gulf laboratories co. · pdf filemmaa approval certificate nos. ... mannai corporation &...

42
GULF LABORATORIES CO. Prequalification Gulf Laboratories Co. W.L.L P.O. Box 4024, Doha, Qatar Tel : +974 4607034 / 4607036 Fax : +974 4607628 e-mail : [email protected] Website : www.gulflaboratories.com

Upload: doandang

Post on 07-Mar-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

GULF LABORATORIES CO.

Prequalification

Gulf Laboratories Co. W.L.L

P.O. Box 4024, Doha, Qatar

Tel : +974 4607034 / 4607036

Fax : +974 4607628

e-mail : [email protected]

Website : www.gulflaboratories.com

Page 2: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification Document

Contents

Page No.

COMPANY PROFILE....................................................................................................... 1

ORGANIZATION .............................................................................................................. 2

EQUIPMENT AND RESOURCES .................................................................................... 3

SERVICES ....................................................................................................................... 5

APPENDICES

APPENDIX A CERTIFICATATIONS & ACCREDITATIONS

APPENDIX B ORGANIZATION CHART

APPENDIX C CURRICULUM VITAE OF GEOTECHNICAL STAFF

APPENDIX D CURRICULUM VITAE OF LABORATORY STAFF

APPENDIX E COMPANY EXPERIENCE

APPENDIX F FIELD & LABORATORY TESTING

Page 3: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Organization Profile

1

Company Details

QATAR

Name of Company : Gulf Laboratories Co. W.L.L

Head Office Address : P.O. Box 4024, Doha, Qatar

Commercial Reg. # : 14419

Nature of Business : Geotechnical Investigations and Materials Testing

Established : Mid-1970’s (Formerly part of Wimpey Laboratories

Owners : Mannai Corporation – Doha

Employees : 136

Office Location : Salwa Industrial Area.

Junction of Street # 2 and Al Kassarat Street

MMAA Approval Certificate Nos.

Geotechnical / Soil Investigation : No. SI012

Material Testing Laboratory : No. 061

SULTANATE OF OMAN

Name of Company : Gulf Geotechnical Services & Material Testing LLC

Head Office Address : PO Box 686, Ruwi, Sultanate of Oman

Commercial Reg. # : 1041094

Nature of Business : Geotechnical Investigations and Materials Testing

Established in Oman : 2008

Owners : Mannai Corporation & Gulf Laboratories Co. WLL

Employees : 28 (by end of 2008)

Gulf Laboratories are certified to ISO 9001:2000 and OHSAS18001 and are an ISO17025:2005 accredited laboratory.

Page 4: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Organization Profile

2

Organization Structure

General Manager : Andrew Slate

Drilling & Geotechn. Manager : K.P.Abdul Majeed

Laboratory Manager : Thomas Varghese

Senior Geotechnical Staff : Wael Salah

Senior Laboratory Staff : K.M. Arunan

Geologists / Engineers : Abdul Rahman, Durga Bashyal, Elizabeth Raji John, Rajendra Shrestha, M.N Sananth, Bal Dhoj Karki, J.Sujin, Allan Nabong

Drilling Supervisor : K. Kunamani

Drilling Engineer : Subrajith Nayak

Drillers & Drilling Assistants : 38 nos.

Laboratory Staff : 41 nos.

Other Support Staff : 42 nos.

Page 5: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Organization Profile

3

Equipment and Resources

Drilling Rigs – 17 no. Dual Purpose Truck Mounted

Hands England HE-35, Hands England HE-36

Boyles BBS 25, Dando – Bedford,

2 no. Pilcon Traveller T30 Rigs

2 no. Beretta T44 Rigs, 9 Hanjin P4000SD Rigs

Drilling Rigs – Cable Percussion

Pilcon Wayfarer Light Cable Percussion Rig

Specialized Rig

Pagani 200T Cone Penetration Rig with Piezocone

Marine Equipment

Jack-up Drilling Barge “Nautilus” (12m x 6m)

Ancillary Equipment

9 no. Holman and Ingersoll Rand Air Compressors – 250 to 750cfm

9 no. Water Bowsers and Water Tanker

Various vehicles and sundries.

Page 6: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Organization Profile

4

Laboratory Facilities

Physical Properties Testing Laboratory

Chemical Laboratory

Environmental testing laboratory (ICP and GCMS)

On-site Materials Testing Laboratories

Nuclear Density Testing Equipment

Geophysical Equipment

Soil Resistivity Testing Equipment

Thermal Resistivity Testing Equipment

Ground Penetrating Radar with DGPS

Pile Integrity Testing Equipment

Hydrological Resources

4 no. Submersible Pumps

2 no. V-Notch Weir Tanks

8 no. Absolute Pressure Transducer and Dataloggers

Page 7: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Organization Profile

5

Services

GROUND INVESTIGATION

Onshore Soil Investigations, Nearshore Soil Investigations

Contaminated Land and Environmental Investigations

Exploratory Borehole Drilling and Sampling

Trial Pitting

In-Situ Testing

Static “Dutch” Cone Penetration Testing

Probehole Surveys

Geophysical Investigations

Soil Resistivity Testing

WATER RESOURCES AND WATER MANAGEMENT

Water Well Drilling

Soakaway Borehole Drilling

Well Casing Installation

Pumping Tests and Permeability Testing

Earthing and Cathodic Protection Boreholes

LABORATORY / MATERIALS TESTING

Soil and rock mechanics laboratory testing

Water & Wastewater testing

Concrete testing

Aggregate testing

Asphalt testing

Chemical testing

Environmental testing

GEOLOGICAL INVESTIGATIONS / MINERAL RESOURCES

Geological mapping

Walk-over surveys

Exploratory drilling

GROUND ENGINEERING AND GROUND IMPROVEMENT

Pressure grouting

Gravity filling of cavities and voids

Anchor drilling

Micropiling

OTHER SERVICES

Geotechnical Consultancy

Pile Integrity Testing

Current meter and tidal monitoring

Underground Service Detection

Ground Penetrating Radar

Electromagnetic Surveys

Electrical Resistivity Surveys

Page 8: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification Document

APPENDIX A

CERTIFICATATIONS &

ACCREDITATIONS

Page 9: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

Page 10: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

Page 11: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

Page 12: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

ISO 9001:2000 CERTIFICATE

(Please press CTRL and click on hyperlink to access)

ISO/IEC 17025:2005 CERTIFICATE

(Will be accessible from IAS website from June 2008)

Page 13: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

APPENDIX B

ORGANIZATION CHART

Page 14: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Organization Profile

Page 15: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E1

APPENDIX C

CURRICULUM VITAE OF GEOTECHNICAL

STAFF

CVs – DRILLING & GEOTECHNICAL DEPT.

CVs - LABORATORY

(Please press CTRL and click on hyperlink to access)

Page 16: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E2

APPENDIX D

RESUME OF COMPANY

EXPERIENCE

Page 17: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E3

Major Completed Projects

Geotechnical Investigations & Drilling Projects

2007

CLIENT PROJECT VALUE IN QRS

CDE IRELAND LTD GEOTECHNICAL INVESTIGATION FOR SAND WASHING PLANT AT AL KARANA

82,355.00

HYDRO ALUMINIUM AS QATALUM PROJECT – GEOTECHNICAL INVESTIGATION FOR BRIDGES ACROSS COOLING WATER CHANNEL

39,900.00

JGC - KBR C/O QATAR SHELL

GEOTECHNICAL WORKS FOR THE FIREWATER TANK / WEST LAYDOWN AREA LOT W7A

34,475.00

JGC KBR - QATAR SHELL POTABLE WATER & FIRE WATER SYSTEM, CAMP AREA, RASLAFFAN - GEOTECHNICAL INVESTIGATION

52,560.00

NIPPON KOEI CO. LTD / ASCO CONSULTING ENGINEER

ABU HAMOUR SOUTHERN OUT FALL - GEOTECHNICAL AND GEOPHYSICAL INVESTIGATION

819,275.00

STRABAG QATAR WLL PLANT OFFICE AREA BUILDINGS - GEOTECHNICAL INVESTIGATION

51,155.00

PRIVATE ENGINEERING OFFICE / GHD

PRIVATE BEACH VILLA AL THAKHIRA - GEO TECHNICAL INVESTIGATION

42,850.00

CONSOLIDATED CONTRACTORS INT'L CO. (CCIC)

QATARGAS II LNG FACILITIES PROJECT, RASLAFFAN - DRILLING EARTHING BORE HOLE (CONTRACT GTC-QG-11-ONS-15)

546,250.00

GEA BARWA BUSINESS CENTER - GEOTECHNICAL & HYDROLOGICAL INVESTIGATION

1,114,935.00

AL JABER ENERGY SERVICES

COMMON SULPHUR PLANT, QATAR GAS II - RLIC, GEOTECHNICAL INVESTIGATION

82,310.00

ENCANA INTERNATIONAL (QATAR) LIMITED

DRILLING WATER WELL & PUMPING TEST 223,380.00

RAS LAFFAN OLFINS COMPANY LTD (RLOC)

ETHYLENE PIPELINE - MESAIEED TOPOGRAPHICAL SURVEY

110,066.00

GEA GERMAN ENGINEERS AND ARCHITECTS

BARWA BUSINESS CENTER - GEOTECHNICAL & HYDROLOGICAL INVESTIGATION - 2ND PHASE

1,410,625.00

ATKINS QATAR FOUNDATION EDUCATION CITY - ADDITIONAL GEOTECHNICAL INVESTIGATION

239,595.00

CBI SHELL PEARL GTL TANKAGE- CBI CONTRACT NO. 153130 - GEOTECHNICAL SITE INVESTIGATION

2,932,118.00

Page 18: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E4

STFA MARINE CONSTRUCTION

CONSTRUCTION OF NEW TEMPORARY BERTH NO. 7 AT MESAIEED - STAND PIPE INSTALLATION & ASS. WORKS

223,145.00

JGC MIDDLE EAST FZE GROUND WATER MONITORING WELLS CONSTRUCTION AT DOLPHIN PROJECT

198,200.00

RAFAEL VINOLY ARCHITECTS

ARAB MUSEUM OF MODERN ART - GEOTECHNICAL INVETIGATION

429,685.00

JGC KBR - QATAR SHELL STORAGE OF CORE BOXES 87,000.00

FCB QNC-3 ANCHORS IN ROCK UMMBAB - DRILLING BOREHOLES FOR ANCHORS

229,000.00

QATAR PRIMARY MATERIALS

GEOLOGICAL PROSPECTING FOR SAND DEPOSITS, SOUTH QATAR. SITE INVESTIGATION

289,450.00

QATAR PRIMARY MATERIALS

QPMC SAND WASHING PLANT-SOUTH OF AL-KARANA, GROUND INVESTIGATION

72,120.00

2006

CLIENT PROJECT VALUE IN QRS

HALCROW DEVELOPMENT OF RUWAIS PORT PHASE 2, DRILLING EARTHING BOREHOLES

325,094.00

HALCROW NEW DOHA INT’L AIRPORT, AIRLINE OPERATIONS FACILITIES GEOTECHNICAL INVESTIGATION

409,465.00

GULF EINGINEERING MULTI PURPOSE ADMIN. COMPLEX – RASLAFFAN, GEOTECHNICAL INVS.

248,200.00

PUNJ LLOYD NDIA FUEL SYSTEM-GEOTECHNICAL & GEOPHYSICAL SIOL INVESTIGATION

561,476.00

CTJV AL KHALEEJ PROJECT PHASE 2, GEOTECHNICAL & TOPOGRAPHICAL SURVEY

190,712.00

IMCO DRILLING EARTHING BOREHOLES & INSTALLATION OF EARTH RODS

147,050.00

CHIYODA TECHNIP AL KHALEEJ GAS PROJECT 102.656.00

QATAR SHELL GTL PEARL GTL PROJECT PI-017, HARBOUR TANK FARM INTERIM SITE INESTIGATION

329,585.00

HALCROW OLD DOHA PORT REDEVELOPMENT GEOTECHNICAL INVESTIGATION

102,665.00

HYDER CONSULTING LUSAIL DEVELOPMENT GROUND WATER INVESTIGATION

1,378,355.00

Page 19: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E5

CLIENT PROJECT VALUE IN QRS

STS CONSULTANTS QATAR CONVENTION CENTER & TOWER GEOTECHNICAL SITE INVESTIGATION

932,780.00

ELLERBE BECKET SPECIALITY TEACHING HOSPITAL IN EDUCATION CITY, GEOTECHNICAL INVS.

177,260.00

CHIYODA TECHNIP QATAR LIQUIFIED GAS CO PMP/AGX PROJECT GEOTECHNICAL & TOPOGRAPHICAL SURVEY

352,214.00

FCB CEMENT THIRD EXTENSION OF UMMBAB CEMENT PLANT-GEOTECHNICAL INVESTIGATION

192,880.00

CHIYODA TECHNIP QATAR GAS 3 & 4 ONSHORE PROJECT TRAINS 6 & 7 SUB CONTRACTORS CAMP

114,172.00

HYDRO ALUMINIUM AS QATALUM PROJECT-GEOTECHNICAL INVESTIGATION

47,400.00

BAUER INTERNATIONAL OLD GHANIM SITE DRILLING GROUND WATER MONITORING WELL

80,780.00

QATAR KENTZ RL3 COMMON OFFLOT PROJECT-RASLAFFAN 138,100.00

QATAR KENTZ PEARL GTL PLANT TANK AREA BOREHOLE WORK 277,300.00

QATAR SHELL PEARL GTL PROJECT CONSTRUCTION CAMP TRIAL PIT WORK

111,185.00

QAPCO SIOL & WATER CONTAMINATION SURVEY IN AREA A & B OF QATOFIN PROJECT

312,520.00

CBI CBI CONTRACT # 146682, RASLAFFAN GEOTECHNICAL INVESTIGATION

323,530.00

GALFAR ALMISNAD EPIC UMMBAB TO SALWA ROAD DUAL CARRIAGE, EARTHING BOREHOLES

410,750.00

LINDE AG AIR SEPERATION UNITS, RASLAFFAN – PEARL QATAR, GEOTECHNICAL INVS.

400,300.00

JGC-KBR C/O QATAR SHELL

PEARL GTL PROJECT ADDITIONAL CAMP SOIL INVESTIGATION WORK

348,440.00

AL-JABER & PARTNERS PEARL PROJECT-EFFLUENT TREATMENT PLANT, GEOTECHNICAL INVESTIGATION

1,578,110.00

GALFAR ALMISNAD CONSTRUCTION OF ROADS, UTILITY CROSSINGS & STREET LIGHTING IN INDUSTRIAL AREA, MESAIEED GROUND WW

91,530.00

HYDRO ALUMINIUM AS QATALUM PROJECT – ADDITIONAL TOPOGRAPHICAL, BATHYMETRICAL & GEOTECHNICAL INVESTIGATION

390,925.00

Page 20: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E6

2005

CLIENT PROJECT VALUE in QRS.

MANNAI CORPORATION WAREHOUSE AT STREET 23/24 SALWA INDUSTRIAL AREA

13,350.00

QATAR DREDGING CO. PEARL OF THE GULF PROJECT – DOHA 172,046.00

HYDRO ALUMINIUM AS QATAR ALUMINIUM PROJECT 974,033.00

J & P QATAR W.L.L ERC 0492/C1 AL GHARRAFFA INTERCHANGE 8,800.00

KBAS CONTRACTIN & TRADING

QUARRY FEASIBILITY AT KARAMA 62,800.00

INDUSTRIAL SERVICE GROUP

OFFICE BLDG (2B +G + 9) AT NEW NEW KHOLAIFAT 22,000.00

CHIYODA CORPORATION RASGAS NEW CAMP AREA FOR TRAIN 6 & FEED PROJECT

287,766.00

KBAS CONTG & TRADING KHALIFA STADIUM 6,725.00

MANNAI CORPORATION WARE HOUSE AT ST 23/24 SALWA INDUSTRIAL AREA – ENVIRONMENTA SAMPLING & TESTING

13,350.00

C C C RAS LAFFAN EXPANSION PROJECT GROUND WATR MONITORING WELLS

27,000.00

KBAS CONTRACTING SALAM STREET / DRILLING OF SOAKWAY BOREHOLES 20,400.00

JGC MIDDLE EAST FZE DOLPHIN – UPSTREAM AND COMPRESSION FACILITIES 66,850.00

MTC SURVEY QAFAC II & GEOTECHNICAL SURVEY 142,650.00

MTC SURVEY NEW BRITISH EMBASSY OFFICES RESIDENCE & AMENITIES TOPOGRAPHICAL & GEO TECHNICAL SURVEY

46,250.00

CHIYODA CORP SOIL INVESTIGATION & TOPOGRAPHICAL SURVEY – QATAR GAS III – PROJECT QATAR GAS 3 FEED PROJECT RASLAFFAN

1,110,957.00

J & P DRILLING BORE HOLES OUR QUOTE ER/6553 15,225.00

QATAR KENTZ WLL QATARGAS II DEVELOPMENT PROJECT RLIC CAMP AREA, RASLAFFAN, (7-BOREHOLES, SOIL & ROCK SAMPLING LAB TEST)

35,950.00

FBJ ENTERPRISES VILLA COMPLEX LUQTA – GEOTECHNICAL INVESTIGATION

21,795.00

GULF ENGINEERING & INDUSTRIAL CONSULTANCY

BMC 2004023 CONSULTANCY QTY SURVEY FOR AQUATIC & FISHERIES REASEARCH CENTRE AT WAKRAH

123,660.00

SMEC INTERNATIONAL HALUL ISLAND REMEDIATION 378,386.00

COWI A/S NORTH BEACH DEVELOPMENT ADDITIONAL BOREWELL 12,400.00

QATAR KENTZ 524-QG-II LABOUR CAMP FACILITIES PHASE II – RASLAFFAN

24,400.00

DODSAL PTE LTD DOLPHIN UPSTREAM & COMPRESSION FACILITIES PROJECT RLIC – DRILLING EARHING BOREHOLES

13,750.00

PENINSULAR PETROTECH ENG.

HALUL TANK CP SYSTEM, DRILLING BOREHOLES FOR CATHODIC PROTECTION

223,925.00

Page 21: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E7

CLIENT PROJECT VALUE in QRS.

ARAB CONSULTING ENGINEERS

15 NEW SCHOOLS AROUND DOHA AND VILLAGES 183,000.00

CPC/LATTANZI DOHA AIRPORT – GEOTECHNICAL INVESTIGATION 21,042.00

QATAR PETROLEUM GEOTECHNICAL INV. FOR GABBRO PROJECT 1,266,285.00

DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

KELLOG BROWN ROOT FEED FOR RATIONALIZATION OF CONTROL SYSTEM AT KHATIYAH AND FAHAHIL DEGASSING STATION

57,650.00

TRAGS AL KHOR CLUB CONVERSION – EARTHING BOREHOLES 18,570.00

C.D.C BARJEEL RESIDENTIAL TOWERS AT WEST BAY – PILING AND EXCAVATION WORKS

452,030.00

J & P DRILLIJNG BORE HOLE FOR STREET LIGHTING 7,140.00

ALHUDA ENG WORKS DEVELOPMENT OF KHALIFA TENNIS & SQUASH 17,800.00

Q-CON EPIC OF 11KV DUKHAN TOWNSHIP NETWORK UPGRADE

68,650.00

ATKINS PRIMARY INFRASTRUCTURE DESIGN SERVICES FOR EDUCATION CITY

404,485.00

QATAR PETROCHEMICAL HIGH COD TANK IN ETHYLENE PLANT GEOTECHNICAL INVESTIGATION

28,350.00

ATKINS FEED FOR LPG PIPELINE FROM QP REFINARY TO NEW LPG BOTTLING PLANT

156,735.00

PRIVATE ENGINEERING OFFICE

VILLA AT AL THAKIRA – GEOTECHNICAL INVESTIGATION 20,400.00

GULF DESIGN PROPOSED BUILDING AT A-RING ROAD FOR AHMED DARWISH

19,150.00

ATKINS QATAR PRIMARY ROUTES DHUKAN HIGHWAY 270,150.00

CHIYODTECHNIP JOINT VENTURE

ADDITIONAL TOPOGRAPHICAL SURVEY OF DESALINATED WATER PIPES ROUTE AND GEOTECHNICAL INVESTIGATION AT LEAN LNG TANK AREA

105,710.00

SLAG AGGREGATE PRODUCER

QUARRY FEASIBILITY STUDY AT KARAMA 28,500.00

AL-SAAD CONSULTING ENG

2B+G+M+14+SERVICE FLOOR FOR DR. SUMAIKH AT OLD SALATA

35,700.00

CTJV RASGAS ONSHORE/ONPLOT EXPANSION PROJECT – GEOTECH INVESTIGATION

287,766.00

SILVER ARACH PROPOSED G+5 BUILDING AT UMM GHUWALINA 16,000.00

CCC/TEYSEER JV QATAR GAS II DEVELOPMENT PROJECT RASLAFFAN – DRILLING GROUND WATER

68,000.00

QATAR PETROLEUM GEOTECHNICAL INVESTIGATION FOR THE GABBRO SUPPORT SERVICES

1,266,285.00

CDC BARJEEL RESIDENTIAL TOWER AT WEST BAY – PILING AND EXCAVATION WORKS

452,030.00

TEFFEN EPIC OF RASLAFFAN, MESAIEED ETHANE TRANSMISSION PIPELINE PROJECT

135,600.00

Page 22: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E8

CLIENT PROJECT VALUE in QRS.

WS ATKINS NEW DOHA INTERNATIONAL AIRPORT – INFRASTRUCTURE ROAD PRELIMINARY DESIGN

387,391.00

HALCROW LTD MUSEUM OF ISLAMIC ARTS – GEOTECHNICAL INVESTIGATION

100,575.00

2004

CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN 591,281.00

KETTANESH CONSTRUCTION

RAS LAFFAN LNG TANK-5 149,140.00

AL HUDA ENGINEERING WORKS

KHALIFA SPORTS HALL – DOHA 45,000.00

DOHA PETROLEUM CONST. CO.

HELIUM RECOVERY UNIT – RAS LAFFAN 68,500.00

AMERICAN INT’L. CONTRACTORS INC. (AICI)

MILLENNIUM VILLAGE FACILITIES – AL UDEID AIRBASE 43,250.00

CHIYODA CORPORATION AL KHALEEJ GAS PROJECT – LPG TANKS – RAS LAFFAN 184,072.00

QATAR PETROLEUM GEOTECHNICAL INVESTIGATION FOR PHOTOGRAPHY MUSEUM

152,775.00

ENELPOWER RAS LAFFAN POWER & DESALINATION STATION 54,500.00

LG ENGG. & CONST. CORP. – KOREA

QP LAB PROJECT – MESAIEED 76,525.00

OVERSEAS BECHTEL, INCORPORATED – UK

NEW DOHA INTERNATIONAL AIRPORT PROJECT 6,316,883.00

CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN (ON-PLOT)

442,325.00

W.S ATKINS & PARTNERS

DUKHAN ROAD – DETAILED DESIGN 148,160.00

AL ATTIYAH CONTG. & TRADG. CO.

ERC 0588 C1 RIW IN NORTH OF DUHAIL – STAGE 2 61,200.00

CHIYODA CORPORATION RLIC – CAMP AREA 388,518.00

DORNIER CONSULTING GROUNDWATER ASSESSMENT PROJECT – MONITORING WELLS IN DUKHAN

167,325.00

MECON QAPCO EXPANSION PROJECT – MESAIEED 96,570.00

DORNIER CONSULTING GROUNDWATER ASSESSMENT – HALUL ISLAND 91,000.00

JAMES CUBITT & PARTNERS ENGINEERING CONSULTANCY

LAFFAN TOWER (3 B+G+M+32+2 P+15) ADMINISTRATIVE TOWER AT WEST BAY

42,950.00

JOANNOU & PARASKEVAIDES QATAR W.L.L.

ERC 0492/C1 – AL GHARRAFFA INTERCHANGE 126,300.00

QATAR PETROLEUM LTC 172/03 – BASELINE SURVEY AND MONITORING OF THE GROUNDWATER MONITORING WELLS IN MESAIEED INDUSTRIAL CITY

1,027,175.00

Page 23: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E9

FCB CEMENT QATAR CEMENT PLANT UMM BAB 99,000.00

CHIYODA CORPORATION QATARGAS II LNG PLANT PROJECT – SULPHUR HANDLING AREA & PIPELINE ROUTE

222,701.00

BUZWAIR E&C. ERC 0390 C5 – DESIGN & CONST. OF ACCESS ROADS TO MOTORCYCLE RACETRACK

56,400.00

MARUBENI GTC 1/2002 – POWER SUPPLY TO QATAR FOUNDATION AND 132kV OHL REPLACEMENT BY CABLE IN GHARRAFA – DOHA

189,950.00

COWI – QATAR NORTH BEACH DEVELOPMENT – DOHA 2,655,802.00

QATAR PETROLEUM SO # 30443 – FIREWALL TANK AT FAHAHIL STRIPPING PLANT

23,700.00

MMAA – DRAINAGE DEPT.

7A+7B+7E – ABU HAMOUR SOUTHERN OUTFALL 76,615.00

ATKINS NEW QASCO DIRECT REDUCTION IRON FACILITY 27,000.00

INDUSTRIAL SERVICES GROUP

TOWER BUILDING AT WEST BAY 28,500.00

NASSER S. AL HAJRI CO. LTD.

DOLPHIN ONSHORE FACILITIES PROJECT – RAS LAFFAN

500,000.00

QATAR DREDGING CO. NDIA – CORE DRILLING IN ROCK OUTCROP 42,400.00

QATAR LIQUEFIED GAS CO.

AMINE REGENERATION UNIT AREA 28,500.00

MEDGULF CONST. CO. GTC 04/175/ED – EPIC OF NEW PRODUCTION & INJECTION WELLS AT ARAB D PLANT IN DUKHAN

92,445.00

ATKINS DUKHAN HIGHWAY – ADDITIONAL BOREHOLES 61,670.00

RMJM – DUBAI DUBAI TOWER – DOHA 2,130,060.00

CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN 29,692.00

MOHAMED BIN MUBARAK SALEH AL KULAIFI

DEVELOPMENT AT WEST BAY LAGOON – DOHA 24,350.00

TRADING & AGENCY SERVICES

DUKHAN FITNESS CENTRE, DUKHAN TOWNSHIP 40,250.00

2003

GULF STYLE ENGINEERING CONSULTANCY

AL-BAKER TOWER AT WEST BAY 42,120.00

QATAR STEEL CO. LTD. NEW DRI PLANT PROJECT, QASCO, MESAIEED 34,700.00

RIZZANI DE ECCHER – QATAR BRANCH

AL UDEID PROJECT 36,250.00

MECON GTC 116/ED/02 – KHUFF WELLHEAD TREATMENT PLANTS 152,520.00

CHEVRON PHILLIPS CHEMICAL INT’L. QATAR HOLDINGS – USA

TENDER # QC2-0005 – ENGG., ANALYTICAL & OTHER SERVICES FOR RAS LAFFAN ETHYLENE PLANT – RAS LAFFAN TO MESAIEED

1,155,634.00

H.E. ABDULLAH MOHD. APARTMENT TOWER (2B+G+20) AT WEST BAY 21,300.00

Page 24: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E10

AL OTHMAN – C/O. AEB

QATAR PETROLEUM STC 064/03 – SI WORK FOR RAS ABU ABOUD DEVELOPMENT PROJECT

101,625.00

DORNIER CONSULTING GROUNDWATER ASSESSMENT PROJECT 76,395.00

AL BAIDA TECHNICAL SERVICES

4 DEEP WELL DRILLING PROJECT 44,120.00

CHIYODA CORPORATION

FEED OF NGL RECOVERY FACILITIES – RAS LAFFAN 234,528.00

MMAA – DRAINAGE DEPT.

AL KHOR SEWERAGE EXTENSION TO AL KHOR STW – C517

23,450.00

GRANHERNE INTERNATIONAL LTD.

ECS FOR FEED FOR FIRE AND GAS DETECTION, PROTECTION & SAFETY UPGRADES IN DUKHAN FIELDS

63,725.00

CH2MHILL – U.K. ENVIRONMENTAL ASSESSMENT DRILLING, RAS LAFFAN 133,850.00

MMAA – DRAINAGE DEPT.

MURAIKH AREA SEWERAGE PHASE 3 41,050.00

CROSCO INTEGRATED DRILLING & WELL SERVICES CO.

WATER WELL DRILLING PROJECT – SW QATAR 47,500.00

MMAA – DRAINAGE DEPT.

INDUSTRIAL AREA SEWERAGE 116,600.00

MMAA – DRAINAGE DEPT.

SITE INVESTIGATION – GROUNDWATER QUALITY 57,000.00

QAPCO GEOTECHNICAL SOIL INVESTIGATION FOR QATOFIN PROJECT

415,335.00

MMAA – DRAINAGE DEPT.

ABU HAMOUR SOUTHERN OUTFALL – SEDIMENT SOIL SAMPLES (PART 2) & LAKE SURFACE WATER SAMPLES (PART 4)

127,010.00

WS ATKINS & PARTNERS

STATE AUDIT BUREAU HEAD QUARTERS – WEST BAY 70,000.00

KBAS CONTG. TRADG. ERC 0593/C4 ACCESS ROADS TO HOUSES AT M. KABAN – ZONE 77

170,000.00

CH2MHILL – UK Q-CHEM PLANT, MESAIEED – GROUNDWATER MONITORING WELLS

26,450.00

KETTANESH CONSTRUCTION

RAS LAFFAN LNG TANK-4 200,800.00

PETROSERV LTD. GTC 185/ED/02 – NEW DUKHAN SEWAGE TREATMENT PLANT

23,875.00

QATAR PETROLEUM LINEAR ALKYL BENZENE (LAB) PROJECT – MESAIEED 32,870.00

RIZZANI DE ECCHER AL UDEID PROJECT – PACKAGE 4 32,500.00

H.S. CONSULTANTS CONSULTANCY SERVICES FOR CLOSURE & REHABILITATION OF UMM AL AFFAI LANDFILL SITE

25,700.00

HYDER CONSULTING DOHA WEST STW – EXTENSION NO. 3 252,295.00

WORLEY QATAR GTC 149/2000 – FEED FOR RAS LAFFAN TO MESAIEED GAS PIPELINE PROJECT

155,000.00

BUZWAIR ENGG. & CONTG.

ERC 0621 RIW – AL ITTIHAD SPORTS CLUB ROADS 53,400.00

Page 25: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E11

CCIC & MURRAY & ROBERTS

SPORTS HALL AT KHALIFA SPORTS CITY 291,350.00

JOANNOU & PARASKEVAIDES QATAR W.L.L.

ERC 0492/C1 – AL GHARRAFA (IMMIGRATION) INTERCHANGE

50,255.00

MARBU CONTRACTING EST.

DEVELOPMENT OF AL SAAD CLUB 42,700.00

2002

CCIC RAS LAFFAN ONSHORE EXPANSION PROJECT – GROUNDWATER MONITORING WELLS

62,850.00

MEDGULF CONSTRUCTION CO.

GTC 107/ED/02 – SITE PREPARATION & EARTH WORKS FOR LPG TANKS AT MESAIEED

95,600.00

GRANHERNE INTERNATIONAL LTD.

RAG UTILIZATION PROJECT 33,170.00

GALFAR AL MISNAD ENGG. & CONTG. EST.

GTC 188/ED/01 – TWO CRUDE OIL STORAGE TANKS IN MESAIEED TANK FARM

23,774.00

ASCO CONSULTING ENGG.

LTC 249/2001 – FEED FOR NEW DUKHAN SEWAGE TREATMENT PLANT

25,700.00

GALFAR AL MISNAD ENGG. & CONTG.

DRILLING OF SOAKAWAY BOREHOLES AT AL KHARATIYAT

252,500.00

GALFAR AL MISNAD ENGG. & CONTG.

DRILLING OF SOAKAWAY BOREHOLES AT GARAFFAH 292,500.00

GALFAR AL MISNAD ENGG. & CONTG.

DRILLING OF SOAKAWAY BOREHOLES AT DUKHAN 165,000.00

MMAA – CED GARAFFA DRAINAGE & OUTFALL SYSTEM 28,960.00

MECON GTC 116/ED/02 – EPIC OF KHUFF WELLHEAD TREATMENT PLANTS FACILITIES

60,620.00

W.S. ATKINS ERC 0638/D2 QATAR PRIMARY ROUTES – DUKHAN ROAD 223,465.00

MMAA – DRAINAGE DEPT.

ABU HAMOUR SOUTHERN OUTFALL – TIDAL LEVEL & CURRENT METER SURVEY

36,100.00

CCIC DCPT – RAS LAFFAN COMMON COOLING WATER PROJECT

14,650.00

MMAA – BED ADD. SI FOR DEEPENING OF AL RUWAIS CHANNEL 255,500.00

PETROFAC INTERNATIONAL – SHARJAH

GTC 136/EM/02 – FEED FOR RAG UTILISATION PROJECT 101,550.00

DESERT BYRNE DRILLING – OMAN

4 NO. DEEP WELL DRILLING - PUMPING TEST AND LAB TEST

170,000.00

WS ATKINS QATAR TAXI PROJECT 99,050.00

DREDGING INTERNATIONAL – DUBAI

SOIL INVESTIGATION CAMPAIGN – WEST BAY, DOHA 80,050.00

PARSONS BRINCKERHOFF LTD.

QATAR BROADCASTING COMPLEX – DESIGN SERVICES 79,970.00

Page 26: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E12

MMAA – DRAINAGE DEPT.

ABU HAMOUR SOUTHERN OUTFALL – MARINE WORKS – PART 6B

61,095.00

2001

HALCROW EIC 546/D5 UMM SALAL PHASE 4 133,610.00

HALCROW EIC 546/D6 AL MANASEER 185,000.00

HYDER CONSULTING EIC 543/D3 HBK LANDS AND ABU HAMOUR WEST 98,715.00

HYDER CONSULTING ERC 1418/D1 LINK ROAD TO UMM BIRKA 97,355.00

CHIYODA RASGAS RNF PROJECT 700,000.00

HYDER CONSULTING ERC 1416/D1 DESIGN OF ROADS IN ZONE 51 105,405.00

HYDER CONSULTING EIC 543/D1 BANI HAJER NORTH PHASE 1 & 2 263,000.00

HYDER CONSULTING ERC 1412/D1 DESIGN OF ROADS IN WAKRAH AREAS 1 & 4

54,700.00

HYDER CONSULTING ERC 545/D1 WEST OF WAKRAH 62,600.00

CHIYODA-MISUI-SNAMPROGETTI

RASGAS ONSHORE EXPANSION PROJECT 89,515.00

PENCOL INTERNATIONAL

QGPC GTC 104/2000 - KHUFF GAS REPLACEMENT 60,935.00

MECON DESC FUEL STORAGE FACILITY AT MESAIEED 49,800.00

HALCROW CONSULTING ENGINEERS

BTC 7000 - DEEPENING OF CHANNELS FOR PORTS 70,685.00

QAFCO QAFCO-4 PROJECT - OFFSHORE SITE INVESTIGATION 111,277.00

STORK ENGINEERS & CONTRACTORS

EPIC OF DUKHAN FLARE UPGRADE PROJECT – DUKHAN 187,750.00

TRADING & AGENCY SERVICES LTD.

EARTHING BOREHOLES AT KHUFF 'A' STATION – DUKHAN

60,443.00

HALCROW DEEPENING PORTS AT AL WAKRAH 77,990.00

QATAR PETROLEUM ADD. CLASSROOMS & MULTIPURPOSE HALL – DUKHAN 19,828.00

DOHA PETROLEUM & CONSTRUCTIPON CO. (DOPET)

EPQ/DE2.04 AL KHALIJ FIELD DEVELOPMENT AT HALUL 34,770.00

MMAA PS41 AREA SEWERAGE PHASE 2 & PS41A 27,556.00

2000

LG ENGINEERING CONSTRUCTION

NODCO REFINERY EXPANSION PROJECT 49,000.00

QATAR ELEC. & WATER CO.

RAF 'B' STATION EXTENSION PROJECT 34,050.00

SNAMPROGETTI ITALY S.P.A

14" RAW PIPELINE FROM DUKHAN TO MESAIEED 79,767.00

Page 27: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E13

QATAR FERTILISER CO.

QAFCO-4 PROJECT 357,478.00

INDUSTRIAL SERVICES GROUP

G + 6 STOREY BUILDING AT MANSOORA FOR MOHAMMED AHMED AL THANI

8,800.00

H.E SHK. ABD. BIN KHALID BIN HAMAD AL-THANI

PUMPING TESTS AT AL WAAB FARM 40,500.00

BIN SRAIYA QUARRY FEASIBILITY STUDY AT UMM AL QAHAB 18,990.00

HALCROW BTC 6010 - UPGRADING OF SHEIKH'S JETTY 24,309.00

TAMIMI CONST. CO. EARTHING BOREHOLES AT RAS LAFFAN 15,420.00

GULF INTERNATIONAL CONSULTANTS

RAS LAFFAN UTILISATION PROJECT BLDG. & UTILITIES 5,550.00

MTC SURVEYS DUKHAN FIELD GAS LIFT PROJECT 217,854.00

MMAA (CED) PS 26 & PS 25 CATCHMENTS SEWERAGE DESIGN 43,853.00

ARAB ENGINEERING BUREAU

VILLA FOR SH. SAUD BIN MOHAMMED AL THANI 39,789.00

CCIC JETTY EXTENSION - QVC PROJECT, MESAIEED 7,205.00

TECHNIP ITALY S.P.A. TOPOGRAPHICAL SURVEY - SULPHUR EXPANSION 8,525.00

DAMES & MOORE PUMPING TESTS AT RAS LAFFAN 14,100.00

PENCOL INT’L 12" RAW NGL PIPELINE REPAIR WORKS 10,300.00

GALFAR AL MISNAD ENGG. & CONTG. CO.

SOAKAWAY BOREHOLES AT RAS LAFFAN 9,000.00

JGC KELLOGG JOINT VENTURE

SEAWATER OUTFALL CHANNEL 22,310.00

QATAR PETROCHEMICAL CO.

PRELIMINARY SURVEY AT QAPCO PLANT – MESAIEED 49,100.00

DAR AL-HANDASAH SHAIR & PARTNERS

CUSTOMS CENTRE & STAFF ACC.- ABU SAMRA 128,347.50

CCIC DRILLING OF H2O MONITORING WELLS AT QVC – MESAIEED

42,043.00

TEYSEER CONTRACTING CO.

ERC 0430/C1 ROUTE 55 - MESAIEED TO SALWA RD. 9,395.50

TECHNICAL SERVICES CONS.

PROPOSED SHAHEEN PROJECT 58,785.00

TRADING & AGENCY SERVICES LTD.

GTC 111/2000 - EPIC OF KHUFF WELLHEAD TREATMENT PLANTS

22,727.00

QATAR PETROLEUM TEST WELLS FOR GROUNDWATER MONITORING AT MIC 246,853.00

RAMBOLL CONSULTING ENG.

RASGAS OFF – SPEC POND AT RAS LAFFAN 14,542.00

GALFAR AL MISNAD ENGG. & CONTG. CO.

SUBSTATION BLDG. AT MESAIEED TANK FARM 9,280.00

MANCO INT’L EPIC - 1 FIRE WATER & 4 CRUDE OIL TANKS – MESAIEED 57,824.50

*Pre-2000 project references are available on request.

Page 28: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E14

Major Completed Projects

Laboratory

CLIENT PROJECT DETAILS PERIOD

CHIYODA CORPORATION

QATAR GAS LNG PROJECT, RAS LAS LAFFAN

CONCRETE TESTING 1994 - 1996

TAYLOR WOODROW

QATAR FLOUR MILL, DOHA LAB AND FIELD TESTING OF SOIL, CONCRETE & AGGREGATE

1995 - 1997

TOYO ENGINEERING

QATAR GAS UPSTREAM PROJECT, RAS LAFFAN

ALL TESTING WORKS INCLUDING ONSITE LABORATORY

1995 - 1998

MIDMAC CONTRACTING CO

QAFCO – III EXPANSION, MESAIEED

LAB AND FIELD TESTING OF SOIL, CONCRETE & AGGREGATE

1996 - 1998

DAMES & MOORE NGL-4 BASE CASE, NGL-3 AND NGL TANK FARM – ENVIRONMENTAL IMPACT ASSESSMENT

SAMPLING AND ANALYSIS OF SOIL AND WATER FOR CONTAMINATION STUDY

Aug 1999

QAFCO QAFCO – IV CONTAMINATED LAND INVESTIGATION

SAMPLING AND ANALYSIS OF SOIL AND WATER FOR CONTAMINATION STUDY

May 2000

LG ENGINEERING NODCO REFINERY EXPANSION, MESAIEED

ALL TESTING WORKS INCLUDING ONSITE LABORATORY

1999 - 2001

TECHNIP ALBA, BAHRAIN ALL TESTING WORKS INCLUDING ONSITE LABORATORY

1999 - 2001

HYDER CONSULTING

DOHA SOUTH SEWAGE TREATMENT WORKS – FLOW SAMPLING & LABORATORY TESTING

SEWAGE SAMPLING & LABORATORY TESTING

Jul2001

ERM / LAHMYER RAS ABU FONTAS, SAILIYAH, WAJBAH AND DOHA SOUTH – EIA

SAMPLING AND ANALYSIS OF SOIL AND WATER FOR CONTAMINATION STUDY

Sep 2001

MECON / KHARAFI SULPHUR RECOVERY EXPANSION

LAB AND FIELD TESTING OF SOIL, CONCRETE & AGGREGATE

2001 - 2002

QAPCO GROUND WATER MONITORING WELLS

SAMPLING AND ANALYSIS OF SOIL AND WATER FOR CONTAMINATION STUDY

Feb 2002

WSP INTERNATIONAL

RAS ABU ABOUD - EIA SAMPLING AND ANALYSIS OF SOIL AND WATER FOR CONTAMINATION STUDY

Dec 2002

CCIC QAFCO – IV EXPANSION, MESAIEED

ALL TESTING WORKS INCLUDING ONSITE LABORATORY

2002 - 2004

INTERBETON QAFCO – IV EXPANSION, MESAIEED

ALL TESTING WORKS INCLUDING ONSITE LABORATORY

May 2002 – May 2003

READINESS MANAGEMENT

U.S. AIRBASE, AL UDEID ASPHALT AND CONCRETE TESTING WORKS

Apr - Jun 2002

CCIC KHALIFA SPORTS HALL MATERIALS AND IN-SITU TESTING Sep 2003 –

Page 29: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E15

CLIENT PROJECT DETAILS PERIOD

Aug 2005.

J&P IMMIGRATION & SALWA INTERCHANGES

MATERIALS AND IN-SITU TESTING Apr 2003 – Sep 2004

CCIC RAS LAFFAN EXPANSION PROJECT

MATERIALS AND IN-SITU TESTING Oct 2001 - 2004

CCIC RAS LAFFAN COMMON COOLING WATER PROJECT

MATERIALS AND IN-SITU TESTING Jun 2002 - Sep 2004

GRANDI LAVORI FINCOSIT

RAS LAFFAN COMMON COOLING WATER PROJECT

MATERIALS AND IN-SITU TESTING Jun 2002 - Nov 2003

GRANDI LAVORI FINCOSIT

CRUSHED STONE FACILITY AT MESAIEED

MATERIALS AND IN-SITU TESTING Oct 2001 - Aug 2004

GRANDI LAVORI FINCOSIT

MULTI-PRODUCTS BERTH, MESAIEED

MATERIALS AND IN-SITU TESTING Oct 2001 – Sep 2004

GRANDI LAVORI FINCOSIT

LAND RECLAMATION IN LPG STORAGE AREA AT RAS LAFFAN

MATERIALS AND IN-SITU TESTING Mar 2002 – May 2003

GULF HOUSING & CONST.

QATARGAS – DEBOTTLENECKING PROJECT, RAS LAFFAN

MATERIALS AND IN-SITU TESTING Jul 2002 – Jul 2005

MMAA – DRAINAGE DEPARTMENT

ABU HAMOUR SOUTHERN OUT FALL.

MARINE WATER, LAKE SURFACE WATER & SEDIMENT AND DISCHARGE WATER SAMPLING AND ANALYSIS FOR CONTAMINATION STUDY. OFFSHORE CURRENT AND TIDAL MONITORING.

Jun 2002 - Apr 2003

NITCO AL KHOR SEWAGE TREATMENT WORKS

LABORATORY ANALYSIS OF SEWAGE SAMPLES

May - Sep 2002

QATAR PETROLEUM

WOQOD BITUMEN STORAGE AND LOADING FACILITIES – MESAIEED

SOIL AND WATER SAMPLING AND TESTING FOR VARIOUS CONTAMINANT SPECIES

Jan 2003

MMAA – DRAINAGE DEPARTMENT

CP-505 INDUSTRIAL AREA SEWERAGE

LABORATORY ANALYSIS OF SEWAGE SAMPLES

Feb 2003

MMAA – DRAINAGE DEPARTMENT

GROUND WATER SAMPLING AND ANALYTICAL LABORATORY TESTING – PUMP STATIONS ENVIRONMENTAL IMPACT STUDY

GROUND WATER SAMPLING AND LABORATORY TESTING FOR VARIOUS CONTAMINANT SPECIES

May 2003

QP / MIC NODCO REFINERY AREA, MESAIEED

ENVIRONMENTAL ANALYSIS – HEAVY METALS AND TPH

Apr 2003

AL BAIDA TECHNICAL SERVICES

DEEP WELL DRILLING PROJECTS, SW QATAR

HEAVY METAL ANALYSIS OF GROUND WATER SAMPLES

Jul 2003

QAPCO QATOFIN PROJECT, MESAIEED

SOIL AND WATER SAMPLING AND TESTING FOR VARIOUS

Nov 2003

Page 30: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E16

CLIENT PROJECT DETAILS PERIOD

CONTAMINANT SPECIES

HYDER CONSULTING

DOHA WEST SEWAGE TREATMENT WORKS - FLOW SAMPLING AND LABORATORY TESTING

SEWAGE SAMPLING AND LABORATORY TESTING

Sep - Oct 2003

OVERSEAS BECHTEL INC.

NEW DOHA INTERNATIONAL AIRPORT PROJECT

SOIL AND WATER SAMPLING AND TESTING FOR VARIOUS CONTAMINANT SPECIES

Feb - Aug 2004

SIX CONSTRUCT / MIDMAC

KHALIFA STADIUM REDEVELOPMENT – PACKAGE 3 – WEST STAND

MATERIALS AND IN-SITU TESTING Oct 2003 Mar 2005

SIX CONSTRUCT MUSEUM OF ISLAMIC ARTS MATERIALS AND IN-SITU TESTING Jan 2004 - Feb 2005

QATAR PETROLEUM

BASE LINE SURVEY OF GROUND WATER MONITORING WELLS AT MIC

GROUNDWATER SAMPLING AND LABORATORY TESTING.

Jul 2004 – Apr 2008

NASSER AL HAJRI DOLPHIN PROJECT, RAS LAFFAN

MATERIALS AND IN-SITU TESTING Oct 2004 – Ongoing

ASHGHAL AL DHAKIRA SEWAGE TREATMENT WORK

SEWAGE WATER TESTING May - Jun 2005

ITT INDUSTRIES DOHA SOUTH SEWAGE WATER ANANLYSIS

SEWAGE WATER TESTING Jun - Jul 2005

SIX CONSTRUCTION CO.

NEW INTERNATIONAL AIR PORT

CONCRETE TESTING Aug 2005 - Nov 2006

MIDMAC NEW INTERNATIONAL AIRPORT

SOIL, ASPHALT, CONCRETE AGGREGATE TESTING

Sep 2005 - Ongoing

CDC/TAKENAKA NEW INTERNATIONAL AIRPORT

SOIL, & CONCRETE TESTING Sep 2006- Ongoing

NASSER AL HAJRI QATARGAS SRU, RAS LAFFAN

MATERIALS AND IN-SITU TESTING Sep 2006- Ongoing

NASSER AL HAJRI RAS GAS, RAS LAFFAN MATERIALS AND IN-SITU TESTING Sep 2006- Ongoing

FLUOR MIDDLE EAST

RAS GAS, RAS LAFFAN MATERIALS AND IN-SITU TESTING Sep2006- Ongoing

ALJABER ENERGY COMMON SULPHUR, QATARGAS II, RAS LAFFAN

MATERIALS AND IN-SITU TESTING Jun 2006- Ongoing

DESCON ENG.CO OLEFIN PROJECT, RAS LAFFAN

MATERIALS AND IN-SITU TESTING Jul 2006- Ongoing

MUSHRIF CONT.CO

DOHA WEST STW MATERIALS AND IN-SITU TESTING Sep 2006- Ongoing

BOSKALIS WESTMINSTER

RAS LAFFAN ENVIRONMENTAL TESTING ON SOIL & WATER

Feb 2006 Ongoing

SATCO Int’national RAS LAFFAN ENVIRONMENTAL TESTING ON SOIL & WATER

Aug 2006 Ongoing

QATAR DREDGING NEW DOHA ENVIRONMENTAL TESTING Jan 2005 -

Page 31: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

E17

CLIENT PROJECT DETAILS PERIOD

CO INTERNATIONAL AIRPORT 2007

RUMAILLAH SERVICES

PUMPING STATIONS-DOHA SEWAGE WATER TESTING Spe 2005 – Sep 2006

A.A. ENGINEERING INDUSTRIAL AREA STW SEWAGE WATER TESTING Mar 2006 – Ongoing

URS CORPORATION

ORYX GTL, RAS LAFFAN ENVIRONMENTAL TESTING Mar 2006

METITO PROJECT; C705 ENVIRONMENTAL TESTING Dec 2006 – Ongoing

SYNOHYDRO GAMUDA

NEW DOHA INT’NATIONAL AIRPORT

ENVIRONMENTAL TESTING & POTABLE WATER ANALYSIS

April 2006 - Ongoing

JGC MIDDLE EAST DOLPHIN, RAS LAFFAN GROUND WATER MONITORING Oct 2005 - Ongoing

CCIC RLX, RAS LAFFAN GROUND WATER MONITORING April 2006 - Ongoing

GULF CEMENT CO NEW CEMENT FACTORY, UMMBAB-FEASIBLITY STUDY.

CHEMICAL ANALYSIS ON LIMESTONE.

Oct – Dec 2006

Page 32: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

APPENDIX F

FIELD AND LABORATORY TESTING

Page 33: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

F-1

No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time

1. CONCRETE

1.1 Compressive strength of cubes including weight, nominal dimensions and approximate density of specimen

BS : 1881 : Part : 116 As per project specification

As per project specification 1 Day

1.2 Compressive strength of concrete cylinders ASTM C 39 As per project specification

As per project specification 1 Day

1.3 Flexural strength of concrete beams ASTM C 78 As per project specification

As per project specification 1 Day

1.4 Indirect Tensile Strength of concrete cylinders ASTM C 496 As per project specification

As per project specification 1 Day

1.5 Compressive strength, density and visual examination and preparation, of drilled concrete cores

BS 1881 : Part : 120 Min. 2 days Length / diameter ratio is between 1 and 1.2

4 Days

1.6 Compressive strength of concrete blocks including weight and nominal dimensions of specimens

BS : 2028, Appendix F Not applicable 12 samples from each lot 2 Days

1.7 Water absorption of concrete specimen including preparation

BS 1881 : Part : 122 Age of sample shall be within 28 - 32 days

3 samples from each set 5 Days

1.8 Water absorption and volume of permeable voids including sample preparation

ASTM C 642 Not applicable 1 sample from each set 7 Days

1.9 Initial surface absorption test (ISAT) BS 1881 : Part : 208 As per project specification

As per project specification 2 Days

1.10

Concrete mix design and laboratory trial mixes

BS 1881 : Part : 125 Not applicable As per mix design

5 Days and compression test results on 7

th and

28th

day

1.11 Water permeability test DIN 1048 As per project specification

3 cubes per mix 4 Days

1.12 Chloride Permeability test ASTM C 1202 As per project specification

As per project specification 3 Days

Page 34: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

F-2

No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time

2. FRESH CONCRETE

2.1 Slump test and temperature BS 1881: Part: 102 Max. 2 hrs. After mixing Each truck Immediate

2.2 Air content BS 1881:Part: 106 Max. 2 hrs. After mixing As per project specification Immediate

2.3 Sampling and manufacture of concrete cubes 150mm size

BS 1881 Part: 108 Max. 2 hrs. after mixing As per project specification 1 Day

3. TILES / MARBLES

3.1 Water absorption ASTM C 97 Not applicable As per project specification 3 Days

3.2 Density ASTM C 97 Not applicable As per project specification 3 Days

3.3 Modulus rupture ASTM C 99 Not applicable As per project specification 2 Days

3.4 Compressive strength ASTM C 170 Not applicable As per project specification 2 Days

3.5 Transverse strength BS 4131 Not applicable As per project specification 2 Days

4. CEMENT

4.1 Initial and final setting times BS : 4550 A.S.A.P 1 Kg 2 Days

4.2 Soundness of cement BS : 4550 A.S.A.P 1 Kg 3 Days

4.3 Fineness of cement (specific surface) BS : 4550 A.S.A.P 1 Kg 2 Days

4.4 Compressive strength of mortar cubes using standard sand (set of 6 cubes)

BS : 4550 A.S.A.P 2 Kg 28 Days

Page 35: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

F-3

No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time

5. BITUMINOUS MIXTURES

5.1 Density of drilled bitmac core BS 598 As per project specification

As per project specification 2 Days

5.2 Determination of bitumen content and aggregate grading of bituminous mixtures

BS 598 A.S.A.P 20 Kgs 2 Days

6. AGGREGATES

6.1 Moisture content BS : 812 A.S.A.P 5 Kgs 1 Day

6.2 Sieve analysis BS : 812 Not specified 10 Kgs 1 Day

6.3 Clay, silt and dust content in fine or coarse aggregates

BS : 812 / ASTM C 117 Not specified 10 Kgs 2 Days

6.4 Flakiness index BS : 812 Not specified 10 Kgs 1 Day

6.5 Elongation index BS : 812 Not specified 10 Kgs 1 Day

6.6 Bulk density (compacted and uncompacted) BS : 812 Not specified 20 Kgs 1 Day

6.7 Specific gravity and water absorption BS : 812 Not specified 10 Kgs 2 Days

6.8 Shell content (visual description) BS : 812 Not specified 10 Kgs 1 Day

6.9 Aggregate impact value BS : 812 Not specified 10 Kgs 2 Days

6.10 Aggregate crushing value BS : 812 Not specified 10 Kgs 2 Days

6.11 Ten percent fines value BS : 812 Not specified 10 Kgs 3 Days

6.12 Los Angeles abrasion value ASTM C 131 Not specified 10 Kgs 3 Days

6.13 Soundness of aggregate (Sodium or Magnesium sulphate)

ASTM C 88 Not specified 10 Kgs 7 Days

Page 36: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

F-4

No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time

6.14 Immersed rotational test CML Test Method 1.97 Not specified 100 Kgs 3 Days

6.15 Clay lumps and friable particles content ASTM C 14271 Not specified 10 Kgs 3 Days

6.16 Scratch hardness ASTM C 851-76 Not specified 10 Kgs 2 Days

6.17 Drying shrinkage of aggregate BS : 812 Not specified 10 Kgs 15 Days

7. SOILS

7.1 Moisture content BS : 1377 A.S.A.P 5 Kgs 1 Day

7.2 Wet density undisturbed sample BS : 1377 A.S.A.P 2 Kgs 1 Day

7.3 Dry density undisturbed sample BS : 1377 A.S.A.P 2 Kgs 2 Days

7.4 Atterberg limits - Liquid and Plastic BS : 1377 Not specified 5 Kgs 2 Days

7.5 Specific gravity BS : 1377 Not specified 5 Kgs 2 Days

7.6 Sieve analysis BS : 1377 Part : 2, 9.2 Not specified 10 Kgs 3 Days

7.7 Sedimentation analysis BS : 1377 Part : 2 Test 9.5 Not specified 10 Kgs 3 Days

7.8 Dry density / Moisture content relationship

BS : 1377 and ASTM D 1557

Not specified 50 Kgs 2 Days

7.9 California bearing ratio (CBR) BS : 1377 Not specified 35 Kgs 6 Days

7.10 Linear shrinkage BS : 1377 Not specified 10 Kgs 3 Days

7.11 Sand Equivalent Value ASTM D 2419 Not specified 10 Kgs 2 Days

Page 37: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

F-5

No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time

8. ROCKS

8.1 Point load test - per specimen ASTM D 5731 A.S.A.P

Irregular specimen Min. size 50mm Core sample - length diameter ratio to be > 1

1 Day

8.2 Uniaxial compression test and modulus of deformation (including specimen preparation, moisture content and wet density determination)

ASTM 2938 / 3148 A.S.A.P Length diameter ratio to be > 1

2 Days

8.3 Splitting tensile strength ASTM D 3967 A.S.A.P Length diameter ratio to be > 1

2 Days

9. CHEMICAL TESTING

Aggregate / Rock

9.1 Water soluble sulphate content BS 812 : Part : 118 Not specified 5 Kgs 3 Days

9.2 Water soluble chloride content BS 812 : Part : 117 Not specified 5 Kgs 3 Days

9.3 Acid soluble sulphate content BS 812 : Part : 118 Not specified 5 Kgs 3 Days

9.4 Acid soluble chloride content BS 812 : Part : 117 Not specified 5 Kgs 3 Days

9.5 Organic matter ASTM C 40 Not specified 5 Kgs 3 Days

9.6 Potential alkali silica reactivity ASTM C 289 Not specified 5 Kgs 4 Days

9.7 Full chemical analysis ASTM C 471 Not specified 5 Kgs 4 Days

Soil (For Back fill)

9.8 pH value BS 1377 : Part : 3 Not specified 1 Kg 1 Day

9.9 Electrical conductivity BS 1377 : Part : 3 Not specified 1 Kg 1 Day

Page 38: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

F-6

No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time

9.10 Water soluble sulphate content BS 1377 : Part : 3 Not specified 2 Kgs 3 Days

9.11 Water soluble chloride content BS 1377 : Part : 3 Not specified 2 Kgs 3 Days

9.12 Acid soluble sulphate content BS 1377 : Part : 3 Not specified 2 Kgs 3 Days

9.13 Acid soluble chloride content BS 1377 : Part : 3 Not specified 2 Kgs 3 Days

9.14 Organic matter BS 1377 : Part : 3 Not specified 2 Kgs 3 Days

Soil (For Agricultural purposes)

9.15 Sodium Absorption Ratio (SAR) Laboratory Manual for the Examination of Water, Waste Water and Soil

Not specified 2 kgs 4 days

9.16 Boron Laboratory Manual for the Examination of Water, Waste Water and Soil

Not specified 2 kgs 3 days

9.17 Cat ion Exchange capacity Laboratory Manual for the Examination of Water, Waste Water and Soil

Not specified 2 kgs 4 days

9.18 Exchangeable Sodium Laboratory Manual for the Examination of Water, Waste Water and Soil

Not specified 2 kgs 3 days

9.19 Salinity Laboratory Manual for the Examination of Water, Waste Water and Soil

Not specified 2 kgs 2 days

9.20 Chloride Laboratory Manual for the Examination of Water, Waste Water and Soil

Not specified 2 kgs 2 days

9.21 Sulphate Laboratory Manual for the Examination of Water, Waste Water and Soil

Not specified 2 kgs 3 days

Page 39: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

F-7

No. Test Standard Sample Holding Time

Required Volume Standard Turn Around Time

9.22 Phosphate Laboratory Manual for the Examination of Water, Waste Water and Soil

Not specified 2 kgs 2 days

9.23 Total Kjeldahl Nitrogen (TKN) Laboratory Manual for the Examination of Water, Waste Water and Soil

Not specified 2 kgs 3 days

9.24 Total Nitrogen Laboratory Manual for the Examination of Water, Waste Water and Soil

Not specified 2 kgs 3 days

9.25 Carbonates Laboratory Manual for the Examination of Water, Waste Water and Soil

Not specified 2 kgs 2 days

Concrete

9.26 Sulphate content BS 1881 : Part : 124 Not specified 5 Kgs 3 Days

9.27 Chloride content BS 1881 : Part : 124 Not specified 5 Kgs 3 Days

9.28 Cement content BS 1881 : Part : 124 Not specified 5 Kgs 3 Days

9.29 Depth of carbonation BS 1881 : Part : 124 Not specified 5 Kgs 1 Day

9.30 Type of cement BS 1881 : Part : 124 Not specified 5 Kgs 3 Days

Cement /Lime/ Gypsum

9.31 Full chemical analysis BS 4550 / ASTM C 71/ ASTM C114

A.S.A.P 5 Kgs 4 Days

Water for Concrete

9.32 pH Using pH meter A.S.A.P 200 ml 1 Day

9.33 Sulphate content AWWA / APHA 28 Days 200 ml 3 Days

9.34 Chloride content AWWA / APHA 28 Days 200 ml 3 Days

Page 40: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

F-8

No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time

9.35 Total dissolved solids (TDS) AWWA / APHA 28 Days 200 ml 3 Days

9.36 Total suspended solids (TSS) AWWA / APHA 28 Days 200 ml 3 Days

9.37 Carbonate & Bi carbonate AWWA / APHA 28 Days 200 ml 3 Days

Water for Drinking

9.38 Cations and anions including pH, EC, TDS & TSS AWWA / APHA 7 Days 500 ml 2 Days

9.39 Bacteria – Total & Faecal Coliforms AWWA / APHA 6 Hours 500 ml 2 Days

9.40 Trace Metals USEPA 3005/6010B 6 months (acidified) 200 ml 3 Days

9.41 Tri halo methane USEPA5030/8015 2 days

Waste water

9.42 Biochemical Oxygen Demand (BOD) AWWA / APHA 24 Hours 500 ml 6 Days

9.43 Chemical Oxygen Demand (COD) AWWA / APHA

7 Days 500 ml 2 Days

9.44 Dissolved oxygen

AWWA / APHA A.S.A.P 500 ml 1 Day

9.45 Chlorine content AWWA / APHA A.S.A.P 500 ml 1 Day

9.46 Ammonia AWWA / APHA 7 Days 500 ml 2 Days

9.47 Sulphide AWWA / APHA 7 Days 500 ml 2 Days

9.48 Nitrate AWWA / APHA 28 Days 500 ml 1 Day

9.49 Nitrite

AWWA / APHA 2 Days 500 ml 1 Day

9.50 Total Kjeldahl Nitrogen (TKN) AWWA / APHA 7 Days 500 ml 3 Days

Page 41: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

F-9

No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time

9.51 Total Nitrogen AWWA / APHA 7 days 500 ml 2 Days

9.52 Total Suspended Solids AWWA / APHA 7 Days 200 ml 1 Day

9.53 Sludge Volume Index AWWA / APHA 6 Hours 1.5 L 1 Day

9.54 Turbidity AWWA / APHA 24 hours 200 ml 1 Day

9.55 Total Faecal Coliform AWWA / APHA 6 Hours 500 ml 2 Days

9.56 Phenols AWWA / APHA 28 Days 500 ml 2 Days

9.57 Cyanides AWWA / APHA 14 days 500 ml 3 Days

9.58 Fat, Oil & Grease AWWA / APHA 28 Days 1000 ml 3 Days

9.59 Total Organic Carbon (TOC) AWWA / APHA 28 Days 200 ml 3 Days

9.60 Phosphate AWWA / APHA 48 Hours 100 ml 2 Days

9.61 Heavy metals USEPA 3010/6010B 6 months 200 ml 2 Days

10. Environmental Analysis

10.1 Total petroleum hydrocarbons (TPH) USEPA 8015 / 5030 / 3540 3510 / 1664

14 Days 2000 ml / 2 kg 5 Days

10.2 Volatile organic compounds (VOC) USEPA 8260 14 Days 500ml / 1 kg 5 Days

10.3 Semi volatile organic compounds (SVOC) USEPA 8270 14 Days 1000ml / 1 kg 5 Days

10.4 Polyaromatic hydrocarbon (PAH) USEPA 8310 14 Days 1000ml / 1 kg 5 Days

10.5 PCBs USEPA 8082 / 3540 14 Days 1000ml / 1 kg 5 Days

10.6 Pesticides USEPA 8081 14 Days 1000ml / 1 kg 5 Days

Page 42: GULF LABORATORIES CO. · PDF fileMMAA Approval Certificate Nos. ... Mannai Corporation & Gulf Laboratories Co. WLL ... DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00

Prequalification 2008

F-10

No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time

10.7 Chlorinated Hydrocarbons USEPA 3510/8121 14 Days 100 ml/200gm 4 Days

10.8 BTEX USEPA 5030/8015 14 Days 100 ml/200gm 4 Days

10.9 TCLP USEPA 1311 14 Days 100 ml/200 gm 2 Days

10.10 Heavy metals USEPA 3005 / 3010/6010B 6 Months 500ml / 1 kg 5 Days

11. PULVERISED FUEL ASH (PFA)

11.1 Loss on ignition BS : 3892 Not specified 1 Kg 4 Days

11.2 Magnesia content BS : 3892 Not specified 1 Kg 4 Days

11.3 Sulphate content BS : 3892 Not specified 1 Kg 4 Days

11.4 Moisture content BS : 3892 Not specified 1 Kg 4 Days

11.5 Fineness BS : 3892 Not specified 1 Kg 4 Days

12. FIELD TESTING

12.1 Insitu Density Testing BS 1377 Part: 9 - - -

12.2 Concrete Core Drilling (Maximum 400mm depth)

BS 1881 Part: 120 - - -

12.3 California Bearing Ratio Tests, allows for reaction up to 20kN, client to provide reaction vehicle

BS 1377 Part: 9 - - -

12.4 Plate Bearing Tests 0.555m diameter plate loaded up to 900 KN/m

2.

BS 1377 Part: 9 - - -