The Project contd.  The Project is not only saving time for production, but also saving time for Engineering and their support teams.  Instead of waiting for JIRA tasks to be generated due to a failed setup, the issues will present themselves during the screening process.  The screening process will also alleviate requests for the repair queue since they will be addressed at the time the failure is produced allowing more time for new program builds.

TRANSCRIPT

Page 1: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware.

Page 2: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

The Project, and what it is. The Preventative Hardware Maintenance process is a

standard that will be put in place to ensure hardware is in full working order on a periodic review.

Through this process hardware that is being utilized on the test floor will go through a screening process to alleviate any concerns in regards to the functionality of the hardware itself.

In doing so we are eliminating potential for yield loss, and wasted setup time due to bad components.

Page 3: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

The Project contd. The Project is not only saving time for production, but

also saving time for Engineering and their support teams.

Instead of waiting for JIRA tasks to be generated due to a failed setup, the issues will present themselves during the screening process.

The screening process will also alleviate requests for the repair queue since they will be addressed at the time the failure is produced allowing more time for new program builds.

Page 4: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

The Project contd. Through the screening process we will not only ensure

robust hardware, but instill confidence in the users that they are receiving a known good setup.

Verify outgoing hardware is good.

ScreeningEliminates

issues before they

happen.

Mechanical components

have a lifespan, and

will ultimately

fail.

Life CyclesTolerances and values may drift over time.

Takes away intermittent issues with

pass/fail ratio.

Stability

Allows for tight

tolerances to be met, and stay

within guidelines.

Page 5: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

The Project contd. The Hardware screening routine will be established by

dissecting the life span of the components, in comparison to the redundancy of use per device.

One example is the throw counts for mechanical relays during testing.

Page 6: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

The reasoning for screening hardware.

Components are prone to fail over time.

There could be potential for contact resistance.

Parasitic structure may also occur which is outside of normal

operating conditions.

Page 7: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

Reasoning contd. The continuous use of a relays contacts during the

open and close routine produces wear which may eventually break down the component.

Opens or even shorts may present themselves during link tests.

Deterioration of dielectric material may cause shifts in values.

Resistor and solder cracking may occur over time.

Page 8: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

Reasoning contd.Higher running

devices will have a greater tendency for failure due the

amount of use received in

comparison to the lower running

devices.

Through Screening the amount of time

invested in setups, and down events will

be lowered.

Legacy devices need to be ran to ensure when the product is

needed the hardware will be available and in active condition.

Page 9: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

The role, and contributions.

TSE will be assigned to run hardware based

off the lifecycles

established from the data

gathered.

PM cycles will be entered on

all product specific

hardware in Indy Soft.

Maintenance will be

performed on hardware using

the Flying Prober test

system.

Necessary repairs, or

passing results will be recorded

as necessary.

Page 10: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

The role, and contributions contd.

Once the PM process has been implemented TSE training will take place for all TSE to

have the ability to run the Flying prober and

make repairs.

Once TSE has been trained SPA’s will then

be given the same training to give greater

bandwidth to the PM process.

Equipment will then be assigned for all

individuals on a PM cycle that will be

logged into Indy Soft.

Page 11: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

Change InitiationEstablish a PM timeline for all product specific hardware.

Only hardware that has a released program will be put on a PM cycle. As programs are developed the hardware will be added to the PM process.

Assign hardware accordingly to individuals that have received training on the system and process.

Page 12: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

Change Initiation contd.Create tasks to be completed.

The main Target would be establishing the frequency of the PM.Secondary would Training TSE/SPA.

Third would be entering PM per hardware and assigning ownership.

Page 13: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

Change Initiation contd.Once all hardware has

received a PM schedule failure mechanisms will be recorded.

Data can be gathered to dissect highest failure rate,

and areas prone to fail.

Issues will be tracked to find problem areas with particular

hardware, and products.

Page 14: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

The Future. The future will have more robust

hardware. Provide education for everyone so

issues can be addressed on the fly. Create a PM process that will prevent

issues form arising.

Page 15: Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware

The Future contd.

To remove uncertainty

with hardware .

To remove disparity of low yields,

and unknown cause.

Creating repeatable results, and