hana 10things
TRANSCRIPT
-
8/12/2019 HANA 10Things
1/18
Ten Key Considerations for Your First SAP HANA Project
Alison BesshoDirector, HANA Solutions
-
8/12/2019 HANA 10Things
2/18
Optimal Solutions At-a-Glance
Ten Key Considerations for Your First SAP HANA Project
Contact Information
Contents
-
8/12/2019 HANA 10Things
3/18
At-A-Glance Founded in 1995 based in Dallas, TX
Award-winning SAP consulting firm, focused 100%on SAP planning, implementation and support
Premier SAP Consulting Partner; Gold-Level SAP All-in-One/Business Objects Partner; RunSAPcertified
Exclusive sponsor of the ASUG ExecutiveExchange
900+ highly-skilled SAP consultants/architectsworldwide
Dallas Chicago Austin Washington Atlanta
Global Headcount
2012 Revenue
SAP Clients in 2012 SAP Certified Architects & Consultants
Average SAP Experience/Consultant
Average SAP Solution Architects Experience
Prac t ice S tat i s t i c s
Were the largest pure-play SAP firm in
the world.
-
8/12/2019 HANA 10Things
4/18
Ten Key Considerations for Your First SAP HANA Project
-
8/12/2019 HANA 10Things
5/18
Find the Right Business Use CaseStart with a small initiative that will:
Wow your customer! Deliver significant improvement to a business
challenge and provide new insights and knowledge
Introduce new capability that the business wasunable to achieve previously
Introduce SAP HANA to the IT team and developtheir skills and expertise
Build the foundation for SAP HANA expansionand further value
1
-
8/12/2019 HANA 10Things
6/18
Cases that Can Benefit Significantly Business Analytics
- Financial and operational data- Customer and marketing data- SKU and inventory levels
BW on HANA for faster reporting, analytics, transactions
New SAP solutions + HANA: CRM, BPC, Predictive Analytics
Custom applications + HANA built by SAP or third-parties
Rapid Deployment Solutions (RDS) created to address aspecific performance challenge or complexity
1
-
8/12/2019 HANA 10Things
7/18
Develop High-Level ArchitectureConsider and determine:
Data sources
ETL tools
New applications (if applicable )
Analytics tools (if applicable )
Frequency and timing of:
- Data updates- Data access
2
-
8/12/2019 HANA 10Things
8/18
Finalize the Environment PlanSeveral SAP HANA environment options:
Consider a POC with a reliable integration partner
Partner with your preferred hardware vendor todeploy HANA in-house
Evaluate in-cloud solutions with Amazon or SAP
Think about the number of environments you need:
- Develop, test, produce
Remember disaster recovery or HA needs
3
-
8/12/2019 HANA 10Things
9/18
Determine Hardware Appliance Needs
Consider size of:
Production SAP HANA appliance
Development and test environments
HA and backup/recovery needs
4
-
8/12/2019 HANA 10Things
10/18
Determine Hardware Appliance Needs
Where do you begin?
Work with your SI and SAP to estimate theamount of data to be stored in HANA
- Remember: aggregation tables not needed- Only store data critical to business challenge
- Archive/purge non-critical data
Work with your HW partner to finalize theappliance architecture
4
-
8/12/2019 HANA 10Things
11/18
Contract for SAP HANA SoftwareWork with your System Integrator orSAP account representativeto determine softwarelicensing needs.
5
-
8/12/2019 HANA 10Things
12/18
Identify Your Project TeamKey positions may include: Project manager
HANA architect /data modeler
ETL team
Data source extract developers
New application developers
Report/analytics developers
HANA administrator
Test team
SAP members & SI partner members
Business users for requirements, design & UAT
6
-
8/12/2019 HANA 10Things
13/18
Coordinate HANA Training for IT Team
Obtain training from SAP or yourintegration partner. Training isavailable in many formats:
Online tutorials
Classroom training
Customized training
7
-
8/12/2019 HANA 10Things
14/18
Coordinate HANA Training for IT Team
Critical areas covered:
Introduction to SAP HANA
Data services: replication (SLT)and integration
SQL on HANA
Data modeling BW on HANA
Application training
7
-
8/12/2019 HANA 10Things
15/18
Identify Performance Metrics
Important to measure speed and capability ofthe HANA solution:
Create queries or reports in legacy databases toserve as a benchmark for HANA queries/reports
Monitor and record the processing time of similar
IT services for comparison
Collaborate with the business to understandtheir expectations
8
-
8/12/2019 HANA 10Things
16/18
Identify Testing MethodologyThink about test approach related to:
Quality and accuracy of data loaded into HANA
Speed time of data load processes
HANA processing speed determine if any fine -tuning isneeded for the data model
Application functionality (if applicable )
Data volume testing requirements
9
-
8/12/2019 HANA 10Things
17/18
Gather Business RequirementsMeet with your business partners togather organizational requirements:
Challenge business to think outside the boxand focus on just what s done today
Remember : the power of SAP HANA lies inits ability to process data very quickly and
introduce new, unexpected insights to thebusiness!
10
-
8/12/2019 HANA 10Things
18/18
Alison BesshoDirector, HANA Solutions
Cell: 303-475-0649
Thank you!
mailto:[email protected]:[email protected]:[email protected]