    Feryery Safariaafaria MT MT

    PelatihanPelatihan ManajemenManajemen Proyek Proyek (Primavera)(Primavera)

    PTPT WijayaWijaya KaryaKarya ( (PerseroPersero) ) Tbk Tbk – – April 2013 April 2013

    INSTALLATION

    2

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    2/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 2

    Minimum Requirement in order to able forMinimum Requirement in order to able for

    Primavera InstallationPrimavera Installation

    Supported Platforms for Primavera Client modules (Project Management, 

    Methodology

    ,  , 

    ■ Microsoft Windows 2000 Professional (SP4)

    ■ Microsoft Windows XP (SP2)

    ■ Citrix MetaFrame XP FR2 (for Windows 2000)

    ■ Citrix MetaFrame XP FR3 (for Windows 2003)

    Minimum Client Configurations  For clients running the Project Management, 

    Portfolio Analysis, and Methodology Management modules

    ■ 128 MB of  RAM, 256 MB free recommended

    ■ 40 MB

     of 

     hard

    ‐disk

     space

     (per

     module)

    ■ Microsoft Internet Explorer 6.0 (SP1 or SP2)

    ■ TCP/IP network protocol

    3

    Primavera Installation ProcessPrimavera Installation Process

    If  you are installing  from a CD, insert  CD 1.  An introductory  screen should  appear  

    that   provides installation options. If  the screen does not  appear, or  if  you are 

    installing  from a network  location, double‐click  SETUP.EXE  in the root   folder  of  CD 1 

    .

    Click  Install  Client   Applications.

    4

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    3/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 3

    Primavera Installation ProcessPrimavera Installation ProcessEnter  the  product  key  located  on the CD 1 label.

    If  you are installing  from a network  location and  are not  sure what  the  product  key  is, ask  

    your  system administrator.

     

    ECEC –– C01C01

    5

    Primavera Installation ProcessPrimavera Installation Process

    If  you want  to install  the stand the stand ‐‐alone alone version, choose Primavera Stand Stand ‐‐alone.alone.

    6

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    4/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 4

    Browse to

     the

     location

     of 

     the

     LICENSE.TXT 

      file.

      A

     license

     key 

      file

     is

     required 

     to

     use

     the

     

    software and  should  have been  provided  via e‐mail  or  diskette.

    Primavera Installation ProcessPrimavera Installation Process

    7

    Primavera Installation ProcessPrimavera Installation ProcessSelect  the driver  type  for  the Primavera database.

    8

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    5/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 5

    Primavera Installation ProcessPrimavera Installation ProcessEnter  your   public login information.

    9

    Primavera Installation ProcessPrimavera Installation Process

    Click  Next  to test  the database connection.

    10

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    6/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 6

    Primavera Installation ProcessPrimavera Installation Process

    Click  Finish to complete the installation.

    11

    PROJECT MANAGEMENT REVIEW

    12

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    7/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 7

    WHAT IS A PROJECT??

    Suatu proyek adalah serangkaian aktivitas dan

    rencana untuk membuat produk ataumemberikan pelayanan.

    Proyek memiliki tanggal mulai dan selesai, workbreakdown structure (WBS), sejumlah aktivitas,u ungan, penge uaran, res o, an a nnya.

    13

    CHARACTERISTICS OF PROJECTS

    New / innovative, relevant / important.New / innovative, relevant / important.

    Complex, dynamic.Complex, dynamic.

    Interdisciplinary.Interdisciplinary. Project “ culture” (rules and way ofProject “ culture” (rules and way of

    management).management).

    14

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    8/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 8

    WHAT IS A PROJECT ?WHAT IS A PROJECT ?

    Project is a process to reach a unique certain target,which limited by time and resources.

    performanceperformance

    TargetTarget

    reqreq performanceperformance

    CostCost

    Time (schedule)Time (schedule)

    due datedue date

    15

    TEN PROBLEMS WITH PROJECTSEN PROBLEMS WITH PROJECTS

    BIENKOWSKIIENKOWSKI, 1989) 1989)

    The project is a solution in search of a.

    Only the project team is interested in the endresult.

    No one is in charge.

      .

    The project plan lacks detail.

    The project is under-budgeted.

    16

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    9/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 9

    TEN PROBLEMS WITH PROJECTSEN PROBLEMS WITH PROJECTS

    BIENKOWSKIIENKOWSKI, 1989) 1989)

    Insufficient resources are allocated.

    The project is not tracked against its plan.

    The project team is not communicating.

    The project strays from its original goals.

    Solution:employ Project Management techniques!

    17

    PROJECT MANAGEMENT PMBOK)ROJECT MANAGEMENT PMBOK)

    Project management is the application ofProject management is the application of

    knowledge, skills, tools, and techniquesknowledge, skills, tools, and techniques

    o pro ec ac v es n or er o mee or exceeo pro ec ac v es n or er o mee or excee

    stakeholder needs and expectationsstakeholder needs and expectations

    from a project from a project . Meeting or exceeding stakeholder. Meeting or exceeding stakeholderneeds and expectations invariablyneeds and expectations invariably

    involves balancing competing demands among:involves balancing competing demands among:

    • Scope, time, cost, and quality.• Scope, time, cost, and quality.

    • Stakeholders with differing needs and• Stakeholders with differing needs and

    expectations.expectations.

    • Identified requirements (needs) and unidentified• Identified requirements (needs) and unidentified

    requirements (expectations).requirements (expectations).

    18

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    10/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 10

    WHAT IS MANAGEMENT?HAT IS MANAGEMENT?

    Basic Principles of Management:Basic Principles of Management:

    Think and act resultThink and act result--orientated.orientated.

    Contribute to the big picture.Contribute to the big picture.

    Focus on few things.Focus on few things.

    Use your strengths.Use your strengths.

    Create trust.Create trust. Think positive.Think positive.

    19

    (Fredmund Malik)

    PROJECT MANAGEMENTROJECT MANAGEMENT

    WHO doesWHO does

    WHATWHAT

    (until) WHEN(until) WHENHOW (in which form)HOW (in which form)

    WHYWHY

    WHERE.WHERE.

    20

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    11/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 11

    PRIME OBJECTIVES OF PROJECT MANAGEMENTRIME OBJECTIVES OF PROJECT MANAGEMENT

    Done on time.

    Completed within budget.

    Quality work (meets specifications).

    Safe work environment.

    Free from litigation.Time

    21

    Quality $

    WHY PROJECT MANAGEMENT?WHY PROJECT MANAGEMENT?

     Actual workOptimal work

       L  e  v  e   l  o   f   E   f   f  o  r   t Max work load

    22

     AssignedDate

    Due Date

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    12/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 12

    PROJECTS ARE BALANCING ACTSROJECTS ARE BALANCING ACTS

    Cost/Resources Schedule/Duration Scope/Quality

    23

    Project

    PROJECT MANAGEMENT SCOPEROJECT MANAGEMENT SCOPE

    Planning Planning 

    ObjectivesObjectives Scheduling Scheduling 

    ResourcesResources

    Work break Work break- -downdown

    scheduleschedule

    OrganizationOrganization

     

    Start & end timesStart & end times

    Network Network 

    24

    Controlling Controlling 

    Monitor, compare, revise, actionMonitor, compare, revise, action

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    13/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 13

    PROJECT MANAGEMENT SCOPEROJECT MANAGEMENT SCOPE- PLANNINGLANNING

    25

    BeforeBefore Start of project  Start of project During  During 

     project  project TimelineTimeline project   project 

    PROJECT MANAGEMENT SCOPEROJECT MANAGEMENT SCOPE- SCHEDULINGCHEDULING

    26

    BeforeBefore Start of project  Start of project During  During 

     project  project TimelineTimeline project   project 

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    14/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 14

    PROJECT MANAGEMENT SCOPEROJECT MANAGEMENT SCOPE- CONTROLLINGONTROLLING

    27

    BeforeBefore Start of project  Start of project During  During 

     project  project TimelineTimeline project   project 

    PROJECT MANAGEMENT SCOPEROJECT MANAGEMENT SCOPE

    28

    BeforeBefore Start of project  Start of project During  During 

     project  project TimelineTimeline project   project 

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    15/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 15

    “If you do not know where you are“If you do not know where you are

    going, every road will get yougoing, every road will get you

    nowhere.” nowhere.” 

    Henry Kissinger Henry Kissinger 

    29

    PRIMAVERA SOFTWAREPRIMAVERA SOFTWARE

    Primavera provides a set of  integrated 

    components that meet the project management 

    needs of  different areas of  an organization. It  uses 

    standard  Windows

     interfaces,

     Web

    ‐enabled 

     technology, and  stand ‐alone (Microsoft  SQL Server 

    Desktop Engine (MSDE)) or  network ‐based  (Oracle 

    .

    30

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    16/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 16

    MSDE is a data engine built on SQL Server

    MSDEMSDE

    .

    users and multiple databases, limited to 2

    GB perdatabase. If your requirements extend

    beyond these limitations, you can easily

    move to SQL Server.

    31

    Module of PrimaveraModule of Primavera

    1. Project Management module, which can stand alone for  pro ject and resource management or be used with companion

    roducts. Timesheets enables Web-based team communication

    and time keeping;

    2. Methodology Management  a module for authoring andstoring methodologies, or project plan templates. Methodology

    Management enables your organization to gather its “ best

    practices” and store them in a central methodology

    management database.

    3. Portfolio Analysis Portfolio Analysis is an executivereporting tool, providing summaries and tracking layouts of

    project data. Portfolio Analysis is the ideal tool for members of

    the senior management team to review project data and analyze

    performance.

    32

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    17/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 17

    GETTING STARTED

    33

    GETTING STARTEDETTING STARTED

    •• Click Proj ect Management IconClick Proj ect Management Icon•• Login Name:Login Name:

    adminadmin•• Password:Password:

    adminadmin

    34

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    18/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 18

    Getting Started

    35

    CUSTOMIZING DISPLAY

    36

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    19/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 19

    CREATING A NEW PROJECT FILE

    • File > New.

    • oose w ere e pro ec w edeveloped.

    • Determine ID and the New Project Name;

    • Determine Starting Date of Project;

    •  

    • Choose rate type;

    • Choose No, do not run the Project Architect.

    • Finish.37

    CREATING A NEW PROJECT FILE

    38

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    20/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 20

    ENTERPRISE PROJECT STRUCTURE (EPS)

    39

    EPSPS ENTERPRISE PROJECT STRUCTURE ENTERPRISE PROJECT STRUCTURE

    40

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    21/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 21

    Primavera TermsPrimavera Terms

    •• EPS EPS   A A hierarchyhierarchy thatthat representsrepresents thethe breakdownbreakdown of of projectsprojects inin thetheorganizationorganization.. NodesNodes atat thethe highest,highest, or or root,root, levellevel mightmight representrepresent divisionsdivisions withinwithinyour your company,company, projectproject phases,phases, sitesite locations,locations, or or other other major major groupingsgroupings thatthat meetmeet

    •• OBS OBS  A A globalglobal hierarchyhierarchy thatthat representsrepresents thethe managersmanagers responsibleresponsible for for thetheprojectsprojects inin your your organizationorganization.. TheThe OBSOBS usuallyusually reflectsreflects thethe managementmanagement structurestructureof of your your organization,organization, fromfrom toptop--levellevel personnelpersonnel downdown throughthrough thethe variousvarious levelslevels

    -- --

    thethe needsneeds of of your your organization,organization, whilewhile projectsprojects alwaysalways representrepresent thethe lowestlowest levellevelof of thethe hierarchyhierarchy.. EveryEvery projectproject inin thethe organizationorganization mustmust bebe includedincluded inin anan EPSEPSnodenode..

    .. ..

    •• WBS WBS  A A hierarchicalhierarchical arrangementarrangement of of thethe productsproducts andand servicesservices producedproducedduringduring andand byby aa projectproject.. InIn thethe ProjectProject ManagementManagement module,module, thethe projectproject isis thethehighesthighest levellevel of of thethe WBS,WBS, whilewhile anan individualindividual activityactivity requiredrequired toto createcreate aaproductproduct or or serviceservice isis thethe lowestlowest levellevel.. EachEach projectproject inin thethe EPSEPS hashas itsits ownownWBSWBS..

    41

    EPS

    • Enterprise project structure (EPS) membentuk.

    • Tiap EPS node (atau folder ) bisa diuraidiurai

    keberbagai tingkatan untuk menunjukkanpekerjaan yang harus dilakukan.

    • Jumlah tingkatan dan strukturnya masing-masing bergantung pada lingkup dari poyek dancara merangkum data.

    42

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    22/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 22

    EPS

    Kita bisa gunakan EPS untuk

    e a u an op- own u ge ng ser a ana s ssumber daya dan biaya.

    Mengatur WBS dan OBS dalam satu strukturyang umum.

    Men elola berba ai ro ek dari tin katan

    tertinggi sampai pada individu yang melakukanaktivitas spesifik dari proyek.

    43

    Enterprise ProjectEnterprise Project StructStruct. (EPS). (EPS)

    WIKA

    DEPT. ENERGIDEPT. UTILITASDEPT. SIPIL

    UMUMDEPT. WILAYAH& LUAR NEGRI

    DEPT. SIPILUMUM i

    DEPT. SIPILUMUM II

    CIREBON STA.MODIFICATION

    PROJECT

    BANDENGANFLYOVERPROJECT

    WBS1

    WBS2 44

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    23/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 23

    Setting up EPSToTo establishestablish thethe EPS EPS nodesnodes that that will will containcontain your your projects, projects, choosechoose Enterprise,Enterprise,

    EnterpriseEnterprise Project Project StructureStructure..

    45

    Setting up EPSSetting up EPS

    46

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    24/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 24

    ORGANIZATIONAL BREAKDOWN (OBS)

    47

    OBS

    • Organizational breakdown structure (OBS)

    yang bertanggung jawab untuk berbagai proyek

    di perusahaan.• OBS biasanya menguraikan struktur 

    manajemen dari perusahaan, mulai dari jajaranop- eve sampa pa a er aga ng a an

    dibawahnya.

    48

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    25/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 25

    OBS

    (MENAMPILKAN OBS)

    • Kita bisa menampilkan OBS dalam dua cara.

    1. engan mengguna an  c ar  un umenampilkan gambaran grafikal dari informasiOBS.

    2. Dengan menggunakan OBS table untukmenampilkan informasi dalam format kolom.

    49

    OBS

    (MENAMPILKAN OBS)

    Enterprise > OBS.

     pa a a og ox un u menen u ancara penampilan OBS yang diinginkan (dalam

    bentuk Chart View atau Table View).

    50

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    26/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 26

    Organizational Breakdown (OBS)Organizational Breakdown (OBS)

    51

    Setting up OBS

    ChooseChoose Enterprise,Enterprise, OBS OBS.. Select Select thethe OBS OBS element element immediately immediately aboveabove and and of of 

    thethe samesame hierarchy hierarchy level level asas thethe element element you you want want toto add,add, thenthen click click Add  Add 

    52

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    27/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 27

    Setting up OBS

    53

    WORK BREAKDOWN STRUCTURE (WBS)

    54

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    28/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 28

    WORK BREAKDOWN STRUCTURE

    • Work breakdown structure (WBS) adalah hirarki 

    menyelesaikan suatu proyek.

    • WBS disusun dalam tahapan detail pekerjaan,dimulai dari outputnyaoutputnya, dan kemudian diuraikanke berbagai elemen kerja yang bisa

    en as an.

    55

    Dalam membuat proyek, manajer proyek secara tipikal mengembangkan 

    WBS terlebih dahulu, menyediakan dokumen untuk tiap elemen WBS, dan 

    menentukan berbagai aktivitas untuk melakukan elemen kerja yang ada.

    SUCCESSFUL WBSUCCESSFUL WBS

    Each activity in the WBS will be:Each activity in the WBS will be:

    SingleSingle--purposed;purposed;

    Of a specific t ime duration;Of a specific t ime duration;

    Manageable;Manageable; Its time and cost easily derived;Its time and cost easily derived;

    Deliverables clearly understood;Deliverables clearly understood;

     

    assigned; andassigned; and

    The final defined activit ies will be known asThe final defined activit ies will be known as

    entities.entities.

    56

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    29/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 29

    VIEWING Work breakdown structureVIEWING Work breakdown structure

    View the Work Breakdown Structure chartClick the Display Options bar, then choose Show on Top, Chart View. To changethe displayed information, click the Display Options bar and choose Chart BoxTemplate, then an information type.

    57

    VIEWING Work breakdown structureVIEWING Work breakdown structure(TABLE style)(TABLE style)

    58

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    30/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 30

    GROUPING BYROUPING BY WBSBS PATHATH

    59

    WBS OF CIREBON STATION MODIFICATION PROJECT

    CommencementCommencement MobilizationMobilization

    Topographical SurveyTopographical Survey

    General ProvisionGeneral Provision

    Relocation & Protection Relocation & Protection 

    of  Public Utilitiesof  Public Utilities

    Temporary Access Temporary Access 

    Civil WorkCivil Work

    Utilities InvestigationUtilities Investigation

    Soil InvestigationSoil InvestigationTemporary BridgeTemporary Bridge

    Cut & FillCut & Fill

    Platform & ShelterPlatform & Shelter

    DEPODEPO

    POLSUSKAPOLSUSKA

    Watchman Watchman 

    Rehabilitation Rehabilitation 

    Facility WorkFacility Work

    Railway SwitchRailway Switch

    New Track PanelNew Track Panel

    Track WorkTrack Work

    Bridge WorkBridge Work

    Modification of  InterlockingModification of  Interlocking

    Point MachinePoint Machine

    Axle CounterAxle Counter

    Signal & Telecom Signal & Telecom 

    WorkWork

    KejaksanKejaksan Station Station 

    Building.Building.

    JPJP -- JDIRJDIR

    CTC CTC 

    CommissioningCommissioning

    CompletionCompletion

    60

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    31/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 31

    FORMATTING CURRENCY, DATES & UNIT

    61

    Formatting CurrencyFormatting Currency

    62

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    32/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 32

    SETTING UP USER PREFERENCESETTING UP USER PREFERENCES

    Choose Edit, User Preferences, then click the Currency tab to specify theChoose Edit, User Preferences, then click the Currency tab to specify the

    currency used to view cost data, and whether to show or hide the currencycurrency used to view cost data, and whether to show or hide the currencysymbol and/or decimal values in cost values.symbol and/or decimal values in cost values.

    63

    Formatting CurrencyFormatting Currency

    64

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    33/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 33

    Formatting Time Unit

    TimeTime unit unit settingssettings affect affect how how timetime unit unit valuesvalues areare displayed displayed inin tracking tracking layouts,layouts, activity activity durations,durations, resourceresource prices, prices, availability,availability, and and work work effortsefforts..

    ChooseChoose Edit,Edit, User User Preferences,Preferences, thenthen click click thethe TimeTime UnitsUnits tabtab..

    65

    Formatting DatesChooseChoose Edit,Edit, User User Preferences,Preferences, thenthen click click thethe DatesDates tabtab toto specify specify how how toto

    display display datesdates..

    66

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    34/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 34

    Formatting Units

    ChooseChoose Admin, Admin, Admin Admin Categories,Categories, thenthen click click thethe Unit Unit MeasuresMeasures

    67

    CALENDARS

    68

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    35/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 35

    Creating CalendarsCreating Calendars

    ThereThere areare threethree calendar calendar poolspools:: global,global, resourceresource,, andand

    projectproject..

    •• ee g o ag o a ca en ar  ca en ar  poopoo con a nscon a ns ca en arsca en ars aaapplyapply toto al lall projectsprojects inin thethe databasedatabase..

    •• TheThe projectproject calendar calendar poolpool isis aa separateseparate poolpool of  of calendarscalendars for for eacheach projectproject inin thethe organizationorganization..

    •• TheThe resourceresource calendar calendar poolpool isis aa separateseparate poolpool of  of calendarscalendars for for eacheach resourceresource..

    69

    Creating CalendarsCreating Calendars

    Create a global calendarCreate a global calendar

    Choose Enterprise, Calendars. Choose Global, then click Add. Select theChoose Enterprise, Calendars. Choose Global, then click Add. Select the

    calendar you want to copy for the new global calendar, then click the Selectcalendar you want to copy for the new global calendar, then click the Select

    button. Type the new calendar’s name. To make the new calendar the defaultbutton. Type the new calendar’s name. To make the new calendar the default

    g o a ca en ar or ac v es an resources, mar e e au c ec ox. o eg o a ca en ar or ac v es an resources, mar e e au c ec ox. o e

    the new calendar, click Modify. To view the calendar’s assignments beforethe new calendar, click Modify. To view the calendar’s assignments before

    changing it, click Used By.changing it, click Used By.

    70

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    36/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 36

    Modifying CalendarsModifying Calendars

    71

    Modifying CalendarsModifying Calendars

    72

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    37/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 37

    Modifying CalendarsModifying Calendars

    73

    ACTIVITIES

    74

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    38/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 38

    ACTIVITY CODES

    • Kita bisa mengelola berbagai proyek didalam 

    spesifik, misalnya lokasi dan manajer,menggunakan kodekode proyekproyek (project codes).

    • Kita bisa mendefinisikan kode proyek hirarkisyang tak-terbatas untuk memenuhi persyaratanmenyaring, mengurutkan, dan melaporkan

    proyek, dan mengatur secara hirarkis untukpengelolaan dan penempatan yang lebihmudah.

    75

    ACTIVITY CODES

    Kode proyek bersifat global untuk seluruh.

    Tetapkan nilai untuk tiap kode proyek yang

    dibuat.

    76

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    39/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 39

    Establishing Activity Codes (Pay Item)Establishing Activity Codes (Pay Item)

    77

    Establishing Activity Codes (Pay Item)Establishing Activity Codes (Pay Item)

    78

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    40/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 40

    Establishing Activity Codes (Pay Item)Establishing Activity Codes (Pay Item)

    79

    Establishing Activity CodesEstablishing Activity Codes

    Create global activity codes

    Choose Enterprise, Activity Codes. Choose Global, then click Modify. Click Add, thentype the name of the global activity code.

    80

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    41/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 41

    Establishing Activity CodesEstablishing Activity Codes

    81

    Overview Activ itiesOverview Activ ities

     Activi ties represent work that must take place in a Activi ties represent work that must take place in a

    determined amount of time.determined amount of time.

     Activ ity ID and name Activ ity ID and name – – to uniquely ident ify andto uniquely identify and

    describe the activitydescribe the activity

    Predecessor and successor relationshipsPredecessor and successor relationships – – to defineto define

    relationships with other activities in the same projectrelationships with other activities in the same projector in di fferent projects in the enterprise projector in di fferent projects in the enterprise project

    structure (EPS)structure (EPS)

     Activi ty start and fin ish dates Activi ty start and fin ish dates

     Activi ty calendar  Activi ty calendar 

     Activi ty type, duration type, and percent complete Activi ty type, duration type, and percent complete

    type; whether an activity is a start or finish milestone;type; whether an activity is a start or finish milestone;

    how to keep an activity’s unit values, duration values,how to keep an activity’s unit values, duration values,

    and resource units/time values synchronized; andand resource units/time values synchronized; and

    how to calculate an activity’s percent completehow to calculate an activity’s percent complete 82

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    42/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 42

    WBS elementWBS element

     Activi ty codes and values Activi ty codes and values – – to categorize activ it iesto categorize activities

    ’’

    Overview ActivitiesOverview Activities

     

    ExpensesExpenses

    Work products and documents, standards, and deliverablesWork products and documents, standards, and deliverables

    ResourcesResources

    RolesRoles – – to identi fy sk ill requi rements for staff ing the activi tyto identify ski ll requirements for staffing the activity

    Notes and feedbackNotes and feedback – – to communicate with the resourceto communicate with the resource

    working on an activityworking on an activity

    Notes about performing the activityNotes about performing the activity

    StepsSteps – – to divide the activi ty in to smaller uni tsto divide the activity into smaller units

     Ac tivi ty Step Templates Ac tivi ty Step Templates – – to def ine sets of reusable stepsto define sets of reusable steps

    common to many activities in a project or across projectscommon to many activities in a project or across projects

    83

     Adding Activities Adding Activities

     Add activities in the Activity Table

    Select an activity within the group to which you want to add a new activity, then

    click Add. The new activity is placed according to the sorting options selected for the layout.

    84

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    43/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 43

    DEFINING GENERAL ACTIVITY INFORMATION

    In the Activities window, select the activity whose general information you want todefine. Click the Layout Options bar, then choose Show on Bottom, Activity Details;click the General tab.

    85

    RELATIONSHIPS

    86

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    44/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 44

    • Hubungan mendefinisikan bagaimana suatu

    ACTIVITY RELATIONSHIPSCTIVITY RELATIONSHIPS

    selesainya aktivitas lainnya.

    • Tetapkan hubungan antar aktivitas untukmembentuk suatu jalur  jalur didalam jadwal mulaidari aktivitas pertama sampai pada aktivitas

    era r  .

    • Hubungan ini, yang membentuk logika dari jaringan proyek, digunakan bersama dengandurasi aktivitas untuk menentukan jadwal.

    87

    ACTIVITY RELATIONSHIPSCTIVITY RELATIONSHIPS

    ExamplesDefinitionType

    You can't finish logging inventory off a truck until everythinghas been unloaded from the truck."I " ' " "

    Task A must be completedbefore

    Finish to FinishFF

    You have to begin training new employees before you canevaluate their progress. The training, however, need not becomplete before evaluation begins."Level concrete" can't begin until "Pour foundation" begins.

    Task A must be started(but does not need to be completed)

    before Task B can begin.

    Start to Start(SS)

    You can't take a picture until you've loaded the camera withfilm.

    "Paint fence" can't start until "Construct fence" finishes.

    Task A has to be completed beforeTask B can begin.

    Finish to Start(FS)

     

    Task B

    Task A

    Task B

    Task A

    88

    We need to begin painting the house before someone canevaluate the color for a proper match. But the painting neednot be finished before the evaluation is completed

    Task A has to be started before Task B can befinished.

    Start to Finish(SF)

    I .  .Task B

    Task A

    Task B

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    45/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 45

    ACTIVITY RELATIONSHIPSCTIVITY RELATIONSHIPS

    LAG represents a delay between the finish of

    successor task.

    Example: Use on day lag between the finish of“Paint Wall” and the start of “Hang Pictures” toallow the paint to dry.

    89

    Paint Wall Hang PicturesFinish to Startw/ 1 day LAG

    ACTIVITY RELATIONSHIPSCTIVITY RELATIONSHIPS

    LEAD is an overlap of two tasks, so the

    finishes. Lead time is represented as

    negative lag (i.e. -1 day).Example: Use lead time to begin “Plaster Walls”

    when “Construct Walls” is half done.

    90

    Construct Wall

    Plaster Walls

    Finish to Start

    w/ 50% LEAD

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    46/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 46

    ASSIGN RELATIONSHIPS USING ACTIVITY DETAILS

    In the Activi ties window, select the activity to which youIn the Activi ties window, select the activity to which you

    want to add a predecessor or successor relationship.want to add a predecessor or successor relationship.

    91

    RESOURCES

    92

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    47/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 47

    RESOURCES

    ResourcesResources includeinclude thethe personnelpersonnel andand

    equipmentequipment thatthat performperform workwork onon activitiesactivities

    acrossacross allall projectsprojects..

    ResourcesResources areare different different thanthan expensesexpenses.. WhileWhile

    somesome resourcesresources areare timetime- -based based and and generally generally 

    extend extend acrossacross multiplemultiple activitiesactivities and and projects, projects,

    expensesexpenses areare oneone- - meme expen uresexpen ures or  or 

    nonreusablenonreusable itemsitems required required by by activitiesactivities..

    93

    RESOURCES

    94

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    48/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 48

    RESOURCES

    95

    DEFINE RESOURCE SHIFTS

    Define resource shiftsDefine resource shifts

    Choose Enterprise, Resource Shifts. Click Add, then type the new shift’s name.Choose Enterprise, Resource Shifts. Click Add, then type the new shift’s name.

    To edit the new shift, click Modify.To edit the new shift, click Modify.

    96

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    49/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 49

    VIEW RESOURCES

    ChooseChoose Enterprise,Enterprise, Resources,Resources, or or c lickclick ResourcesResources onon thethe

    HomeHome workspaceworkspace.. ClickClick thethe DisplayDisplay OptionsOptions bar,bar, thenthen

    choosechoose oneone of  of thethe followingfollowing::

    ToTo viewview detaileddetailed informationinformation aboutabout aa specif icspecific resource,resource,

    choosechoose Detai ls,Details, thenthen selectselect thethe resourceresource whosewhose

    informationinformation youyou wantwant toto viewview..

    ToTo viewview resourcesresources asas aa chart,chart, choosechoose ChartChart ViewView..

    ToTo selectselect thethe columnscolumns toto includeinclude inin thethe display,display, choosechoose

    Columns,Columns, Customize,Customize, or or oneone of  of thethe predefinedpredefined columncolumn

    97

    displaysdisplays..

    ToTo selectselect thethe resourcesresources toto display,display, choosechoose Filter Fi lter By,By,

    thenthen choosechoose All Al l Active Active Resources,Resources, All Al l Resources,Resources, or or 

    CurrentCurrent Project’sProject’s ResourcesResources..

    ADD RESOURCE CODE VALUES

    InIn thethe ResourceResource CodesCodes dialog dialog box,box, select select thethe codecode for for whichwhich you you want want toto

    establishestablish values,values, thenthen click click Add  Add.. TypeType thethe resourceresource codecode valuevalue namename;; thethe

    maximummaximum number number of of characterscharacters isis preset  preset at at thethe resourceresource codecode level level.. TypeType aa

    descri tiondescri tion for for thethe valuevalue.. ToTo createcreate aa hierarchhierarch of of codecode valuesvalues click click thethe ri ht  ri ht  

    arrow arrow key key toto indent indent thethe selected selected valuevalue oneone level level..

    98

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    50/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 50

    ASSIGN RESOURCE CODE VALUES

    ToTo useuse thethe CodesCodes tab,tab, click click thethe Display Display OptionsOptions bar bar and and choosechoose DetailsDetails (the(the

    box box next next toto thethe DetailsDetails command command should should bebe marked)marked).. Click Click thethe CodesCodes tab,tab,

    thenthen click click Assign Assign..

    99

    KODE SUMBER DAYAODE SUMBER DAYA

    Equiv. Rp. ¥

    LABOUR

    Kode

    SDY  Sumber Daya Unit

      UNIT RATEQuantity

      AMOUNTResources

    - , .  , .  , ,  - 

    C002 Trade Foreman man-day 76,885.00  2,720.71  209,181,907  - 

    C003 Foreman man-day 59,143.00  18,653.20  1,103,206,479  - 

    C004 Mechanic man-day 59,143.00  2,642.52  156,286,363  - 

    C007 Welder man-day 65,057.00  272.00  17,695,504  - 

    C008 Mason man-day 65,057.00  4,239.75  275,825,416  - C014 Skilled Labour man-day 59,143.00  33,972.10  2,009,212,059  - 

    C015 Labour man-day 53,228.00  84,579.37  4,501,990,832  - 

    C018 Surveyor man-day 70,971.00  3,547.56  251,773,565  - 

    C019 Technician man-day 76,885.00  252.26  19,394,981  - 

    C020 Install of Geotextile m2 591.00  73,305.00  43,323,255  - 

    C021 Placing Concrete without Concrete Pu m3 53,228.00  1,928.26  102,637,477  - 

    C024 Inst all & Fabric at ion of Reinforcement k g 1, 136.00  308,268.39  350,192,891  - 

    -

    100

      , .  .  , , 

    C045 Install RCP dia 100 cm m 236,571.00  98.00  23,183,958  - 

    C046 Labour Ls 72,864.00  15.00  1,092,960  -  P ASEP JFE REV

    C048 Labour Ls 82,445,309.00  2.00  164,890,618  -  P ASEP JFE REV

    C049 Labour Ls 38,534,349.00  2.00  77,068,698  -  P ASEP JFE REV

    C050 Labour Ls 128,423,644.00  2.00  256,847,288  -  P ASEP JFE REV

    C051 Labour Ls 214,079,719.00  2.00  428,159,438  -  P ASEP JFE REV

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    51/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 51

    ADD A RESOURCE CURVE

    Choose Enterprise, Resource Curves. Click Add. Select an existing curveChoose Enterprise, Resource Curves. Click Add. Select an existing curve

    from which to copy the curve value percentages, then click Select. Type afrom which to copy the curve value percentages, then click Select. Type a

    name for the new resource curvename for the new resource curve

    101

    ADD A RESOURCE CURVE

    Click Modify to define the curve’s distribution. Edit the curve valueClick Modify to define the curve’s distribution. Edit the curve value

     percentages to create a curve that indicates how your costs/units should percentages to create a curve that indicates how your costs/units should

    distribute over time. Curves are defined by 21 points (at 5% intervals from 0distribute over time. Curves are defined by 21 points (at 5% intervals from 0

    to 100 . Click Prorate to make the total of the distribution values e ual toto 100 . Click Prorate to make the total of the distribution values e ual to 

    100% while maintaining the shape you specified. Click OK, then Close100% while maintaining the shape you specified. Click OK, then Close

    102

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    52/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 52

    MANAGING RESOURCE ASSIGNMENTS

    Display the Resource Usage Spreadsheet

    Choose View, Resource Usage Spreadsheet, or click the Display Options bar, then

    choose Resource Usage Spreadsheet.

    103

    ROLES

    104

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    53/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 53

    ROLESOLES

    RolesRoles areare project  project personnel  personnel job job titlestitles or  or skills,skills, for for 

    example,example, project  project planner, planner, quality quality assuranceassurance tester,tester, and and 

    engineer engineer..

    View View rolesroles

    ChooseChoose Enterprise,Enterprise, Roles,Roles, thenthen click click thethe Display Display OptionsOptions

    bar bar..

    ToTo view view only only thosethose rolesroles that that havehave assignmentsassignments inin thethe

    ’ ’ 

    105

    ,, ,, ..

    ToTo view view all all roles,roles, choosechoose Filter Filter By,By, All  All RolesRoles..

    ROLESOLES

    106

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    54/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 54

    ROLES VS PROJECT ORGANIZATION CHARTOLES VS PROJECT ORGANIZATION CHART

    107

    ASSIGNING RESOURCES AND ROLES

    InIn thethe Activities Activities window,window, select select thethe activity activity toto whichwhich you you want want toto assignassign aa

    resourceresource or or rolerole.. Click Click thethe ResourcesResources tabtab inin Activity  Activity DetailsDetails

    Click Add Resource to assign a resource to the selected activity; clickClick Add Resource to assign a resource to the selected activity; click

     Add Role to assign a role to the selected activity. Select the resource Add Role to assign a role to the selected activity. Select the resource

    or role you want to assign. To assign multiple resources or roles, holdor role you want to assign. To assign multiple resources or roles, hold

    down the Ctrl key, then click each resource/role you want to assign.down the Ctrl key, then click each resource/role you want to assign.

    Click the Select button, then click the Close buttonClick the Select button, then click the Close button

    108

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    55/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 55

    BUDGETING

    109

    COST ACCOUNTS AND PROJECT EXPENSES

    ExpensesExpenses areare nonnon--resourceresource costscostsassociatedassociated withwith aa projectproject andand assignedassigned toto

    aa project’sproject’s activitiesactivities.. TheyThey areare typicallytypicallyoneone--timet ime expendituresexpenditures for  for nonnon--reusablereusable

    itemsitems.. ExamplesExamples of  of expensesexpenses includeinclude

    110

    ,, ,, ,, ..

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    56/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 56

    COST ACCOUNT

    • Kita bisa membuat akun biaya (cost accounts)

    pengeluaran dari sumber daya aktivitas padaproyek.

    •  Akun biaya bersifatbersifat hirarkishirarkis dan memungkinkankita menelusuri biaya aktivitas dan nilai yang

    apa .

    111

    CREATE A COST ACCOUNT HIERARCHY

    ChooseChoose Enterprise,Enterprise, Cost Cost Accounts Accounts.. Click Click thethe Cost Cost Account  Account IDID columncolumn label label toto

    display display thethe cost cost accountsaccounts hierarchy hierarchy.. An An outlineoutline symbol symbol inin thethe Cost Cost Account  Account IDID

    columncolumn label label indicatesindicates aa hierarchy hierarchy display display..

    112

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    57/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 57

    SET THE PROJECT DEFAULT COST ACCOUNT

    ChooseChoose Enterprise,Enterprise, Projects,Projects, toto openopen thethe ProjectsProjects window window.. Display Display Project Project 

    DetailsDetails by by clicking clicking thethe Display Display OptionsOptions bar bar and and choosing choosing Show Show onon Bottom,Bottom,

    Project Project DetailsDetails.. Click Click thethe DefaultsDefaults tab,tab, select select aa project  project inin thethe upper upper layout,layout,

    thenthen click click thethe BrowseBrowse buttonbutton inin thethe Cost Cost Account  Account field field.. Select Select thethe default default cost cost 

    accoun ,accoun , enen c c  c c ee e ec  e ec u onu on

    113

    ADDING EXPENSES AND ENTERING COST

    INFORMATION

    ToTo includeinclude Project Project ExpenseExpense DetailsDetails at at thethe bottombottom of of thethe Project Project ExpensesExpenses

    window,window, click click thethe Display Display OptionsOptions bar bar and and choosechoose ExpenseExpense DetailsDetails

    114

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    58/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 58

    ENTER COST INFORMATION FOR EXPENSES

    ChooseChoose Project,Project, ExpensesExpenses.. Select  Select thethe expenseexpense whosewhose cost  cost 

    informationinformation you you want want toto enter,enter, thenthen click click thethe CostsCosts tabtab

    115

    ENTER AN EXPENSE ACCRUAL TYPE

    ChooseChoose Project,Project, ExpensesExpenses.. Select Select thethe expenseexpense whosewhose accrual accrual typetype you you want want 

    toto enter,enter, thenthen click click thethe Activity  Activity tabtab..

    Select one of the following accrual types:Select one of the following accrual types:

    ■■Start of Activity,Start of Activity, to accrue the entire expense on the date the activity beginsto accrue the entire expense on the date the activity begins

    ■■End of Activity,End of Activity, to accrue the entire expense on the date the activity endsto accrue the entire expense on the date the activity ends

    ■■Uniform Over Activity,Uniform Over Activity, to evenly distribute the expense over the course ofto evenly distribute the expense over the course of

    the activity’s durationthe activity’s duration

    116

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    59/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 59

    CHANGE AN EXPENSE ASSIGNMENT

    ChooseChoose Project,Project, ExpensesExpenses.. Select Select thethe expenseexpense you you want want toto reassign,reassign, thenthen

    click click thethe Activity  Activity tabtab..

    117

    ANALYZING COSTS

    118

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    60/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 60

    BASELINES

    119

    MANAGING BASELINES

     A A baseline is a complete copy ofbaseline is a complete copy of

    a project plan that you cana project plan that you can

    compare to the current schedulecompare to the current scheduleto evaluate progress.to evaluate progress.

    120

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    61/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 61

    CREATE PROJECT BASELINES

    ChooseChoose Project,Project, MaintainMaintain BaselinesBaselines.. TheThe MaintainMaintain BaselinesBaselines dialog dialog box box 

    groupsgroups thethe currently currently openopen projects projects intointo individual individual bands,bands, withwith any any existing existing 

    baselinebaseline projects projects beneathbeneath itsits current current project  project 

    121

    COMPARING CURRENT AND BASELINE SCHEDULES

     After  After aa project   project isis updated,updated, you you cancan quickly quickly evaluateevaluate progress progress and and 

     performance performance onscreenonscreen.. UseUse aa layout layout that that showsshows current current and and baselinebaseline barsbars toto

    identify identify taskstasks that that start start or or finishfinish later later thanthan planned  planned 

    122

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    62/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 62

    UPDATING SCHEDULE

    123

    HIGHLIGHTING ACTIVITIES FOR UPDATING

    124

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    63/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 63

    UPDATING ACTIVITIES MANUALLY

    125

    PERCENT COMPLETE

    126

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    64/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 64

    PERCENT COMPLETE TYPEPERCENT COMPLETE TYPE

    toto calculatecalculate anan activity’sactivity’s percentpercent completecomplete accordingaccording toto activityactivityduration,duration, activityactivity units,units, or or aa physicalphysical percentpercent completecomplete thatthat youyouen er en er or  or eaceac ac v yac v y.. ouou musmus e nee ne aa percenpercen comp e ecomp e e ypeypefor for eacheach activityactivity..ToTo indicateindicate thatthat thethe activity’sactivity’s percentpercent completecomplete willwill bebe enteredentered

    byby thethe user user for for thisthis activity,activity, selectselect Physical Physical ..ToTo specifyspecify thatthat thethe activity’sactivity’s percentpercent completecomplete bebe calculatedcalculated

    fromfrom thethe originaloriginal andand remainingremaining duration,duration, selectselect DurationDuration..’’

    fromfrom thethe actualactual andand remainingremaining units,units, selectselect UnitsUnits..

    127

    UPDATE ACTIVITIES WITH DURATION PERCENT

    COMPLETE TYPE

    128

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    65/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 65

    UPDATE ACTIVITIES WITH PHYSICAL PERCENT

    COMPLETE TYPE

    129

    UPDATE ACTIVITIES WITH UNITS PERCENT

    COMPLETE TYPE

    130

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    66/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 66

    ASSIGN A TRACKING LAYOUT TO AN ISSUE

    131

    REPORTS

    132

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    67/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 67

    REPORTING

    • Dua alat pelaporan yang tersedia: Report.

    • Report Editor adalah alat yang sangat baik yangmemungkinkan kita untuk membuat berbagailaporan dengan kastomasi yang sangat tinggi.

    • Dibandingkan dengan Report Wizard, Report

    Editor memiliki kapabilitas untuk memberikanlaporan yang sangatsangat dekatdekat dengan persyaratanspesifik pengguna.

    133

    REPORTING

    (LAPORAN DENGAN REPORT WIZARD)

    Tools > Report Wizard.

    u ns ru s pa a ap a og ox pa a w zaruntuk membuat laporan yang diinginkan.

    134

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    68/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 68

    REPORTING

    (LAPORAN DENGAN REPORT EDITOR)

    Pilih suatu laporan yang sudah ada.

      o y.

    Klik Yes untuk konfirmasi bahwa kita inginmenggunakan Report Editor .

    Pada Report Editor , klik ikon New Report.

      .

    135

    PELAPORAN

    (PRA-TINJAU LAPORAN)

    Pada Reports window, pilih laporan dan klik Run.

    Pilih Print Preview, lalu klik OK.

    136

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    69/70

    4/10/2013

    ery Safaria, MT - Primavera Softwareaining 69

    CREATING AND MODIFYING REPORTS

    Create a report with the Report Wizard, Choose Tools, Report Wizard, and followCreate a report with the Report Wizard, Choose Tools, Report Wizard, and follow

    the prompts. Using the Wizard, you can select multiple subject areas for the report.the prompts. Using the Wizard, you can select multiple subject areas for the report.

    For each selected subject area you can customize columns and apply group, sort,For each selected subject area you can customize columns and apply group, sort,

    and filter o tionsand filter o tions  ..

    137

    USING THE REPORT EDITOR

    138

  • 8/17/2019 Handbook of Primavera Training (Indonesia)

    70/70

    4/10/2013

    THANK YOUTHANK YOU

    139

    ABOUT TRAINERBOUT TRAINER

    Full Name*) : FeryFerySafariaSafariaEmployee Number : ET042204Gender : MaleReligion : MoslemMarital Status : Married (1 son & 1 daughter);Permanent Address : Jl. Rancapetir 49A Ciamis West Java;Mobile Phone Number : +62-813-23687756Email : [email protected]

    Education : Bachelor Program (ST), Sebelas MaretUniversity ( !994-1998)Post Graduate Program (MT), Bandung Institute of Technology (1999-2002)

    Work Experience : Lecturer (1999 Lecturer (1999--2003) 2003)- Garut School of Tecnology;- Siliwangi University;- Galuh University;

     Head o De artment o Civil En ineerin Head o De artment o Civil En ineerin  Garut School of Tecnolo 2002-2003  Engineering Staff  Engineering Staff  , Double Tracking of Jogja-Kroya Project

    h f f dh f f d bl k f