Henderson Mine Site. Henderson Mine. Shaft Collar Elev 10,400 ft. Harrison Mt. Elev. 12,300 ft. Shaft Bottom Elev 7,500 ft. LA Ramp. Exhaust air. Fresh air. To crusher. Primary Access Ramp 3600 ft. Secondary Access Ramp 3200 ft. Central Campus Elev. 6,750 ft (4200 mwe). - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/1.jpg)
Henderson Mine Site
![Page 2: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/2.jpg)
Henderson Mine
![Page 3: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/3.jpg)
Central Campus
Shaft CollarElev 10,400 ft
Shaft BottomElev 7,500 ft
LA Ramp
Primary Access Ramp3600 ft
Central CampusElev. 6,750 ft(4200 mwe)
Secondary Access Ramp3200 ft
Fresh air Exhaust air
To crusher
Harrison Mt.Elev. 12,300 ft
UNO
![Page 4: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/4.jpg)
Central CampusElev. 6750 ft(4200 mwe)
Midway CampusElev. 5825 ft(5100 mwe)
Lower CampusElev. 4900 ft(6000 mwe)
EarthLab/GeoscienceArea
Deep Access
Internal Shaft
![Page 5: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/5.jpg)
Preliminary Cost Estimates(Excluding UNO)
![Page 6: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/6.jpg)
Preliminary Time Schedule(Excluding UNO)
![Page 7: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/7.jpg)
UNO Preliminary Cost Estimates
![Page 8: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/8.jpg)
Equipment and Excavation Techniques
![Page 9: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/9.jpg)
2.3.1 Conventional Development
Basic drilling cycle for drill and blast drifting and tunneling:
•Surveying and setup•Drilling•Charging•Blasting•Ventilation•Scaling•Mucking•Scaling•Bolting
![Page 10: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/10.jpg)
3 Boom Drill Jumbo
![Page 11: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/11.jpg)
LHD
![Page 12: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/12.jpg)
Development Haul Truck
![Page 13: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/13.jpg)
Raise Drill Operating Cycle
![Page 14: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/14.jpg)
Sandvik TamrockRock World, 2/2001
Drilling the ventilation raises at the Kiruna Mine, 1998
![Page 15: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/15.jpg)
Shaft Widening by Drill and Blast
![Page 16: Henderson Mine Site](https://reader036.vdocuments.us/reader036/viewer/2022081603/56813a26550346895da2085c/html5/thumbnails/16.jpg)
Shaft Boring Machine (Wirth)
V-mole method
Raise bored pilot hole 1.8 to 2.4 m diameter.
Ream shaft to up to 8.5 m diameter.
Limited by maximum length raise bored hole, currently 1,300 m.
7.5 m day average