Hardware Commissioning. Preparation Documentation MTF Programme Status The Review The commissioning activity in 2005-2006 Resources Outlook The new schedule. Roberto Saban on behalf of the Hardware Commissioning Team. MAC19 060616. The method. Sytem owners define and carry-out. . - PowerPoint PPT PresentationTRANSCRIPT
Hardware Commissioning
PreparationDocumentationMTFProgramme
StatusThe ReviewThe commissioning activity in 2005-2006Resources
OutlookThe new schedule
Roberto Saban on behalf of the Hardware Commissioning Team
MAC19 060616
Roberto Saban TS MAC 19 060616
The methodin
div
idual sy
stem
test
shard
ware
com
mis
sionin
g
After the qualification qualification for operation of the for operation of the individual systemsindividual systems of a sector (vacuum, cryogenics, quench protection, interlocks, powering, etc.),
each sector will be each sector will be commissioned as a commissioned as a wholewhole up to the powering to nominal current of all the circuits.Validation and Validation and specific studiesspecific studies will be carried-out on the first commissioned sector.
What testsWhat tests• the procedures and the sequencethe procedures and the sequence
How How • what conditions are required to startwhat conditions are required to start• what conditions determine it is finishedwhat conditions determine it is finished• what conditions are required during the testswhat conditions are required during the tests
Sytem owners define and carry-outSytem owners define and carry-out
Hardware Commissioning Coordination Hardware Commissioning Coordination ensures that the conditions required existensures that the conditions required exist
What testsWhat tests• the procedures and the sequencethe procedures and the sequence
How How • what conditions are required to startwhat conditions are required to start• what conditions determine it is finishedwhat conditions determine it is finished• what conditions are required during the testswhat conditions are required during the tests
Hardware Commissioning Coordination Hardware Commissioning Coordination with System Owners define and carry-outwith System Owners define and carry-out
and ensures that the conditions required and ensures that the conditions required existexistP
rep
ara
tion
Roberto Saban TS MAC 19 060616
The logicPre
para
tion
subsystems ready
all systems ready for machine check out
individualsystem tests
hardwarecommissioning
two types of documents : as designedas tested
impact on equipment safety impact on equipment/system performance impact on machine performance
Roberto Saban TS MAC 19 060616
Commissioning Procedures & Failure Scenarios
Progress has been made in convincing our colleagues from the equipment groups of the usefulness of the documentation
Documentation describing the Individual System Test and Hardware Commissioning Procedures now exist for most of the systems
Only a few documents describing Failure Scenarios have been prepared
A standard chapter on Safety was introduced in all of them following the guidelines of the Safety Coordinators
These documents are used as a hard reference by those who carry out the tests in the field; these documents are alive: in fact, the have undergone updates following experience when carrying them outP
rep
ara
tion
Roberto Saban TS MAC 19 060616
SECTOR 7-8Sector
Region Components
Equipment group
Superconducting
Circuits
RQS.A78B2.RR77
Equipment
Arc 78Arc 78
Power Converter
ISTIST
The Manufacturing & Test FolderPre
para
tion
Roberto Saban TS MAC 19 060616
The Manufacturing & Test FolderPre
para
tion
EDMS – MTF for Circuit Related Components:
AC Distribution Powering Interlock for warm and cold circuits Quench Protection System Energy ExtractionControl Cooling & Ventilation Cooling Power Cables Electrical Quality Assurance Power Converter Short Circuit Tests DFBs CryogenicsVacuum Access & Safety
EDMS – MTF for Beam Related Components:
Beam Instrumentation Controls + Beam Energy Meter Collimators Kicker System Diluters Beam Interlock System Beam Dumping System Beam Injection SystemRF
Roberto Saban TS MAC 19 060616
The Manufacturing & Test FolderPre
para
tion
Data already uploaded for Sectors 78, 45 and 81 ! (~1000 slots filled in)
Roberto Saban TS MAC 19 060616
The commissioning programmePre
para
tion
Front 1Front 2 Front 1 Front 2
Left Right
6.6 km
Front 1 arc and the matching section on the even side
Front 2 arc, the matching section on the odd side and the inner triplets on both sides
two shifts = 15 hour days
Roberto Saban TS MAC 19 060616
The day to day coordination : the human resourcesPre
para
tion
operationsupport to operationdata recordingreporting
Field Control Room or CCC
Sector A1 Engineer1 Technician
1 AB Operator
Sector B1 Engineer1 Technician
Progress TrackingPlanningRe-schedulingMeetingsCrisis ManagementMTFDatabaseAnalysisInformation processingPublications
Project Management
1 Project Leader1 Mr.Circuit & DPL1 Database/Web Expert1 Administrative Assistant
hardware orientedsmall repairmissing detailsaccess/balisage
Field Preparation
LHC Safety Coordinationadvise on safety mattersenforce safety in the field
Roberto Saban TS MAC 19 060616
The review & its recommendationsS
tatu
s
Some organisational matters were judged worth further attention.
It was noted that Hardware Commissioning will be the first occasion where the safety measures (responsibility, training, access conditions, signalling, etc.) put in place for LHC will be evaluated for the first time. Furthermore, Hardware Commissioning will be a test of the new organisation of Safety at CERN; its impact must be monitored.
A number of issues related to controls & informatics were noted.
Important technical issues related to either the conditions under which the tests are carried-out (e.g. the ventilation of the tunnel during the tests) or the tests themselves were considered; some of them must be reconsidered in the light of the present installation and commissioning scenario.
Roberto Saban TS MAC 19 060616
The commissioning activity in 2005-2006
Three underground powering areas around even points were tested with the power converters connected to the cables (water and air cooled)
Sta
tus
DFBs
fieldcontrolroom
PowerConverters
EnergyExtractionSystems
One smaller underground powering area close to Point 7 is being tested now.
Roberto Saban TS MAC 19 060616
The commissioning activity in 2005-2006S
tatu
s
Roberto Saban TS MAC 19 060616
The supply air temperature of the HVAC units is regulated at 17.5 ± 1.5 ˚C except ESCL 7,9,10,11 and 12. ESCL1 PID is optimized for hi-speed fan . ESCL7 showed a regulation problem since a manual valve had remained closed. ESCL9 to 12 inefficiency problem.
Data provided by ST-CV
The commissioning activity in 2005-2006S
tatu
s
Roberto Saban TS MAC 19 060616
The temperature at the ducts showed maximum values of 74 ˚C 10h after start up PC. At 03:15 cables 1808470 showed 154 ˚C at their end. Tightening problem solved at 04:30.
The commissioning activity in 2005-2006S
tatu
s
Roberto Saban TS MAC 19 060616
ResourcesS
tatu
s
Roberto Saban TS MAC 19 060616
The new scheduleO
utl
ook
A piece of cake
The nightmare
Roberto Saban TS MAC 19 060616
The new schedule
It looks it can be done with a few reserves like the activation of the tunnel during this first run, the commissioning of the access safety and access control system, the approval of the as-built access safety and access control system by the INB authorities, the fact that we would start with a machine which is not so well aligned (no smoothing)
Careful tuning of co-activities is needed Some additional resources will be needed in
2007 (man power and hardware) Resources not originally planned for will be
needed in 2008 The program for 2008 must be closely watched
to ensure that the remaining commissioning can really be done in the three months allocatedO
utl
ook
Roberto Saban TS MAC 19 060616
Conclusions
Preparation “finished” Awareness of safety and equipment
integrity must be continuously stimulated
First experience in the field positive but the real heat is not yet on
The resources were found but must be monitored in the light of the changing scenario
Delicate scheduling of the activities to match the available resources and the requirements of the scheduleH