/m

A : ave. 27 MV/m

Ave. Eacc = 26.2 MV/m ; FB/on, Piezo/on, 1299.900 MHz

100Hz/div 200Hz/div 200Hz/div 100Hz/div

100Hz/div 100Hz/div 100Hz/div

C2 : Detune

Page 22: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

22

Stability of Detuning Frequency Cryomodule - C

Cryomodule - A

Piezo/on

Piezo/on

C1 C4C2(Detune)

C3

A1 A2 A3 A4

33.2Hz(rms)

12.4Hz(rms)

38.6Hz(rms)

4.6Hz(rms)

7.3Hz(rms)

7.3Hz(rms)

9.9Hz(rms)

2h

Page 23: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

23

SUMMARY Ave. Eacc of 26 MV/m was successfully demonstrated in the 7-cavity operation by the vector-sum control. Two cavities showed the performance degradation of the Eacc,max from vertical tests to cryomodule tests. The x-rays radiation levels were higher than others. Two frequency tuning systems did not work correctly. Qo values measured by dynamic rf losses were lower than 1x1010 in each cavity. This cause might be due to electron loading with strong x-rays radiation. Frequency shifts by Lorentz detuning in the KEK cavities were much less than those in the TESLA-type cavities. This is due to the stiff structure in the KEK cavities. Stability of the detuning frequency in the KEK cavities was much better than those in the TESLA-type cavities.

Page 24: High Power Tests in the S1-Global Cryomodule

E. KAKO (KEK) 2011' Feb 28 TTC meeting, Milano

Global Design Effort

24

END