h2 layout for emu
DESCRIPTION
H2 Layout for EMU. a brief report of a couple of visits by Darin A., Jay R., and FG. H2 Layout. PC#1 plus add’l rack space. more rack space + room for desks. TTCmi/ex. gas pad. beam. H2 beam dump. ME1/1. ME1/1. HCAL. magnet. preferred location of CSCs. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: H2 Layout for EMU](https://reader035.vdocuments.us/reader035/viewer/2022062520/56815d76550346895dcb842f/html5/thumbnails/1.jpg)
H2 Layout for EMU
a brief report of a couple of visits by Darin A., Jay R., and FG
![Page 2: H2 Layout for EMU](https://reader035.vdocuments.us/reader035/viewer/2022062520/56815d76550346895dcb842f/html5/thumbnails/2.jpg)
July 2, 2004 H2 Layout for EMU 2
H2 Layout
• Available rack space in Bats. HNA360, 363 and possibly 370 (TTC)• Desk space available in Bat. HNA363• fast cables between H2 TTCmi/ex rack (HNA370) and available rack space in HNA360.• Fast and wireless networks available• Gas lines and hook-ups available• need to add multiple concrete blocks for the CSC constellation
TTCmi/exPC#1 plus
add’l rack spacemore rack space+ room for desksgas pad
preferred location of CSCs
H2 beam dump
magnetHCAL ME1/1
ME1/1
beam
![Page 3: H2 Layout for EMU](https://reader035.vdocuments.us/reader035/viewer/2022062520/56815d76550346895dcb842f/html5/thumbnails/3.jpg)
July 2, 2004 H2 Layout for EMU 3
main CSC locationconcrete block
need more of those …
cable tray
an artist’s impression …
![Page 4: H2 Layout for EMU](https://reader035.vdocuments.us/reader035/viewer/2022062520/56815d76550346895dcb842f/html5/thumbnails/4.jpg)
July 2, 2004 H2 Layout for EMU 4
Gas hook-ups
• Available space on the mezzanine gas pad• Available (and labeled) gas lines• Patch panels in the beam area
gas pad patch panel
![Page 5: H2 Layout for EMU](https://reader035.vdocuments.us/reader035/viewer/2022062520/56815d76550346895dcb842f/html5/thumbnails/5.jpg)
July 2, 2004 H2 Layout for EMU 5
Open Issues• ME1/1 location
– directly behind HCAL• quantify punch through, but at higher rates?• timing issue?• PC location likely to be inside the beam area.
– in conjunction with the other 3 chambers• similar set-up as previous EMU Slice Test• compact set-up beneficial for timing
• TTC setup– install 6U crate close to TTCmi (HN370)
• use fast cables– split fiber signal and install TTC crate in HN360
• Safety requirements regarding the “CSC floor”– too many concrete blocks may block access to a search box behind the
beam dump