hdb si tc33 wi 022_final report _woodlands n7c34

Upload: kokuei

Post on 14-Apr-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    1/220

    SSooii ll IInnvveesstt iiggaatt iioonn RReeppoorrtt

    Soil Investigation Works for Woodlands N7C34

    WWII NNoo.. :: WWII--002222 WWOO NNoo.. :: 22220000000033333377

    Term Contract No.33 for Site Investigation Works

    for a Period of 30 Months

    PPrreeppaarreedd ffoorr

    BBuuiillddiinngg && IInnffrraassttrruuccttuurree DDeeppaarrttmmeenntt

    HHDDBB HHuubb 448800 LLoorroonngg 66 TTooaa PPaayyoohh

    SSiinnggaappoorree 331100448800

    07 DECEMBER 2012

    PPrreeppaarreedd bbyy::

    FOSTA PTE LTD

    215 Kaki Bukit Avenue 1, Shun Li Industrial Park, SINGAPORE 416042Tel: 67442661(3 Lines) Fax: 65613766,

    WEBSITE: WWW.FOS-TA.COM

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    2/220

    Soil Investigation Works for Woodlands N7C34

    Term Contract No.33 for Site Investigation Worksfor a Period of 30 Months

    Work Instruction No. :WI-022

    Works Order No. : 2200003337

    Location : Woodlands Drive 70

    Owner : Housing & Development BoardEngineer : Mott MacDonald Singapore Pte Ltd

    Contractor : FOSTA Pte Ltd

    Document No. : FOSTA/HDB/SI/TC33/WI-022 Revision No. : 0 Date : 07 December 2012

    Prepared by :

    Moe Ko Ko

    Aung Myo Zaw

    Khin San Lwin

    Reviewed by :

    Tun Myat

    SOIL INVESTIGATION REPORT

    FOSTA Pte Ltd

    215 Kaki Bukit Avenue 1Shun Li Industrial Park, Singapore 416042Tel: 67442661 (3 Lines) Fax: 65613766Email: [email protected]; www.fos-ta.com

    SPECIALISTS IN:

    Structural Health Monitoring & DTS Structural and Geotechnical

    Instrumentation & Monitoring

    FRP Wrap

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    3/220

    Certification by Professional Engineerfor Soil Investigation Report

    1. I, _Er. Ng Chen Sing_ the Professional Engineer, PERegistration No.___1989__certify the Soil Investigation Report forSoil Investigation Works for Woodlands N7C34 comprising allfield and laboratory data, tests and results therein has been carriedout by me or under my supervision or direction, and I have verifiedthe accuracy of the information given in the soil investigation report,and to the best of my knowledge and belief, all have been prepared

    in compliance in all respects with the provisions of the BuildingControl Act and Regulations, relevant Codes and Practice andStandards.

    2. I further certify that I have the appropriate qualifications andexperience, and I am familiar with the purpose of the investigationfor which this Soil Investigation Report is prepared in reference toProject Ref. No. FOSTA/HDB/SI/TC33/WI-022.

    3. Total number of pages in the Soil Investigation Report is 215 .

    __________________ 07/12/2012_Professional Engineer DateSignature and Stamp

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    4/220

    FACTUALREPORT

    SOIL INVESTIGATIONWORKSFOR WOODLANDSN7C34

    iFOSTA Pte Ltd

    CONTENTS

    1.0 INTRODUCTION.......................................................................................................................................... 1

    2.0 LOCATIONOFSITE..................................................................................................................................... 2

    2.1 Location of Boreholes........................................................................................................... 3

    3.0 SCOPEOFWORK........................................................................................................................................ 3

    3.1 General....................................................................................................................................... 3

    3.2 Description of Field Investigation ....................................................................................... 3

    3.2.1 Positions of Boreholes................................................................................................ 3

    3.2.2 Cable & Services Detection and Trial Pit................................................................ 3

    3.2.3 Machinery and Equipment......................................................................................... 4

    3.2.4 Drilling........................................................................................................................... 4

    3.2.5 Rock Coring (Diamond Drilling) .........................................................................4

    3.2.6 In-situ Testing.............................................................................................................. 4

    3.2.7 Soil Sampling............................................................................................................... 5

    3.2.8 Groundwater Observation.......................................................................................... 5

    3.2.9 Water Standpipe Installation..................................................................................... 8

    3.2.10 Termination of Boring................................................................................................. 9

    3.3 Description of Laboratory Testing...................................................................................... 10

    3.3.1 General......................................................................................................................... 10

    3.3.2 Code of Practice.......................................................................................................... 10

    3.3.3 Physical Properties Tests.......................................................................................... 10

    3.3.4 Strength and Compressibility Properties................................................................. 11

    4.0 SITEGEOLOGY&SOILPROFILE.................................................................................................................. 12

    4.1 General Geology of site......................................................................................................... 12

    4.2 Soil & Rock Classification.................................................................................................... 13

    4.3

    Borehole Logs..........................................................................................................................

    15

    4.4 Subsoil description................................................................................................................. 15

    4.4.1 FILL................................................................................................................................. 15

    4.4.2 KALLANGFORMATION................................................................................................. 16

    4.4.3 BUKITTIMAHGRANITE................................................................................................. 18

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    5/220

    FACTUALREPORT

    SOIL INVESTIGATIONWORKSFOR WOODLANDSN7C34

    iiFOSTA Pte Ltd

    APPENDICES

    TABLE1 SummaryofTotalQuantityofFieldInvestigationWorksAndLaboratoryTests

    24

    FIGURES Figure5.1 SPTNValueVsDepth

    Figure5.2 MoistureContentVsDepth

    Figure5.3 BulkDensityVsDepth Figure5.4 DryDensityVsDepth

    Figure5.5 ParticleDensityVsDepth

    Figure5.6 AtterbergLimitsSummary

    Figure5.7 UndrainedShearStrengthVsDepth

    26

    27

    28

    29

    30

    31

    32

    APPENDIX A WaterStandpipeInstallation&MonitoringData 3536

    APPENDIX B BoreholeLocationPlan,

    AsbuildCoordinates&ReducedLevelofBoreholes

    38 40

    APPENDIX C GeologicalCrossSectionandBoreholeLogs 4279

    APPENDIXD LaboratoryTestsResults

    SummaryofLaboratoryTestResults

    Moisture Content / Bulk & Dry Density / Particle Density

    Determination

    IndexTest(AtterbergLimits)

    GrainSizeAnalysis

    UnconsolidatedUndrained(UU)Traixialcompressiontest

    UnconfinedCompression(UC)TestonRockCore

    82 190

    APPENDIXE

    SPT

    Photograph

    192202

    APPENDIX F CorePhotograph 204 215

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    6/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    1.0 INTRODUCTION

    FOSTA Pte Ltd has been appointed by the client, House & Development Board to provide soil

    investigation works for Woodlands N7C34.

    The works described here in this report has been carried out as per specification and under the

    technical direction of the client appointed Engineer, Mott MacDonald Singapore Pte Ltd.

    The particulars of this project are as follows.

    Project Title : Soil Investigation Works for Woodlands N7C34

    Location : Woodlands Drive 70

    Contract No. : D/118/12 (Term Contract No.33 for Site Investigation Works for

    a Period of 30 Months)

    WI No. : 022

    WO No. : 2200003337

    Client : HOUSING & DEVELOPMENT BOARD

    Engineer : Mott MacDonald Singapore Pte Ltd

    Contractor : FOSTA Pte Ltd

    Period of Work : Field Works

    15 October 2012 to 09 November 2012

    Scope of Work : Soil Drilling (11 Boreholes)

    In-situ Testing

    Standard Penetration Test

    Sampling

    Undisturbed Sampling

    Disturbed Sampling

    Laboratory Testing

    Reporting

    1

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    7/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    2.0 LOCATIONOFSITE

    The project site is located at the Northern part of Singapore, Woodlands Area.

    The location of site is shown below in Figure 1.1.

    Figure1.1SITELOCATIONMAP

    SITE

    2

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    8/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    2.1 LOCATION OF BOREHOLES

    The Eleven (11) boreholes location shown in APPENDIX B, Boreholes and coordinates and ground

    levels are summarized below in Table 2.1.

    Table 2.1 Boreholes Location Details

    Borehole No.Coordinates (SVY 21) Ground Level

    Northing (m) Easting (m) (m RL)

    BH-1 47014.5456 24116.7195 118.3121

    BH-2 47005.6350 24145.3592 118.1624

    BH-3 46985.2818 24123.3410 118.3812

    BH-4 46988.0172 24166.0389 118.6038

    BH-5 46965.6873 24146.0379 118.7479

    BH-6 46957.9184 24119.7398 118.5381

    BH-7 46956.9320 24170.3836 118.6817

    BH-8 46937.7084 24150.5276 118.6363BH-9 46918.8167 24127.2358 118.1396

    BH-10 46926.9703 24178.5391 118.5044

    BH-11 46908.0789 24155.2351 118.2070

    3.0 SCOPEOFWORK

    3.1 GENERALThe scope of work for the soil investigation service of this project is summarized as follows:

    Drilling a total eleven (11) exploratory boreholes including standard penetration test at every

    3.0m interval and undisturbed soil sampling at 2.0m & 4.0m below ground level.

    All boreholes terminated at as instruction given by the client on site.

    Install water standpipes at BH-2 & BH-9. Installation depth is 12.0m.

    Conducting laboratory tests on soil samples and rock samples.

    Submission of five (5) copies of final report (including five (5) CD containing the report,AGS format and one (1) CD containing Digitally Endorsed) duly endorsed by ProfessionalEngineer.

    The field works were generally carried out in accordance with BS 5930:1999 Code of Practice for Site

    Investigation and as per direction of the Client.

    3.2 DESCRIPTION OF FIELD INVESTIGATION

    3.2.1 POSITIONS OF BOREHOLESPositions of the borehole locations were done by Singapore registered Surveyor.

    All the positions and reduced level of borehole location were referenced to SLA SVY21 datum.

    3.2.2 CABLE &SERVICES DETECTION ANDTRIAL P IT

    Cables and services detection works at all borehole locations carried out by Licensed Cable DetectionWorker, Nasharudin Bin J umary L/No.97-0871. Trial pit size (1m x 0.6m x 1.2m) and hand augering

    3

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    9/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    from 1.2m to 2.0m was done at each borehole location for all (11) boreholes to check undetectableunderground services.

    3.2.3 MACHINERY AND EQUIPMENT

    Six (6) Rotary Drilling Rigs were deployed in this project.

    3.2.4 DRILLINGThe boreholes were drilled by rotary method. Drilling fluid was pumped down via the hollow drilling rods

    and cutting bit to wash out the soil remnants. The diameter of the borehole is 100mm.

    All boreholes were backfilled with cement / bentonite grout upon completion of drilling.

    A summary of the field investigation works and laboratory tests is listed in Table 1. Detailed boring logs

    are presented inAPPENDIX C.

    3.2.5 ROCKCORING (DIAMOND DRILLING)

    An NMLC (triple tube) diamond annular bit, fixed to the bottom of the outer rotating tube of a rotary core

    barrel cuts 52mm diameter cores, which is retained within the inner stationary tube of the core barrel

    and brought to the surface for examination and testing.

    All description and logging is in general accordance with BS 5930:1999. Besides linear core recovery, a

    determination of Rock Quality Designation (RQD, which is defined as percentage of rock recovered as

    sound lengths which are 100mm or more in length) as a quantitative measure of the fracture state of the

    rock is given. It is to be noted that the RQD is not the only criteria to assess the strength of the rock

    mass.

    Rock cores recovered were logged and subsequently delivered to geotechnical contractors office to be

    photographed. Upon completion of the photography and testing, the core samples were properly placed

    in a store. Core Photographs are presented inAPPENDIX F.

    3.2.6 IN-SITUTESTING

    3.2.6.1 STANDARD PENETRATION TESTING

    Standard penetration tests were carried out at intervals of 3.0m and the test was carry out in

    accordance to BS 1337:1990. The SPT test service for the following purposes:

    4

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    10/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    a) to determine the relative density or consistency of soils, and

    b) to recover disturbed samples for visual inspection.

    This empirical dynamic penetration test determines the resistance of soils to the penetration of a split

    barrel sampler of 50mm external diameter, driven by a 65 kg automatic drop hammer, allowing a free fallof 760mm. The penetration resistance, N is the number of blows required to effect a 300mm penetration

    below the seating drive which is, for this project, taken as completed at 25 blows or 150mm penetration.

    The values of N obtained in this investigation are recorded in borehole logs attached in the

    APPENDIX C and SPT Photograph in APPENDIX E.

    3.2.7 SOIL SAMPLING

    All undisturbed samples were taken at depths indicated by the client's Engineer, waxed at both ends

    and labelled properly before transporting to the laboratory for testing.

    3.2.7.1 THIN-WAL L SAMPL ER

    Thin-walled, open tube of 75mm diameter, having a sharp cutting edge at its lower end was pushed into

    the soil at the bottom of the boring by hydraulic means. Thin-Wall sampler is generally used for sampling

    soft to stiff soils.

    3.2.7.2 DISTURBED SAMPLES

    Disturbed samples were taken from the drill tools or from a split tube sampler for identification purpose,

    and were stored in sealed plastic containers.

    3.2.8 GROUNDWATER OBSERVATION

    Daily readings of the groundwater level in the boreholes were taken during the progress of the work,

    usually before work commences in the morning, and after completion of work in the evening. These are

    recorded in the log of boring. However, this method does not reflect the true groundwater level in the

    locality.

    Groundwater observation during operation detail is summarized below in Table 3.1.

    BoreholeNo.. Date&Time HoleDepth

    (m)

    CasingDepth(m)

    WaterDepth(m)

    Remark

    BH1 15/10/20126:00:00PM 20.00 12.00 2.20

    BH1 16/10/20128:30:00AM 20.00 12.00 2.70

    BH1 16/10/20126:00:00PM 39.45 12.00 3.80

    BH1 17/10/20128:30:00AM 39.45 12.00 2.60

    BH1 17/10/20126:00:00PM 43.50 12.00 2.10

    BH1 19/10/20128:30:00AM 43.50 43.50 4.80

    BH1 19/10/20126:00:00PM 48.50 43.50 5.00

    BH2

    22/10/2012

    6:00:00

    PM

    21.45

    9.00

    1.30

    5

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    11/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    BoreholeNo.. Date&Time HoleDepth

    (m)CasingDepth

    (m)WaterDepth

    (m)Remark

    BH2

    23/10/2012

    8:30:00

    AM

    21.45

    9.00

    1.80

    BH2 23/10/20126:00:00PM 33.00 33.00 1.70

    BH2 24/10/20128:30:00AM 33.00 33.00 2.80

    BH2 24/10/20126:00:00PM 37.00 33.00 2.40

    BH2 25/10/20128:30:00AM 37.00 33.00 2.10

    BH2 25/10/20126:00:00PM 39.00 33.00 2.00

    BH2 27/10/20128:30:00AM 39.00 33.00 2.10

    BH2 27/10/20126:00:00PM 40.00 33.00 2.05

    BH2

    29/10/2012

    8:30:00

    AM

    40.00

    33.00

    2.20

    BH2 29/10/20126:00:00PM 40.70 33.00 1.80

    BH3 23/10/20126:00:00PM 19.00 18.00 0.00

    BH3 25/10/20128:30:00AM 19.00 18.00 2.80

    BH3 25/10/20126:00:00PM 34.00 18.00 0.00 FULL

    BH3 27/10/20128:30:00AM 34.00 18.00 3.00

    BH3 27/10/20126:00:00PM 39.00 39.00 0.00 FULL

    BH3 29/10/20128:30:00AM 39.00 39.00 3.20

    BH3

    29/10/2012

    6:00:00

    PM

    44.00

    39.00

    0.00

    FULL

    BH4 30/10/20126:00:00PM 19.00 12.00 0.00 FULL

    BH4 31/10/20128:30:00AM 19.00 12.00 2.70

    BH4 31/10/20126:00:00PM 36.38 15.00 2.55

    BH4 1/11/20128:30:00AM 36.38 15.00 3.20

    BH4 1/11/20126:00:00PM 42.19 15.00 3.15

    BH5 1/11/20126:00:00PM 9.45 9.00 0.00 FULL

    BH5 2/11/20128:30:00AM 9.45 9.00 1.70

    BH5

    2/11/2012

    6:00:00

    PM

    21.45

    12.00

    1.65

    BH5 3/11/20128:30:00AM 21.45 12.00 2.20

    BH5 3/11/20126:00:00PM 33.45 12.00 2.10

    BH5 5/11/20128:30:00AM 33.45 12.00 2.10

    BH5 5/11/20126:00:00PM 39.45 12.00 2.00

    BH5 6/11/20128:30:00AM 39.45 12.00 2.70

    BH5 6/11/20126:00:00PM 43.70 12.00 2.85

    BH5 9/11/20128:30:00AM 43.70 43.70 2.90

    BH5

    9/11/2012

    6:00:00

    PM

    44.70

    43.70

    2.80

    6

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    12/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    BoreholeNo.. Date&Time HoleDepth

    (m)CasingDepth

    (m)WaterDepth

    (m)Remark

    BH6

    15/10/2012

    6:00:00

    PM

    20.00

    15.00

    2.00

    BH6 16/10/20128:30:00AM 20.00 15.00 2.80

    BH6 16/10/20126:00:00PM 36.00 36.00 2.70

    BH6 17/10/20128:30:00AM 36.00 36.00 4.40

    BH6 17/10/20126:00:00PM 38.00 36.00 4.30

    BH6 18/10/20128:30:00AM 38.00 36.00 5.90

    BH6 18/10/20126:00:00PM 42.50 36.00 5.80

    BH6 20/10/20128:30:00AM 42.50 35.00 7.10

    BH6

    20/10/2012

    6:00:00

    PM

    45.50

    36.00

    0.00

    FULL

    BH6 22/10/20128:30:00AM 45.50 41.50 7.90

    BH6 22/10/20126:00:00PM 45.91 41.50 7.80

    BH7 30/10/20126:00:00PM 9.45 9.00 0.00 FULL

    BH7 31/10/20128:30:00AM 9.45 9.00 2.30

    BH7 31/10/20126:00:00PM 32.00 12.00 2.10

    BH7 1/11/20128:30:00AM 32.00 12.00 2.80

    BH7 1/11/20126:00:00PM 38.00 12.00 2.65

    BH7

    2/11/2012

    8:30:00

    AM

    38.00

    12.00

    2.75

    BH7 2/11/20126:00:00PM 43.00 12.00 2.10

    BH7 3/11/20128:30:00AM 43.00 12.00 2.85

    BH7 3/11/20126:00:00PM 44.00 43.00 2.95

    BH7 5/11/20128:30:00AM 44.00 43.00 3.80

    BH7 5/11/20126:00:00PM 48.00 43.00 3.90

    BH8 31/10/20126:00:00PM 15.45 9.00 0.00 FULL

    BH8 1/11/20128:30:00AM 15.45 9.00 2.80

    BH8

    1/11/2012

    6:00:00

    PM

    33.45

    12.00

    2.10

    BH8 2/11/20128:30:00AM 33.45 12.00 3.20

    BH8 2/11/20126:00:00PM 35.50 35.50 2.70

    BH8 3/11/20128:30:00AM 35.50 35.50 2.50

    BH8 3/11/20126:00:00PM 37.50 35.50 2.80

    BH8 5/11/20128:30:00AM 37.50 35.50 2.50

    BH8 5/11/20126:00:00PM 40.50 35.50 3.40

    BH9 23/10/20126:00:00PM 9.45 9.00 0.70

    BH9

    25/10/2012

    8:30:00

    AM

    9.45

    9.00

    1.90

    7

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    13/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    BoreholeNo.. Date&Time HoleDepth

    (m)CasingDepth

    (m)WaterDepth

    (m)Remark

    BH9

    25/10/2012

    6:00:00

    PM

    30.45

    12.00

    1.80

    BH9 27/10/20128:30:00AM 30.45 12.00 2.20

    BH9 27/10/20126:00:00PM 47.00 12.00 2.05

    BH9 29/10/20128:30:00AM 47.00 12.00 2.10

    BH9 29/10/20126:00:00PM 49.00 49.00 2.05

    BH9 30/10/20128:30:00AM 49.00 49.00 4.00

    BH9 30/10/20126:00:00PM 51.00 49.00 4.20

    BH9 31/10/20128:30:00AM 51.00 49.00 4.60

    BH9

    31/10/2012

    6:00:00

    PM

    54.00

    49.00

    4.40

    BH10 3/11/20126:00:00PM 21.45 12.00 0.00 FULL

    BH10 5/11/20128:30:00AM 21.45 12.00 2.20

    BH10 5/11/20126:00:00PM 38.00 12.00 2.00

    BH10 6/11/20128:30:00AM 38.00 12.00 2.90

    BH10 6/11/20126:00:00PM 43.50 40.50 2.50

    BH10 7/11/20128:30:00AM 43.50 40.50 3.10

    BH10 7/11/20126:00:00PM 46.70 40.50 2.90

    BH11

    27/10/2012

    6:00:00

    PM

    9.45

    9.00

    0.80

    BH11 29/10/20128:30:00AM 9.45 9.00 1.00

    BH11 29/10/20126:00:00PM 33.45 12.00 2.10

    BH11 30/10/20128:30:00AM 33.45 12.00 2.20

    BH11 30/10/20126:00:00PM 45.45 12.00 2.10

    BH11 31/10/20128:30:00AM 45.45 12.00 2.20

    BH11 31/10/20126:00:00PM 49.00 30.00 2.40

    BH11 1/11/20128:30:00AM 49.00 30.00 3.20

    BH11

    1/11/2012

    6:00:00

    PM

    50.00

    49.00

    3.10

    3.2.9 WATER STANDPIPE INSTALLATION

    Total two (2) numbers of Water Standpipe was installed in borehole BH-2 & BH-9.

    After the borehole was terminated and filled with grout up to approximately 50cm below the required

    installation depth of the water standpipe. Clean sand filter of 50cm was placed directly above this backfill

    and the standpipe complete with PVC cap and Nylon mesh was lowered into the borehole. Clean sand

    filter was again backfilled into the borehole, so as to completely cover the perforated section of the

    standpipe. And then cement mortar plug was placed over this up to the ground level.

    8

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    14/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    The water standpipes were monitored two times a week for 4 weeks. A Sinco water level indicator was

    used to measure the water level. The water standpipe installation data and monitoring results are shown

    in theAPPENDIX A.

    3.2.10 TERMINATION OF BORING

    All the boreholes were terminated at as instruction given by the client. Termination depth of boreholes

    are summarized below in Table 3.2.

    Table 3.2 Boreholes Termination Depth & SPT

    Borehole No.TerminationDepth (m)

    Final SPT N Value

    (blow count/cm)

    Remarks

    BH-1 48.50 1000/0 @ 43.50m Encountered rock @ 43.50m ( 5.0m Coring)

    BH-2 40.70 100/0 @ 33.00m Encountered rock @ 33.00m ( 7.7m Coring)

    BH-3 44.00 100/0 @ 39.00m Encountered rock @ 39.00m ( 5.0m Coring)

    BH-4 42.19 100/140 @ 42.00m -

    BH-5 44.70 100/0 @ 43.70m Encountered rock @ 43.70m ( 1.0m Coring)

    BH-6 45.91 100/0 @ 41.50mEncountered rock @ 36.00m & 41.50m

    ( 5.0m Coring)

    BH-7 48.00 100/0 @ 43.00m Encountered rock @ 43.00m ( 5.0m Coring)

    BH-8 40.50 1000/ @ 35.50m Encountered rock @ 35.50m ( 5.0m Coring)

    BH-9 54.00 100/0 @ 49.00m Encountered rock @ 49.00m ( 5.0m Coring)

    BH-10 46.70 100/0 @ 40.50m Encountered rock @ 40.50m ( 6.2m Coring)

    BH-11 50.00 100/0 @ 49.00m Encountered rock @ 49.00m ( 1.0m Coring)

    9

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    15/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    3.3 DESCRIPTION OF LABORATORY TESTING

    3.3.1 GENERAL

    The laboratory test program is to evaluate the soil properties as scheduled by the Client Engineer. All

    soil tests were carried out at SAC-SINGLAS accredited laboratory Geo Lab (S) Pte Ltd (Cert No. LA-

    2011-0501-B). Chemical Test were carried out at SAC-SINGLAS accredited laboratory ALS Technichem

    (S0 Pte Ltd (Cert No. LA-1993-0064-A & Cert No. LA-2000-0178-F).

    The following laboratory tests were conducted on the undisturbed samples recovered from the

    boreholes:

    Moisture Content / Bulk & Dry Density Determination

    Particle Density

    Index Test (Atterberg Limits)

    Grain Size Analysis

    Unconsolidated Undrained (UU) Traixial compression test

    Unconfined Compression (UC) Test on Rock Core

    The testing program aimed towards the evaluation of shear strength, compressibility characteristics and

    for classification purposes.

    The summary and results of tests are provided inAPPENDIX D.

    3.3.2 CODE OF PRACTICE

    Unless mentioned otherwise, the following tests were carried out in accordance with BS1377:1990 -

    Methods of Test for Civil Engineering Purposes.

    3.3.3 PHYSICAL PROPERTIESTESTS

    3.3.3.1 MOISTURE CONTENT

    To measure moisture content, a specimen is taken from an undisturbed sample, weighed and placed in

    a tin, where it is over dried at 105-110 C for 18-24 hours. The soil is weighted after the drying and the

    weight of water content is calculated simply by subtracting the two values. The moisture content is then

    defined as the percentage of the weight of water over weight of dry soil.

    3.3.3.2 BULK AND DRY DENSITY

    The bulk density is the measured weight of a solid cylindrical soil specimen taken from an undisturbed

    sample divided by its volume. The dry density was calculated from bulk density and moisture content.

    3.3.3.3 PARTICLE DENSITY

    The particle density of specimen is determined in accordance to BS 1377 using an over dried

    representative portion of the undisturbed sample. The particle density is defined as the ratio of the

    weight of soil to the water needed to displace the soil particles.

    10

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    16/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    3.3.3.4 ATTERBERG L IMITS

    The liquid limit of a specimen is derived using the Cone penetrometer method as to BS 1377. Four

    readings are taken in order to determine liquid limit graphically. The plastic limit is defined as the

    moisture content of a specimen at the point where it can be satisfactorily rolled into a 3mm diameter

    thread without cracking. The soils plasticity index is then derived by subtracting the plastic limit from the

    liquid limit. Two tests are done on a given sample.

    3.3.3.5 GRAIN SIZEANALYSIS

    The grain size analysis has been carried out utilizing both sieve and hydrometer analysis.

    The sieve analysis was carried out by wet sieving method in which the material was first washed

    through a 2mm test sieve nested in 63 m test sieve. The soils retained in the sieves were then dried in

    an oven. The dried soils were then sieved by dry sieving by passing the soils through a series of square

    mesh sieves, which become progressively finer down to 63 m test mesh. Each fraction thus collected

    was then weighed and the percentage retained on each sieve was calculated by dividing individual

    weights by the total sample weight.

    The soil passing through 63 m mesh was analyzed by sedimentation using hydrometer method. The

    hydrometer method involves measuring the rate of settlement of fine particles suspended in a solution.

    Utilizing the principle of stokes law, particle size can be directly related to its rate of settlement in a fluid

    such as water. From this process, the particle diameter and percentage finer is calculated.

    3.3.4 STRENGTH AND COMPRESSIBILITY PROPERTIES

    3.3.4.1 UNCONSOLIDATED UNDRAINED (UU)TRIAXIAL COMPRESSION TEST

    Unconsolidated undrained triaxial compression test was conducted to determine the undrained shear

    strength of the soil. The soil specimen is subjected to a constant confining pressure and to strain-controlled

    axial loading, when no change in total moisture content is allowed. The axial load is increased by applying a

    constant rate of strain until the specimen fails.

    3.3.4.2 UNCONFINED COMPRESSION (UC)TEST ON ROCK CORE SAMPLE

    Unconfined compression test was conducted on selected rock core sample to assess the strength

    characteristic. This is determined by statically loading the cylinder of rock to tailure, the load being applied

    across the upper and lower faces of the sample. The test was conducted in accordance with ASTM D2938-

    95.

    11

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    17/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    4.0 SITEGEOLOGY& SOIL PROFILE

    4.1 GENERAL GEOLOGY OF SITE

    The investigation site area lies within the geological formation ofKALLANG FORMATION & BUKITTIMAH GRANITE.

    The following (Figure 4.1) shows the approximate site location on the Geological Map extracted from

    the Geology Map of Singapore published by Defence Science & Technology Agency (DSTA),

    Singapore (2009).

    Figure 4.1The Approximate site location on the Geological Map extracted from theGeology Map of Singapore published by DSTA, 2009

    SITE

    12

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    18/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    4.2 SOIL & ROCK CLASSIFICATION

    The soil classification is based on the geological classification and British classification system. The

    consistencies of clay / silt and relative densities of sand have been classified according to the following

    criteria:

    Table 4.1 Classification of Clays/Silts from Shear Strength (BS5930:1999)

    Undrained Shear Strength (kPa) Consistency

    300 Hard

    Table 4.2 Classification of Clays/Silts from SPT results (Terzaghi and Peck)

    Approximate Relation of Consistency to SPT

    N-Value (blows / 300mm of penetration) Consistency

    30 Hard

    Table 4.3 Classification of Sands from SPT results (BS5930:1999)

    Approximate Relation of Relati ve Density to SPT

    N-Value (blows/300mm of penetration) Consistency

    50 Very Dense

    13

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    19/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    Weathering grade of rock have been classified according to the following criteria:

    Table 4.4 Classification of Weathered Rock for Engineering Purposes (BS5930:1999)

    Approach 2: Classi fication For Uni form Materials

    Grade Classifier Typical Characteristics

    I Fresh Unchanged from original state

    II Slightly Weathered Slight discoloration, slight weakening

    III Moderately WeatheredConsiderably weakened, penetrative discolorationLarge pieces cannot be broken by hand

    IV Highly WeatheredLarge pieces cannot be broken by handDoes not readily disaggregate (slake) when dry sample immersed in water

    V Completely WeatheredConsiderably weakenedSlakesOriginal texture apparent

    VI Residual SoilSoil derived by in situ weathering butretaining none of the original texture or fabric

    Table 4.5 Weathering classification for BUKIT TIMAH GRANITE and GOMBAK NORITE(Rail & Engineering Groups, Civil Design Criteria, Revision A6, 2008)

    Grade Basic for Assessment

    IIntact strength, unaffected by weathering. Not broken easily by hammer-rings when struck. No visiblediscoloration.

    IINot broken easily by hammer-rings when struck. Fresh rock colors generally retained but stained near jointsurfaces.

    IIICannot be broken by hand. Easily broken by hammer. Makes a dull or slight ringing sound when struck withhammer. Stained throughout.

    IV Core can be broken by hand. Does not slake in water. Completely discolored.

    V Original rock structure preserved can be crumbled by hand. Slakes in water. Completely discolored.

    VIOriginal rock structure completely degraded to a soil, with none of the original fabric remains. Can be crumbledby hand.

    Table 4.6 Weathering Classification for JURONG FORMATION(Rail & Engineering Groups, Civil Design Criteria, Revision A6, 2008)

    Grade Basic for Assessment

    I Intact Strength, unaffected by weathering

    II Slightly weakened, slightly discoloration, partially along joints

    III Considerably weakened and discolored, but larger pieces cannot be broken by hand (RQD is generally >0, butRQD should not be used as a major criteria for assessment).

    IV Core can be broken by hand or consist of gravel size pieces. Generally highly to very highly fractured, butmajority of sample consist of litho relics. (RQD generally=0; but RQD should not be used as a major guide forassessment). For siltstone, shale, sandstone, quartzite and conglomerate, the slake test can be used todifferentiate between Grade V (slake) and Grade IV (does not slake).

    V Rock weathered down to soil-like material, but bedding intact. Material slakes in water.

    VI Rock degraded to a soil in which none of the original bedding remains.

    14

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    20/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    4.3 BOREHOLE LOGS

    Borehole logs, presented in APPENDIX C, give a general indication of the soil conditions at each

    borehole location. The borehole logs show:

    Soil description

    Stratum changes

    SPT results

    General information such as borehole coordination, level, sample reference, etc.

    In the borehole logs, the consistency/ density of the subsoil were based on SPT N-values of soils.

    4.4 SUBSOIL DESCRIPTION

    The present site investigation report is mainly based on the Code of practice for si te investigations,

    British Standard BS5930:1999, Civil Design Criteria for Road and Rail Transit Systems, Revision

    A6, Rail & Engineering groups, LTA, Singapore and Geology of Singapore, 2nd

    Edition, DSTA,

    Singapore.

    In the borehole logs, the consistency/density of the subsoils were based on SPT N-values and

    laboratory test results of soils.

    Based on the borehole data, visual classification and lab tests results obtained, the underlying sub-soils

    can be sub-divided into the following layers:

    - FILL

    - KALLANG FORMATION

    - BUKIT TIMAH GRANITE

    4.4.1 FILLFill is made by man. The fill layer consists of soft to very stiff multi-colour sandy SILT/sandy

    CLAY/gravelly sandy SILT and very loose to loose silty SAND/gravelly silty SAND mixed with foreign

    debris such as woods, concrete, aggregates, hardcore and dumped materials. The Fill layer was

    observed in all (11) boreholes with thickness varies from 10.00m (BH-3, BH-5 & BH-11) to 19.00m

    (BH-10). SPT N value range in this layer is from 1 to 23.

    Details are summarizes below in table.

    BOREHOLE

    DEPTH (m) THICKNESS SPT N Value

    SOIL DESCRIPTION

    Top(m)

    Bottom(m) (m)

    minimum maximum

    BH1 0.00 14.00 14.00 2 8

    SandySILT,gravellysandySILT,silty

    SAND,reddishbrownandyellowish

    brown,lightgrey,grey

    BH2 0.00 14.00 14.00 2 15SandySILT,gravellysandySILT,reddish

    brownandyellowishbrown,lightgrey

    BH3 0.00 10.00 10.00 4 20

    sandySILT,gravellysandySILT,sandy

    CLAY,yellowishgrey,reddishbrownand

    lightgrey,reddishgreymottledwith

    yellowandbrown

    BH

    4

    0.00

    13.00

    13.00

    2

    5

    SandySILT,gravellysandySILT,yellowish

    grey,palered,darkreddishbrownand

    lightgrey,

    reddish

    brown

    mottled

    with

    yellowandwhite

    15

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    21/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    BOREHOLE

    DEPTH (m) THICKNESS SPT N Value

    SOIL DESCRIPTIONTop

    (m)

    Bottom

    (m) (m)minimum maximum

    BH5 0.00 10.00 10.00 5 6 SandySILT,gravellysandySILT,reddishbrown

    BH6 0.00 12.00 12.00 2 23

    SandySILT,gravellysandySILT,gravelly

    siltySAND,reddishbrown,yellowish

    brownandlightgrey

    BH7 0.00 15.00 15.00 2 10

    SandySILT,sandyCLAY,gravellysilty

    SAND,yellowishbrown,reddishbrown,

    redandpink

    BH8 0.00 18.00 18.00 4 6GravellysandySILT,reddishbrown,

    yellowishbrownandlightgrey

    BH9 0.00 15.00 15.00 1 11SandySILT,gravellysandySILT,yellowish

    brownandreddishbrown

    BH

    10

    0.00

    19.00

    19.00

    2

    12

    SandySILT/CLAY,gravellysandyCLAY,

    silty

    SAND,

    reddish

    brown,

    yellowish

    brown,pink,lightgreyandgrey

    BH11 0.00 10.00 10.00 3 11SandySILT,gravellysandySILT,reddish

    brownandyellowishbrown

    4.4.2 KALLANG FORMATION

    The KALLANG FORMATION consists of marine, alluvial, littoral, transitional and reef members. This

    was formed from the erosion of basic formation and further deposition of soft clays, organic clays, peaty

    clays, etc. This formation covers one quarter of the Singapore Island and can be found mainly at the

    coastal plain and immediate offshore in Singapore.

    The KALLANG FORMATION Alluvial Member was encountered in most of the boreholes. Itsthickness ranges from2.70m to 6.00m. It is composed of transitional and alluvial sediments such as:

    - Fluvial SAND

    - Fluvial CLAY / SILT

    - Marine Member

    4.4.2.1 PEATY CLAY(E)

    Peaty CLAY was found in boreholes (BH-2, BH-3, BH-5, BH-6 & BH-11). Thickness of the layer is

    3.00m (BH-2) to 6.00m (BH-3). SPT N value range in this layer is 0 to 5.

    Details are summarizes below in table.

    BOREHOLE

    DEPTH (m) THICKNESS SPT N Value

    SOIL DESCRIPTIONTop

    (m)

    Bottom

    (m) (m)minimum maximum

    BH2 14.00 17.00 3.00 4 4 PeatyCLAY,black

    BH3 10.00 16.00 6.00 2 4 PeatyCLAY,brownishgrey

    BH5 10.00 15.00 5.00 3 3 PeatyCLAY,darkbrown

    16

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    22/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    BOREHOLE

    DEPTH (m) THICKNESS SPT N Value

    SOIL DESCRIPTIONTop

    (m)

    Bottom

    (m) (m)minimum maximum

    BH6 12.00 15.30 3.30 0 2 PeatyCLAY,darkbrown

    BH11 10.00 15.00 5.00 5 5 PeatyCLAY,greyandyellowishbrown

    4.4.2.2 MARINE CLAY(M)

    Marine CLAY layer was only found in borehole (BH-7) with thickness of the layer is 3.00m. SPT N

    value in this layer is 2.

    Details are summarizes below in table.

    BOREHOLE

    DEPTH (m) THICKNESS SPT N Value

    SOIL DESCRIPTIONTop

    (m)

    Bottom

    (m) (m)minimum maximum

    BH7 15.00 18.00 3.00 2 2 MarineCLAY,bluishgrey

    4.4.2.3 FLUVIAL SAND(F1)

    This layer was found in boreholes (BH-1, BH-2, BH-4, BH-5 & BH-6). Thickness of the layer is 2.70m

    (BH-6) to 6.00 (BH-4). SPT N value range in this layer is 8 to 35.

    Details are summarizes below in table.

    BOREHOLE

    DEPTH (m) THICKNESS SPT N Value

    SOIL DESCRIPTIONTop

    (m)

    Bottom

    (m) (m)minimum maximum

    BH1 14.00 18.00 4.00 14 14 SAND,lightgrey

    BH2 17.00 20.00 3.00 17 17 ClayeySAND,lightgrey

    BH4 13.00 19.00 6.00 32 35 SAND,brownishgrey,yellowishbrown

    BH5

    15.00

    18.00

    3.00

    8

    8

    SAND,

    light

    grey

    to

    grey

    BH6 15.30 18.00 2.70 ClayeySAND,lightgrey

    17

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    23/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    4.4.2.4 FLUVIAL CLAY/SILT(F2)

    This layer was only found in borehole (BH-6). Thickness of the layer is 2.00m. SPT N value in this layer

    is 3.

    Details are summarizes below in table.

    BOREHOLE

    DEPTH (m) THICKNESS SPT N Value

    SOIL DESCRIPTIONTop

    (m)

    Bottom

    (m) (m)minimum maximum

    BH6 18.00 20.00 2.00 3 3SandyCLAY,reddishbrownmottled

    withyellow

    4.4.3 BUKITTIMAH GRANITE

    The logs of rock-cores retrieved from boreholes of the investigated, indicated the occurrence of BukitTimah Granite rocks, Biotite/Hornblende Granite and strongly foliated Granite (or Granite Gneiss).

    The foliation and old joint sets system appeared to be controlled by the same set of tectonic stresses at

    the time of faulting activity that had taken place in the batholith rock-mass.

    4.4.3.1 RESIDUAL SOIL (G VI)

    The Residual Soils (G VI) are composed of soft to hard sandy SILT and medium dense to very dense

    silty SAND. Texture of the granite is not obvious in these soils. This layer was observed in all boreholes

    with thickness varies from 11.00m (BH-4) to 27.00m (BH-11). SPT N value range in this layer is from

    2 to 100.

    Details are summarizes below in table.

    BOREHOLE

    DEPTH (m) THICKNESS SPT N Value

    SOIL DESCRIPTIONTop

    (m)

    Bottom

    (m) (m)minimum maximum

    BH1 18.00 39.00 21.00 7 21SandySILT,whitishgrey,pinkspotted

    withwhite,reddishbrownandlight

    grey,yellowishbrown

    BH2 20.00 33.00 13.00 20 35Sandy

    SILT,

    silty

    SAND,

    yellowish

    brownspottedandmottledwithlight

    greyandblack,

    BH3 16.00 34.00 18.00 10 40SandySILT,reddishbrown/yellowish

    brownspottedwithwhiteandmottled

    withlightgrey

    BH4 19.00 30.00 11.00 24 42

    SiltySAND,sandySILT,lightgrey,

    yellowgreymottledwithlightgreyand

    black,yellowishbrownspottedwith

    white

    18

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    24/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    BOREHOLE

    DEPTH (m) THICKNESS SPT N Value

    SOIL DESCRIPTIONTop

    (m)

    Bottom

    (m) (m)minimum maximum

    BH5 18.00 34.00 16.00 7 73SandySILT,siltySAND,lightyellow,

    lightgreyandyellowishbrown,black

    andwhitishgrey

    BH6 20.00 36.00 16.00 4 100

    SandySILT,reddishbrownspotted

    withwhite,pinkandwhitishgrey,

    yellowishbrownspottedwithlight

    grey

    BH7 18.00 43.00 25.00 2 100SandySILT,siltySAND,whitishgrey,

    reddishbrown,yellowishbrown,light

    grey

    BH8 18.00 33.00 15.00 17 66SiltySAND,yellowishbrownand

    purplish red,yellowandlightgrey

    BH9 15.00 41.00 26.00 8 23SandySILT,siltySAND,reddishbrown

    andyellowishbrown,whitishgreyand

    lightgrey

    BH10 19.00 40.50 21.50 4 100

    SandySILT,siltySAND,reddishbrown,

    yellowishbrownmottledwithlight

    grey,lightgreenishgreyspottedwith

    yellowishbrown

    BH11 15.00 42.00 27.00 10 41SandySILT,reddishbrown/yellowish

    brownmottledwithwhitishgreyand

    lightgrey

    4.4.3.2 COMPLETELY WEATHERED GRANITE (G V)

    The Completely Weathered Granite (G V) are composed of hard sandy SILT and dense to very dense

    silty SAND. The relic texture of granite is very obviously in these soils. This layer was observed in all

    boreholes except (BH-2, BH-7 & BH-10) with thickness range from 2.50m (BH-8) to 12.19m (BH-4).

    SPT N value range from 48 to100.

    Details are summarizes below in table.

    BOREHOLE

    DEPTH (m) THICKNESS SPT N Value

    SOIL DESCRIPTIONTop

    (m)

    Bottom

    (m) (m)minimum maximum

    BH1 39.00 43.50 4.50 54 100SiltySAND,yellowishbrownspotted

    withwhiteandlightgrey

    BH3

    34.00

    39.00

    5.00

    58

    100

    Sandy

    SILT,

    yellowish

    grey

    mottled

    withlightgrey

    19

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    25/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    BOREHOLE

    DEPTH (m) THICKNESS SPT N Value

    SOIL DESCRIPTIONTop

    (m)

    Bottom

    (m) (m)minimum maximum

    BH4 30.00 42.19 12.19 68 100Silty

    SAND,

    whitish

    grey,

    light

    grey,

    lightgreenishgreyandyellowish

    brown

    BH5 34.00 43.70 9.70 78 100SiltySAND,yellowishbrown,whitish

    grey, lightgrey

    BH637.00to

    41.50

    45.50to

    45.914.91 100 100 SiltySAND,lightgreytodarkgrey

    BH8 33.00 35.50 2.50 67 100 SiltySAND,lightgrey

    BH9

    41.00

    49.00

    8.00

    73

    100

    SandySILT,siltySAND,yellowish

    brownmottled

    with

    white

    and

    spotted

    withlightgrey

    BH11 42.00 49.00 7.00 48 100SiltySAND,yellowishbrownmottled

    withwhitishgreyandblack,lightgrey

    4.4.3.3 HIGHLY WEATHERED GRANITE (G IV)

    The Highly Weathered Granite (G IV) are encountered as GRANITE layer in all boreholes except

    (BH-3 & BH-4). This layer was encountered depth at 34.00m bgl (BH-2) and at 49.00m bgl (BH-9 &

    BH-11).

    Details are summarizes below in table.

    BOREHOLE

    DEPTH (m) THICKNESS RQD

    ROCK DESCRIPTIONTop

    (m)

    Bottom

    (m)(m)

    (%)

    BH1 43.50 45.50 2.00 010Highlyweathered,greenishgrey,lightgreyto

    greyspottedwithblack,GRANITE

    BH234.00to

    35.00

    36.00to

    37.002.00 010

    Highlyweathered,lightgreytogreyspotted

    withblack,greenishgrey,GRANITE

    BH5

    43.70

    44.70

    1.00

    0

    Highly

    weathered,

    light

    grey

    and

    yellowish

    brownspottedwithblack,GRANITE

    BH636.00to

    37.00

    41.50to

    43.50

    &

    44.50to

    45.50

    4.00 047Highlyweathered,greenishgrey,yellowish

    brown,lightgreytogrey,GRANITE

    BH7 43.00 44.00 1.00 20 Highlyweathered,greenishgrey,GRANITE

    BH8 35.50 40.50 5.00 0Highlyweathered,lightgreyandyellowish

    brown,GRANITE

    20

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    26/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    BOREHOLE

    DEPTH (m) THICKNESS RQD

    ROCK DESCRIPTIONTop

    (m)

    Bottom

    (m)(m)

    (%)

    BH9 49.00 50.00 1.00 16Highly

    weathered,

    light

    grey

    and

    white,

    GRANITE

    BH10 40.50 42.50 2.00 016Highlyweathered,greenishgreyandwhite,

    GRANITE

    BH11 49.00 50.00 1.00 0Highlyweathered,lightgreytogreyspotted

    withblack,GRANITE

    4.4.3.4 MODERATELY WEATHERED GRANITE (G III)

    The Moderately Weathered Granite (G III) are encountered as GRANITE layer in boreholes (BH-1,

    BH-2, BH-3, BH-6, BH-7, BH-9 & BH-10). This layer was encountered depth at 33.00m bgl (BH-2) and

    at50.00m bgl (BH-9).

    Details are summarizes below in table.

    BOREHOLE

    DEPTH (m) THICKNESS RQD

    ROCK DESCRIPTIONTop

    (m)

    Bottom

    (m)(m)

    (%)

    BH1 45.50 48.50 3.00 2545 Moderatelyweathered,greenishgrey,GRANITE

    BH2

    33.00to

    34.00

    &

    35.00to

    36.00

    37.00to

    40.705.70 3966 Moderatelyweathered,greenishgrey,GRANITE

    BH3 39.00 44.00 5.00 024 Moderatelyweathered,greenishgrey,GRANITE

    BH6 43.50 44.50 1.00 61 Moderatelyweathered,greenishgrey,GRANITE

    BH7 44.00 48.00 4.00 1270 Moderatelyweathered,greenishgrey,GRANITE

    BH9 50.00 54.00 4.00 1726 Moderatelyweathered,greenishgrey,GRANITE

    BH10 42.50 46.70 4.20 020Moderately

    weathered,

    greenish

    grey,

    light

    greytogreyspottedwithblack,GRANITE

    For further details of soil and rock strata, please refer to the borehole logs, in- situ test results, laboratory

    test results and logs of the profile.

    * * * * * * * * *

    21

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    27/220

    FACTUALREPORTSOIL INVESTIGATIONWORKSFORWOODLANDSN7C34

    FOSTA Pte Ltd

    References:

    1. BS 5930: 1999, Code of Practice for Site Investigations, British Standard Institution.

    2. DSTA, 2009, Geology of Singapore, 2

    nd

    Edition, Defence Science & Technology Agency,Singapore.

    3. LTA, 2008, Civil Design Criteria for Road and Rail Transit Systems, Revision A6, Rail &

    Engineering groups, Land Transport Authority, Singapore.

    4. PWD, 1976, Geology of Singapore, Public Work Department, Singapore.

    22

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    28/220

    FOSTA Pte Ltd

    TABLE 1

    Summary of Total Quantity of

    Field Investigation Works AndLaboratory Tests

    23

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    29/220

    CLIENT : HOUSING AND DEVELOPMENT BOARDPROJ ECT : SOIL INVESTIGATION WORKS FOR WOODLANDS N7C34LOCATIONCONTRACT NO. :D/118/12WO NO. : 2200003337WI NO.

    TABLE 1 SUMMARY OF TOTAL QUANTITY OF FIELD INVESTIGATION WORKS AND LABOR

    :WOODLANDS DRIVE 70

    : 022

    Sampling & In-situ TestsDimond Coring (52mm dia.)Period of Fieldwork

    Total

    In

    InDrilling in Soil

    FOSTAPteLtd

    0-15 m 15-30 m >30m

    BH-1 15-Oct-12 19-Oct-12 47014.5456 24116.7195 118.3121 48.50 15.00 15.00 13.50 - - 1.50 3.50 2 14 4 5 6

    BH-2 22-Oct-12 29-Oct-1247005.635 24145.3592 118.1624

    40.70 15.00 15.00 3.00 - - 7.70 - 2 10 4 5 2

    BH-3 23-Oct-12 29-Oct-12 4 69 85 .2 81 8 2 41 23 .3 41 1 18 .3 81 2 44.00 15.00 15.00 9.00 - - 5.00 - 2 12 4 5 4

    BH-4 30-Oct-12 1-Nov-12 46988.0172 24166.0389 118.6038 42.19 15.00 15.00 12.19 - - - - 2 14 4 5 5

    BH-5 1-Nov-12 9-Nov-12 46965.6873 24146.0379 118.7479 44.70 15.00 15.00 13.70 - - 1.00 - 2 14 4 5 6

    BH-6 15-Oct-12 22-Oct-12 46957.9184 24119.7398 118.5381 45.91 15.00 15.00 10.91 - - 4.50 0.50 2 14 4 5 7

    BH-7 30-Oct-12 5-Nov-12 46956.932 24170.3836 118.6817 48.00 15.00 15.00 13.00 - - 2.00 3.00 2 14 4 5 6

    BH-8 31-Oct-12 5-Nov-12 46937.7084 24150.5276 118.6363 40.50 15.00 15.00 5.50 - - 5.00 - 2 11 4 5 3

    Woodlands Drive 70

    TW

    (no.)

    DisturbedSample

    (no.)

    0-15 m 15-30m >30m

    SPT (no.)

    0-15 m 15-30m 30-45m 45-60m

    SiteBorehole

    No.

    Borehole

    Depth(m)

    Northing EastingReduce

    LevelSt

    Commenced

    Date

    Completed

    Date

    BH-9 23-Oct-12 31-Oct-12 46918.8167 24127.2358 118.1396 54.00 15.00 15.00 19.00 - - - 5.00 1 16 4 5 8

    BH-10 3-Nov-12 7-Nov-12 46926.9703 24178.5391 118.5044 46.70 15.00 15.00 10.50 - - 4.50 1.70 2 13 4 5 5

    BH-11 27-Oct-12 1-Nov-12 4 69 08 .0 78 9 2 41 55 .2 35 1 1 18 .2 07 50.00 15.00 15.00 19.00 - - - 1.00 2 16 4 5 8

    Total 11 505.20 165.00 165.00 129.30 0.00 0.00 31.20 14.70 21 148 44 55 60

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    30/220

    FOSTA Pte Ltd

    FIGURES

    Figure 5.1 -SPT N Value Vs Depth

    Figure 5.2 -Moisture Content Vs Depth

    Figure 5.3 -Bulk Density Vs Depth

    Figure 5.4 -Dry Density Vs Depth

    Figure 5.5 - Particle Density Vs Depth

    Figure 5.6 - Atterberg Limits Summary

    Figure 5.7 - Undrained Shear Strength Vs Depth

    25

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    31/220

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    500 20 40 60 80 100

    SPT N Value

    Depth(m)

    SPT N Value versus Depth

    A4215 Kaki Bukit Avenue 1Shun Li Industrial Park

    Singapore 416042Tel: 67442661 (3 Lines) Fax:65613766

    Email: [email protected];Website:www.fos-ta.com

    PointID LegendBH-1BH-10BH-11BH-2BH-3BH-4BH-5

    BH-6BH-7BH-8BH-9

    FIGURE NoPROJECT No

    SCALE

    CHECKED DATE

    DATEDRAWNTITLE

    KSL

    MOE KO KO

    27/11/2012

    27/11/2012

    WI-022 Fig 5.1

    Not to Scale

    Housing & Development Board

    Soil Investigation Works for Woodlands N7C34

    26

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    32/220

    0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.50 20 40 60 80 100

    Depth(m)

    Moisture Content (%)

    Moisture Content versus Depth

    A4215 Kaki Bukit Avenue 1Shun Li Industrial Park

    Singapore 416042Tel: 67442661 (3 Lines) Fax:65613766

    Email: [email protected];Website:www.fos-ta.com

    PointID LegendBH-1BH-10BH-11BH-2BH-3BH-4BH-5

    BH-6BH-7BH-8BH-9

    FIGURE NoPROJECT No

    SCALE

    CHECKED DATE

    DATEDRAWNTITLE

    KSL

    MOE KO KO

    27/11/2012

    27/11/2012

    WI-022 Fig 5.2

    Not to Scale

    Housing & Development Board

    Soil Investigation Works for Woodlands N7C34

    27

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    33/220

    0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.50.5 1.0 1.5 2.0 2.5 3.0

    Depth(m)

    Wet/Bulk Density (Mg/m3)

    Bulk Density versus Depth

    A4215 Kaki Bukit Avenue 1Shun Li Industrial Park

    Singapore 416042Tel: 67442661 (3 Lines) Fax:65613766

    Email: [email protected];Website:www.fos-ta.com

    PointID LegendBH-1BH-10BH-11BH-2BH-3BH-4BH-5

    BH-6BH-7BH-8BH-9

    FIGURE NoPROJECT No

    SCALE

    CHECKED DATE

    DATEDRAWNTITLE

    KSL

    MOE KO KO

    27/11/2012

    27/11/2012

    WI-022 Fig 5.3

    Not to Scale

    Housing & Development Board

    Soil Investigation Works for Woodlands N7C34

    28

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    34/220

    0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.50.5 1.0 1.5 2.0 2.5 3.0

    Depth(m)

    Dry Density (Mg/m3)

    Dry Density versus Depth

    A4215 Kaki Bukit Avenue 1Shun Li Industrial Park

    Singapore 416042Tel: 67442661 (3 Lines) Fax:65613766

    Email: [email protected];Website:www.fos-ta.com

    PointID LegendBH-1BH-10BH-11BH-2BH-3BH-4BH-5

    BH-6BH-7BH-8BH-9

    FIGURE NoPROJECT No

    SCALE

    CHECKED DATE

    DATEDRAWNTITLE

    KSL

    MOE KO KO

    27/11/2012

    27/11/2012

    WI-022 Fig 5.4

    Not to Scale

    Housing & Development Board

    Soil Investigation Works for Woodlands N7C34

    29

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    35/220

    0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.52.4 2.5 2.6 2.7 2.8 2.9 3.0

    Depth(m)

    Particle Density (Mg/m3)

    Particle Density versus Depth

    A4215 Kaki Bukit Avenue 1Shun Li Industrial Park

    Singapore 416042Tel: 67442661 (3 Lines) Fax:65613766

    Email: [email protected];Website:www.fos-ta.com

    PointID LegendBH-1BH-10BH-11BH-2BH-3BH-4BH-5

    BH-6BH-7BH-8BH-9

    FIGURE NoPROJECT No

    SCALE

    CHECKED DATE

    DATEDRAWNTITLE

    KSL

    MOE KO KO

    27/11/2012

    27/11/2012

    WI-022 Fig 5.5

    Not to Scale

    Housing & Development Board

    Soil Investigation Works for Woodlands N7C34

    30

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    36/220

    0

    10

    20

    30

    40

    50

    60

    0 20 40 60 80 100

    Liquid Limit (%)

    PlasticityIndex(%)

    Atterberg Limits Summary

    A4215 Kaki Bukit Avenue 1Shun Li Industrial Park

    Singapore 416042Tel: 67442661 (3 Lines) Fax:65613766

    Email: [email protected];Website:www.fos-ta.com

    PointID LegendBH-1BH-10BH-11BH-2BH-3BH-4BH-5

    BH-6BH-7BH-8BH-9

    FIGURE NoPROJECT No

    SCALE

    CHECKED DATE

    DATEDRAWNTITLE

    KSL

    MOE KO KO

    27/11/2012

    27/11/2012

    WI-022 Fig 5.6

    Not to Scale

    CL CI CVCH

    MH MV MEML MI

    CE

    Housing & Development Board

    Soil Investigation Works for Woodlands N7C34

    31

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    37/220

    0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.50 100 200 300 400

    Depth(m)

    Undrained Shear Strength (kPa)

    Undrained Shear Strength versus Depth

    A4215 Kaki Bukit Avenue 1Shun Li Industrial Park

    Singapore 416042Tel: 67442661 (3 Lines) Fax:65613766

    Email: [email protected];Website:www.fos-ta.com

    PointID LegendBH-1BH-10BH-11BH-2BH-3BH-4BH-5

    BH-6BH-7BH-8BH-9

    FIGURE NoPROJECT No

    SCALE

    CHECKED DATE

    DATEDRAWNTITLE

    KSL

    MOE KO KO

    27/11/2012

    27/11/2012

    WI-022 Fig 5.7

    Not to Scale

    Housing & Development Board

    Soil Investigation Works for Woodlands N7C34

    32

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    38/220

    FOSTA Pte Ltd

    APPENDICES

    APPENDIX A - Water Standpipe Installation & Monitoring Data

    APPENXIX B - Borehole Location Plan,As-build Coordinates & Reduced Level of Boreholes

    APPENXIX C - Geological Cross Section and Borehole Logs

    APPENDIX D - Laboratory Tests Results SummaryofLaboratoryTestResults

    MoistureContent

    /Bulk

    &

    Dry

    Density

    /Particle

    Density

    Determination

    IndexTest(AtterbergLimits)

    GrainSizeAnalysis

    UnconsolidatedUndrained(UU)Triaxialcompressiontest

    UnconfinedCompression(UC)TestonRockCore

    APPENXIX E - SPT Photograph

    APPENXIX F - Core Photograph

    33

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    39/220

    FOSTA Pte Ltd

    APPENDIX A

    Water Standpipe Installation &Monitoring Data

    34

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    40/220

    CLIENT HOUSING AND DEVELOPMENT BOARD (HDB) INSTRUMENT NO. BH2/ WSP1

    WI No. 022 WO No. 2200003337 BOREHOLE NO. BH-2

    PROJECT REDUCE LEVEL 118.162 m RL

    TOP OF PIPE LEVEL 118.412 m RL

    LOCATION WOODLANDS DRIVE 70 DATE INSTALLED 29-Oct-12

    Date Ground Top of Pipe Depth of Ground Water Remarks SKETCH OF WATER STANDPIPE

    (dd-mmm-yy) Level Level Water Level (not to scale)(m RL) (m RL) (m BGL) (m RL)

    30-Oct-12 118.162 118.412 1.970 116.442 Initial

    2-Nov-12 118.162 118.412 2.020 116.392 Ground Level

    6-Nov-12 118.162 118.412 1.830 116.582

    9-Nov-12 118.162 118.412 1.970 116.442

    12-Nov-12 118.162 118.412 1.930 116.482

    16-Nov-12 118.162 118.412 1.890 116.522

    20-Nov-12 118.162 118.412 1.950 116.462

    23-Nov-12 118.162 118.412 1.860 116.552

    27-Nov-12 118.162 118.412 1.730 116.68230-Nov-12 118.162 118.412 1.680 116.732

    3-Dec-12 118.162 118.412 1.560 116.852

    6-Dec-12 118.162 118.412 1.510 116.902

    2.50 m b l

    WATER STAND PIPE

    GROUND WATER LEVEL MONITORING DATA AND GRAPH

    SOIL INVESTIGATION WORKS FOR WOODLANDS N7C34

    PVC Pipe50mm diameter

    Compacted Sealof Local Soil

    Top Cap

    :

    :

    :

    :

    :

    :

    :

    :

    :

    :

    100 diameterBorehole

    .

    3.00 m bgl

    12.00 m bglBottom Cap

    112.00

    113.00

    114.00

    115.00

    116.00

    117.00118.00

    119.00

    120.00

    121.00

    122.00

    30-Oct-12

    02-Nov-12

    05-Nov-12

    08-Nov-12

    11-Nov-12

    14-Nov-12

    17-Nov-12

    20-Nov-12

    23-Nov-12

    26-Nov-12

    29-Nov-12

    02-Dec-12

    05-Dec-12

    08-Dec-12

    GroundWaterLev

    el(mRL)

    Date

    Ground Water Level Monitoring

    Ground Level 118.162 m RL

    50mm dia.Perforated PVC pipeWrapped all roundwith Green Nylon Net

    Graded Filter

    Materal ofClean Sand andGravels Mix

    Graded FilterMaterial Of CleanSand Gravels Mix

    5mm HoleStaggered At100mm (BothDirection)

    FOSTAPTELTD35

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    41/220

    CLIENT HOUSING AND DEVELOPMENT BOARD (HDB) INSTRUMENT NO. BH9/ WSP2

    WI No. 022 WO No. 2200003337 BOREHOLE NO. BH-9

    PROJECT REDUCE LEVEL 118.140 m RL

    TOP OF PIPE LEVEL 118.460 m RL

    LOCATION WOODLANDS DRIVE 70 DATE INSTALLED 1-Nov-12

    Date Ground Top of Pipe Depth of Ground Water Remarks SKETCH OF WATER STANDPIPE

    (dd-mmm-yy) Level Level Water Level (not to scale)(m RL) (m RL) (m BGL) (m RL)

    2-Nov-12 118.140 118.460 2.820 115.640 Initial

    6-Nov-12 118.140 118.460 2.700 115.760 Ground Level

    9-Nov-12 118.140 118.460 2.750 115.710

    12-Nov-12 118.140 118.460 2.800 115.660

    16-Nov-12 118.140 118.460 2.760 115.700

    20-Nov-12 118.140 118.460 2.790 115.670

    23-Nov-12 118.140 118.460 2.810 115.650

    27-Nov-12 118.140 118.460 2.770 115.690

    30-Nov-12 118.140 118.460 2.710 115.7503-Dec-12 118.140 118.460 2.680 115.780

    6-Dec-12 118.140 118.460 2.560 115.900

    2.50 m b l

    WATER STAND PIPE

    GROUND WATER LEVEL MONITORING DATA AND GRAPH

    SOIL INVESTIGATION WORKS FOR WOODLANDS N7C34

    PVC Pipe50mm diameter

    Compacted Sealof Local Soil

    Top Cap

    :

    :

    :

    :

    :

    :

    :

    :

    :

    :

    100 diameterBorehole

    .

    3.00 m bgl

    12.00 m bglBottom Cap

    111.00

    112.00

    113.00

    114.00

    115.00

    116.00117.00

    118.00

    119.00

    120.00

    121.00

    02-Nov-12

    05-Nov-12

    08-Nov-12

    11-Nov-12

    14-Nov-12

    17-Nov-12

    20-Nov-12

    23-Nov-12

    26-Nov-12

    29-Nov-12

    02-Dec-12

    05-Dec-12

    08-Dec-12

    GroundWaterLev

    el(mRL)

    Date

    Ground Water Level Monitoring

    Ground Level 118.140 m RL

    50mm dia.Perforated PVC pipeWrapped all roundwith Green Nylon Net

    Graded Filter

    Materal ofClean Sand andGravels Mix

    Graded FilterMaterial Of CleanSand Gravels Mix

    5mm HoleStaggered At100mm (BothDirection)

    FOSTAPTELTD36

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    42/220

    FOSTA Pte Ltd

    APPENDIX B

    Borehole Location Plan,

    As-build Coordinates & Reduced Level

    of Boreholes

    37

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    43/220

    Project:SOI

    Clie

    nt:HOU

    WIN

    o.:022

    WO

    No.:22

    Con

    tractNo.

    INVESTIGA

    ING&DEVE

    0003337

    :D/118/12

    ION

    FORW

    OPMENTB

    ODLANDSN

    ARD

    ITEL

    C3

    4

    C

    ATI

    SITE

    NPLAN

    FOT

    APteLtd

    38

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    44/220

    Project:SOI

    Clie

    nt:HOU

    WIN

    o.:022

    WO

    No.:22

    Con

    tractNo.

    INVESTIGA

    ING&DEVE

    0003337

    :D/118/12

    ION

    FORW

    OPMENTB

    ODLANDSN

    ARDB

    HL

    BH1

    BH2

    BH3

    BH6

    BH9/WS

    C3

    4

    C

    ATI

    WSP B

    H4

    H5

    BH7

    BH8

    BH10

    BH11

    NPLN

    FO

    LEGEN

    Bore

    T

    APteLtd

    ole

    Loca

    tion

    39

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    45/220

    40

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    46/220

    FOSTA Pte Ltd

    APPENDIX C

    Geological Cross Section and

    Borehole Logs

    41

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    47/220

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    48/220

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    49/220

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    50/22045

    LEGEND OF GEOLOGICAL CLASSIFICATION

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    51/22046

    LEGEND OF SOIL PATTERN

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    52/220

    UD1

    UD2

    D2SPT2

    D3SPT3

    D4SPT4

    D5SPT5

    D6SPT6

    3/36/45/16

    3/41/48/8

    36.01(UU)

    36.7(UU)

    Leg

    end

    SPT N blows / 300 mm

    D1

    12.00

    20 40 60 80

    2.00

    2.903.00

    3.45

    4.00

    4.90

    6.00

    6.45

    9.00

    9.45

    12.45

    15.45

    18.45

    Reddish brown, sandy SILT mixed withgravels (FILL)

    Soft, reddish brown and yellowishbrown, slightly gravelly sandy SILT(FILL)

    Soft, reddish brown and light grey,slightly gravelly sandy SILT (FILL)

    Soft, reddish brown mottled withyellow, sandy SILT (FILL)

    Firm, reddish brown, sandy SILTmixed with gravels (FILL)

    Very loose to loose, grey, silty SAND(FILL)

    Medium dense, light grey, SAND(KALLANG FORMATION)

    Firm, whitish grey, sandy SILT mixedwith gravels, Residual soil (BUKITTIMAH GRANITE)

    15.00

    18.00

    3/300

    2/300

    8/300

    4/300

    14/300

    7/300

    FILL

    FILL

    FILL

    FILL

    FILL

    FILL

    F1

    G(VI)

    BF

    BF

    BF

    BF

    BF

    BF

    S

    MS

    116.81

    115.31

    112.31

    109.31

    106.31

    104.31

    100.31

    98.31

    (1.50)

    1.50

    (1.50)

    3.00

    (3.00)

    6.00

    (3.00)

    9.00

    (3.00)

    12.00

    (2.00)

    14.00

    (4.00)

    18.00

    (2.00)

    20.00

    Gra

    phic

    Log

    NORTHING: 47014.5456 m

    EASTING: 24116.7195 m

    PROJECT: Soil Investigation Works for Woodlands N7C34

    CLIENT: Housing & Development Board

    CONSULTANTS: Mott MacDonald Singapore Pte Ltd

    LOCATION: Woodlands Drive 70

    LOGGED BY: KSL

    CHECKED BY: MOE KO KO

    WI NO: WI-022

    REDUCED LEVEL: 118.3121 m

    BOREHOLE DIA: 100mm

    CORE DIA: 52 mm

    DRILLING METHOD: RO

    DRILLED BY: Khun Aung/Mizanun

    DRILLING RIG: HANJ IN-1

    Terminated

    Shear Strength

    Undrained Shear StrengthkPa

    20 40 60 80

    DescriptionType

    &No.

    SP

    TN

    blows/300mm

    TCR(%

    )

    RQD(%)

    Geological

    Classification

    Britis

    hSoil

    Classification

    Sc

    ale

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    20 40 60 80

    PL LLWC

    Red

    uced

    Leve

    l(m)

    DRILLING DATE COMPLETED: 19/10/2012

    DRILLING DATE STARTED: 15/10/2012

    REMARKS:

    Sheet 1 of 3

    Rock

    GWL: m dated

    DATA QUALITY RATING

    Bulk DensityMg/m

    3

    1.5 1.8 2.1 2.4Depth(m)

    (Thickness)

    Grain SizeAnalysis

    G/SA/S/C

    C

    (kPa)

    ()

    BOREHOLE NO:BH-1

    BORELOG

    215 Kaki Bukit Avenue 1Shun Li Industrial Park, Singapore 416042Tel: 67442661 (3 Lines) Fax: 65613766

    E-mail.: [email protected] www.fos-ta.com

    P

    SPTLS - SPT Liner

    Thick WallOpen Drive

    -AttemptTW/P/MZ/U

    -PZS

    WSP

    CassagrandePiezometer

    WaterStandpipe

    -

    Permeability /Packer Test (PKT)Sample

    Core Run-

    Vane ShearTest (VST)

    -Piston Sample-

    - Thin Wall Push

    -

    SPT N Value

    -

    -PressuremeterTest (PRM)

    TW

    U -

    W - Water

    -

    C - Core Run

    M - Mazier

    SPT1

    47

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    53/220

    D7SPT7

    D8SPT8

    D9SPT9

    D10SPT10

    D11SPT11

    D12SPT12

    D13SPT13

    21.45

    24.45

    27.45

    30.45

    33.45

    36.45

    39.45

    Stiff, pink spotted with white, reddishbrown and light grey, sandy SILT,Residual soil (BUKIT TIMAHGRANITE)

    Very stiff, yellowish brown and lightgrey, reddish brown spotted with pink,white and yellow, sandy SILT,Residual soil (BUKIT TIMAHGRANITE)

    Very dense, yellowish brown spottedwith white and light grey, silty SAND,Completely weathered (BUKIT TIMAHGRANITE)

    11/300

    13/300

    12/300

    14/300

    16/300

    21/300

    54/300

    G(VI)

    24.00

    27.00

    30.00

    33.00

    36.00

    39.00

    G(VI)

    G(V)

    MS

    MS

    SM

    85.31

    79.31

    (13.00)

    33.00

    (6.00)

    39.00

    Leg

    end

    SPT N blows / 300 mm

    20 40 60 80

    Gra

    phic

    Log

    NORTHING: 47014.5456 m

    EASTING: 24116.7195 m

    PROJECT: Soil Investigation Works for Woodlands N7C34

    CLIENT: Housing & Development Board

    CONSULTANTS: Mott MacDonald Singapore Pte Ltd

    LOCATION: Woodlands Drive 70

    LOGGED BY: KSL

    CHECKED BY: MOE KO KO

    WI NO: WI-022

    REDUCED LEVEL: 118.3121 m

    BOREHOLE DIA: 100mm

    CORE DIA: 52 mm

    DRILLING METHOD: RO

    DRILLED BY: Khun Aung/Mizanun

    DRILLING RIG: HANJ IN-1

    Terminated

    Shear Strength

    Undrained Shear StrengthkPa

    20 40 60 80

    DescriptionType

    &No.

    SP

    TN

    blows/300mm

    TCR(%

    )

    RQD(%)

    Geological

    Classification

    Britis

    hSoil

    Classification

    Sc

    ale

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40

    20 40 60 80

    PL LLWC

    Red

    uced

    Leve

    l(m)

    DRILLING DATE COMPLETED: 19/10/2012

    DRILLING DATE STARTED: 15/10/2012

    REMARKS:

    Sheet 2 of 3

    Rock

    GWL: m dated

    DATA QUALITY RATING

    Bulk DensityMg/m

    3

    1.5 1.8 2.1 2.4Depth(m)

    (Thickness)

    Grain SizeAnalysis

    G/SA/S/C

    C

    (kPa)

    ()

    BOREHOLE NO:BH-1

    BORELOG

    215 Kaki Bukit Avenue 1Shun Li Industrial Park, Singapore 416042Tel: 67442661 (3 Lines) Fax: 65613766

    E-mail.: [email protected] www.fos-ta.com

    P

    SPTLS - SPT Liner

    Thick WallOpen Drive

    -AttemptTW/P/MZ/U

    -PZS

    WSP

    CassagrandePiezometer

    WaterStandpipe

    -

    Permeability /Packer Test (PKT)Sample

    Core Run-

    Vane ShearTest (VST)

    -Piston Sample-

    - Thin Wall Push

    -

    SPT N Value

    -

    -PressuremeterTest (PRM)

    TW

    U -

    W - Water

    -

    C - Core Run

    M - Mazier

    21.00

    48

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    54/220

    D14SPT14

    CR1

    CR2

    SPT15

    CR3

    CR4

    CR5

    43.50

    44.50

    45.50

    46.50

    47.50

    Very dense, yellowish brown spottedwith white and light grey, silty SAND,Completely weathered (BUKIT TIMAHGRANITE)(continued)

    Moderately weak, greenish grey,GRANITE, highly weathered, highly tomoderately fractured, closely toextremely closely spaced (BUKIT

    TIMAH GRANITE)Moderately weak to moderately strong,light grey to grey spotted with black,GRANITE, highly to moderatelyweathered, highly to moderatelyfractured, extremely closely to closelyspaced (BUKIT TIMAH GRANITE)

    Moderately strong, greenish grey,GRANITE, moderately weathered,moderately fractured, very closely tomedium spaced (BUKIT TIMAHGRANITE)

    Hole Terminated at 48.50 m

    100/180

    100/0

    100

    42.33

    48.50

    95

    100

    95

    100

    11

    0

    25

    45

    42

    G(V)

    G(IV)

    G(IV)

    G(III)

    SM

    GR

    GR

    GR

    74.81

    73.81

    72.81

    69.81

    (4.50)

    43.50

    (1.00)

    44.50

    (1.00)

    45.50

    (3.00)

    48.50

    Leg

    end

    SPT N blows / 300 mm

    20 40 60 80

    Gra

    phic

    Log

    NORTHING: 47014.5456 m

    EASTING: 24116.7195 m

    PROJECT: Soil Investigation Works for Woodlands N7C34

    CLIENT: Housing & Development Board

    CONSULTANTS: Mott MacDonald Singapore Pte Ltd

    LOCATION: Woodlands Drive 70

    LOGGED BY: KSL

    CHECKED BY: MOE KO KO

    WI NO: WI-022

    REDUCED LEVEL: 118.3121 m

    BOREHOLE DIA: 100mm

    CORE DIA: 52 mm

    DRILLING METHOD: RO

    DRILLED BY: Khun Aung/Mizanun

    DRILLING RIG: HANJ IN-1

    Terminated

    Shear Strength

    Undrained Shear StrengthkPa

    20 40 60 80

    DescriptionType

    &No.

    SP

    TN

    blows/300mm

    TCR(%

    )

    RQD(%)

    Geological

    Classification

    Britis

    hSoil

    Classification

    Sc

    ale

    41

    42

    43

    44

    45

    46

    47

    48

    49

    50

    51

    52

    53

    54

    55

    56

    57

    58

    59

    60

    20 40 60 80

    PL LLWC

    Red

    uced

    Leve

    l(m)

    DRILLING DATE COMPLETED: 19/10/2012

    DRILLING DATE STARTED: 15/10/2012

    REMARKS:

    Sheet 3 of 3

    Rock

    GWL: m dated

    DATA QUALITY RATING

    Bulk DensityMg/m

    3

    1.5 1.8 2.1 2.4Depth(m)

    (Thickness)

    Grain SizeAnalysis

    G/SA/S/C

    C

    (kPa)

    ()

    BOREHOLE NO:BH-1

    BORELOG

    215 Kaki Bukit Avenue 1Shun Li Industrial Park, Singapore 416042Tel: 67442661 (3 Lines) Fax: 65613766

    E-mail.: [email protected] www.fos-ta.com

    P

    SPTLS - SPT Liner

    Thick WallOpen Drive

    -AttemptTW/P/MZ/U

    -PZS

    WSP

    CassagrandePiezometer

    WaterStandpipe

    -

    Permeability /Packer Test (PKT)Sample

    Core Run-

    Vane ShearTest (VST)

    -Piston Sample-

    - Thin Wall Push

    -

    SPT N Value

    -

    -PressuremeterTest (PRM)

    TW

    U -

    W - Water

    -

    C - Core Run

    M - Mazier

    42.00

    Date(dd/mm/yyyy)

    Time(hh:mm)

    BoreholeDepth (m)

    CasingDepth (m)

    WaterLevel (m)

    Ground Water Level (Measured from Ground Level)

    15/10/2012 18:00 20.00 12.00 2.20

    16/10/2012 08:30 20.00 12.00 2.70

    16/10/2012 18:00 39.45 12.00 3.80

    17/10/2012 08:30 39.45 12.00 2.60

    17/10/2012 18:00 43.50 12.00 2.10

    19/10/2012 08:30 43.50 43.50 4.80

    19/10/2012 18:00 48.50 43.50 5.00

    49

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    55/220

    UD1

    UD2

    D2SPT2

    D3SPT3

    D4SPT4

    D5SPT5

    D6SPT6

    2.00

    2.903.00

    3.45

    4.00

    4.90

    6.00

    6.45

    9.00

    9.45

    12.45

    15.45

    18.45

    Reddish brown and yellowish brown,sandy SILT mixed with gravels (FILL)

    Soft to firm, reddish brown and lightgrey, slightly gravelly sandy SILT(FILL)

    Stiff, reddish brown, slightly gravellysandy SILT (FILL)

    Stiff to very stiff, reddish brown, sandySILT mixed with gravels (FILL)

    SPT1

    15.00

    18.00

    Soft, black, peaty CLAY mixed withsand (KALLANG FORMATION)

    Medium dense, light grey, clayeySAND (KALLANG FORMATION)

    2/300

    3/300

    12/300

    15/300

    4/300

    17/300

    FILL

    FILL

    FILL

    FILL

    E

    F1

    BF

    BF

    BF

    BF

    CPt

    SC

    116.16

    114.16

    109.16

    104.16

    101.16

    98.16

    (2.00)

    2.00

    (2.00)

    4.00

    (5.00)

    9.00

    (5.00)

    14.00

    (3.00)

    17.00

    (3.00)

    20.00

    4/44/41/11

    2/42/46/10

    48.34(UU)

    84.66(UU)

    Leg

    end

    SPT N blows / 300 mm

    20 40 60 80

    Gra

    phic

    Log

    NORTHING: 47005.635 m

    EASTING: 24145.3592 m

    PROJECT: Soil Investigation Works for Woodlands N7C34

    CLIENT: Housing & Development Board

    CONSULTANTS: Mott MacDonald Singapore Pte Ltd

    LOCATION: Woodlands Drive 70

    LOGGED BY: KSL

    CHECKED BY: MOE KO KO

    WI NO: WI-022

    REDUCED LEVEL: 118.1624 m

    BOREHOLE DIA: 100mm

    CORE DIA: 52 mm

    DRILLING METHOD: RO

    DRILLED BY: Khun Aung/Shakil

    DRILLING RIG: D2K-2

    WSP at 12.0m installed

    Shear Strength

    Undrained Shear StrengthkPa

    20 40 60 80

    DescriptionType

    &No.

    SP

    TN

    blows/300mm

    TCR(%

    )

    RQD(%)

    Geological

    Classification

    Britis

    hSoil

    Classification

    Sc

    ale

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    20 40 60 80

    PL LLWC

    Red

    uced

    Leve

    l(m)

    DRILLING DATE COMPLETED: 29/10/2012

    DRILLING DATE STARTED: 22/10/2012

    REMARKS:

    Sheet 1 of 3

    Rock

    GWL: m dated

    DATA QUALITY RATING

    Bulk DensityMg/m

    3

    1.5 1.8 2.1 2.4Depth(m)

    (Thickness)

    Grain SizeAnalysis

    G/SA/S/C

    C

    (kPa)

    ()

    BOREHOLE NO:BH-2

    BORELOG

    215 Kaki Bukit Avenue 1Shun Li Industrial Park, Singapore 416042Tel: 67442661 (3 Lines) Fax: 65613766

    E-mail.: [email protected] www.fos-ta.com

    P

    SPTLS - SPT Liner

    Thick WallOpen Drive

    -AttemptTW/P/MZ/U

    -PZS

    WSP

    CassagrandePiezometer

    WaterStandpipe

    -

    Permeability /Packer Test (PKT)Sample

    Core Run-

    Vane ShearTest (VST)

    -Piston Sample-

    - Thin Wall Push

    -

    SPT N Value

    -

    -PressuremeterTest (PRM)

    TW

    U -

    W - Water

    -

    C - Core Run

    M - Mazier

    D1

    12.00

    50

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    56/220

    D7SPT7

    D8SPT8

    D9SPT9

    D10SPT10

    CR1

    CR2

    CR3

    CR4

    CR5

    CR6

    CR7

    21.45

    24.45

    27.45

    30.45

    33.00

    34.00

    35.00

    36.00

    37.00

    38.00

    39.00

    24.00

    27.00

    30.00

    SPT11

    Stiff, yellowish brown spotted with lightgrey, sandy SILT mixed with gravels,Residual soil (BUKIT TIMAHGRANITE)

    Medium dense, yellowish brownspotted with black, silty SAND mixedwith gravels, Residual soil (BUKITTIMAH GRANITE)

    Dense, yellowish brown mottled withblack and light grey, silty SAND,Residual soil (BUKIT TIMAH

    GRANITE)

    Moderately weak to moderately strong,greenish grey, GRANITE, moderatelyweathered, moderately fractured, veryclosely to closely spaced (BUKITTIMAH GRANITE)

    Weak to moderately strong, light greyto grey spotted with black, GRANITE,highly to moderately weathered, highly

    to moderately fractured, closely toextremely closely spaced (BUKITTIMAH GRANITE)

    Moderately strong, greenish grey,GRANITE, moderately weathered,moderately fractured, medium to veryclosely spaced (BUKIT TIMAHGRANITE)

    Weak to moderately strong, greenishgrey, GRANITE, highly to moderatelyweathered, highly to moderatelyfractured, extremely closely to closelyspaced (BUKIT TIMAH GRANITE)

    Moderately strong, greenish grey,GRANITE, moderately weathered,moderately fractured, very closely tomedium spaced (BUKIT TIMAHGRANITE)

    15/300

    15/300

    17/300

    35/300

    100/0

    100

    100

    100

    100

    100

    97

    97

    41

    0

    42

    10

    39

    52

    66

    G(VI)

    G(VI)

    G(VI)

    G(III)

    G(IV)

    G(III)

    G(IV)

    G(III)

    G(III)

    MS

    SM

    SM

    GR

    GR

    GR

    GR

    GR

    GR

    91.16

    89.16

    85.16

    84.16

    83.16

    82.16

    81.16

    80.16

    (7.00)

    27.00

    (2.00)

    29.00

    (4.00)

    33.00

    (1.00)

    34.00

    (1.00)

    35.00

    (1.00)

    36.00

    (1.00)

    37.00

    (1.00)

    38.00

    (2.70)

    Leg

    end

    SPT N blows / 300 mm

    20 40 60 80

    Gra

    phic

    Log

    NORTHING: 47005.635 m

    EASTING: 24145.3592 m

    PROJECT: Soil Investigation Works for Woodlands N7C34

    CLIENT: Housing & Development Board

    CONSULTANTS: Mott MacDonald Singapore Pte Ltd

    LOCATION: Woodlands Drive 70

    LOGGED BY: KSL

    CHECKED BY: MOE KO KO

    WI NO: WI-022

    REDUCED LEVEL: 118.1624 m

    BOREHOLE DIA: 100mm

    CORE DIA: 52 mm

    DRILLING METHOD: RO

    DRILLED BY: Khun Aung/Shakil

    DRILLING RIG: D2K-2

    WSP at 12.0m installed

    Shear Strength

    Undrained Shear StrengthkPa

    20 40 60 80

    DescriptionType

    &No.

    SP

    TN

    blows/300mm

    TCR(%

    )

    RQD(%)

    Geological

    Classification

    Britis

    hSoil

    Classification

    Sc

    ale

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40

    20 40 60 80

    PL LLWC

    Red

    uced

    Leve

    l(m)

    DRILLING DATE COMPLETED: 29/10/2012

    DRILLING DATE STARTED: 22/10/2012

    REMARKS:

    Sheet 2 of 3

    Rock

    GWL: m dated

    DATA QUALITY RATING

    Bulk DensityMg/m

    3

    1.5 1.8 2.1 2.4Depth(m)

    (Thickness)

    Grain SizeAnalysis

    G/SA/S/C

    C

    (kPa)

    ()

    BOREHOLE NO:BH-2

    BORELOG

    215 Kaki Bukit Avenue 1Shun Li Industrial Park, Singapore 416042Tel: 67442661 (3 Lines) Fax: 65613766

    E-mail.: [email protected] www.fos-ta.com

    P

    SPTLS - SPT Liner

    Thick WallOpen Drive

    -AttemptTW/P/MZ/U

    -PZS

    WSP

    CassagrandePiezometer

    WaterStandpipe

    -

    Permeability /Packer Test (PKT)Sample

    Core Run-

    Vane ShearTest (VST)

    -Piston Sample-

    - Thin Wall Push

    -

    SPT N Value

    -

    -PressuremeterTest (PRM)

    TW

    U -

    W - Water

    -

    C - Core Run

    M - Mazier

    21.00

    51

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    57/220

    CR8

    40.00 Moderately strong to very strong,greenish grey, GRANITE, moderatelyweathered, slightly fractured, veryclosely to medium spaced (BUKITTIMAH GRANITE)(continued)

    Hole Terminated at 40.70 m

    100 61 G(III) GR77.46 40.70

    Leg

    end

    SPT N blows / 300 mm

    20 40 60 80

    Gra

    phic

    Log

    NORTHING: 47005.635 m

    EASTING: 24145.3592 m

    PROJECT: Soil Investigation Works for Woodlands N7C34

    CLIENT: Housing & Development Board

    CONSULTANTS: Mott MacDonald Singapore Pte Ltd

    LOCATION: Woodlands Drive 70

    LOGGED BY: KSL

    CHECKED BY: MOE KO KO

    WI NO: WI-022

    REDUCED LEVEL: 118.1624 m

    BOREHOLE DIA: 100mm

    CORE DIA: 52 mm

    DRILLING METHOD: RO

    DRILLED BY: Khun Aung/Shakil

    DRILLING RIG: D2K-2

    WSP at 12.0m installed

    Shear Strength

    Undrained Shear StrengthkPa

    20 40 60 80

    DescriptionType

    &No.

    SP

    TN

    blows/300mm

    TCR(%

    )

    RQD(%)

    Geological

    Classification

    Britis

    hSoil

    Classification

    Sc

    ale

    41

    42

    43

    44

    45

    46

    47

    48

    49

    50

    51

    52

    53

    54

    55

    56

    57

    58

    59

    60

    20 40 60 80

    PL LLWC

    Red

    uced

    Leve

    l(m)

    DRILLING DATE COMPLETED: 29/10/2012

    DRILLING DATE STARTED: 22/10/2012

    REMARKS:

    Sheet 3 of 3

    Rock

    GWL: m dated

    DATA QUALITY RATING

    Bulk DensityMg/m

    3

    1.5 1.8 2.1 2.4Depth(m)

    (Thickness)

    Grain SizeAnalysis

    G/SA/S/C

    C

    (kPa)

    ()

    BOREHOLE NO:BH-2

    BORELOG

    215 Kaki Bukit Avenue 1Shun Li Industrial Park, Singapore 416042Tel: 67442661 (3 Lines) Fax: 65613766

    E-mail.: [email protected] www.fos-ta.com

    P

    SPTLS - SPT Liner

    Thick WallOpen Drive

    -AttemptTW/P/MZ/U

    -PZS

    WSP

    CassagrandePiezometer

    WaterStandpipe

    -

    Permeability /Packer Test (PKT)Sample

    Core Run-

    Vane ShearTest (VST)

    -Piston Sample-

    - Thin Wall Push

    -

    SPT N Value

    -

    -PressuremeterTest (PRM)

    TW

    U -

    W - Water

    -

    C - Core Run

    M - Mazier

    40.70

    Date(dd/mm/yyyy)

    Time(hh:mm)

    BoreholeDepth (m)

    CasingDepth (m)

    WaterLevel (m)

    Ground Water Level (Measured from Ground Level)

    22/10/2012 18:00 21.45 9.00 1.30

    23/10/2012 08:30 21.45 9.00 1.80

    23/10/2012 18:00 33.00 33.00 1.70

    24/10/2012 08:30 33.00 33.00 2.80

    24/10/2012 18:00 37.00 33.00 2.40

    25/10/2012 08:30 37.00 33.00 2.10

    25/10/2012 18:00 39.00 33.00 2.00

    27/10/2012 08:30 39.00 33.00 2.1027/10/2012 18:00 40.00 33.00 2.05

    29/10/2012 08:30 40.00 33.00 2.20

    29/10/2012 18:00 40.70 33.00 1.80

    52

  • 7/29/2019 HDB SI TC33 WI 022_Final Report _Woodlands N7C34

    58/220

    UD1

    UD2

    D2SPT2

    D3SPT3

    D4SPT4

    D5SPT5

    D6SPT6

    Leg

    end

    SPT N blows / 300 mm

    20 40 60 80

    Gra

    phic

    Log

    NORTHING: 46985.2818 m

    EASTING: 24123.341 m

    D1

    12.00

    PROJECT: Soil Investigation Works for Woodlands N7C34

    CLIENT: Housing & Development Board

    CONSULTANTS: Mott MacDonald Singapore Pte Ltd

    LOCATION: Woodlands Drive 70

    LOGGED BY: KSL

    CHECKED BY: MOE KO KO

    WI NO: WI-022

    REDUCED L EVEL: 118.3812 m

    BOREHOLE DIA: 100mm

    CORE DIA: 52 mm

    DRILLING METHOD: RO

    DRILLED BY: Shanto/Zhenthi

    DRILLING RIG: YBM-2

    Terminated

    Shear Strength

    2.00

    2.903.00

    3.45

    4.00

    4.70

    6.00

    6.45

    9.00

    9.45

    12.45

    15.45

    18.45

    Stiff, yellowish grey, sandy SILT mixedwith gravels (FILL)

    Stiff, reddish brown and light grey,slightly gravelly sandy SILT (FILL)

    Soft to very stiff, reddish grey mottledwith yellow and brown, sandy CLAYmixed with peat (FILL)

    15.00

    18.00

    Soft, brownish grey, peaty CLAYmixed with decomposed materials(KALLANG FORMATION)

    Stiff, yellowish grey mottled with lightgrey, fine to medium grained sandySILT mixed with gravels, Residual soil(BUKIT TIMAH GRANITE)

    Very stiff, reddish brown mottled withwhite, fine to medium grained sandySILT mixed with gravels, Residual soil(BUKIT TIMAH GRANITE)

    9/300

    4/300

    20/300

    4/300

    2/300

    10/300

    FILL

    FILL

    FILL

    E

    G(VI)

    G(VI)

    BF

    BF

    BF

    CPt

    MS

    MS

    116.38

    113.38

    108.38

    102.38

    99.38

    (2.00)

    2.00

    (3.00)

    5.00

    (5.00)

    10.00

    (6.00)

    16.00

    (3.00)

    19.00

    13/43/29/15

    3/41/36/20

    136.8(UU)

    75.22(UU)

    Undrained Shear StrengthkPa

    20 40 60 80

    DescriptionType

    &No.

    SP

    TN

    blows/300mm

    TCR(%

    )

    RQD(%)

    Geological

    Classification

    Britis

    hSoil

    Classification

    Sc

    ale

    1