HIGH RADIATION TO MATERIALS: STATUS OF THE EXPERIMENTAL AREA Ans Pardons HiRadMat Hearing, 27 th of July 2011 Outline Location of HiRadMat facilities Table assemblies Status of experimental area Status July 2011 Remaining work for Q3 2011 Shut-down work 2011-2012 Operation with test table Handling Life cycle EDMS 1155004

Upload: zaynah

Post on 11-Feb-2016

40 views

Category:

Documents


0 download

DESCRIPTION

Outline Location of HiRadMat facilities Table a ssemblies Status of e xperimental a rea Status July 2011 Remaining work for Q3 2011 Shut-down work 2011-2012 Operation with test table Handling L ife cycle. Hi gh Rad iation to Mat erials: Status of the Experimental Area . - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

HIGH RADIATION TO MATERIALS:STATUS OF THE EXPERIMENTAL AREA

Ans Pardons HiRadMat Hearing, 27th of July 2011

Outline Location of HiRadMat facilities Table assemblies Status of experimental area

Status July 2011 Remaining work for Q3 2011 Shut-down work 2011-2012

Operation with test table Handling Life cycle

EDMS 1155004

Page 2: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Location of HiRadMat Facilities2

User access: When all safety conditions are

met: access until assembly & preparation area in TJ7

Access to TNC only with special permission and planned in advance

Control room

Surface lab

Handling test tablesTest object is mounted on table in

lab with BA7 overhead craneBA7-TJ7: custom-made trailerTJ7-TNC: remote handling with

overhead crane

Assembly & Preparation

area

Ans Pardons HiRadMat Hearing, 27th of July 2011

Page 3: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Table assemblies3

Test object mounted on movable table = test table

3 base tables in tunnel, with a dummy table in the surface lab for aligning & test before beam

Remote plug-in connectors Water cooling, signal (2011) &

power (2012) Remote handling of test table with

crane, using mechanical guides

Assembly of test object and movable table – installed on base table

4

4 Base table

1

3

2

Movable table

Connectors

Test object (e.g. LHC collimator) mounted on movable table in lab

1

3

2

Ans Pardons HiRadMat Hearing, 27th of July 2011

Page 4: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Status of the experimental area4

Status after the last technical stop (TS 4-8/7/2011):Status July 2011 & remaining work 2011

3 base tables installed and aligned to the beam

All signal cables pulled from TNC to TJ7 and from TJ7 to control room (installation rack in TJ7 and connection cables to tables planned for next TS)

Table cooling circuit installed (connection to tables and pressure test planned for next TS)

Also to be done in the next TS: quick connector on gas line opposite tables + completion gas line from TJ7 to surface

Ans Pardons HiRadMat Hearing, 27th of July 2011

Page 5: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Status of the experimental area5

Status after the last technical stop (TS 4-8/7/2011):Status July 2011 & remaining work 2011

3 supports for test tables installed in cool-down zone

Extensive handling tests done with movable table (remote tests planned for next TS, when final camera system installed)

Ans Pardons HiRadMat Hearing, 27th of July 2011

Page 6: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Shut-down work6 Activities for 2011-2012 shut-down:

Cabling of tables 1 and 3 from table to control room Installation of power line (4kV) from table 2 to surface Additional remote handling tests if needed Exchange of entrance window of TED-style beam dump

(remote handling of upstream collimator, shielding &TED) Remote handling of 2011 test tables from cool-down area

to surface (after RP green light) ??? Disposal of former-T9 copper blocks currently stored

in sarcophagus in downstream T9 (only if RP green light, possibly delayed until 2013-2014 shut-down)

Ans Pardons HiRadMat Hearing, 27th of July 2011

Page 7: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Handling of test table7

Set of 5 Pan-Zoom-Tilt optic fibre network cameras on crane frame(also on lifting beam)

Cameras installed right before intervention

Viewing station with screens in TJ7 – test during next TS

Operation

TNC

TJ7

To material lift and BA7

Ans Pardons HiRadMat Hearing, 27th of July 2011

Page 8: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Life cycle of test table8 Operation

Reminder: Test objects must be contained, cable feed-throughs and portholes must be tight

Installation of table is 100% remoteEach access to TNC must be duly justified. They must be requested before the test table installation.

After the beam test, the test table will be moved remotely to the downstream cool-down zone for a cool-down period defined by the radioprotection team.

After the cool-down period, the object will be transported to the surface and brought to an adapted (CERN-RP) lab for dismantling. HiRadMat project recovers the mobile table, the user is responsible for treatment of the test object (disassembly, analysis, disposal).

Ans Pardons HiRadMat Hearing, 27th of July 2011

Page 9: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

9

Thank you for your attention – Any questions?

High Radiation to Materials: EXPERIMENTAL Area DESIGN

Ans Pardons HiRadMat Hearing, 27th of July 2011

Page 10: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Spare slides

Page 11: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Test tables

HiRadMat Review, 26th of May 2011

11 Mobile table: geometry and services

Test table geometry Mostly aluminium Weight 450kg Base plate 50mm thick

Available for test object: Volume: 2 m x 0.7 m x (H) 1.5m

(or cylinder of R=0.35m around beam) Weight: 2000kg Plug-in connectors

Remote handling with overhead crane Test object mounted in surface lab

1

3

2

1

1

2

13

2

Movable table

Connectors

Test object (e.g. LHC collimator) mounted on table as in lab

Page 12: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Test tables12 Mechanical guides

Base table: mechanical guides for remote installation 3 V- shaped supports per mobile table(Extra V-shaped supports allow for different table sizes) Lab-tested (<0.1mm), tunnel exercises planned

1

2

3

1 2

3

Page 13: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Cooling test tables

IEFC Workshop Mar. 22, 2011

13 (more details in presentation of Paul Pepinster/Magali Mendez)

Ans Pardons

Detection pressure drop safety valves

close

B. Lacarelle, Y. Lupkins

TJ7

TNC

TA7

, 9 bar

Page 14: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Handling of test tables

HiRadMat Review, 26th of May 2011

14

1. From lab to test zone (non-radioactive object) Surface lab: overhead crane to trailer Trailer: from BA7 material lift TJ7 TJ7: transfer to overhead crane Remote with crane: TJ7 test zone in TNC

Lab to test zone

Custom-made trailer

Page 15: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Handling of test tables15 Cool-down zone

Cool-down zone for test tables with test objects Downstream in TNC, within reach of crane 3 places (supports) foreseen for 2011, 5 more for 2012

Downstream end of TNC

Test table supports 100% Aluminium Mechanical guides for remote

installation (also remote dismantling) Handling exercises in tunnel planned

Page 16: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Handling of test tables16 Test zone to cool-down zone

2. From test zone to cool-down zone (radioactive object) Remote with crane: TJ7 cool-down zone in TNC Remote with crane: place on cool-down zone supports

Page 17: Hi gh  Rad iation to  Mat erials: Status of the Experimental Area

Handling of test tables17 Cool-down zone to surface

3. From cool-down zone to surface (radioactive object) Remote, with crane: cool-down zone in TNC TJ7 Remote, with crane: place on trailer Manually, protected by distance (and shielding if needed):

TJ7 material lift surface Manually and in truck with container (and shielding if needed):

surface CERN radioactive lab for disassembly When needed, followed by waste disposal (CERN) If dose rate negligible empty mobile table can be re-used