guoneng electricals, china gne. business sectors power generations – energy solutions –project...

Click here to load reader

Upload: bailey-disney

Post on 31-Mar-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

  • Slide 1

GuoNeng Electricals, China GNE Slide 2 Business Sectors Power Generations Energy Solutions Project Engineering Machinery Supply Auto Control Solutions Parts & Services Environmental Protections Total Solutions Thermal power plant by burning urban garbage Ethonol Vinasse treatment GNE Slide 3 Power Generation-Thermal Steam Boiler CFB/PC/Bagasse/Biomass Steam Turbine Condensing/Extraction/Back Pressure Turbo Generator Direct Coupling/Gearbox, Air/Hytrogen Cooling Total Controls DCS/PLC, Instrumentations GNE Slide 4 Hydro Turbine Axial Inflow/Intrusion/Pressure Inflow Hydro Generator Single Shaft/Gearbox Total Controls DCS/PLC, Instrumentations Power Generation-Hydro GNE Slide 5 Business Associated with: CNIEC, CHEC GXYA China Science Group Hualan Engineering Top Brands of Manufacturers Power Generation-Thermal GNE Slide 6 Sound Track Thermal Power Plants: CFB/PC boiler 120-300t/h, Steam Turbine 15-50mw major boiler, turbine, generator plus auxiliaries, 3 sets Heat and Power Plants for Sugar Mills bagasse boiler 35-85t/h, turbo generator 3-12mw major boiler, turbine, generator plus auxiliaries, 5 sets Heat and Power Plants for Textile, Chemical Mills CFB/PC boiler 35-120t/h turbo generator 3-15mw major boiler, turbine, generator plus auxiliaries, 2 sets Thermal Power Plants of Burning Urban Garbage CFB boiler 35-65t/h, turbo generator 6-15mw major boiler, turbine, generator plus auxiliaries, 2 sets Thermal Boiler Burning Vinasse from Alcohol Plant: 15T/H, vinasse treatment 600t/d Auto Controls: DCS, PLC, Instrumentations: 60 sets Hydro Power Plant 3-10mw: major boiler, turbine, generator plus auxiliaries, 2 sets GNE Slide 7 Typical Thermal Power Plant Huaxing Power Plant, Baise, China Boiler 1*220t/h CFB, 9.81MPa, 540 Turbo Generator: 1*50MW, 9.0MPa, 500 Completion: Dec., 2004 Notes: Second hand turbo generator, made in 1959 Total Plant Turbo Generator Control RoomDCS Operator Station Feed Pumps GNE Slide 8 Captive Power Plant (1) Deyongjia Garment Plant, Dongguan, China Boiler 475t/h, CFB, 3.98MPa, 450 Turbine 15MW 3.5MPa 435 DCS BTG synchronized auto controls Date of Completion: May, 2001 Total Plant TG Set Control Room Power Panels Coal Conveying GNE Slide 9 1 2 3 4 Boiler auto controls, Baiganhua Sugar Mill, Baise, China Honeywell HC-900 DCS system All boilers communicate to each other plus remote controls EJA series pressure transmitters, ZKZ series control valves, Wayleber flow meters GNE Captive Power Plant (2) Slide 10 Power Plant Burning Garbage Dongguan Garbage Power Plant, 215 112mw, 1200t/d garbage handling, Guangdong, China Ningbo Garbage Power Plant, 215mw, 800t/d garbage handling, Zhejiang, China Boiler 65t/h CFB, 3.98MPa 450 Turbo Generator 15mw, 3.5MPa, 435 Date of Completion Dongguan-March, 2005, Ningbo-Dec., 2005 Dongguan Plant Ningbo Plant Control RoomCFB Boiler Turbo Generator GNE Slide 11 International Projects AA Group, 300t/h, CFB Biomass, Thailand Boiler 300t/h, CFB, 9.8MPa, 540 Date of Completion under construction, to commissioning in Oct. 2008 Signing Ceremony Technical Agreement Signing Site Survey China Representatives GNE Slide 12 International Projects SSYPL, 2*35t/h, CFB 2*7.5MW STG, India 2009.04.25 Signing of contract with SSYPL Signing Ceremony GNE Slide 13 Lhoknga 216MW Power Plant EP Project, Indonesia Boiler 75t/h,CFBC Boiler, 3.9MPa, 450 Steam turbine and generator 15MW, 3.5MPa, 435 Associated with CHEC, 2006 Used plant package supplied to Indonesia, 2008. Boiler: 275t/h,CFBC Boiler, 3.9MPa, 450 Steam turbine and generator 215MW, 3.5MPa, 435 HFO DG Sets, 410MW, 2008, package supplied to Indonesia 410MW, HFO DG Sets Associated with GD Imp/Exp Corp. GNE International Projects Slide 14 India KPPL 225MW thermal power plant EP Project Boiler 2130t/h, PC Boiler, 3.9MPa, 450 Steam turbine and generator 225MW, 3.5MPa, 435 Contract Signing GNE Slide 15 SSYPL, Surat, India - Boiler: CFB, 2x35t/h, 3.82MPa, 450 - TG: 2x7.5MW, 3.82MPa, 435 Typical International Projects GNE Slide 16 DCS Applications Typical DCS installed XDPS-400, Shanghai Xinhua MACS, Beijing Hollysys WebField ECS-100, Supcon PCS7, Siemens Florence 2000, ABB UMC-800/HC900, Honeywell GNE Slide 17 Typical PLC installed S7-200/S7-300, Siemens Schneider Allen Bradley FX2N, Mitsubishi GNE PLC Applications Slide 18 Drum leveler Pressure Transmitters Temprature Probe Generator Hydrogen Cooling 50MW Turbo Generator Industrial Monitors Speed Sensors Sony Video Camera Installed Instrumentations GNE Slide 19 1 2 3 4 Boiler auto controls, Baiganhua, Baise, China Honeywell HC-900 DCS system All boilers communicate to each other plus remote controls EJA series pressure transmitters, ZKZ series control valves, Wayleber flow meters Typical Projects GNE Slide 20 G N E Guo N eng Electricals Ltd. Addr.: Rm1612, Xincheng Intl Bldg, No.92-1, Nanning, Guangxi, 530028 China Tel: 0771 5511310 5501300 Fax 0771 5511852 Email: [email protected]@163.com GNE