Criterium Track Ongoing Upgrade and realign existing bicycle competition track. Existing carpark formalized and sealed Stage 1 Complete Existing soccer field retained and upgraded Stage 1 Complete Separate cycle/pedestrian paths Stage 1 Complete Cricket Nets Stage 2 Complete Three enclosed synthetic grass cricket nets. Children’s Educational Bicycle Facility Stage 2 Complete Replica road network system for children’s road bicycle education. Shared Pathway Stage 2 80 % complete Crossing point connecting with Randwick Bicycle Stage 2 Complete Route Network Netball Courts : Retained and upgraded Stage 3 Complete New carpark and landscape Stage 3 Current New junior overflow field/passive recreation area Stage 3 Current New soccer field and cricket pitches Stage 3 Current Tennis Courts Stage 4 Future Construct 13 new synthetic grass tennis courts. Exhibition Tennis Court Stage 4 Future Construct new acrylic surface tennis court with stands for spectators. Handball Court Stage 4 Future Construct 2 X one wall, 1 X three wall concrete surfaced courts. New internal carpark Stage 4 Future AFL/Cricket Oval Stage 4 Future New soccer pitches installed Stage 4 Future Sand Dune Stage 5 Future Protect existing remnant sand dunes. Provide Boardwalk circulation through the area. Multi Use All Weather Field Stage 3 Current Construct synthetic grass field with stands for spectators. Cricket pitch realigned to allow for full size Stage 5 rugby league field and existing fields upgraded (field orientation/layout to be finalized) Multi-use field size expanded to accommodate Existing senior cricket and two multi use field. Multi-use field size expanded to accommodate Existing senior cricket and two multi use field. Rugby League Fields to remain Existing Perimeter shared pathway 80% complete H E F F R O N P A R K M A S T E R P L A N (Revised 2015) 13 12 18 22 5 15 25 20 21 8 10 7 23 17 9 6 16 14 11 3 24 4 19 2 1 ROBEY AVE BUNNERONG RD FITZGERALD AVE JERSEY RD STAGE 1 STAGE 3 STAGE 2 STAGE 4 STAGE 5 1 5 4 3 2 6 10 9 8 7 11 13 14 12 15 16 18 19 17 20 22 21 23 24 25 Stage 1: Complete Stage 2: Complete Stage 3: New soccer and cricket pitch. New large carpark and landscaping. Remediation and construction currently under way. Stage 4: Future Stage 5: Future DES RENFORD AQUATIC CENTRE

Upload: others

Post on 27-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: H E F F R O N P A R K M A S T E R P L A N · 2015-09-10 · New soccer field and cricket pitches Stage 3 Current Tennis Courts Stage 4Future Construct 13 new synthetic grass tennis

Criterium Track OngoingUpgrade and realign existing bicycle competition track. Existing carpark formalized and sealed Stage 1 CompleteExisting soccer field retained and upgraded Stage 1 CompleteSeparate cycle/pedestrian paths Stage 1 CompleteCricket Nets Stage 2 CompleteThree enclosed synthetic grass cricket nets. Children’s Educational Bicycle Facility Stage 2 CompleteReplica road network system for children’s road bicycle education. Shared Pathway Stage 2 80 % completeCrossing point connecting with Randwick Bicycle Stage 2 CompleteRoute Network Netball Courts : Retained and upgraded Stage 3 CompleteNew carpark and landscape Stage 3 CurrentNew junior overflow field/passive recreation area Stage 3 CurrentNew soccer field and cricket pitches Stage 3 CurrentTennis Courts Stage 4 FutureConstruct 13 new synthetic grass tennis courts. Exhibition Tennis Court Stage 4 FutureConstruct new acrylic surface tennis court with stands for spectators. Handball Court Stage 4 FutureConstruct 2 X one wall, 1 X three wall concrete surfaced courts. New internal carpark Stage 4 FutureAFL/Cricket Oval Stage 4 FutureNew soccer pitches installed Stage 4 FutureSand Dune Stage 5 FutureProtect existing remnant sand dunes. Provide Boardwalk circulation through the area. Multi Use All Weather Field Stage 3 CurrentConstruct synthetic grass field with stands for spectators. Cricket pitch realigned to allow for full size Stage 5rugby league field and existing fields upgraded (field orientation/layout to be finalized) Multi-use field size expanded to accommodate Existingsenior cricket and two multi use field. Multi-use field size expanded to accommodate Existingsenior cricket and two multi use field. Rugby League Fields to remain ExistingPerimeter shared pathway 80% complete

H E F F R O N P A R K M A S T E R P L A N (Revised 2015)

13

12

18

22

5

15

25

20

21

8

10

7

23

17

9

6

16

14

11

3

24

4

19

2

1

RO

BEY AVE

BU

NN

ERO

NG

RD

FITZGERALD AVE

JERSEY RD

STAGE 1STAGE 3

STAGE 2

STAGE 4

STAGE 5

1

5432

6

109

87

11

13

14

12

15

16

1819

17

20

22

21

23

2425

Stage 1: CompleteStage 2: CompleteStage 3: New soccer and cricket pitch. New large carpark and landscaping. Remediation and construction currently under way.Stage 4: Future Stage 5: Future