IN ACTION ROUND THE WORLD Herrenknecht Gripper technology can be found in action in projects all around the world for all types of tunnel use and all diameters. RING ERECTOR installs steel arches to stabilize the excavated tunnel. BUCKETS transport the excavated rock behind the cutterhead onto a belt conveyor system. CUTTERHEAD The excavation tools are mounted in the cutterhead, which also supports the tunnel face. GOTTHARD BASE TUNNEL Installed power: 3,500 kW – Weight: around 220 t SHIELD (partial shield) supports the rock behind the cutterhead. MESH INSTALLER places steel mats in the inserted bolts. DISC CUTTERS are mounted in the cutterhead and roll in concentric circles over the tunnel face. The rock is crushed by the contact pressure. GOTTHARD BASE TUNNEL – Weight per disc cutter: around 125 kg Contact pressure per disc cutter: up to 26 t ROOF BOLTING UNIT can be moved around the machine’s axis. Drills holes for the bolts which stabilize the rock. BELT CONVEYOR transports the excavated material to the end of the back-up system. WALKING DEVICE The rear of the TBM and the back-up systems rest on the feet of the walking device. They are lifted as tunnelling progresses, and the back-up system follows. GOTTHARD BASE TUNNEL - Overall volume of excavated material: around 10.5 million m³. THRUST CYLINDERS brace against the gripper shoes and press the rotating cutterhead against the tunnel face. GOTTHARD BASE TUNNEL – Thrust force: 27,488 kN total – Stroke: max. 2 m SHOTCRETE ROBOT lines the tunnel with shotcrete to stabilize it. CONTROL CABIN From here the TBM driver operates the machine and monitors tunnelling. SELECTION OF REFERENCE PROJECTS GRIPPER TBM TUNNEL PROJECT Jinping Hydropower Station II, China Tunnel length: 15,903 m Mumbai Freshwater Pipeline, India Tunnel lengths: 4,366 m /1,800 m / 1,675 m / 1,900 m CONTRACTOR Ertan Hydropower Development Company Ltd. Patel Engineering Ltd., Pratibha Industries Ltd. MACHINE DATA S-405 Gripper TBM Diameter: 12,400 mm M-1150M / M-1249M Gripper TBM3000XH / Gripper TBM2800XH Diameters: 3,000 mm / 2,800 mm GRIPPER CYLINDERS press the GRIPPER PLATES laterally against the tunnel wall. GOTTHARD BASE TUNNEL - Gripping force: 72,142 kN total

Upload: antoniusnoro

Post on 25-Nov-2015

32 views

Category:

Documents


2 download

TRANSCRIPT

  • IN ACTION ROUND THE WORLD Herrenknecht Gripper technology

    can be found in action in projects all around the world for all types of

    tunnel use and all diameters.

    RING ERECTOR installs steel arches to

    stabilize the excavated tunnel.

    BUCKETS transport the excavated

    rock behind the cutterhead onto a belt

    conveyor system.

    CUTTERHEAD The excavation tools are mounted in

    the cutterhead, which also supports the tunnel face.

    GOTTHARD BASE TUNNEL

    Installed power: 3,500 kW

    Weight: around 220 t

    SHIELD (partial shield) supports the rock

    behind the cutterhead.

    MESH INSTALLER places steel mats in the

    inserted bolts.

    DISC CUTTERS are mounted in the cutterhead

    and roll in concentric circles over the tunnel face.

    The rock is crushed by the contact pressure.

    GOTTHARD BASE TUNNEL

    Weight per disc cutter: around 125 kg

    Contact pressure per disc cutter: up to 26 t

    ROOF BOLTING UNIT can be moved around

    the machines axis. Drills holes for the bolts

    which stabilize the rock.

    BELT CONVEYOR transports the excavated

    material to the end of the back-up system.

    WALKING DEVICE The rear of the TBM and the

    back-up systems rest on the feet of the walking

    device. They are lifted as tunnelling progresses,

    and the back-up system follows.

    GOTTHARD BASE TUNNEL

    - Overall volume of excavated material:

    around 10.5 million m.

    THRUST CYLINDERS brace against the gripper

    shoes and press the rotating cutterhead against

    the tunnel face.

    GOTTHARD BASE TUNNEL

    Thrust force: 27,488 kN total

    Stroke: max. 2 m

    SHOTCRETE ROBOT lines the tunnel with

    shotcrete to stabilize it.

    CONTROL CABIN From here the TBM driver

    operates the machine and monitors tunnelling.

    SELECTION OF REFERENCE PROJECTS GRIPPER TBM

    TUNNEL PROJECT

    Jinping Hydropower Station II, ChinaTunnel length: 15,903 m

    Mumbai Freshwater Pipeline, IndiaTunnel lengths: 4,366 m / 1,800 m / 1,675 m / 1,900 m

    CONTRACTOR

    Ertan Hydropower Development Company Ltd.

    Patel Engineering Ltd., Pratibha Industries Ltd.

    MACHINE DATA

    S-405 Gripper TBMDiameter: 12,400 mm

    M-1150M / M-1249M Gripper TBM3000XH / Gripper TBM2800XHDiameters: 3,000 mm / 2,800 mm

    GRIPPER CYLINDERS press the GRIPPER

    PLATES laterally against the tunnel wall.

    GOTTHARD BASE TUNNEL

    - Gripping force: 72,142 kN total