h 18 riverpark residence strut works
TRANSCRIPT
![Page 1: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/1.jpg)
VietnamH 18 – Riverpark Residence Project referenceSteel sheet piling with strut systemFoundation contractor: OSP Vietnam
![Page 2: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/2.jpg)
Project in BriefH 18 Riverpark ResidenceStarted: 30/10/2009Address: PHU MY HUNG Dist 7 HCMCScales: VND350 Billion, 16,747.5 m2 floor,
02 basements, Block A (13 storey), Block B (24 storey),Block C (16 storey) Total: 69,277.26 m2.
Package: Supply, Install of H 350 bracing systemClient: COTECCONSInvestor: Phu My Hung JVFoundation: OSP Vietnam Consultant: SFCCDuration: 22 months
![Page 3: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/3.jpg)
OSP feasibility proposalH 18 Riverpark Residence
![Page 4: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/4.jpg)
Plan view of project & excavation level
H 18 Riverpark Residence
![Page 5: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/5.jpg)
5
H 18 Riverpark Residence
Install of bracing system @ -2.0m from 1st Nov – 11th Nov 2009
![Page 6: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/6.jpg)
6
H 18 Riverpark Residence
Install of bracing system OT 22 kingpost at block B
![Page 7: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/7.jpg)
7
H 18 Riverpark Residence
Completed strut work at Block A
![Page 8: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/8.jpg)
8
H 18 Riverpark Residence
On-going conrete work at Block A
![Page 9: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/9.jpg)
9
H 18 Riverpark Residence
Incident strut & knee due to careless connection weld
Detail
![Page 10: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/10.jpg)
10
H 18 Riverpark Residence
Block B overview
![Page 11: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/11.jpg)
11
H 18 Riverpark Residence
Completely install of bracing system on 18th Dec 2009
![Page 12: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/12.jpg)
H 18 Riverpark Residence
![Page 13: H 18 Riverpark Residence Strut Works](https://reader033.vdocuments.us/reader033/viewer/2022052904/557c3e86d8b42a77088b4721/html5/thumbnails/13.jpg)
H 18 Riverpark Residence