hess growing deepwater capability final - subsea uk · 2015-02-24 · l hess 28% w.i. l proved...

16
GROWING DEEPWATER CAPABILITY Aidan McKay GROWING DEEPWATER CAPABILITY Aidan McKay

Upload: others

Post on 16-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

GROWING DEEPWATER CAPABILITY

Aidan McKay

GROWING DEEPWATER CAPABILITY

Aidan McKay

Page 2: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

2

SE Asia Regional Context for Deepwater

1989-2009 – Small DW vs North Sea, USA GoM, W Africa or Brazil.l Subsea tiebacks Malaysia, Brunei, Indonesia, mini-TLP & FPSOs.

Regional pipelines into deeper waters lagged Europe/USA/ W Africa l Lack of demand for big gas transmission pipes or DW infrastructure.

Regional developments now focusing on deepwater & subsea activities:l Malaysia - Kikeh , Gumust-Kapak, Malaki developments

l Indonesia – Gendalo-Gehem-Bangka, Abadi, Cepu Devt, Natuna D-Alpha (despite tech, commercial challenges).

SE Asia is under explored in DW & growing market for DW services

Page 3: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

3

Independents & Supermajors

Independents have been successful provided they are nimble, take intelligent risks and focus on value.

In Deepwater in last 5 -10 years we have seen this too : Supermajor Independents

GoM DW Nakika Devt Independence hub Malaysia DW Gumusut Kikeh DevtAustralia DW Blackbear Enfield etc

• Worldwide success in deepwater & subsea development • Application of innovative technology • Prudent risk management & mitigation• Leveraging off contracting community & non-operated

Page 4: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

4

Nakika 2004Shell’s DW Technology Flagship

Independence Hub 2007Independents “Industry Solution”

Shell/BP 50/50% Water Depth: 6340 ft

Fields : 5200 -7600 ft WD

6 small fields hooked up(Ariel, Kepler, Herchel, E

Anstey, Fourier, Couloumb)

5 Independents (Anadarko, KM, Spinnaker, Dominion, Devon)

Water depth: 8000 ft

7 small fields :Jubilee, Merganser, Atlas, Atlas N, San Jacinto,

Spiderman, Vortex

Best EP Technology replicated within 30 Months

25

Page 5: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

5

Hess SE Asia is a 90,000 boe/d scale business, vs 32,000 boe/d in 2005• Development & production success in conventional EP business in

Thailand, Indonesia & also Malaysia

In parallel, DW exploration campaign for big gas opportunities• Obtaining a significant share of initial discoveries • Assess new acreage very quickly, look to reduce Devt cycle times • Build and improving our organisational capabilities• Look for innovative technical and commercial solutions for value creation• Remain flexible, fast & opportunistic

Hess execution capability (Drilling, Devts, Prodn, Tech) is building

A diverse portfolio, lots of growth opportunities to double production

Hess SE Asia Future

21

Page 6: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

6

Hess Global Deepwater Interests

Okume EG

Okume EG

Area 54 Libya

Area 54 Libya

West Med, Egypt

Schehallion, Schehallion, Clair

Australia NW Australia NW Shelf

Llano

North Sea

Shenzi

BM-S-22, Brazil

Semai V, IndonesiaSemai V, Indonesia

Penn State

Conger

Snoviit

Brunei J Blocks

Pony

Ghana

Non Non Operated Operated

Malaysia SB302 Belud

Malaysia SB302 Belud

Page 7: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

7

Equatorial Guinea - Okume Complex15 Subsea Production Wells / 9 Water Injection Wells / Flowlines / Power and Control UmbilicalsFramo Subsea multiphase pumpsFixed platforms, tension leg platformsFloating storage and offloading facilities

Ceiba

Sendje CeibaFPSO

OvengTLP

Okume/EbanoTLP

Central processing

facility

Satellite 1

Satellite 2

Satellite 3

Elon

(CPF)HydrocarbonsGas LiftWater Injection

Processed OilGas Injection

l 300 MMBOE SCALE

l Net production ~65 MBOED

l 300 MMBOE SCALE

l Net production ~65 MBOED

Page 8: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

8

Conger Subsea Devt GoM Conger Subsea Devt GoM

• 20-22,000’ MD WELLS• HIGH PRESSURES • HIGH TEMPERATURES • HIGH WELL RATES• VOLATILE OIL RESERVOIR SYSTEM

• First commercial 15,000 psi sub-sea tree, manifold & flowlines

• ~1,500 ft water / Peak Prodn Rates ~120 MMSCFD & 28,000 bopd

Page 9: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

9

Shenzi Field BHP Operated

l Hess 28% W.I.l Proved & Prob. Resources: 145

MMBOE l Large deepwater production host

TLP• 15,500 st payload capacity• 43,500 st hull displacement • ~4,300 feet water

l Oil & gas production end Q1 2009l Currently ramping up production l ~25 MBOED net peak in 2010

l Hess 28% W.I.l Proved & Prob. Resources: 145

MMBOE l Large deepwater production host

TLP• 15,500 st payload capacity• 43,500 st hull displacement • ~4,300 feet water

l Oil & gas production end Q1 2009l Currently ramping up production l ~25 MBOED net peak in 2010

Tahiti

Mad DogAtlantis

K2 Area

Puma

Tonga

Neptune

Pony / Knotty Head

Miocene Fields

Green Canyon Area Shenzi

Page 10: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

10

Shenzi – BHP Operated Extensive subsea wells tieback architecture :

• 3 drill centers, expandable to 5• 7 initial + 8 future production wells • dual piggable production flowlines• 6 future water injection wells and facilities• 10 steel catenary risers (SCRs)• multiple hydraulic control and chemical umbilicals

Page 11: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

11

US Gulf Of Mexico – Pony Devt

Salt

3 Miles

Pony WellGC 468 No. 2

Knotty Head WellGC 512 No. 1 ST 1

Pony WellGC 468 No. 1

Pony WellGC 468 No. 2 ST

Pony WellGC 468 No. 1 St 1

• Hess 100% W.I.

• Water Depth: 3,500 ft

• Drilling confirmed 200+ MMBOE net resource

• Currently evaluating development options

• Further exploration upsideKnotty Head Well

GC 512 No. 1

Page 12: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

12

Pony – One Possible Development Concept

Water Injection

Gas ExportDiscovery P/L

Gas LiftProduction

Umbilical

Oil Export

Umbilical

1-2 Drill Centers – 7P Wells

TLP Depth = 3500’

6”

I-S4

Drilling sequence

4”

12”

12”

10”

6”

I-N14

I-S13

I-C11

I-XX Well name

#

6”

6”

3 Remote WI Wells

2

Page 13: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

13

Australia Exploration Program

WA-390-P

Pluto4-6 TCF

Scarborough8 TCF

Greater Gorgon Area50 TCF

60 km

WA-404-P

North West Shelf, Australia WA-404-P•Hess 50% W.I.•Martell discovery encountered

360 feet gross gas column•Drilling to resume in 1Q10

WA-390-P• Hess 100% W.I., operator• Initial four well program resulted

in three discoveries• 3 discoveries Glencoe, Briseis &

Nimblefoot discoveries • Second drilling program of 10

wells to commence in 2H 09

Glencoe-1

Briseis-1

Nimblefoot-1

Martell-1

Page 14: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

14

Wiriagar/Vorwata Fields20 Tcf (2P)

Semai V Block

Semai V – Papua Deepwater Indonesia

Water Depth Range 300 to 6500 feet

200 Km

PSC awarded end 2008, 2D seismic acquired, 3 expln wells by end 2011

Page 15: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

15

SUBSEA UK OPENING : Conclusion

Under explored & growing market for DW services (esp. gas)

Large number of DW developments & ongoing DW exploration activities in region, some of which will be successful.

PSC environment (contractors to host govts), remote locations, little infrastructure support, vs GoM/N Sea/Africa

Hess growing strongly in region building capabilities in DW- Technocrats, nimble & a good company to work with. - We have an exciting future in the region.

Page 16: Hess Growing Deepwater Capability Final - Subsea UK · 2015-02-24 · l Hess 28% W.I. l Proved & Prob. Resources: 145 MMBOE l Large deepwater production host TLP " 15,500 st payload

16

Growing Deepwater Experience

SUBSEA UK