Supplier Opportunities
SaskPower Swift Current Combined Cycle Plant
A B O U T BU R N S & M C D O N N E L L
Who We Are
100% EMPLOYEE- OWNED
TOP 5% TOP 500
DESIGN FIRMS
MORE THAN
5,300 PROFESSIONALS
STRENGTH
EXCELLENCE EXCELLENCE
SERVICE
TOP 1% SAFETY RANKING
35+ OFFICES
WORLDWIDE
STRENGTH
What We Do
MILITARY BASE
HYDROELECTRIC DAM
SOLAR FARM WIND FARM
MGP SITE
Among the Industries and Markets We Serve
TRANSMISSION LINE
ELECTRIC POWER
GENERATION
NUCLEAR POWER PLANT
EXPORT TERMINAL
WETLANDS
RAIL
AIRPORT
WATER TREATMENT PLANT
CLEAN COAL POWER PLANT
FOOD PROCESSING
PLANT
REFINERY
GAS PROCESSING
PLANT
HIGHWAY
RETAIL, OFFICE, MIXED USE URBAN
FACILITIES
BRIDGE
5
Canada Experience
Queen Elizabeth Power Station Expansion Project: ► Increase Generation Capacity from 430
MW to 600 MW ► Addition of 6 heat recovery boilers to
increase efficiency by 15 to 20 percent ► Increased capacity will serve 205,000
additional households ► Joint Venture with Alberici ► ISD – Sep, 2015 Our Scope: ► EPCM Services
Engineering, Procurement, Field Engineering, Construction Management
► (2013-2015)
SASKPOWER | Saskatoon, Saskatchewan
TransCanada | Halton Hills, Ontario Project: ► 670 MW 2 SW 501F
CC Natural gas ► 100% Air Cooled ► Fully enclosed HRSGs
and steam turbine ► EPC Joint Venture ► Online August 2006 - 2010 Our Scope: ► Engineering ► Procurement ► Construction
Halton Hills Gas
Project: ► New 350MW, 1x1 Combined Cycle
Natural Gas Power Plant Our Scope: ► EPC Contractor (Responsible for
Engineering, Procurement, Construction, Start-Up)
SASKPOWER | Swift Current, Saskatchewan
Swift Current CC Gas Turbine Facility
9
Swift Current CC Gas Turbine Facility
HRSG
Gas / Steam Turbine
Air Cooled Condenser
Pipe racks / Piping
Major Electrical
Schedule: ► 2017 – Enclose HRSG, Gas Turbine
Building ► 2018 – Build out Powerhouse, Water
Treatment Building ► Early 2019 – Commissioning,
Completion
Swift Current CC Gas Turbine Facility – Project Schedule
1 7
Schedule
Sept
embe
r-16
Oct
ober
-16
Nov
embe
r-16
Dece
mbe
r-16
Janu
ary-
17
Febr
uary
-17
Mar
ch-1
7
April
-17
May
-17
June
-17
July
-17
Augu
st-1
7
Sept
embe
r-17
Oct
ober
-17
Nov
embe
r-17
Dece
mbe
r-17
Janu
ary-
18
Febr
uary
-18
Mar
ch-1
8
April
-18
May
-18
June
-18
July
-18
Augu
st-1
8
Sept
embe
r-18
Oct
ober
-18
Nov
embe
r-18
Dece
mbe
r-18
Janu
ary-
19
Febr
uary
-19
Mar
ch-1
9
April
-19
May
-19
June
-19
July
-19
Augu
st-1
9
Sept
embe
r-19
Oct
ober
-19
Clearing and grubbing / gen sitework
Piling
Foundations / underground utilities
Building steel erection
HRSG Erection
Piperack / piping erection
Gas turbine erection
Steam turbine erection
Air Cooled Condenser
Water Treatment building
Electrical installation
Start-up / commissioning
1 8
EPC Lump Sum Contractor
1 9
Purchasing Process
2 0
Major Opportunities Prefabrication / Modularization
• Air cooled condenser fan deck and steam duct / distribution • Pipe rack modules • Pump skids • Electrical buildings / PDCs • Stack prefabrication • HRSG platforming / Transition Duct • Fire protection building • Valve stations
Material supply
• Piping • Structural steel • Cable / tray • Valves
Misc. services, supplies
2 1
Major Opportunities
2 2
We Want You to Work with Us
www.burnsmcd.com/suppliers