h e f f r o n p a r k m a s t e r p l a n · 2015-09-10 · new soccer field and cricket pitches...
TRANSCRIPT
Criterium Track OngoingUpgrade and realign existing bicycle competition track. Existing carpark formalized and sealed Stage 1 CompleteExisting soccer field retained and upgraded Stage 1 CompleteSeparate cycle/pedestrian paths Stage 1 CompleteCricket Nets Stage 2 CompleteThree enclosed synthetic grass cricket nets. Children’s Educational Bicycle Facility Stage 2 CompleteReplica road network system for children’s road bicycle education. Shared Pathway Stage 2 80 % completeCrossing point connecting with Randwick Bicycle Stage 2 CompleteRoute Network Netball Courts : Retained and upgraded Stage 3 CompleteNew carpark and landscape Stage 3 CurrentNew junior overflow field/passive recreation area Stage 3 CurrentNew soccer field and cricket pitches Stage 3 CurrentTennis Courts Stage 4 FutureConstruct 13 new synthetic grass tennis courts. Exhibition Tennis Court Stage 4 FutureConstruct new acrylic surface tennis court with stands for spectators. Handball Court Stage 4 FutureConstruct 2 X one wall, 1 X three wall concrete surfaced courts. New internal carpark Stage 4 FutureAFL/Cricket Oval Stage 4 FutureNew soccer pitches installed Stage 4 FutureSand Dune Stage 5 FutureProtect existing remnant sand dunes. Provide Boardwalk circulation through the area. Multi Use All Weather Field Stage 3 CurrentConstruct synthetic grass field with stands for spectators. Cricket pitch realigned to allow for full size Stage 5rugby league field and existing fields upgraded (field orientation/layout to be finalized) Multi-use field size expanded to accommodate Existingsenior cricket and two multi use field. Multi-use field size expanded to accommodate Existingsenior cricket and two multi use field. Rugby League Fields to remain ExistingPerimeter shared pathway 80% complete
H E F F R O N P A R K M A S T E R P L A N (Revised 2015)
13
12
18
22
5
15
25
20
21
8
10
7
23
17
9
6
16
14
11
3
24
4
19
2
1
RO
BEY AVE
BU
NN
ERO
NG
RD
FITZGERALD AVE
JERSEY RD
STAGE 1STAGE 3
STAGE 2
STAGE 4
STAGE 5
1
5432
6
109
87
11
13
14
12
15
16
1819
17
20
22
21
23
2425
Stage 1: CompleteStage 2: CompleteStage 3: New soccer and cricket pitch. New large carpark and landscaping. Remediation and construction currently under way.Stage 4: Future Stage 5: Future
DES RENFORD AQUATIC CENTRE