high density, vertical, urban mixed-use village … › wp-content › uploads › 2020 › 01 ›...

16
1 High Density, Vertical, Urban Mixed-Use Village Development in the Heart of Castle Rock, CO

Upload: others

Post on 31-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

1

High Density, Vertical, Urban Mixed-Use Village Development in the Heart of Castle Rock, CO

Page 2: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

2

MILLER’SLANDING

DOUGLASCOUNTY

FAIRGROUNDS

DOWNTOWNCASTLE ROCK

FESTIVALPARK

FULL INTERCHANGE AT I-25

PHILIP S. MILLER PARK

ROCK PARK

Page 3: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

3

The VisionP A S S I O N M E E T S P O S S I B I L I T Y

Pad Sites Available•   65-acre mixed-use development with 1 to 20+ acre sites available •   Interchange overlay zone district with 90’ height limitation•   Fully zoned and entitled•   Flexible uses allowed•   High visibility and accessibility to the north and south from I-25 •   Company signage available — visible from I-25

Miller’s Landing is a place that connects the past with the present, employers to talent and everyone to more of what they love. It’s the premier place in Colorado that’s exploring the fringes of the future by building a smart, dynamic new town center that creates a direct path to new personal, professional and recreational opportunities every day. From hospitality to retail, community gatherings to individual adventures, Miller’s Landing will be an exciting place to build the future together.

OpportunitiesHospitality | Retail | Corporate | Medical | Recreational

Page 4: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

4

G

G

G

GG

FO

FO

FO OH

T

SERVICE & FIREACCESS (CONCEPT)

RIGHT IN/RIGHT OUT

HOTEL FRONT ENTRANCE(CONCEPT)

PARKING ACCESS

86'

INCOMING TRAFFIC DOESNOT STOP

80'50' MIN

80'

60'PHASE 1 BOUNDARY

300'

60'

300'

300'

60'

190.8'

DETENTIONPOND (TYP)

REGIONALTRAIL

100'50'0

1 inch = 50 ft.

PROPOSEDHotel & Conference Center Site

PHASE II Sites Coming Soon

GREENWAY CORRIDOR

PHASE I Sites Available Now1 - 4+ Acres

PHASE I Sites Available Now1 - 4+ Acres

PHASE II Sites Coming Soon

Site PlanIdeal Uses Include:

•   Hospitality Including Hotel and Conferencing Centers

•   Innovative Users Seeking an Engaging Environment

•   Retail

•   Mixed-Use Tenants

•   Office

•   Medical Users

•   Corporate Campus

•   Headquarters

CONTACT BROKER FOR PRICING

Page 5: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

5

Depending on the stage of development and construction of public improvements, pad buyer requests for the stub location will be taken under consideration. If roadways are already paved and stub relocation is required for your specific use, this is the responsibility of the pad developer. This list is subject to change and would be finalized in any Purchase and Sale Agreement between Buyer and Seller.

Pad Delivery Timeline & ConditionCleanup Complete

2019

Phase II AvailableTBD

Phase 1 AvailableTBD

Construction BeginsTBD

DETENTIONDetention will be provided by the master developer outside of the pad allowing the property purchased to be used for structures, traffic access, parking and common space.

ELECTRICALElectrical conduit will be provided to the pad for electrical service. Transformers will not be set by the developer. The electrical provider is IREA.

FIBER OPTICFiber will be provided to the premises.

GRADINGA graded pad with varying slopes between 2% and 4%.

NATURAL GASA natural gas stub will be provided to each pad. The natural gas provider is Black Hills Energy.

SANITARY SEWERA 6” sanitary sewer stub extending a minimum of 5’ past the road ROW will be provided.

STORM DRAINAGEA storm drain stub extending a minimum of 5’ past the road ROW will be provided. The stub will be appropriately sized to accommodate anticipated storm runoff.

WATERA water stub extending a minimum of 5’ past the road ROW to be used for domestic and fire water usage. Meters and any connection fees are the responsibility of the pad developer.

Page 6: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

6

Page 7: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

7

Castle Rock is a modern frontier of opportunity. It’s home to approximately 72,000 residents, with 1,000+ new additions moving to the area every year. The town’s “Come-And-Get-It” attitude, high-quality education system and centralized access to the state’s best talent pool are attractive prospects for residents and business owners seeking a connected place to build a promising future.

Nestled along I-25 between Denver and Colorado Springs, Castle Rock is poised to become the next major opportunity destination along the Front Range corridor. It’s a town on the rise, with a well-educated, wealthy population that is growing by leaps and bounds every year.

Highlights•   #4 Best Place to Live (CNN Money)

•   #7 Fastest-Growing City (US Census)

•   #5 Wealthiest County (Forbes)

•   #2 Healthiest County in Colorado

•   2018 National Gold Medal Award for Class IV Parks

Castle RockT H E E P I C E N T E R O F P O S S I B I L I T Y

Page 8: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

8

Page 9: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

9

Demographics

Source: CoStar Group 2019

1 MILE 3 MILES 5 MILES

BUSINESS ENVIRONMENT

Total Businesses 853 1,965 2,390

Total Employees 8,670 19,401 23,228

POPULATION

2023 Projection 3,538 41,461 71,411

2018 Estimate 3,193 37,228 53,634

Growth 2010 - 2018 20.58% 25.84% 20.21%

Average Age 37.10 36.60 36.30

HOUSEHOLDS

Average HH Size 2.40 2.70 2.80

Median Home Value $426,681 $442,276 $457,580

INCOME & EDUCATION

Average HH Income $91,122 $118,318 $127,006

Bachelor’s Degree 29.05% 31.20% 32.08%

Page 10: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

10

PHILIP S. MILLER PARK

DOUGLAS COUNTYFAIR GROUNDS

CENTRAL CASTLE ROCK RESIDENTIAL

RED HAWKRESIDENTIAL

RETAIL &INDUSTRIALCORRIDOR

CITADEL INDUSTRIAL PARK

DOWNTOWN CASTLEROCK

ROCKPARK

Page 11: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

11

Between Philip S. Miller Park and downtown Castle Rock lies a massive opportunity. Philip S. Miller Park is more than a playground. It’s Castle Rock’s only true lifestyle destination. Located on Plum Creek Parkway at the western edge of Miller’s Landing, the 300-acre park attracts residents and tourists for concerts in the park, fundraising events, summer fitness classes, zipline tours, athletic adventure towers, community sports, rides and marathons on the mountain trail network and more.

With no food or beverage service offered in the park, and regular programming that concludes before 9pm year-round, Philip S. Miller Park creates an unprecedented opportunity to provide more than 1.5 million visitors with inspiring recreational and hospitality services directly across the street at Miller’s Landing.

It’s a chance to bring the energy of the park into the heart of the city with a thriving new adventure-focused lifestyle district unlike anywhere else in Colorado.

Philip S. Miller ParkA L A U N C H P A D F O R A D V E N T U R E

Page 12: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

12

East

Plu

m C

reek

Tra

il

Sellars Gulch Trail

E Wolfensberger Road

DOUGLAS COUNTY

FAIRGROUNDS

EAST PLUM CREEK

TRAILHEAD

EAST

PLU

M

CRE

EK T

RAIL

FAIRGROUNDS REGIONAL PARK

CENTENNIAL PARK

ROCK PARK

MEMMEN RIDGE OPEN

SPACE

MEMMEN RIDGE

TRAILHEAD

PLUM CREEK PARKWAY

WILC

OX

STREETDOWNTOWN

CASTLE ROCK

MILLER’S LANDING

PHILIP S. MILLER PARK

Planned Trail Connection

Existing Trail

Major Roadways

Planned Prairie Hawk Road Extension

Connected access to Philip S. Miller Park, a $30M, 300-Acre Regional Park with 2 Million Annual Visitors.

Access to Full Interchange with I-25 (85,000 VPD) with Excellent Highway Visibility.

Page 13: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

13

Framework Plan

Page 14: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

PHASE 1 CONCEPT

Page 15: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80
Page 16: High Density, Vertical, Urban Mixed-Use Village … › wp-content › uploads › 2020 › 01 › ML...(CONCEPT) PARKING ACCESS 86' INCOMING TRAFFIC DOES NOT STOP 80' 50' MIN 80

16

MATT CALLPrincipal

[email protected]

IAN ELFNERBrokerage Services

[email protected]

SHAWN TEMPLEDeveloper

[email protected]