Page 1: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

Henry van Veldhuizen

Amersfoort, 2014

Page 2: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

Vallei enVeluwe

Page 3: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

244. 833 ha

1.082.000 inhabitants

16 wwtp’s

1.471.00 p.e.

Waterschap Vallei en Veluwe

Page 4: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

WWTP Amersfoort (300.000 p.e.)

Page 5: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

Presentation

• History– Vision Energy and Resources– Energy Measures WWTP Amersfoort– Research Omzet.Amersfoort– Project Omzet.Amersfoort

• 2013: Procurement Omzet.Amersfoort phase 1 en 2

• Future: Phase 3 Sludge drying

Page 6: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

Ambition(2010)

(international) coöperation innovation! Knowledge exchange

Wastewater

sandnutrients

Paper fibers/ cellulose

Sludge

Fuel

energy

Clean water

Vision Energy and Resources

Raw Materials

Page 7: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

Measures wwtp Amersfoort

• 2010

• 2012

• 2011

• 2012

Page 8: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

-

2.000.000

4.000.000

6.000.000

8.000.000

10.000.000

2005 2006 2007 2008 2009 2010 2011 2012

kWh/y

totaal verbruik elektriciteit elektriciteit voor beluchting

elektriciteit door gasmotor inkoop van elektriciteit

Biogas filtration with activated carbon

Introduction bubble aeration

Introduction sand filter

DEMON

Page 9: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

Research Omzet.Amersfoort (2010)

1 Omzet.

Amersfoort

2Central

Digestion

3PE dosing

4Sludge pre-treatment

5Sludge drying

6P-recovery

7 CHP study

8Sudge sale

Results:

• Central digestion + Thermal Pressure Hydrolysis

• No PE dosing (effluent quality)

• Bio-P en P-recovery

• Sludge drying: 75% feasible, but many risc’s

• CHP, no ORC

Page 10: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

Project Omzet.Amersfoort (2010)

• Proposal: Three Phases:1. Central digestion + Thermal

Hydrolysis2. Bio-P en P-recovery3. Sludge drying with excess heat

• LIFE+ subsidy:• Realisation innovative aspects

(TPH, P, sludge drying)• Monitoring results• Knowledge sharing

Page 11: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

Project Omzet.Amersfoort

• Expected results:

– Phase 1: Energy:• Amersfoort Energy Neutral• Region 65% self sufficient• Heat: dependent on process• Sludge: 30% d.w.• ROI: 6 years

– Phase 2: Phosphate: • 40% recovery of total phosphate region• Chemical usage: Reduction 50%

– Phase 3: Sludge drying• Sludge: 90% d.w. for 75% of the sludge• ROI 7 years

Page 12: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

2013: Procurement

• Procurement of Phase 1 and 2 at once

• Selection: SH+E• TPH: Stulz – Lysotherm : • P recovery with Wasstrip and Pearl

Page 13: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe
Page 14: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

Result Procurement

– Phase 1 and 2: Energy en Phosphate:• Amersfoort Energy neutral 130%• Surplus: 2 M kWh/jaar • Region 65% self sufficient 70%• Heat: dependent on process maximum• 40% recovery of total phosphate region 42%• Chemical usage: Reduction 50%• Sludge: 30% d.w. 31%• ROI: 6 years 6,7 jaar

Page 15: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

BI 6%

Process according to procurement

GT

ATVBT NBT

Amersfoort

Woudenberg

GI

ontw

sec. slib

BI4,0%

wkk DEMON

strip

pearl

Nijkerk

sec. slib

Soest

prim. slib

sec. slib

prim. slib GT

TDH

Buffer

eindvwniet specifiek

Silo

wkk + div

extra wkk

GT

Page 17: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

Future: Phase 3 – sludge drying

• Sludge drying with excess heat• Project not possible on WWTP Amersfoort with project period• Choice: pilot/demo with 10% on wwtp Ede: 200 kWth

• Period: 2014-2016• Interpretation of results for WWTP Amersfoort in 2015

Page 18: Henry van Veldhuizen Amersfoort, 2014. Vallei en Veluwe

Everything clear…

more information: www.omzetpuntamersfoort.nl/english