Page 1: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

H1 2018 Results PresentationAugust 7, 2018

Page 2: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

Disclaimer

2

The information contained in these materials has been provided by ContourGlobal plc (the “Company”) and has not been independently verified. No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of the information or opinions contained herein. It is not the Company’s intention to provide, and you may not rely on these materials as providing, a complete or comprehensive analysis of the Company’s financial position or prospects. The information and opinions contained in these materials are provided as at the date of this presentation and are subject to change without notice. Neither the Company nor any of its affiliates, advisors or representatives shall have any liability whatsoever (in negligence or otherwise) for any loss whatsoever arising from any use of this presentation or its contents or otherwise arising in connection with this presentation.

Certain statements in this presentation are “forward-looking statements.” All statements other than statements of historical facts included in this presentation, including, without limitation, those regarding the Company’s financial position, business strategy, plans and objectives of management for future operations, are forward-looking statements. These statements involve a number of factors that could cause actual results to differ materially, including, but not limited to, changes in economic, business, social, political and market conditions, success of business and operating initiatives, and changes in the legal and regulatory environment and other government actions. Forward-looking statements contained in this presentation regarding past trends or activities should not be taken as a representation that such trends or activities will continue in the future. Any forward-looking statement made during this presentation or in these materials speaks only as of the date on which it is made. The Company assumes no obligation to update or revise any forward-looking statements.

Information contained herein relating to markets, market size, market share, market position, growth rates, penetration rates and other industry data pertaining to the Company’s business is based on the Company’s estimates and is provided solely for illustrative purposes. In many cases, there is no readily available external information to validate market-related analyses and estimates, thus requiring the Company to rely on internal surveys and studies. The Company has also compiled, extracted and reproduced market or other industry data from external sources, including third parties or industry or general publications, for the purposes of its internal surveys and studies. Any such information may be subject to significant uncertainty due to differing definitions of the relevant markets and market segments described.

This presentation contains references to certain non-IFRS financial measures and operating measures. These supplemental measures should not be viewed in isolation or as alternatives to measures of the Company’s financial condition, results of operations or cash flows as presented in accordance with IFRS in its consolidated financial statements. The non-IFRS financial and operating measures used by the Company may differ from, and not be comparable to, similarly titled measures used by other companies. The non-IFRS adjustments for all periods presented are based upon information and assumptions available as of the date of this presentation.

Page 3: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

3

H1 2018 Results Presentation

HAGN Wind Park (Austria)

1. Strategic Highlights 3Joseph Brandt President & Chief Executive Officer

2. Operations 13Karl SchnadtExecutive Vice President & Chief Operating Officer

3. Financial Results 17Jean-Christophe Juillard Executive Vice President & Chief Financial Officer

4. Closing Remarks 25Joseph Brandt President & Chief Executive Officer

Appendix 27

Page 4: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

DIVIDEND GUIDANCE

Interim dividend of $26.6m, 4.0 USD cents per share, corresponding to 1/3rd of $80m (the high end of the previously announced range) to be paid on September 7, 2018

H1 2018 Results Strong Financial Performance – Double Digit Revenue and Adj. EBITDA Growth

4

H1 2018 LTM(1) H1 2018

(1) LTM: H2 2017 + H1 2018(2) Funds From Operations is defined as Cash Flow from Operating Activities excluding changes in working capital, less interest paid, less maintenance capital expenditure, less distribution to minorities.

Funds from Operations is a non-IFRS measure(3) Proforma Net Leverage Ratio: Adjusted EBITDA excludes earnings from newly commissioned development projects and acquisitions that have yet to contribute to a full year of earnings while Adjusted Net

Debt excludes debt associated with these newly commissioned development projects and acquisitions. This ratio includes Net Debt for Spanish CSP and Adj. EBITDA FY 2017 for Spanish CSP

Total Revenue+14%

$1.1bn

$541m

$264m

Adj. EBITDA +18%

FFO (2)

+19%

Total Revenue+16%

$535m

$262m

$111m

Adj. EBITDA +12%

FFO (2)

+8%

RESILIENT BALANCE SHEET

4.6x LTM H1 2018 Net Leverage Ratio(3)

We expect to return to approximately 4.5x by year end through amortisation of the Company’s project financings

$270m Liquidity at Parent Level

$643m PF Adj. EBITDA +40%

Page 5: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

H1 2018 ResultsExecuting Operations and Growth Strategy as Planned

5

Closed 250 MW Spanish CSP acquisition and integration to be completed ahead of schedule. O&M reorganisation strategy expected to reduce fixed costs by 15% per annum from Year 3

Construction of Phase I of Austria Wind Repowering commenced, with planned COD(1) in H1 2019, increasing generation by 81% compared to the earlier installation(2)

Continued execution of European Solar Portfolio Roll-Up strategy with completion of acquisition of 22 MW in H1 2018

Kosovo Project EPC(3) tender underway with formal request for proposal to be released on August 23. Selection of EPC Contractor to happen by end of year

GROWTH STRATEGY PROGRESSING WELLVERY STRONG OPERATIONAL PERFORMANCE

Industry Leader in Health and Safety 0.00 YTD LTI Rate on track to achieve

‘Target Zero’ in 2018 0.14 YTD TRI Rate vs 0.16 target

94.9% Combined Average Availability Across the fleet in line with or close to Top Decile targets for both Thermal and Renewable segments

(1) Commercial Operating Date (2) Based on P65 Generation (3) Engineering, Procurement and Construction

Refinancing of corporate bond led to increase in tenor (weighted average of 5.8 years) and reduction of corporate interest costs by €8.3m per annum Tranche 1: €450m - 5yr @3.375% Tranche 2: €300m - 7yr @4.125%

ATTRACTIVE REFINANCING OF HIGH YIELD DEBT

Page 6: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

7%

21%

22%23%

18%

9%

Fuel Oil Coal Natural Gas

Solar Wind Hydro

6

Global Footprint Diversified Across Geographies and TechnologiesStrongly Diversified Financial Results

2018 H1 LTM PF EBITDA $643m

2018H1 LTM PF EBITDA by Technology(1) 2018H1 LTM PF EBITDA by Geography(1) 2018H1 LTM PF EBITDA by Currency(1)

(1) Adj. EBITDA Proforma: Adjusted to reflect full year contribution of Spanish CSP. LTM H1 2018 (excluding H1 for Spanish CSP) + FY 2017 Spanish CSP

Renewable50%

Thermal50%

61%19%

14%

4%

1%

EUR USD

BRL Unhedged BRL hedged to USD

Other

59%29%

12%

Europe LatAm Africa

Page 7: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

Growth UpdateSuccessful Closing of Spanish CSP, Italian PV Transaction Achieved and Advanced Negotiations for Additional Transactions Ongoing. Well-filled Greenfield Pipeline with Various Projects Advancing Towards Important Milestones

7

M&A YTD Performance & Pipeline Highlights

2 deals closed, Italian PV transaction closed in March and Spanish CSP transaction closed in May

275 MW in capacity added – ~7% capacity growth

Successful ~14 MW PPA extension in Brazil Solutions

Ongoing negotiations for ~518 MW Mexican CHP portfolio

Over 300 MW of further European renewables and thermal transactions in advanced evaluation phase

Signed a farm-down of 49% of the Italian & Slovakian Solar PV Portfolio including a joint development agreement in August 2018

Generally evaluating other potential minority sales across the portfolio

(1) Incl. Italy solar PV acquisition closed in late 2017(2) Based on P65 generation

On May 10, we achieved Closing of the 250 MW Spanish CSP Portfolio that we acquired from Acciona $150m(1) of additional $500m Adj. EBITDA 2022 Growth Target achieved within 6 months

Business Development - Highlights 30% completed2022 $500m Adj. EBITDA Growth Target

Greenfield Pipeline Highlights

Austria Repowering Phase 1 projects moved into construction with CODs expected in H1 2019 as planned and in line with budget. It is expected the repowering will increase generation by 81%(2) compared to the earlier installation for those assets.

Good progress on the development of Austria Repowering Phase 2 that will increase generation by 46%(2) compared to the earlier installation for those assets.

Positive developments on the Sochagota expansion in Colombia, with a capacity auction expected to happen in Q1 2019 following the draft announcement from the CREG (Energy and Gas Regulation Commission) in June this year

~40 MW growth pipeline opportunity in Brazilian Solutions portfolio with existing client

Ongoing ~25 MW integrated PV & battery & wind pilot project to expand capacity of existing Bonaire asset

Page 8: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

Capital Transactions – Italy and Slovakia PV Sell-DownSale of a 49% Minority Stake to Funds Advised by Credit Suisse Energy Infrastructure Partners AG

8

Value Creation

The partnership leverages on ContourGlobal’s expertise as best in class operator and developer

Development agreement under which the parties seek new acquisition opportunities and ContourGlobal’s expert team executes transactions

Asset management agreement under which ContourGlobal will manage the Italian and Slovakian operations, providing corporate services and O&M services to the existing and prospective assets

Strategic Partnership

CSEIP is one of the European leaders in direct energy infrastructure investment which acquires significant minority stakes in long-term contracted or regulated assets from top tier industrial players

Complementary business model as CSEIP is backed by institutional investors seeking long-term capital appreciation and pursing a buy and hold strategy

Signed sale of a 49% stake in ContourGlobal’s solar PV portfolio in Italy and Slovakia to funds advised by Credit Suisse Energy Infrastructure Partners AG (“CSEIP”)

Industrial partnership with buy and hold investor

Value creation through long-term asset management agreement and development incentive structure for new acquisitions

Highlights

Solar Slovakia - Budulov

Page 9: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

9

Capital Transactions – Italy and Slovakia PV Sell-DownSale of a 49% Minority Stake to Funds Advised by Credit Suisse Energy Infrastructure Partners AG Partnership with CSEIP marks the next milestone for our European solar roll-

up strategy as it combines extensive industry network, considerable transaction experience and sector specific knowledge of two leading institutions

Minority sale at attractive premium for highly efficient regional portfolio which was built through development of greenfield projects and a series of acquisitions

Further value creation to the existing portfolio and future acquisitions through asset management and development fees

Portfolio is well positioned for future growth which targets additional 135 MW

We continue to control and consolidate the portfolios as 51% majority owner

Purchase price of EUR 63m(1) for a 49% stake. Net Equity Multiple: 2.3x and Implied EV of €334m(2)

Solar PV

99 MW – total installed capacity

Italy and Slovakia

Closing expected in Sep-18 subject to regulatory approvals

Key Facts

65 MW

35 MW

(1) Expected purchase price at closing including locked box interest and upfront payment of expected refinancing proceeds. Closing is expected for September 2018 (2) EV includes the contemplated refinancing (EV is €302m excl. the contemplated refinancing)

Slovakia Italy Existing Italy Pipeline

5

Portfolio Growth over Time, MW

29

35

6565

135

35

Italian PV Portfolio Expected To Reach 200 MW

611

Page 10: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

Spanish CSPPositive Update on Regulatory Return Reset

CSPs have long-term regulated rate of return, with a six year regulatory period

Regulated rate of return is currently set at 7.4% but the rate of return will be reset as of 1 January 2020

The new rate of return for the period 2020-2025 will be announced in summer 2019

Regulation

Current regulated return of 7.4% was set by reference to

– The average Spanish sovereign 10yr bond yield for the 24 months prior to the reset announcement

– Plus 300bps

July 2018

Regulated Return Reset – Past Practice

In July 2018, the Spanish regulator (CNMC) published a proposed methodology for the upcoming rate reset

The methodology is based on a WACC approach for power generation

After applying the proposed methodology, CNMC recommends a return rate of 7.04% for the regulatory period 2020-2025

CNMC’s opinion is a recommendation to the Spanish Government, which will still need to approve the applicable return rate for the next regulatory period

Regulated Return Reset – Current Indications

10

Page 11: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

11

Major Milestones

Commercial Close 20-Dec-2017

EPC Pre-Qualification Initiated(1) 21-Jun-2018

OPIC Screening Committee First weeks of August

Submission of pre-qualification bids 16-Aug-2018

Release of RfP Document to Prequalified EPCs 23-Aug-2018

Finalise Project ESIA (Plant ESIA and Lignite Mine ESIA)

31-Oct-2018

Selection of Preferred EPC Contractor 26-Nov-2018

Completion of EPC contract 10-Dec-2018

OPIC Board Meeting for Final Approval Mar-2019

Financial Close and EPC Notice to Proceed 29-Mar-2019

Commercial Operation Date (COD) Q4 2022

Financing

We are committed to working with the Government of Kosovo to complete the project, regardless of whether the World Bank participates or not

Various financing options available for a total debt of approximately €930m. Current plan being a mix of Development Finance Institutions (“DFI”) and Export Credit Agencies (“ECA”)

– Target is to maximise ECA guaranteed financing and cover the remainder with DFI funding, such as the Overseas Private Investment Corporation (“OPIC”)

ECAs

– Initial engagement underway with ECAs from Japan, Korea and Poland, among others

– ECA selection will be driven by EPC tender outcome as the process has been crafted as an “EPC + Finance” process

Minority Shareholder

– We are initiating preliminary discussions with minority partners for a stake of up to 49%

Kosovo Project UpdateBuilding Critical Infrastructure for One of Europe’s Poorest Economies

Kosovo A Plant – to be decommissioned at COD of new Kosovo plant

Municipality of Obiliq and Kosovo B plant

(1) 24 interested parties from Japan, South Korea, US, Germany, Turkey, China, Greece, and Poland

Page 12: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

The development of four additional repowerings is well on track and all permits areexpected to be received in 2018 for Berg and TD projects and 2019 for the otherprojects

Net capacity expected to be 53-60 MW after repowering

Based on the current regulation these repowering projects will benefit from a 13 yearFIT contract

The total investment is estimated to be between €71-82m with expected COD for 2021-2022

ContourGlobal is exploring a number of additional projects in Austria in pre-feasibilityphase

Expected FiT to range between €81-82/MWh

12

Rapid Progress on the Wind Repowering in AustriaRepowering of Four Austrian Wind Parks is Well Underway

Overview - Phase I Projects

Overview - Phase II Projects

The construction of Velm-Götzendorf (VG) and Scharndorf Ia (SD Ia) started in Januaryand May 2018

The net Capacity after repowering will be of 28 MW in total: VG - 12 MW VG and SD Ia –16MW

The total investment is €43m. The projects are fully equity funded due the highlyattractive unlevered returns, however we keep the optionality to refinance post COD

COD is expected for January 2019 for VG, and April 2019 for SD 1a

Secured FiT of €83/MWh for VG and €93/MWh for SD Ia

Preparatory works for decommissioning of Velm-Götzendorf

Page 13: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

13

2. OperationsKarl SchnadtExecutive Vice President & Chief Operating Officer

KivuWatt - Methane Gas Extraction Facility & Power Plant (Rwanda)

Page 14: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

0.03 0.07 0.19 0.24 0.59 0.88 1.30 1.322 2.19 2.29 2.30 2.50

3.3

4.6

6.07

14

Industry Leading Health & Safety Performance0.00 YTD LTIR (1) Achieved

Inka Wind Farm, Peru

Leading the Sector in Health and Safety Performance(4)

(1) Lost Time Injury Rate (“LTIR”) is an industry standard reporting convention for calculating injuries in the workplace(2) TRIR: Total Recordable Incident Rate(3) 0.03 figure reflects LTM occurrences(4) Source: Peers information as last reported in Annual Reports/Sustainability Reports published by companies

‘Target Zero’ Remains ContourGlobal’s Core Priority

0.44

0.08

0.27

0.11 0.12 0.130.16 0.160.220.20

0.090.09 0.060.06 0.06 0.03

0.030.03 0.03 0.03

1Q 2015 2Q 2015 3Q 2015 4Q 2015 1Q 2016 2Q 2016 3Q 2016 4Q 2016 1Q 2017 2Q 2017 3Q 2017 4Q 2017 1Q 2018 2Q 2018

QUARTELY LTIR LTIR 12 MRA

(3)

Our YTD TRIR(2) is 0.14 vs. a target of 0.16

Page 15: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

95.1% 94.8% 98.2% 97.1%

2016 2017 H1 2017 H1 2018

World Class Operating PerformanceContinued Strong Performance Across Thermal and Renewable

15

Thermal – Equivalent Availability Factor (1) (%) Renewable – Equivalent Availability Factor (1)

(%)

(1) Equivalent Availability factor refers to the actual amount of time a plant or group of plants is available to produce electricity, which reflects anticipated maintenance and scheduled interruptions

(2) Thermal benchmark sourced from Navigant Benchmark Study (comparable size, technology and load profile of the plant)(3) Renewable benchmark values are sourced from peers benchmarking studies performed by DNV GL for Wind and Navigant for small Hydro plants. Vorotan is not represented in the

Benchmark comparison due to the specifics of the asset.(4) Adjusted for Chapadas Complex ramp-up period and maintenance at Vorotan in 2016

Group availability for both segments in line with or close to top decile targets Brazil wind experienced outages, affecting availability in renewable fleet. Improvement has been made in the cluster’s

performance and we continue to have significant focus on bringing the cluster up to CG’s operational excellence standards

Benchmark= 92.3%(top decile of peers2)

Benchmark= 97.9%(top decile of peers3)

Availability for H1 2018 excludes Vorotan impact due to rehabilitation works

97.1%(4)

Availability for H1 2018 was affected by rehabilitation works in French Caribbean and outages and planned maintenance in KivuWatt

93.0% 92.6%94.4% 93.3%

2016 2017 H1 2017 H1 2018

Page 16: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

86.2%

99.1% 100.0% 97.5% 96.9% 97.9% 93.5%

76.6%83.6%

Maritsa(908MW)

Arrubal(800MW)

Termoemcali(240MW)

Sochagota(165MW)

CG Solutions(132MW)

Togo(100MW)

Cap des Biches(86MW)

French Caribbean& Bonaire (63MW)

KivuWatt(26MW)

Performance of the Consolidated Fleet Above Target94.9% Availability Achieved vs. H1 2018 target of 93.6%

PPA Minimum Availability Requirement

16

Scharndorf Wind Farm, Austria

Knockmore Hill Solutions Plant, Northern Ireland

Thermal fleet equivalent availability factors

Renewable fleet equivalent availability factors

Turbines Engines Solutions

96%

80%82%

92% 92%

65%

41%

95.0% 98.2% 99.3% 93.9% 98.6% 98.7% 98.3%

ChapadaComplex(438MW)

Vorotan(404MW)

Hydro Brazil(167MW)

Asa Branca(160MW)

Austria Wind(150MW)

Inka(114MW)

Solar Europe -PV and CSP(349MW)

Wind Hydro Solar

Page 17: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

17

3. Financial ResultsJean-Christophe Juillard Executive Vice President & Chief Financial Officer

Asa Branca Wind Farm (Brazil)

Page 18: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

142208

256 264

103 111

2015 2016 2017 LTM H12018

H1 2017 H1 2018

Robust Financial PerformanceSignificant Growth in Adjusted EBITDA and FFO

18

(1) Adjusted EBITDA and FFO are non-IFRS measures as defined in IPO Prospectus(2) CAGR calculated between 2015 and LTM H12018 PF figures(3) Proforma numbers: Adjusted to reflect full year contribution of Spanish CSP. LTM H1 2018 (excluding H1 for Spanish CSP) + FY 2017 Spanish CSP

Adjusted EBITDA (1)

(US$m)

CAGR: 30%(2) CAGR: 41%(2)

FFO (1)

(US$m)

331440 513 541

234 262

2015 2016 2017 LTM H12018

H1 2017 H1 2018

643(3) 337(3)

+12%+8%

2018 Adj. EBITDA expected to be in the range of $600-630m

Page 19: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

94

120

( 9 )33

2

Adj. EBITDA H1 2017 Organic Acquisitions FX Impact Adj. EBITDA H1 2018

159 157163

(5) 3

6

Adj. EBITDA H1 2017 Organic Acquisitions net ofDivestitures

FX Impact and Other Adj. EBITDA H1 2018

Spanish CSP Italy Solar and

Biogas Portfolio Hydro Brazil(5)

19

ADJUSTED EBITDA - THERMAL DIVISION (US$m)

ADJUSTED EBITDA - RENEWABLE DIVISION (US$m)

Solutions Brazil(2)

(1) (1)

(1)

(1) Before Corporate Costs(2) Solutions Brazil Acquisition closed on March 17th, 2017. Kramatorsk sell-down occurred in February 26th, 2018. (3) Organic declines are due to timing of availability payments in Maritsa which will be compensated in H2 2018 for the Thermal fleet and to resource performance in Brazil Wind for the Renewable

fleet(4) FX and Other: Includes USD 12m positive impact derived from FX, and USD 6m negative impact from non-cash provision release last year in French Caribbean(5) Spanish CSP Acquisition closed on May 10th 2018. Italy Solar and Biogas portfolio closed on December 4th, 2017 and March 22nd, 2018. Hydro Brazil closed on March 17th, 2017.

Successful Integration of New Assets Drives Growth

Kramatorsk

(1)

27% increase

2%increase

(3)

(3) (4)

Page 20: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

Resource Performance Level

Renewable Resource PerformanceContinued Resilience in Portfolio Performance

20

P84 P46 P16 P81 P95P93

Approximately 5% Adjusted EBITDA impact from resource (combination of lower revenues and/or additional costs arising from the purchase of additional power in the spot market to compensate for lower generation)

Impact on H1 2018 Adjusted EBITDA driven by weak resource across the portfolio, especially Brazil Wind and Austria Wind

H1 is typically weaker in renewable resource due to seasonality. We are seeing and expect improvement through to the end of the year

Impact renewable resource on H1 2018 Adjusted EBITDA (US$m)(1)

(10.4)

(1.4)

(3.0)

(1.2)

0.5

(0.5)

Brazil Wind Peru Wind Austria Wind Solar Europe PV(Italy + Slovakia)

Armenia Hydro(Vorotan)

Brazil Hydro

2017

H1 2018 P78 P92 P71 P86 P67P90

(1) Impact on Adj. EBITDA due to resource performance calculated against H1 2018 budget.

Page 21: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

21

245.7

19.4 3.4

261.8

H1 2018 @ H12017 FX Rates

EUR Impact BRL Impact H1 2018

H1 2018 Adjusted EBITDA, FX sensitivity

FX (vs. USD) H1 2017 --> H1 2018BRL 3.175 (7.50)% 3.413EUR 0.923 10.51% 0.826

BRL Hedging

We have hedged approximately BRL75m of cash flowseach year over the next four years through a 1 yearforward in 2018 and call options for 2019 to 2021

The 2018 forward is currently out of the money (strikerate of 4.068) with current net settlement of ~$0.6m (asat June 30, 2018)

The 2019 to 2021 call options are also out of the moneyso, at current FX rates, there would be no settlement atexpiry

Hedged Position 2018 2019 2020 2021Hedged Notional, BRLm 67.3 75.3 79.1 85.1Strike 4.068 4.310 4.597 4.886Cap 6.125 7.166 8.381

For H1 2018, the USD has been stronger vs. BRL and weaker vs. EUR as compared to H1 2017 rates

Euro appreciation is positive for our Adjusted EBITDA and BRL depreciation is negative

The net impact of these FX fluctuations was a positive contribution of ~$16m to H1 2018 Adjusted EBITDA

Impact of FX Fluctuations on Adjusted EBITDAOverall Positive Impact on H1 2018 Adjusted EBITDA of ~$16m Against H1 2017 Rates

Page 22: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

Significant Cash Conversion Achieved in LTM H1 2018

22

LTM H1 2018 ADJUSTED EBITDA TO FFO (1)

49% cash conversion

(1) Funds From Operations is defined as Cash Flow from Operating Activities excluding changes in working capital, less interest paid, less maintenance capital expenditure, less distribution to minorities. Funds from Operations is a non-IFRS measure

(2) Cash conversion lower than in LTM H1 2018 due to lower EBITDA (caused by resource performance in Brazil wind), while interest payment has remained at similar levels.

H1 2018 ADJUSTED EBITDA TO FFO (1)

42% cash conversion(2)

Page 23: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

Jun-18 LIQUIDITY – (US$m) Jun-18 NET DEBT – (US$m)

Strong Liquidity to Support Future Growth

23

$3.0bn Net Debt as of June 30, 2018 – includes full amount of debt for Spanish CSP ( ~ $940m), while the asset has contributed less than two months of EBITDA for H1 2018 after its acquisition in May

Committed to high value growth while maintaining strong BB credit ratings

$270m liquidity at parent level, including $220m of cash and $50m undrawn capacity under our corporate level revolver

Interim dividend of $26.6m, 4.0 USD cents per share, corresponding to 1/3rd of $80m (the high end of the previously announced range of $75-80m (11.2-11.9 USD cents per share)) to be paid on September 7, 2018

Page 24: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

5.4x

4.6x4.2x

3.9x

2015 2016 2017 LTM H1 2018

24

4.6x Net Leverage Ratio Reflects Successful CSP FinancingYear End Net Leverage Ratio Expected to be Approximately 4.5x

Adj. IFRS Net Debt / Adj. EBITDA (1) (2) (3)

(1) Adjusted Net Debt and Adjusted EBITDA are non-IFRS measures(2) CG share of Net Debt at Termoemcali and Sochagota considered(3) Adjusted EBITDA excludes earnings from newly commissioned development projects and

acquisitions that have yet to contribute to a full year of earnings while Adjusted Net Debt excludes debt associated with these newly commissioned development projects and acquisitions

(4) Excludes Spanish CSP Debt and Adj. EBITDA figures(5) Proforma Net Leverage Ratio that includes Spanish CSP Net Debt and Spanish CSP FY 2017

Adj. EBITDA

(5)

Gross Debt Maturity as of Jun-18 – (US$m)(6)

Leverage target guidance at IPO: 4.0-4.5x

4.6x

(6) Corporate debt reflects adjustment for new bond issuance that closed on July 26, 2018. (New corporate is composed of two tranches: €450m notes due on 2023 and €300m notes due on 2025).

247 263 258 284 232

1,567

876

Jun-19 Jun-20 Jun-21 Jun-22 Jun-23 Due afterJun 2024

Project Debt Corporate Debt

(4)

Page 25: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

25

4. Closing RemarksJoseph Brandt President & Chief Executive Officer

Sao Domingos II Hydro Power Plant (Brazil)

Page 26: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

H1 2018 ResultsClosing Remarks

26

Continued Strong growth in revenues, Adjusted EBITDA and cash flow generation

2018 Adj. EBITDA expected to be in the range of $600-630m

Industry-leading Health & Safety and operational metrics

Signed sale of a 49% stake in our solar PV portfolio in Italy and Slovakia to funds advised by Credit Suisse Energy Infrastructure Partners AG

We expect net leverage to return to approximately 4.5x by year end through amortisation of the Company’s project financings

On track for delivering further growthM&A Ongoing negotiations for >500 MW Mexican CHP assets Continuing to deliver on solar roll-up strategyGreenfield Austrian wind repowering – Phase I construction underway, on time and on budget Kosovo Project on track with EPC tender well-progressed and due to be finished this year

Interim dividend of $26.6m, 4.0 USD cents per share, corresponding to 1/3rd of $80m (the high end of the previously announced range of $75-80m (11.2-11.9 USD cents per share)) to be paid on September 7, 2018

Significant M&A pipeline

Page 27: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

27

Appendix

Sao Domingos II Hydro Power Plant (Brazil)

Page 28: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

H1 2018 Key Financial Metrics

28

Six months ended June 30,Var Var %

In US$ millions 2017 2018

Revenue 462.4 535.4 73.0 15.8%

Gross profit 142.0 143.6 1.6 1.1%

SG&A (20.3) (21.9) (1.6) 7.9%

Adjusted EBITDA 234.4 261.8 27.4 11.7%

Net profit / (loss) after income tax (8.5) 2.7 11.2 NM

FFO 103.0 110.8 7.8 7.6%

Page 29: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

237206 232

251

291

41 41 41 43 43

5.7x

5.1x5.6x

5.9x

6.8x

Jun-17 Sep-17 Dec-17 Mar-18 Jun-18

CFADS (LTM) Annualized Debt Service

DSCR Incurrence Level (2 x - Min.)

29

Leverage Ratio (1) DSCR (1)

(1) DSCR and Leverage Ratio (Non-guarantor combined leverage ratio) as defined in Bond Indenture. Please see slide 30 for calculation of Bond Indenture Leverage Ratio, including Proportionate Adjusted EBITDA and NGPTI (Non-Guarantor Proportionate Total Indebtedness) .

In US$m or multiple In US$m or multiple

Continued Strong Bond Credit Metrics6.8x DSCR & 3.9x Non-Guarantor Combined Leverage Ratio as of June 2018

1,1321,382

1,587 1,583

1,712

1,705

2,399

341 394 456 471 476 483 614

3.3x 3.5x 3.5x 3.4x3.6x 3.5x

3.9x

Dec-16 Mar-17 Jun-17 Sep-17 Dec-17 Mar-18 Jun-18

NGPTI Prop. Adj. EBITDA (LTM)

Leverage Ratio Incurrence Level (5x - Max.)

Page 30: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

Reconciliation of Bond Metrics to IFRS Financials

Bond metrics definitions use Proportionate Adjusted EBITDA (“PAE”) and Non-Guarantor Proportionate Total Indebtedness (“NGPTI”) to calculate leverage ratios. These definitions exclude Corporate Level Financings and Project Finance Subsidiaries (“PFS”) (projects not yet reached, or recently passed, COD). As of June 30, 2018, no project is treated as a PFS.

PAE (Proportionate Adjusted EBITDA)

• Includes our share in JVs (Sochagota & Termoemcali)

• Pro forma for acquisitions mainly relates to our acquisition of the Spanish CSP portfolio

NGPTI (Non-Guarantor Proportionate Total Indebtedness)

• Excludes debt at parent company level (corporate bond)

• Increase in gross debt and NGPTI relating to our acquisition of the Spanish CSP portfolio

Calculation of NGPTI ($m) Dec-17 Jun-18

Non-Current Borrowings 2,673 3,342

Current Borrowings 218 263

Consolidated Gross Debt 2,890 3,605

Accrued Int. & IFRS Adj. 32 61

Share in JVs 14 11

Project Finance Subsidiaries (PFS) - -

DSRA (89) (192)

Corporate Bond (840) (818)

Pro Rata Calculation (294) (268)

NGPTI 1,712 2,399

Calculation of PAE ($m) Dec-17 Jun-18

Income From Operations 269 261

Depreciation & Amortisation 186 206

Share in JVs 22 22

Other 37 52

Adjusted EBITDA 513 541

Pro Forma Acquisitions 14 114

Project Finance Subsidiaries - -

Holdcos & Other 33 34

Pro Rata Adjustment (84) (75)

PAE 476 614

30

Page 31: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

Top Contributors to Adj. EBITDA

31

Top Contributors to Adj. EBITDA (US$m) 2016 2017 LTM H1 2018

Main contributors from thermal fleet

Maritsa East III 117 125 127

Arrubal 62 61 63

CG Solutions 13 27 33

Cap Des Biches 12 26 28

KivuWatt 22 24 22

Togo 21 25 25

Main contributors from renewable fleet

Brazil Wind 79 82 73

Peru Wind 31 25 28

Austria Wind 23 25 23

Brazil Hydro 9 29 36

Vorotan 22 23 23

Solar Europe 31 31 36

Total 443 503 517

% Total Adj. EBITDA before Corp. Costs 93% 93% 90%

Page 32: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

Top Contributors to CFADS

32

(1) CFADS are calculated by asset, excluding corporate and other costs(2) Includes Solar Italy, Solar Slovakia and Solar Romania(3) Includes Solutions Europe and Africa and Solutions Brazil(4) Pro Forma run-rate of CFADS for Spanish CSP

Significant Contributors to CFADS (US$m)(1)

(Before Corporate and Other Costs)2017 LTM H1 2018

European PV Solar(2) 55 62

Maritsa 30 55

Brazil Hydro Portfolio II 51 51

CG Solutions(3) 41 39

Spanish CSP - 35(4)

Arrubal 29 17

Cap des Biches 7 13

Inka 5 13

Vorotan 13 12

Togo 6 6

Total CFADS of Significant Contributors(Before Corporate and Other Costs)

237 303

% of Total CFADS before Corp. Costs 88% 91%

Page 33: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

Segment Facility / Project Name LocationGross Cap.

(MW)Number of

AssetsFuel Type (1) CG

OwnershipCOD Power Purchaser PPA Expiration

Maritsa Bulgaria 908 1 Coal 73% 1978 NEK 2024

Arrubal Spain 800 1 Natural Gas 100% 2005 Gas Natural Fenosa 2021

TermoemCali Colombia 240 1 Natural Gas / Diesel 37% 1999 Various N/A

Sochagota Colombia 165 1 Coal 49% 1999 Gensa 2019(2)

CG SolutionsEurope – Nigeria –Brazil

132 11 Natural Gas / Diesel / LFO100%;100%;

80%1995-2015

Investment grade global industrial companies

2018-2032

Togo Togo 100 1 Natural Gas / HFO / Diesel 80% 2010 CEET 2035

Cap des Biches Senegal 86 1 Oil /Natural Gas 100%Q2 2016 / Q4

2016Senelec 2036

Energies Antilles / Energies St Martin

French Caribbean 35 2 HFO / LFO 100% 2000; 2003 EDF 2020; 2023

Bonaire Dutch Antilles 28 1 HFO / Wind 100% 2010 WEB 2025

KivuWatt Rwanda 26 1 Natural Gas 100% Q4 2015 EWSA (ex-Electrogaz & REC) 2040 (expected)

Total Thermal 2,520 21

Chapada Complex Brazil 438 3 Wind51%, 51%,

100%2015; Q1 2016 CCEE; distribution companies 2035

Vorotan Armenia 404 1 Hydro 100% 1970 AEN 2040

CSP Portfolio(3) Spain 250 5 CSP 100% 2010 CNMC 2034-2037

Hydro Brazil Brazil 167 9 Hydro 79% (4) 1963; 1992; 2009-2012

Distribution companies 2027-2042

Asa Branca Brazil 160 1 Wind 100% 2013 Distribution companies 2033

Austria Wind Austria 150 10 Wind 94% 2003-2014 OeMAG 2016-2027

Inka Peru 114 2 Wind 100% 2014 Distribution companies 2034

Solar Italy Italy 65 10 Solar 100% 2007-2013 Gestore Servizi Energetici S.p.A 2027-2033

Solar Slovakia Slovakia 35 3 Solar 100% 2010-2011 Distribution companies 2025-2026

Solar Romania (5) Romania 7 1 Solar 100% 2013 Distribution companies 2028

Biogas Italy Italy 2 2 Biogas 100% 2013 Gestore Servizi Energetici S.p.A 2028

Total Renewable 1,792 80

Total portfolio 4,312 101

ContourGlobal Portfolio

33

Thermal Renewables

(1) HFO refers to heavy fuel oil, and LFO to light fuel oil. (2) CES has already signed 4 contracts to replace existing PPA, extending expiration to 2024, with and additional

5 year extension expected

(3) Closed in May 2018.(4) Capacity weighted. (5) Closed in June 2018.

Page 34: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

IR InformationNext Event & Contact Point

34

Date Event Location

4 September 2018

Goldman Sachs Leveraged Finance

ConferenceLondon

13 September 2018

Morgan Stanley Power & Utility Summit

London

6 December 2018

Trading Update Conference Call

Laurent HulloSVP, ControllingEmail: [email protected]

Gregory JohnsonVP, FinanceEmail: [email protected]

[email protected]

Corporate Websitewww.contourglobal.com

Investor Relations www.contourglobal.com/investors

IR Contact

Web Resources

Next IR Events

Page 35: H1 2018 Results Presentation - ContourGlobal · The Company assumes no obligation to update or revise any forward-looking statements. ... less distribution to minorities. Funds from

For further information please visit www.contourglobal.com

35