17 Febrary 2010

High Efficiency Energy from Waste

Harmen VeldmanCity of Amsterdam Waste and Energy [email protected]

Presenter
Presentation Notes
Openingsdia Welcome to Amsterdam Welcome to the Afval Energie Bedrijf, de waste incineration installation, and Waternet, the watercycle company. Programma 1. Presentatie Roelof 2. Presentatie/bezoek AEB – Remco Houtkamp/Harmen Veldman 3. Presentatie/bezoek Waternet – Alex Veltman/Maarten Claassen 4. Einde 15.30 uur

17 Febrary 2010

Agenda

Dutch waste managementAfval Energie Bedrijf AEBWaste Fired Power Plant

17 Febrary 2010

Dutch waste management

17 Febrary 2010

Prevention / waste reduction

Re-use

Recycle

Energy from waste D10

Land filling

Preferred environmental option

Least preferred environmental option

Energy from waste R1

17 Febrary 2010

Household / Commercial waste Source sorting

Paper,Glass, Plastic

Kitchen / garden waste

Mixed waste

Recycling

BiogasCompost

EfW(incineration)

8.5 million tons per year

Batteries,Hazardous waste

64 %

Landfill

34 %

2 %

17 Febrary 2010

Energy from Waste in NL12 installationsTotal capacity 6,4 million tonsR1: 4.3 million tons

17 Febrary 2010

Gemeente Amsterdam Afval Energie Bedrijf

17 Febrary 2010

17 Febrary 2010

1st Generation

1917-1969 2nd AVI Noord: 1969 -1993

3rd AVI West 1993 -

present 4th WFPP 2007 -

present

17 Febrary 2010

AEB

society

AEB Philosophy: closing the loop

building materials

MSW

energy

Raw materials & energy

Waste & energy

Presenter
Presentation Notes
Eerst AEB in groter geheel plaatsen: AEB sluit de kringloop. VOOR INTERNATIONALS HIERBIJ VERTELLEN HOE AFVAL VS RECYCLING IS GEORGANISEERD IN NEDERLAND: prevention, recycling, incineration, land filling Dan vertellen over: waste separation at the source: glass, paper, biomass. De rest van het afval wordt aan de kant van de weg gezet, door de gemeente ingezameld en naar AEB gebracht. Daar recyclen we 99% van al het afval en geven dat terug aan de maatschappij in de vorm van energie (stroom en warmte) en grondstoffen voor de bouw.

17 Febrary 2010

WTE plant (1993)1.4 millioninhabitants850.000 tons of MSW

WFPP (2007)530.000 tons of commercial waste

17 Febrary 2010

MSW Incineration

Electricity

Heat

Iron scrap / Non ferro

Bottom ash

Flue gas cleaning residue

Amsterdam, APX

District heatingAmsterdam

Metal industry

Road construction

Salt mines Germany

Fly ash Asphalt

17 Febrary 2010

Facts and figures1,4 tons waste600 trucks and 2 trains per day300.000 gigajoule heat for district heating1 million MWh electricity350 employeesTurnover € 150 Million

Our aim: 99% recycling

17 Febrary 2010

Waste Fired Power Plant

designed for recovery

17 Febrary 2010

Efficiency of electricity productionNatural gas 55 %Oil 50 %Coal 45 %Lignite 40 %Biomass 35 %Waste 15…22 %....30%

State-of-

the-Art

State-of-

the-Art

Best available technology

WFPP

Best available technology

WFPP

EU average EU average

Presenter
Presentation Notes
Up to now energy from waste was seen as a by-product. But recent years have shown great progress in the efficiency of electricity generation. In relation to its fuel qualities it is now in line with all other power plants. Rendement is afhankelijk van de kwaliteit van het verbrandigsproduct

17 Febrary 2010

Technology

High steam parameters: 125 bar, 440 ºC (130 bar, 480 ºC)Corrosion reduction:–

Inconel

steam-steam reheatingFlue gas recirculationBigger boilerWater cooled condensor

17 Febrary 2010

Why did Amsterdam invest

Sustainable electricity production (source, biomass)–

30% net electrical efficiency (22% WtE

conventional)CO2-reduction (11% of 2025 target for Amsterdam)More revenue, lower waste taxesStrengthen AEB position in the waste market

17 Febrary 2010

History

Investment decision 17

September 2003

First fire19 March 2007

Turbine shaft3 February 2008

Fully operational (again)1 March 2009Hand over

1 August 2007

17 Febrary 2010

Operational results (1)

Nominal waste throughput realised30,5% Nett-efficiency provedStable firing through big boilerCorrosion free superheaterLow boiler foulingBoiler corrosion within specs

17 Febrary 2010

Operational results (2)

Turbine shaftWater hammer cooling water pipeReheater pumpsBack fire flue gas recirculation

17 Febrary 2010

Average monthly efficiency

0,0%

5,0%

10,0%

15,0%

20,0%

25,0%

30,0%

35,0%

aug-

07

sep-

07

okt-0

7

nov-

07

dec-

07

jan-

08

feb-

08

mrt-

08

apr-0

8

mei

-08

jun-

08

jul-0

8

aug-

08

sep-

08

okt-0

8

nov-

08

dec-

08

jan-

09

feb-

09

mrt-

09

apr-0

9

mei

-09

jun-

09

jul-0

9

aug-

09

sep-

09

okt-0

9

nov-

09

dec-

09

Effic

ienc

y (a

ccor

ding

to M

EP)

17 Febrary 2010

0,0%

10,0%

20,0%

30,0%

40,0%

1-0

3-09

8-0

3-09

15-

03-0

9

22-

03-0

9

29-

03-0

9

5-0

4-09

12-

04-0

9

19-

04-0

9

26-

04-0

9

3-0

5-09

10-

05-0

9

17-

05-0

9

24-

05-0

9

31-

05-0

9

7-0

6-09

14-

06-0

9

21-

06-0

9

28-

06-0

9

5-0

7-09

12-

07-0

9

19-

07-0

9

26-

07-0

9

2-0

8-09

9-0

8-09

16-

08-0

9

23-

08-0

9

30-

08-0

9

6-0

9-09

13-

09-0

9

20-

09-0

9

27-

09-0

9

4-1

0-09

11-

10-0

9

18-

10-0

9

25-

10-0

9

1-1

1-09

8-1

1-09

15-

11-0

9

22-

11-0

9

29-

11-0

9

6-1

2-09

13-

12-0

9

20-

12-0

9

27-

12-0

9

Effic

ienc

y

ηMEP ηMEP montly average Best day of the month

26,3%

30,9%29,3%

28,9%27,1%

28,3%

31,0%

32,1% 33,0% 33,3%

E net

+ 2/3 Heat outηMEP

= ----------------------Energy in

Efficiency Waste Fired Power Plant 2009

17 Febrary 2010

FutureOptimize firing conditionsMaterials testingTraining personnel130 bar, 480 ºC

Disseminate operational know howNew co-operations (e.g. CenBio)

17 Febrary 2010

Harmen VeldmanCity of Amsterdam Waste and Energy [email protected]

Thank you!