helder preza - luanda urban transit, 03/2011
DESCRIPTION
TRANSCRIPT
1
Mobility and Transportation
The Present and the Future
Helder PrezaMarch 2011
GOVERNO DA PROVÍNCIA DE LUANDA
Autoridade de Transportes de Luanda
2
Summary
1 – Introdution2 – Current Status of Mobility in Luanda3 – Ongoing Projects 4 – Future actions5 - Conclusions
3
1 – Introduction
Luanda
Capital of the Republic of AngolaCostal City (30km radio)Population Aprox 6 MillionsMajor Economic Metropole in Angola
4
5
2. Current Status of Mobility in Luanda
OPTIMAL
MOBILITY
RESULTS
ENGINEERING
ENFORCEMENT EDUCATION
6
2. Current Status of Mobility in Luanda
Engineering
• Infrastructure
• Public Transportation System
• Parking
• Road Traffic Management
• Urban Planning and Management
7
Infrastructure:Road traffic spectrum of Luanda
8
Luanda Urban Railway Transportation Line Data
Line length–33km
Working Hours 05.00 – 19.30
Number of trains10 per day (per sense)
Max. Passengers per train – Aprox 1200
Total Passengers in January 2011 254.115
9
Road Traffic Situation
1.Road network not projected for the current number of vehicles
2.Secondary roads on bad condition
3.Lack of signaling
4.Lack of regulation´s enforcement
5.Not enough parking spots available
6.Inefficiency of public transportation
7.Long traffic jams
8.No road traffic management system
10
Public transportation System
BUS+TRAIN
1. Reduced number of busses (400)2. Low commercial speed (Less than 5km/hour)3. Very low number of taxis (Less than 200)4. Massive use of commuter taxis (Candongueiros) Around 25000 legal and illegal 5. No terminals for intercity buses6. Only one line of train (Aprox. 12000 Pass/day) 7. Crossing points between railway and roads at same level (Slow speed of trains)
11
3 – Ongoing Projects
3.1 - Infrastructure
Road rehabilitation (Primary and secondary)
Increment road network
Implementation of a Traffic Control and Management System (Traffic lights, tarffic surveilance, etc.)
12
3.2 - Parking
Construction of new parking spots
Imposition of parking fees at street level
Forcing creation of parking at all new buildings
13
3.3 – Public Transportation
Increase number of buses and creation of new shuttle lines
Facilitation on private taxis licensing
Increase the size and number of trains
Implementation of a maritime passenger transportation system
14
Luanda Maritime Public Transportation Network
15
4 – Future actions
Increase railway network system (Duplication Current line, Creation new line)
Luanda transportation master plan (Increment road network, integrate modes of transport, creation of intercity terminal buses, implement a high capacity public transportation system.)
16
Future Railway Line
Urban Railway Transportation Line
Current Railway Line
17
4 – Conclusion
Status of Mobility in Luanda
Ongoing Projects
Future actions
18
THANK YOU VERY MUCH
19
Projecto VLATACOM