heavy oil projects in colombia - institute of the … osorio.pdf · any of its contents may be used...
TRANSCRIPT
![Page 1: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/1.jpg)
Gabriel OsorioProduction Vicepresident
HEAVY OIL PROJECTS IN COLOMBIAHEAVY OIL PROJECTS IN COLOMBIA
XVII Annual Latin American Energy Conference, May 13th, 2008
![Page 2: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/2.jpg)
XVII ANNUAL LATIN AMERICAN ENERGY CONFERENCE
DISCLAIMER
2
This document was prepared by Ecopetrol S.A. with the purpose of providing certain information of the Company.
This document may include strategy discussions and forward-looking statements regarding the probable development of Ecopetrol’s Business. Said projections and statements include references to estimates or expectations of the Company regarding its future and operational results. Potential investors and the market in general should be aware that the information provided herein does not constitute any guarantee of its performance, risks or uncertainties that may occur or materialize. Real results may fluctuate and differ from those provided herein due to several factors outside of the control of the Company. Neither Ecopetrol nor its advisors, officers, employees, directors or agents, make any representation nor shall assume any responsibility in the event actual performance of the company differs from what is provided herein. Moreover, Ecopetrol, its advisors, officers, employees, directors or agents shall not have any obligation whatsoever to update, correct, amend or adjust this presentation based on information attained or events occurred after its disclosure.
This presentation is for discussion purposes only and is incomplete without reference to, and should be viewed solely in conjunction with, the oral briefing provided by Ecopetrol. Neither this presentation nor any of its contents may be used for any other purpose without the prior written consent of Ecopetrol.
HEAVY OIL PROJECTS IN COLOMBIA
![Page 3: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/3.jpg)
XVII ANNUAL LATIN AMERICAN ENERGY CONFERENCE
1. Introduction
2. Upstream Projects
• Production• Exploration
3. Downstream Projects
4. Achievements
Agenda
3HEAVY OIL PROJECTS IN COLOMBIA
![Page 4: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/4.jpg)
XVII ANNUAL LATIN AMERICAN ENERGY CONFERENCE
1. Introduction
2. Upstream Projects
Production• Exploration
3. Downstream Projects
4. Achievements
Agenda
4HEAVY OIL PROJECTS IN COLOMBIA
![Page 5: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/5.jpg)
XVII ANNUAL LATIN AMERICAN ENERGY CONFERENCE
1. Introduction
2. Upstream Projects
• Production• Exploration
3. Downstream Projects
4. Achievements
Agenda
5HEAVY OIL PROJECTS IN COLOMBIA
![Page 6: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/6.jpg)
Sou
rce:
Eco
petro
lS
ourc
e: E
cope
trol
HEAVY OIL PRODUCTION
Bogotá
Rubiales fieldCastilla field San Fernando Formation
Nare – Teca fields
![Page 7: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/7.jpg)
XVII ANNUAL LATIN AMERICAN ENERGY CONFERENCE 7
We have doubled heavy oil production in the past 4 years
28 27 26 30 38 52 60 62 723 4 4 6
88
9 911
0 00
00
1118
0 0
2000 2001 2002 2003 2004 2005 2006 2007 2008Goal
Castilla - San Fernando Nare Rubiales
Fuente: Ecopetrol S.A.
3646 60
6982
MB
OPD
100
April 2008 , 100,6 MBOPD , 72,4 Castilla – San Fernando17,6 Rubiales, 10,6 Nare - Teca
3030 30
HEAVY OIL PROJECTS IN COLOMBIA
Heavy oil production represents over 20% of the Ecopetrol’s total production
![Page 8: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/8.jpg)
SHELL GLOBAL SOLUTIONS – EXECUTIVE SUMMIT O8 8HEAVY OIL PROJECTS IN COLOMBIA
HEAVY OIL PRODUCTION –ECOPETROL OPERATION
Rubiales
BOGOTA
VILLAVICENCIO
Acacias
Puerto López
Chichimene field
Granada
Guamal
ApiaySuria
Libertad
50 Kms
Castilla field
Rubiales
![Page 9: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/9.jpg)
SHELL GLOBAL SOLUTIONS – EXECUTIVE SUMMIT O8 9
DIRECT OPERATION OF ECOPETROL
Castilla Field Formations K1-K2
• Production of 70 MBOPD OF 11-13 °API• Drilling of 117 horizontal, vertical, and multilateral wells.
San Fernando –T2 Formation
• Present in the Castilla, Chichimene, Apiay, Suria, Libertad fields.• Production of extra heavy crude 7- 8 API. • Estimated production 20 KBOPD for the year 2012, with future increase as per results of tests performed in 2008.• Evaluation of new deasphalted oil technology (ECOPETROL technology) for pilot plant with 10 KBOPD capacity.
PRODUCTION PROJECTS– LLANOS BASIN
HEAVY OIL PROJECTS IN COLOMBIA
![Page 10: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/10.jpg)
SHELL GLOBAL SOLUTIONS – EXECUTIVE SUMMIT O8 10HEAVY OIL PROJECTS IN COLOMBIA
Associated Operation : Ecopetrol 57%; Petrorubiales 43%
Rubiales Field
• Estimated production for the end of 2008 is 50 MBOPD, 12 °API
• In 2008, 45 wells will be drilled and new treatment facilities will be built, with total investment of 400 MMUS$.
PRODUCTION PROJECTS - LLANOS BASIN
![Page 11: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/11.jpg)
PRODUCTION PROJECT – MIDDLE MAGDALENA VALLEY
![Page 12: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/12.jpg)
SHELL GLOBAL SOLUTIONS – EXECUTIVE SUMMIT O8 12HEAVY OIL PROJECTS IN COLOMBIA
Associated Operation: Ecopetrol 50%; Mansarovar 50%.
Teca – Nare Contracts
• Cocorna, Nare, Under River, Moriche, Girasol and Jazmin fields,producing 11 - 12 °API crude, with steam cyclic stimulation.
• Estimated production in the year 2012 will amount to 30 MBOPD and it may increase depending on the results of adjacent exploration areas.
• 500 shallow wells will be drilled between years 2008 and 2010 .
PRODUCTION PROJECT – MIDDLE MAGDALENA VALLEY
![Page 13: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/13.jpg)
XVII ANNUAL LATIN AMERICAN ENERGY CONFERENCE
1. Introduction
2. Upstream Projects
• Production• Exploration
3. Downstream Projects
4. Achievements
Agenda
13HEAVY OIL PROJECTS IN COLOMBIA
![Page 14: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/14.jpg)
XVII ANNUAL LATIN AMERICAN ENERGY CONFERENCE
EXPLORATION ACTIVITIES IN THE LLANOS BASIN
HEAVY OIL PROJECTS IN COLOMBIA
![Page 15: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/15.jpg)
XVII ANNUAL LATIN AMERICAN ENERGY CONFERENCE
EXPLORATION PROJECTS – LLANOS BASIN
CAÑO SUR BLOCKAssociation: Ecopetrol 50% - Shell E & P 50%Area : 654.000 HectaresActivity 2008:
• Acquisition of 720 Kms 2D seismic in years 2007 and 2008.•Hadas 1 Well
QUIFA BLOCKAssociation: Ecopetrol 30% - Metapetroleum 70%Area: 152,000 HectaresActivity 2008:
• Acquisition of 200 Kms of 2D seismic.• Drilling of 1 well
HEAVY OIL PROJECTS IN COLOMBIA
![Page 16: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/16.jpg)
XVII ANNUAL LATIN AMERICAN ENERGY CONFERENCE
Fuente: Agencia Nacional de Hidrocarburos – Colombia
HEAVY OIL ROUND IN COLOMBIAAGENCIA NACIONAL DE HIDROCARBUROS - ANH
HEAVY OIL PROJECTS IN COLOMBIA
EAST ZONE
Date for submitting Proposals:
June 10, 2008
No. of Blocks: 8
Extension:
12.325.546 (Ha)
For additional information consult: www.anh.gov.co
![Page 17: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/17.jpg)
XVII ANNUAL LATIN AMERICAN ENERGY CONFERENCEHEAVY OIL PROJECTS IN COLOMBIA
HEAVY OIL ROUND IN COLOMBIAAGENCIA NACIONAL DE HIDROCARBUROS - ANH
WEST ZONE
Date for submitting Proposals:
September 5, 2008
No. of Blocks: 17
Extension:
2,962.210 (Hectares)
For additional information consult: www.anh.gov.co
Fuente: Agencia Nacional de Hidrocarburos – Colombia
![Page 18: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/18.jpg)
1. Introduction
2. Upstream Projects
• Exploration• Production
3. Downstream Projects
4. Achievements
Agenda
18HEAVY OIL PROJECTS IN COLOMBIA
![Page 19: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/19.jpg)
SHELL GLOBAL SOLUTIONS – EXECUTIVE SUMMIT O8 19HEAVY OIL PROJECTS IN COLOMBIA
Integrated Project Strategy
DILUTED CRUDEDILUTED CRUDE
DILUENTDILUENT(RECYCLED NAPHTHA)(RECYCLED NAPHTHA)
BARRANCA REFINERYBARRANCA REFINERY
REFINERY REFINERY PRODUCTSPRODUCTS
SUBPRODUCTSSUBPRODUCTS(COKE / SULPHUR)(COKE / SULPHUR)
Market
Production-Enhancement Integrated Scheme : (2013 – 2033)
Dilution
Market
Diluted Heavy Oil Production Scheme : (2008 – 2012)
CASTILLA/S. FERNANDO/RUBIALES CASTILLA/S. FERNANDO/RUBIALES AND TECA NARE HEAVY CRUDE PRODUCTIONAND TECA NARE HEAVY CRUDE PRODUCTION
DILUTED CRUDEDILUTED CRUDE1818°°APIAPI
DILUENTDILUENT(NAPHTHA GCB/IMPORT)(NAPHTHA GCB/IMPORT)
LOCALLOCALREFINERYREFINERY
CASTILLA/S. FERNANDO/RUBIALES CASTILLA/S. FERNANDO/RUBIALES AND TECA NARE HEAVY CRUDE AND TECA NARE HEAVY CRUDE
PRODUCTIONPRODUCTION
![Page 20: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/20.jpg)
SHELL GLOBAL SOLUTIONS – EXECUTIVE SUMMIT O8
PROJECTS – DOWNSTREAM
HEAVY OIL PROJECTS IN COLOMBIA
COVEÑAS
Apiay
GCB
COVEÑAS
Caño Limón
Tibú
Orito
Tumaco
A Lago Agrio
Cusiana
CARTAGENA
CARIBBEANCARIBBEANSEASEA
PACIFICPACIFICOCEANOCEAN
PPANAMAANAMA
EECUADORCUADOR BBRAZILRAZIL
PPERUERU
Cupiagua
Tumaco
CARTAGENA
Tibú
Orito
CIB
Barranca Refinery Modernization Upgrade Heavy oil
Rubiales –Porvenirpipeline
Apiay–Porvenirpipeline
Tocancipa -Castilla pipeline
![Page 21: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/21.jpg)
SHELL GLOBAL SOLUTIONS – EXECUTIVE SUMMIT O8
HEAVY OIL PROJECTS.
21HEAVY OIL PROJECTS IN COLOMBIA
Preliminary portfolio information for the next five years
Upstream……………………………………………………… 2722
Exploration ………………………………………… 50
Production
Castilla………………………………………….... 1050
San Fernando…………………………………... 1080
Rubiales ………………………………………… 400
Nare Project (Jazmin, Girasol & Other Field) 142
Downstream……………………………………………. 3030
Pipelines……………………………………… 650
Refining………………………………………. 2380
Total Investment of 5752 MMUS$
![Page 22: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/22.jpg)
1. Introduction
2. Upstream Projects
• Exploration• Production
3. Downstream Projects
4. Achievements
Agenda
22HEAVY OIL PROJECTS IN COLOMBIA
![Page 23: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/23.jpg)
SHELL GLOBAL SOLUTIONS – EXECUTIVE SUMMIT O8 23HEAVY OIL PROJECTS IN COLOMBIA
Achievements in heavy oil projects
Upstream
• Having high potential exploratory blocks, close to the infrastructure of the producing fields that leverage new discoveries.
• We have doubled the production levels of heavy oil in the past 4 years
• Good production results based on design of horizontal and multilateral wells.
• High possibilities to continue increase both, the reserve base and production levels of heavy oils
![Page 24: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/24.jpg)
SHELL GLOBAL SOLUTIONS – EXECUTIVE SUMMIT O8 24HEAVY OIL PROJECTS IN COLOMBIA
Achievements in heavy crude project
Downstream
• Having an optimum alternative for transportation of heavy oil through raw naphtha dilution, optimizing the existing pipeline infrastructure.
• Optimizing the feed to the Barrancabermeja refinery through the crude segregation program
•Positioning a new blend in the international market: the Castilla blend.
![Page 25: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/25.jpg)
Para uso restringido en Ecopetrol. Todos los derechos reservados. Ninguna parte de esta presentación puede ser reproducida o utilizada en ninguna forma o por ningún medio sin permiso explícito de Ecopetrol.
Mac
hado
y M
olin
a A
soci
ados
200
8
![Page 26: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/26.jpg)
SHELL GLOBAL SOLUTIONS – EXECUTIVE SUMMIT O8
DOWNSTREAM PROJECTS
26HEAVY OIL PROJECTS IN COLOMBIA
Refinery
Heavy Crude Oils CGB
Coker + HCRefined Product
Sales
Barrancabermeja Master Plan
Diluent
Diluted Crude Oils
Potential Diluent
• The project to modernize the Barrancabermeja refinery includes DelayedCoker and Hydrocraker.
• Estimated investment to date 2380 MMUS$.• Estimated date for operation start-up: December 2012
![Page 27: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/27.jpg)
MB
OE
PD
1 MMBOEPD
550 MBOEPD
27HEAVY OIL PROJECTS IN COLOMBIA
Heavy crude production represents over 20%of the Company´s total production
![Page 28: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/28.jpg)
SHELL GLOBAL SOLUTIONS – EXECUTIVE SUMMIT O8HEAVY OIL PROJECTS IN COLOMBIA
Heavy crude project transport system
28
COVEÑAS
PORVENIR
APIAY
RUBIALES
VASCONIA
CASTILLA
Ayacucho
Tocancipá
12”x 180 Km
20,16,14,12” x 315 Km
24”/30”x 482 Km
30”-36”x828 Km
Pozos Colorados
12, 12 y 16”x 111 Km
16 y 20”x 257 Km
12”x 187 Km
Sebastopol
CIB8”x 187 Km
DILUTED CRUDE
DILUENT
EXISTING NEW
Cabotaje Nafta Coveñas-Pozos Colorados
24”x 235 Km
20”x 128 Km
![Page 29: HEAVY OIL PROJECTS IN COLOMBIA - Institute of the … Osorio.pdf · any of its contents may be used for any other purpose without the prior written consent of Ecopetrol. HEAVY OIL](https://reader033.vdocuments.us/reader033/viewer/2022051601/5ab84e987f8b9ad3038ca5db/html5/thumbnails/29.jpg)
SHELL GLOBAL SOLUTIONS – EXECUTIVE SUMMIT O8
DOWNSTREAM PROJECTS
29HEAVY OIL PROJECTS IN COLOMBIA
Apiay – Porvenir PipelineLength: 128 KmDiameter: 20”Capacity: 160.000 BOPDApiay operation start-up: December 30, 2008
Rubiales – Monterrey PipelineLength: 234 KmDiameter: 24”Capacity: 160.000 BOPDOperation start-up : November 1, 2009
Tocancipa – Castilla Multi-product PipelineLength: 170 KmDiameter12”Capacity: 100.000 BOPDOperation start-up : September 30, 2009