heart of georgia mega site€¦ · site condition:: grad certified, expected mccallum sweeney...
TRANSCRIPT
± 2,000 ACRES AVAILABLEShovel-ready, Expected McCallum Sweeney Certification
For development of large-scale facilities
LOCATED HALF WAY BETWEEN ATLANTA AND SAVANNAH
HEART OF GEORGIA MEGA SITE
J.W. WARREN ROAD
OLD
RIVER ROAD
/ S.R. 199
FULGHUM ROAD
EXIT 58
GEORGIA CENTRAL RAILWAY
GEORGIA POWER COMPANY
BUSH ROAD
INTERSTATE
16
HEART OF GEORGIA MEGA SITE
W
W
W
W
W
WW
W
FM
FM
FM
FM
J.W. WARREN ROAD (80' R/W)
GEORGIA POWER COMPANY (200' R/W)
GEORGIA CENTRAL RAILWAY (150' R/W)
OLD RIVER ROAD / S.R. 199 (100' R/W)
BUSH ROAD (80' R/W)
INTERSTATE 16 (R/W VARIES)
FULGHUM ROAD
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
PROPOSED RAIL SIDING AREA (100' WIDE)
PROPOSED RAIL SPUR B
BUSH RD. (REALIGNED)
ROAD A (100' R/W
)
PROP
OSED
RAI
L SP
UR A
ROAD A (100' R/W)
RO
AD
C (100' R
/W)
OPENOOPOPPEENNNSPACESSPSPPAACACCEE
OPENOPENOPENOOPENOOPOPEPEENNS CSPACES CSSSPPAACACCEE
OPENENENENENOOOPPEPENENNENSPACEEESSPPAPAACCECEEEE
OPENOOOPPEENENNSPACESSSPPAACACCEE
OPENOPENOPENOPENOPENOPENOPENOOOPPEPEENNSPACESPACESPACESPACESSPPAPAACCECEE
OPENOPENOPENOPENOPENOPENOOOPPEPENENNSPACESPACESPACESPACESPACESPACESSPSPPAACACECEE
OPENOPENOPENOPENOPENOPENOPENOPENOOOPPEENENNSPACESPACESPACESPACESPACESPACESSPSPAPAACCECEE
SWMFSWMFSSWSWWMWMMFFF
SWMFSWMFSWMFSSWSWWMWMMFFF
SWMFSSWSWWMWMMFF
SWMFSWMFSWMFSWMFSWMFSWMFSSWWWMMMFF
SWMFSWMFSWMFSSWSWWMWMMFFF
SWMFSSWWWMMFMFF
SWMFSSWSWWMWMMFFF
SWMFSWMFSWMFSWMFSWMFSSWWWMMFMFFSWMFSSWMFSSWMFSSWSWWMWMMFF
SWMFSWMFSWMFSWMFSWMFSSWSWWMWMMFF
SWMFSWMFSWMFSWMFSWMFSSWSWWMMMFF
SWMFSWMFSWMFSWMFSWMFSWMFSSSWWWMMFMFF
BUSH RD. (80' R/W TO BE RELOCAT D)OCATED)RELOCAT
BE RELOCRELOCTO BE RE
' R/W TO B800 RR//WWW TTOOO BBBEE RREELLOOOCCAAATTEEDD)
8BUSH RD. (80' R/W TO BE RELOCATED)D)ATED)D)LOCATED)
E RELOCATEO BE RELTO BEO BER/W TOR/W0' RR/WWW TOO BBEE RREELOOCCAATTEEDD))
80BUSH RD. (80' R/W OW TOOR/WR0' RR//WW TTO0 BBE OCATED)CATED)OCATEDCATEDOCATEOCATEELOCREREELLOOCCAATTEEDD))
BBBUUUSSSSHHH RRRDD. ((8(8800 R//W/WWW TTOTOOO BBEEE RELOOOCCACAAATTEDD))
BBBUUUUSSHHHH RRRDDDD (((880' RR/R/W TOOO BBBEE RELOCAATTEEEDDD)
. (80' R/W TO BE REE RE R/W TO BE
( W TO BE R(
ESH RD. (80' R/W TO BE RELOC
B
W
W
W
W
W
W
W
W
WW
W
W
W
W
W
W
W
W
100'
BUFF
ERFF
ER
BUFF
ER
100'
BUFF
100'
B1
100'
BU
FFERRRERFEFF
UF
UF
BU
' B0'
00101
100'
BU
FFERRERFEFFE
UFF
BU
FB
U' B0'
00101
100' BUFFER
11010000'0'0' BBBUBUFUFUFFFFFEFERERRR
100' BUFFER
10100'00' B BUFBUFFEFFERERR
100' BU
FFER1100000'0' ' BB
UB
UUF
UFFFFEFEERERR
PROPOSED RAIL SPUR C
J.W. W
ARREN R
OAD
(80' R
/W)
W
PROPOSED ON SITEPROPOSED ON-SITEPROPOSED ON SITEWATER SUPPLY (ONEWATER SUPPLY (ONE
ELEVATED TANK,2 DEEP WELLS AND2 DEEP WELLS AND2 DEEP WELLS AND2 DEEP WELLS AND2 DEEP WELLS ANDFILTER TREATMENT
SYSTEM)
PROPOSED 12"PROPOSED 12PROPOSED 12WATER MAIN (TYP)WATER MAIN (TYP)WATER MAIN (TYP)WATER MAIN (TYP).
PROPOSED 12PROPOSED 12"PROPOSED 12WATER MAIN (TYP)WATER MAIN (TYP).
PROPOSED 12"WATER MAIN (TYP).
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FMFM
FM
FM
PROPOSEDMASTER PUMPSTATION SITE
PROPOSED 18" FORCE MAINROUTE (TO BE LOCATED WITHIN
EXISTING PUBLIC RIGHTS-OF-WAY
PROPOSED 12"PROPOSED 12"PROPOSED 12PROPOSED 12PROPOSED 12WATER MAIN (TYP)N (TYP)WATER MAIN (TYP).WATER MAIN (TYP)WATER MAIN (TYP)( )
TRACT B - MEGA SITE RESERVATIONTOTAL SITE AREA: 925.1 AC.LESS PROPOSED R/W: (33.7 AC.)LESS PROPOSED OPEN SPACE: (146.4 AC.)NET DEVELOPABLE AREA: 745.0 AC.
TRACT ATOTAL SITE AREA: 522.8 AC.LESS PROPOSED R/W: (49.2 AC.)LESS PROPOSED OPEN SPACE: (124.6 AC.)NET DEVELOPABLE AREA: 349.0 AC.
TRACT CTOTAL SITE AREA: 505.8 AC.LESS PROPOSED R/W: (27.3 AC.)LESS PROPOSED OPEN SPACE: (121.5 AC.)NET DEVELOPABLE AREA: 357.0 AC.
TRACT DTOTAL SITE AREA: 46.0 AC.LESS PROPOSED R/W: (0.3 AC.)LESS PROPOSED OPEN SPACE: (45.7 AC.)NET DEVELOPABLE AREA: 0.0 AC.
M M A R Y
S I T E A R E A S U M M A R Y
AS A % OFAREA (AC) TOTAL SITE
PROPOSED OPEN SPACE AREA - 438.2 21.9%
PROPOSED ON-SITE RIGHT-OF-WAY AREA - 110.5 5.5%
PROPOSED INDUSTRIAL / COMMERCIAL AREA 1,451.0 72.6%
TOTAL SITE AREA 1,999.7 100.0%
O P E N S P A C E / S W M F A R E A S U M M A R Y
AS A % OFAREA (AC) TOTAL OS
PROPOSED STORMWATER MANAGEMENT 126.4 28.8%FACILITIES (SWMF) AREA WITHIN OPEN SPACE
PRESERVED WETLANDS WITHIN OPEN SPACE 122.3 27.9%
PRESERVED UPLANDS WITHIN OPEN SPACE 189.5 43.3%
TOTAL OPEN SPACE AREA 438.2 100.0%
W E T L A N D A R E A S U M M A R Y
AS A % OFAREA (AC) TOTAL WET
PRESERVED ON-SITE WETLAND AREA 122.3 AC. 57.0%
IMPACTED ON-SITE WETLAND AREA 90.4 AC. 43.0%
TOTAL ON-SITE WETLAND AREA 212.7 AC. 100.0%
EXISTING PARK ACCESS ROADS
J.W. WARREN ROAD EXISTING 80' R/W
U.S. HIGHWAY 199 EXISTING 100' R/W
BUSH ROAD EXISTING 80' R/W
PROPOSED PARK ACCESS ROADS
ROAD A PROPOSED 100' R/W
ROAD B PROPOSED 100' R/W
ROAD C PROPOSED 100' R/W
BUSH ROAD (REALIGNED) PROPOSED 80' R/W
PROPOSED RAIL EASEMENTS
RAIL SPUR A PROPOSED 60' R/W
RAIL SPUR B PROPOSED 60' R/W
RAIL SPUR C PROPOSED 60' R/W
RAIL SIDING PROPOSED 100' R/W
NOTE: FINAL LOCATIONS OF UTILITY AND DRAINAGE EASEMENTS TO BEDETERMINED DURING FINAL SUBDIVISION DESIGN AND PLATTING.
T R A N S P O R T A T I O N E L E M E N T S
L E G E N D
PROPOSED DEVELOPABLE AREA
PROPOSED OPEN SPACE
PROPOSED ON-SITE RIGHT-OF-WAY
PROPOSED STORMWATER MANAGEMENT FACILITIES (SWMF)
EXISTING WETLANDS TO BE PRESERVED
EXISTING 100' YEAR FLOODPLAIN
EXISTING WETLANDS TO BE IMPACTED(IMPACTS CAN BE MITIGATED WITHIN 180 DAYS)
PROPOSED 18" FORCE MAIN ROUTE
PROPOSED MASTER PUMP STATION SITE
PROPOSED ON-SITE 12" WATER MAIN
PROPOSED WATER SUPPLY SYSTEMW
FM
U T I L I T Y L E G E N D
W
MASTER PLAN
:: Greg Haynes, SIOR +1 404 923 1436 [email protected]
:: Todd Barton, SIOR +1 404 923 1435 [email protected]
AVAILABLE: ± Up to 2,000 acres available
SITE CONDITION:: GRAD Certified, expected McCallum Sweeney certified, shovel ready
UTILITIES: Water, power, and sewer are available to the site
INCENTIVES: Tier 1 tax incentives
Dublin-Laurens County Economic Development Authority
Expected McCallum Sweeney Certification (the only site in Georgia with this certification) by the end of the year
LOCATION: Located half way between Atlanta and Savannah with frontage on I-16. Excellent access to road, rail, air, and sea.
INTERSTATE ACCESS: The Heart of Georgia Mega Site has immediate access to I-16,
providing easy access to I-75 and I-95.
RAIL/INTERMODAL: Georgia Central Railway service is available on site with
connections to 2 class I railroads - CSX and Norfolk Southern
AIR: Two international airports and one regional airport within a 2 hour drive of the site (Atlanta Hartsfield-Jackson International Airport, Savannah/Hilton Head International Airport, Middle Georgia Regional Airports)
SEA: Port of Savannah and Port of Brunswick
SITE DETAILS
© 2015 CBRE, Inc. This information has been obtained from sources believed reliable. We have not verified it and make no guarantee, warranty or representation about it. Any projections, opinions, assumptions or estimates used are for example only and do not represent the current or future performance of the property. You and your advisors should conduct a careful, independent investigation of the property to determine to your satisfaction the suitability of the property for your needs. Photos herein are the property of their respective owners and use of these images without the express written consent of the owner is prohibited.
For more information, please contact:
:: Greg Haynes, SIOR +1 404 923 1436 [email protected]
:: Todd Barton, SIOR +1 404 923 1435 [email protected]
CERTIFICATIONS
FUTURE
40
55
20
59
10
75
4
75
95
16
95
75
20
85
65
65
59
40
9585
40
77
26Atlanta
Savannah
Charleston
Miami
Orlando
Jacksonville
Greenville
Nashville
CharlotteRaleigh
Montgomery
Birmingham