High performance tunnel lining systems as a cost effective part of a fire
protection system
Dr.-Ing. Roland Bornemann
![Page 2: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/2.jpg)
Contents
• material introduction
• structural safety in tunnels according to ZTV-regulations and xicompensation measures
• user safety – retrofit of smoke extraction
• quick installation methods
• Colouring of lining systems and effect of colour
![Page 3: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/3.jpg)
Group of companies
Xella International GmbH
Building materials / bricks & elementsDry lining
systems / boardsRaw
materials
Calcium silicateblocks
Aerated concrete
Aerated concrete
Gypsum fibreboards
Fireprotection
boards
Lime &limestone
Mineralinsulation
boards
![Page 4: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/4.jpg)
What we are taking about: cementitious fire protective boards
consisting mainly out of:
• Hydraulic binder• Perlite
• AR-resistent fibres
• Water
Highly resistant against
• Humidity• frost/thaw
• Deicing agents
Fire protection via:
• Low lambda values
• Water evaporation
![Page 5: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/5.jpg)
Protection of tunnel structures -Type I: cast on version
![Page 6: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/6.jpg)
Protection of tunnel structures -Type I: cast on version
Installation of boards and fixation
of backing strips
Placing of steelreinforcement
Placing of concrete
![Page 7: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/7.jpg)
Protection of tunnel structures -Type I:cast on version
Fire protection boards on framework
![Page 8: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/8.jpg)
Bolted version –Type II: for new structures and retrofit
![Page 9: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/9.jpg)
Bolted to concrete of circular tunnels with backing strip es.
Lilla Bommen, GothenburgHerrentunnelLübeck, D
Backing stripes in order to safeguard
protection in joint area
View into a completed structure
Bolted version –Type II: for new structures and retrofit
![Page 10: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/10.jpg)
Why tunnel lining systems?
Montblanc tunnel 24/03/1999
• Truck with 9 tons of margarine and 12 tons of flour caug ht fire
• Other vehicles caught fire
• fire burnt for over 53 hours
• Peak temperatures higher than 1000°C were reached
• 39 people died
• tunnel was closed for over 3 years
![Page 11: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/11.jpg)
Objectives of a protection system
• Structural safety
• Protection of users (self rescue, 15 minutes)
• Third party rescue (fire fighters)
Theses targets are similar worldwide
Measures taken differ according to national regulations
![Page 12: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/12.jpg)
Structural safety
• Keep temperatures at reinforcement steel < e.g. 300°C (ZTV-Ing criteria)
resi
dual
str
engt
h
resi
dual
str
engt
h
![Page 13: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/13.jpg)
Structural safety
• Avoid spalling of concret
Tensile strength of HPC
Tensile strength of OPC
Vap
our
pres
sure
[N/m
m²]
Temperature [°C]
Vapourpressure
![Page 14: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/14.jpg)
Destruction of concrete due to:
• Limit concrete deterioration
Structural safety
Bornemann, Roland et al.: fire restistance of UHPC. IN: beton, p.418-422 (9/2002)
![Page 15: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/15.jpg)
Measures for structural safety – ZTV-ING
• peak temperature at reinforcement shall not exceed 300°C
• concrete cover of 60mm plus N94 mesh keeps concrete cove r in place when spalling starts
• further measures are not taken – is that sufficient?
![Page 16: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/16.jpg)
With N94 mesh
Check*) of ZTV-criteria
*) Dehn, F.; Nause,P.; Juknat,M.; Orgass, M.; König, A.: Brand- und Abplatzverhalten von Faserbeton in Straßentunneln. IN: Berichte der Bundesanstalt für Straßenwesen Heft 73B
Tubbingconstruction
Open construction
Fly ash
HWRA
water
Aggregates
Fibres
CEM I 32,5R
Fly ash
w/c(eq.)
w/c
Open construction
![Page 17: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/17.jpg)
ZTV-Ing fire curve and effect on open construct.: steel d12/15mm test with N94 mesh
Thermocouples at 60mm
![Page 18: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/18.jpg)
Thermocouples at 3 – 60mm
ZTV-Ing fire curve and effect on open construct.: steel d12/15mm test with 2kg/m³ PP-fibre
Thermocouples at 60mm
![Page 19: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/19.jpg)
Conclusion:
• No spalling possible because of a porous structure >60vol-%
• better insulation properties
• easy to replace
•Concrete is not kept from spalling by using a N94 mesh
• This is an unreliable approach
• PP-fibres enhance performance
• PP is not perfect because the ZTV-Ing- criteria of <300°C at 60mm is notxfulfilled in all parts
• Concrete cover nevertheless is destroyed > repair with sprayed concrete
Improvement
Solution = porous tunnel lining system
• concrete cover can be reduced > savings• Lining boards can be used as formwork > savings
Positive side effects
![Page 20: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/20.jpg)
Complete heat consumption
At 1.200°C = cp + phase change =
For a 30mm board = 11.700Wh
This equals 19Liter/m² of water
Fundamental idea: consumption of energy from fire
![Page 21: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/21.jpg)
Porous structure: No spalling possible > room for vapour expansion
Stark et al.:Durability of conrete
Calcium Silicate phases dehydrate
� 3CaO*SiO2 + 3*H2O
� 24wt.% are chemically bound water
Ca(OH)2 about 25% of cement weight
![Page 22: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/22.jpg)
Example: tunnel ceiling with 20mm board as lost formwork
Boards 20mm
ceiling
Concrete cast on fireprotective board withoutfixations
![Page 23: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/23.jpg)
Test setup:
• temperature and duration according to ZTV-Ing
• Thermocouples at interface and at 50mm
In order to simulate this setup test according to ZTV-Ing on a furnace
150
20
50
1200
![Page 24: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/24.jpg)
Thermocouples 7 and 8: 50mm fromconcrete surface
Results
∆ 220°C
![Page 25: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/25.jpg)
Conclusion 1:
• ZTV-Ing (car) criteria of 300°C over 90 minutes can be m atched with a reduced concrete cover (e.g. cmin 40mm exposition class XD > EC2-1-1/ZTV-5)
• Spalling is avoided by highly porous material
• Fire protective board can easily be replaced (anchored version)
Conclusion 2:
• In order to take advantage of a reduced concrete cover, the material mustsufficiently resistant against frost and thaw
• If not it will deteriorate and no longer offer a sufficient fire protection
![Page 26: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/26.jpg)
Water spray, splash water and leaks > sources of water
Passive fire protection boards should withstand frost
According to ZTV-Ing Part 3 tunnel members should comply with the exposition classes:
� Ceilings exposed to spray = XF2/XD2 (modestly water saturated + deicing agent/Clorides)
� Ramps and portals (spray and splash water) = XF2/XD2
Cementious boards underneath a leakybutt joint Water sprag at portals
![Page 27: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/27.jpg)
Test method: EN 12467 „fibre reinforced boards“
�100 Cycles (class X for all usages, exposed to weather) �Frost (-20°C) / deicing in water bath (20°C) � Comparision of bending strength of frosted/unfrosted samples
(ratio of bending strength >0,75)
Problem: X-class can´t be matched with XF2
Deicing in water Frosting
![Page 28: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/28.jpg)
Surface resistance to thaw and deicing agents
Test method: Slab test (Ö-Norm B3003), 56 cycles
• Guideline „Protective coatings for enhanced fire protection in undergroundtransport systems of the austrian association of concrete and engineering
Number of CyclesScaling
Exposition class Scaling [cm³/m²]
XF4 = for road tunnels without protective coating for portals
XF2 = for road tunnels without protective coating in frosted areas
XF2 = XF 3 = for road tunnels with protective coatings
![Page 29: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/29.jpg)
Surface resistance to thaw and deicing agents
Uncoated specimen > Test method: Slab test > extrapolation of 25 years of use
Before cycling
After 56 cycles
Exposition classes XF1 / 2 / 3
• Guideline „Protective coatings for enhanced fire protection in undergroundtransport systems of the austrian association of concrete and engineering
![Page 30: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/30.jpg)
Surface resistance to thaw and deicing agents
After 56 frost and deicing cycles
• Epoxy coated surfaces
Exposition classes XF1 / 2 / 3 / 4
![Page 31: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/31.jpg)
Other fire curves are more challenging in terms of temperature and duration –what can we do?
Higher requirements than ZTV-Ing:
Femern-belt-Tunnel
RWS 180 minutes
![Page 32: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/32.jpg)
Comparison of ZTV-Ing.-curve versus RWS-curve with regard to temperatureof steel behind 60mm concrete cover*)
*)Dehn, F.; Hauswaldt, S.; Juknat, M.: Grundsätzliche Überlegungen zur Brandprüfung von Tunnelbauteilen. IN: Beton- und Stahlbetonbau 104 (2009), Heft 12
ZTV-ING curve 140 minutes
Exposure to RWS-curve over120Minutes and defined coolingafterwards
Concrete with 2 kg/m³ PP-fibre addition (mix 1)
Concrete with 2 kg/m³ PP-fibre addition (mix 2)∆ 300°C
![Page 33: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/33.jpg)
Elevation:
RWS 120 with 40mm and anchored boards
Temperatures on concrete surface
Elapsed time [min.]
tem
pera
ture
[°C]
![Page 34: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/34.jpg)
Thermal analysis of fire protective board lined walls• finite element analysis
• unidirectional
• parameters: λ(temp), α and enthalpy > dE/dtemp
![Page 35: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/35.jpg)
Layer temperatures 20mm boards with equilibrium moisture and firecurves according to ZTV-Ing and EBA
�Good match between measurement and calculation
� substitute for real fire test
Inner surface
Outersurface
![Page 36: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/36.jpg)
Objectives of a protection system
• Structural safety �
• Protection of users (self rescue, 15 minutes)
• Third party rescue (fire fighters)
EC guideline 2004/54/EG to improve safety in tunnels
Emergency exits accord. to RABT every 300m > retrofit sometimes difficult
Alternatively smoke extraction system > installation at night shifts
![Page 37: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/37.jpg)
Idea: retrofit of existing tunnels with prefabricated smoke extraction ceilings
Example: Elbtunnel Hamburg, tube 4 (Kaefer Construction)
• 3100m long – transverse smoke removal
• smoke extraction every 60m by four extraction flaps
• 1700 prefabricated elements with Aestuver 2x50mm boards
• Installation speed 10 – 12m per night (8h shift, closin g of tunnel)
![Page 38: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/38.jpg)
� Quick and effective installation overnight� Design according to ZTV-Ing 5
> Stainless steel substructure class II (ZTV-4 betriebstech. Ausstatt.)> matches 300°C criteria for steel substructure> average surface temperatures < ∆140K> leakage <10Vol.-%
� Complies with RABT-requirements> tunnel longer >1200m > smoke extraction via electric driven flaps> adjustable flaps at a distance of 60m> Air extraction approx. 240m³/s
Idea: retrofit of existing tunnels with prefabricated smoke extraction ceilings
![Page 39: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/39.jpg)
Film
![Page 40: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/40.jpg)
Other ways to make installation easier
Wesertunnel
![Page 41: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/41.jpg)
Experience of safety –
or what people prefer
What should be changed?
Which are the prefered colours?
Andreas Mühlberger, university of würzburg:behaviour of humans in tunnel. IN: Solid² conference 2012 in Berlin
![Page 42: High performance tunnel lining systems as a cost effective ... · High performance tunnel lining systems as a cost ... • fire burnt for over 53 hours ... • Lining boards can be](https://reader034.vdocuments.us/reader034/viewer/2022042600/5ad5c4647f8b9a48398dfe49/html5/thumbnails/42.jpg)
Epoxy coated surfaces
Light blue Patterns Orange
Gloss