M cKenney’s completed an HVAC overhaul for an Assurant office tower, replacing a chiller plant and the supporting air handling units (AHUs) with no building downtime. THE CHALLENGE The insurance provider needed to remain oper- ational while a rooftop chiller plant and AHUs on each floor were replaced. The mechanical room had significant space constraints for the chiller plant and new AHUs had to be disman- tled to fit through 36" doorframes. The build- ing also required a complete controls retrofit to increase visibility and energy savings. THE SOLUTION Using a crane over two consecutive week- ends, McKenney’s demolished the existing chiller plant, then staged all the new material, including prefabricated piping, for delivery to the roof. Mezzanine level walls were removed, then rebuilt, to accommodate the new equip- ment as it was installed. During multiple weekends, the team also carefully organized the new AHUs breakdown, delivery to each floor, and reconstruction in the shortest amount of time. THE RESULTS The new chiller plant, AHUs and system controls were successfully installed with no disruption to Assurant’s building occupants. Helping Protect What Matters Most PROJECT NAME Assurant Chiller Plant & AHUs Replacement PROJECT LOCATION Atlanta, Georgia PROJECT TEAM Owner: Assurant, Inc. General Contractor: Short Brothers Construction, Inc. Subcontractor: McKenney’s, Inc. SPECIALIZATIONS Building Information Modeling Pipe Shop Prefab Sheet Metal Shop Prefab MARKETS Commercial Offices Central Plants The content of this document is not intended as an endorsement. www.mckenneys.com © 2015 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214

Upload: mckenneys-inc

Post on 29-Jul-2015

15 views

Category:

Business


2 download

TRANSCRIPT

McKenney’s completed an HVAC overhaul for an Assurant office tower, replacing a chiller plant

and the supporting air handling units (AHUs) with no building downtime.

The ChallengeThe insurance provider needed to remain oper-ational while a rooftop chiller plant and AHUs on each floor were replaced. The mechanical room had significant space constraints for the

chiller plant and new AHUs had to be disman-tled to fit through 36" doorframes. The build-ing also required a complete controls retrofit to increase visibility and energy savings.

The SoluTionUsing a crane over two consecutive week-ends, McKenney’s demolished the existing chiller plant, then staged all the new material, including prefabricated piping, for delivery to the roof. Mezzanine level walls were removed,

then rebuilt, to accommodate the new equip-ment as it was installed. During multiple weekends, the team also carefully organized the new AHUs breakdown, delivery to each floor, and reconstruction in the shortest amount of time.

The ReSulTSThe new chiller plant, AHUs and system controls were successfully installed with no disruption to Assurant’s building occupants.

Helping Protect What Matters MostPRojeCT name

� Assurant Chiller Plant & AHUs Replacement

PRojeCT loCaTion

� Atlanta, Georgia

PRojeCT Team

� Owner: Assurant, Inc.

� General Contractor: Short Brothers Construction, Inc.

� Subcontractor: McKenney’s, Inc.

SPeCializaTionS

Building Information Modeling

Pipe Shop Prefab

Sheet Metal Shop Prefab

maRkeTS

� Commercial Offices

� Central Plants

The content of this document is not intended as an endorsement.

www.mckenneys.com© 2015 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316

704-357-1200 [email protected]

3601 Performance Road Charlotte, North Carolina 28214