Haller Lake Community Club, March 6, 2014
Northgate Link Project: Transmission Line Relocation Update
![Page 2: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/2.jpg)
Link Light Rail System
• 16 miles of light rail with 13 stations currently in service
• University Link under construction; opens 2016
• ST2 Plan funded extensions to Overlake, South King County, and Lynnwood
• 54 mile system
2
![Page 3: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/3.jpg)
Northgate Link Extension
• 4.3-mile light rail extension• Stations at U District, Roosevelt, and
Northgate• Open for Service: 2021• 62,000 daily boardings added to
system by 2030
3
![Page 4: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/4.jpg)
Northgate Station Area Update
• Portal construction underway; first tunnel boring machine (TBM) launched in late May/early June
• Northgate Station design 90% complete; public open house on March 12th
• Station and guideway construction begins in
early 2016
• Early utility relocations in 2014-20154
![Page 5: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/5.jpg)
Public Involvement – December 5th Open House
• Over 740 meeting notices delivered to
residents within 1 block of proposed route
• Project newsletter also sent to Northgate
area residents
• 31 people attended open house
• Over 90 written comments since meeting
5
![Page 6: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/6.jpg)
Transmission Lines Conflict with Elevated Guideway
6
![Page 7: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/7.jpg)
115kV Transmission Lines Relocation• Elevated guideway conflicts with SCL
transmission line on 1st Ave NE
• Alternatives east of I-5 considered; SCL conceptually approved Meridian Avenue N. & N. 115th Street route
• Scope of transmission line relocation:- relocate ~ 4,000’ of 115kV line- install 13 new poles in street right-of-way - taller pole height to avoid tree impacts- steel poles will replace some wood poles
7
![Page 8: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/8.jpg)
Initial concept shown on Dec. 5th
• 7 existing wood poles to be replaced, mostly along N 115th St
- heights (75’ to 115’)
• 5 new poles proposed along Meridian Ave N
- heights (110’ to 130’)
8
![Page 9: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/9.jpg)
Community Feedback
Poles out of character with residential neighborhood and not appropriate for non-arterial street:
• Too tall• Too wide• Steel
9
![Page 10: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/10.jpg)
Design Modifications along N. 115th Street
Sound Transit in cooperation with Seattle City Light and Seattle Department of Transportation have modified the design along N. 115th Street:
• Reduced Pole Heights (5 to 20 ft.)• Replaced Steel with Glued-Laminated
(Glu-Lam) Wood Poles• Reduced Pole Widths
10
![Page 11: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/11.jpg)
Project Improvements
• Modified 3 poles from steel to wood poles
• Reduced heights along N.115th Street down to 95 feet (up to 20 foot reduction)
• Modified pole placements to avoid utility conflicts
11
![Page 12: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/12.jpg)
EXISTING INITIAL
N. 115th Street at Corliss Avenue N. Looking East
MODIFIED 12
![Page 13: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/13.jpg)
EXISTING MODIFIED
2100 Block – N. 115th Street
13
![Page 14: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/14.jpg)
What we heard
• Poles too tall
• Too wide
• Not steel
Summary Response to Community Feedback -Design Modifications on N. 115th
How we responded
• Reduced height
• Smaller base
• Wood poles
14
![Page 15: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/15.jpg)
Next Steps
• Geotechnical Investigations –
Summer 2014
• Final Design – Fall/Winter 2014
• Replace Poles – 2015
15
![Page 16: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/16.jpg)
18
Questions?
![Page 17: Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update](https://reader035.vdocuments.us/reader035/viewer/2022062307/55182bb05503469d318b4e21/html5/thumbnails/17.jpg)
For more information • Sign Up to Receive Email Updates
– www.soundtransit.org/subscribe• Sound Transit Website
– www.soundtransit.org/northlink• Contact Rhonda Dixon:
– 206.398.5300– [email protected]