5/19/2020
Addendum 1 1 of 2
ADDENDUM #1
Gym Floor Refinishing: Wooster Middle School 150 Lincoln Street Stratford, CT 06614 TOWN PROJECT NUMBER: 2020-052 ISSUED: 5/19/2020
PROJECT TEAM
Architect / Project Manager
5/19/2020
Addendum 1 2 of 2
The work shall be carried out in accordance with the following supplemental instructions and in accordance with the Contract Documents.
CHANGES / CLARIFICATIONS
1. Requests for Information (RFI’s) • See attached updated RFI Log.
*** END OF ADDENDUM #1 ***
RFI LOGGym Floor Refinishing:Wooster Middle School5/19/2020
Question Date Received
Directed To Response Response Date
1 There are several metal floor inserts that appear to be unused. Is removing them part of the scope of work?
5/14/2020 Town/Snyder Contractor shall remove all metal floor inserts. For pricing purposes contractor shall assume removing (25) +/-4" metal floor inserts/anchors. Repair, stitch-in, maple flooring to match existing. See attached photos for reference.
5/19/2020