Name of work: Supply and application of ASIAN Apcolite / Berger Premium make
smoke grey synthetic enamel paints on 3 nos. of Inter connecting
Transformers (ICT-1,2,3) of 220KV Switchyard at GBPS, Utran.
(Tender No.Web.07/2011/E)
Sr.
No.
Index
1.
Tender Notice Enclosed Tender Notice along with
important conditions &
prequalification condition
2. Integrity Pact Form enclosed
3. Schedule A & B enclosed
4. General condition at contract Schedule – C1 / C2 enclosed
Issued to:
(S. V.LADANI)
M/s ADDL. CHIEF ENG. (G)
GBPS: GSECL: UTRAN
Receipt No. for Tender Fee.
Receipt No. for E.M.D.
GUJARAT STATE ELECTRICITY
CORPORATION LTD.
UTRAN GAS BASED POWER STATION
UTRAN – SURAT. 394 105GUJARAT- INDIA
Phone: (+91)-0261-2499581. Fax: 2499180
Email: [email protected] Swarnim
Gujarat
AN ISO-
14001:2004
POWER
PLANT
AN ISO-9001:2000
POWER PLANT
INTEGRITY PACT OUR ENDEAVOUR DATE :
To create an environment where Business Confidence is built through best Business Practices and is
fostered in an atmosphere of trust and respect between providers of goods and services and there users for
the ultimate benefit of Society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
• To maintain the highest ethical standards in
business and professions
• Not to bring pressure recommendations
from outside GSECL to influence its
decision
• Ensure maximum transparency to the
satisfaction of stakeholders.
• Not to use intimidation threat, inducement
or pressure of any kind on GSECL or any
of its employees under any circumstances.
• To ensure to fulfill the terms of agreements /
contract and to consider objectively the
viewpoint of parties.
• To be prompt and reasonable in fulfilling
the contract agreement legal obligation.
• To ensure regular and timely release of
payments on due dates for work done.
• To provide goods and / or services timely
as per agreed quality and specifications at
minimum cost to GSECL.
• To ensure that no improper demand is made
by employees or by anyone on our behalf.
• To abide by the general discipline to be
maintained in our dealings.
• To give maximum possible assistance to all
the Vendors / Suppliers / Service Provider and
other to enable them to complete the contract
in time.
• To be true and honest in furnishing
information.
• To provide all information to suppliers /
Contractor relating to contract / job which
facilitate him to complete the contract / job
successfully in time.
• No to divulge any information, business
details available during the course of
business relationship to others without the
written consent of GSECL.
• To ensure minimum hurdles to vendors /
suppliers / contractors in completion of
agreement / contract / work order.
• Not to enter into carter / syndicate /
understanding whether former / non-
formal so as to influence the price.
___________________________ ______________________
Seal & signature Seal & signature
(GSECL’S Authorized Signature) (Party’s Authorized Person)
Name : Name:
Designation :
GUJARAT STATE ELECTRICITY
CORPORATION LTD.
UTRAN GAS BASED POWER STATION
UTRAN – SURAT. 394 105GUJARAT- INDIA
Phone: (+91)-0261-2499581. Fax: 2499180
Email: [email protected] Swarnim
Gujarat
AN ISO-
14001:2004
POWER
PLANT
AN ISO-
9001:2000
POWER
PLANT
Tender Notice No.03/2011(Web.07/2011/E)
UGBPS/ELECT/220KV S/Y/
Tender and specification for supply and application of ASIAN apcolite / berger premaim make somke synthetic
enamel paints on 3 nos. if inter connecting transformer of 220 KV switch yard at GBPS Utran.
1. ESTIMATED COST: : Rs.1,04,400.00
2. EARNEST MONEY DEPOSIT: : Rs..1,044.00
3. TENDER FEE: BY SELF COLLECTION : Rs.500.00
4. LAST DATE for down Loading from Web Site: 08-03-2011 Up to 3-00 P.M
5. LAST DATE OF RECEIPT OF TENDER : 08-03-2011 Up to 3-00 P.M.
(BY RPAD ONLY)
6. DATE OF OPENING THE TENDER (IF POSSIBLE) 08-03-2011 At 3-30 P.M.
7. TIME LIMIT: 30 (Thirty) days.
NOTE:
1. Tender without Earnest money deposit amount will be ignored.
2. Tender fee and E.M.D. amount can be paid either by CASH or by D.D. Drawn in favour of GUJARAT
ELECTRICITY CORPORATION LTD. and payable at any Nationalized Bank at SURAT. (Cheque and postal
order will not be accepted.)
3. Security deposit 10% of total order value on receipt of firm order.
4. Tenderer should invariable quote his G.S.T., C.S.T. and I.T. Numbers.
5. G.S.E.C.L. does not take any responsibility for loss, Let receipt or misplacement of the Tender in postal transit.
6. Tenders will be accepted by Regd. post A.D. only up to the prescribed time and date as per column No. 5
above.
7. The Gujarat Electricity Corporation Ltd. Reserve the rights to reject any or all the tenders without assigning
any reason.
8. The rates should be offered in accordance with the units mentioned in tender schedule only.
9. over writing in the tender rates are not allowed .In case of any overwriting same should be initialed by the
tenderer. The rate should be written in figures and words.
10. Tender offer should be send in sealed Envelope only duly super-scribed on it the tender Number and due date
of receipt and should be addressed. To the Additional Chief Engineer, Gujarat State Electricity Corporation Ltd.
Gas Based Power Station, UTRAN-394105 (Dist. Surat).No personal name be written.
11. All the items and conditions in the offer should clearly be mentioned such as:
a) Taxes
b) Delivery period and destination.
c) Payment terms (Our payment term is within 30 days from the receipt of material and inspection there
of in no case conditional payments against document will be made.)
d) Validity: (The offer should be valid for 120 days from the date of opening the tender.)
e) Guarantee should be mentioned wherever necessary.
f) Other terms if any.
12. The tender should attached along with offer documentary evidence for having supplied such type of material /
works in past to reputed organization.
(S.V.LADANI)
ADDL. CHIEF ENG. (G)
GBPS: GSECL: UTRAN
SCHEDULE – B
Name of Work : Supply and application of ASIAN Apcolite / Berger Premium make
smoke grey synthetic enamel paints on 3 nos. of Inter connecting
Transformers (ICT-1,2,3) of 220KV Switchyard at GBPS, Utran. Name of contractor : Sr. No.
Description of work Quantity
Unit Rate Total Estimated
Amount in Rs 1.
• Cleaning of all surfaces to be painted thoroughly manually and subsequently with supply and application of paint remover agent and preparing surface for primer application.
• Supply and application of one coat of ASIAN / Berger make metal Primer i. e. Red Oxide / Zinc Chromate and subsequently supply and application of two coats of ASIAN Apcolite / Berger Premium make, ISI approved smoke grey Synthetic Enamel Paint on
(a) ABB MAKE, 100MVA, 220/66KV
Interconnecting transformer and its accessories.
(b) APEX MAKE, 100MVA, 220/66KV
Interconnecting transformer and its accessories.
(c) CGL MAKE 100MVA, 220/66kv interconnection
transformer and its accessories.
O3 (three) 34800.00 104400.00
(Total Rupees One lac four thousand four hundred only) Total = 104400.00 OFFERED RATE : % ABOVE THE ESTIMETED COST
%BELOW THE ESTIMETED COST
NET AMOUNT : .
(Rupee only)
NOTE : 1. The above rates are exclusive / inclusive of applicable service tax and please note that if not
mention clearly it shell be presume that rates are inclusive of service tax and if exclusive then applicable service tax will be reimbursed on submission of documentary evidence.
2. Please submit your offer in two separate bids “ Technical bid” and “Price bid” in separate covers. The technical bid shall be open at 15:00 hours on due data in presence of those tenders who wish to remain present. The price bid of only technically accepted tender will be open afterwards.
(S.V.LADANI) SIGNATURE OF CONTRACTOR ADDL. CHIEF ENGNEER (G)
WITH SEAL AND DATE GSECL:GBPS:UTRAN
GUJARAT STATE ELECTRICITY
CORPORATION LTD.
UTRAN GAS BASED POWER STATION
UTRAN – SURAT. 394 105G
UJARAT- INDIA
Phone: (+91)-0261-2499581. Fax: 2499180
Email: [email protected] Swarnim
Gujarat
AN ISO-
14001:2004
POWER
PLANT
AN ISO-
9001:200
0
POWER
PLANT
SCHEDULE-A
Name of Work : Supply and application of ASIAN Apcolite / Berger Premium make smoke grey
synthetic enamel paints on 3 nos. of Inter connecting Transformers of 220KV
Switchyard at GBPS, Utran. Name of Contractor :
SCOPE OF WORK & SPECIAL CONDITIONS:
The work should be carried out at Utran Gas Based Power Station. The work consists of painting by
• Cleaning of all surfaces to be painted thoroughly manually and subsequently with supply and
application of paint remover agent / wire brush, emery paper and preparing surface for primer
application.
• Supply and application of one coat of ASIAN / Berger make metal primer i.e. Red Oxide / Zinc
Chromate and subsequently supply and application of two coats of ASIAN Apcolite / Berger
Premium make, ISI approved smoke grey Synthetic Enamel Paint on inter connecting Transformer
1,2,3 & its related accessories, of 220KV Switchyard at UGBPS, Utran.
1. All the accessories, radiators bank and other part are to be painted at its installed position only.
2. Old paints should be removed thoroughly by paint remover and wire brush and it should be shown
to our Engineer as surface preparation is most important before application of paint.
3. If any rusted part is found which will be shown to you by our engineer then before painting rust
should be removed &. Red Oxide / Zinc Chromate should be applied and it should be shown to our
Engineer & there after two coats of enamel paints of approval make should be applied. Before
applying 2nd coat of paint, it should be shown to our engineer, then only 2nd
coat should be applied.
4. All painting should be done with spray painting & work should be look as good as original.
5. All dust, oil & grease should be cleaned & scraped and it should be shown to our engineer before
applying the paint.
6. All stain of colour should be removed from the insulators, glass or any other parts of the equipment
from where painting is not required to be done.
7. The name plate / identification of all equipments, boxes and panels should be rewritten with
original description with required colour paint as directed by engineer in charge.
8. Wherever original colour difference is observed by engineer in charge, same should be repainted as
per instruction of our engineer in-charge.
9. The electric supply required for running air-compressor will be arranged by GSECL at one place free
of cost or wherever air point is available, air will be supplied free of cost.
10.Air compressor & other equipment & materials, tools & tackles required for painting work should
be arranged by the contractor.
11. No men & materials will be given by GSECL for this work. Necessary scaffolding material, paint
remover , cloth emery paper, wire brush scrapper, painting brush/spray gun, air hose etc. and other
tools will be arranged by the contractor for carrying out the above job.
12. The paint should be got approved first from S.E. (Elect), GBPS, Utran before its use.
13. If GSECL’s any equipment, materials are damaged due to bad workmanship; the cost of same will
be recovered from the contractor.
14. If any loss or damage occurred to your men & materials, GSECL will not be responsible for the
same.
15. If spray painting of equipment is not possible which will be observed by engineer in charge then
contractor has to carry out the painting with the help of brush that too with the prior permission of
engineer in-charge of the work.
16. If any stains are found on wall floor or other place due to painting of other equipment. It should be
cleaned by the contractor without any extra cost to GSECL.
17. No accommodation will be provided by the GSECL for carrying out this work.
18. Contractor will raise first and final single bill after satisfactory completion of the job work.
19. The payment will be made as per actual work done and certified by the Engineer-In-Charge.
20. Measurement will be taken jointly and for any dispute, the decision of Engineer-In-Charge will be
final.
21. You will make safe scaffolding looking to the safety of your working persons.
22. The contractor should give guarantee at least for six months for satisfactory performance for
the painting work carried out and no corrosion/ rusting phenomenon take place, for which
10% of order amount will be withheld till the guarantee period is over.
23. . The paint should be of ASIAN Apcolite / Berger Premium make only having ISI
24. The contractor should ensure that there is no deviation in shade & correct shade should be
maintained.
25. The drum of the paint should be opened in the present of GSECL’s Engineer-in-charge.
26. The progress of the work is to be maintained as per our requirement.
27. Any labour laws in force from time to time will be applicable.
Time Note :
1.As per availability of shutdown Transformer will be spared and will be intimated in advance work
should be started immediately should be completed within four days.
2.The contract will be valid for 12 months from the date of placement of order without any
additional cost / rise in order value.
(S.V. LADANI)
ADDL. CHIEF ENGINEER
GSECL: GBPS: UTRAN
GUJARAT STATE ELECTRICITY CORPORATION LTD.
UTRAN GAS BASED POWER STATION
UTRAN – SURAT. 394 105
GUJARAT- INDIA
Phone: (+91)-0261-2499581. Fax: 2499180
Email: [email protected]
AN ISO-
14001:2004
POWER
PLANT
AN ISO-
9001:2000
POWER
PLANT
NAME OF WORK : Supply and application of ASIAN Apcolite / Berger Premium make smoke grey
synthetic enamel paints on 3 nos. of Inter connecting Transformers of 220KV
Switchyard at GBPS, Utran
NAME OF CONTRACTOR : LABOUR LAWS :
01 Persons below the age of 18 years shall not be employed for the work. 02 No female workers shall be employed in the night shift between 7.00 PM to 6.00 AM. 03 Contractor/ Agency shall have to maintain valid Labour License under the Contract
Labour (Regulation & Abolition) Act 1970 and Rules 1972 for employing necessary manpower to be required by him and in the absence of such license the contract shall be liable to be terminated without assigning any reasons thereof.
04 The contractor / Agency shall at his own expense have to comply with all the Labour
Laws and keep the Corporation indemnified in respect thereof. Some of the major liabilities under various Labour and Industrial Laws which the contractor / Agency shall have to comply with are as under.
05 Payment of contribution of employees (Contractor’s Labour / Agency ‘s Labour) as well
as employer’s (Contractor / Agency) contribution towards Provident Fund, Family Pension Scheme, Employees Deposit Linked Insurance Scheme, Administrative charges, inspection charges etc. at the rates made applicable from time to time by Government of Gujarat / Government of India or other statutory authorities shall be made.
06 Labourers engaged by Contractor/Agency shall be entitled for Earn leave as per the
provision laid down in factories Act-1948. Contractor / Agency shall have to extend the facility of E.L. as per the provision laid down in Factories Act and shall also have to maintain leave records in prescribed form under Factories Act.
07 No labourers are allowed to enter in power station premises that do not have Identity
Card prescribed under Factories Act.
08 Contractor / Agency shall have to comply with the Maternity benefit if they happen to engage female labours as per Maternity benefit Act.
09 Contractor / Agency shall have to obtain Insurance of the laborers engaged by him to carry out contractual work before commencement of work under workmen’s compensation Act.
10 \P.F. CODE UNDER :
It should be ensured that no tender is issued to any Contractor who has no separate PF Code number as well as not considered for acceptance of tender and without PF code number tender is likely to be disqualified.
11 PROVIDENT FUND AND FAMILY PENSION SCHEME : : The contractor / Agency shall have to submit along with his bill ( Month wise ) a
statement regarding deductions at the rate of 12% of the wages against employee’s Provident Fund & Family Pension Scheme in respect of each concerned employees ( or at the rates made applicable by the Government from time to time ) of the wages. The Contractor’s / Agency’s contribution and his worker’s contribution along with Admn. charges, Insp. charges, EDLI Insp. Charges, Group Ins. Scheme Premium etc at the rates applicable from time to time towards Provident Fund and Family Pension Scheme shall be deposited by the contractor with Regional Provident Fund Commissioner Ahmedabad / Vadodara/ Surat or to the authority prescribed under the Act along with the other charges applicable.
12 If any workman engaged by Contractor / Agency, meets with fatal or non- fatal
accident while on duty then Contractor/ Agency shall be liable to pay compensation to the legal hair or to the Workman as the case may be as per Workman’s compensation Act.
13 EMPLOYEES DEPOSIT LINKED INSURANCE SCHEME : :
The Contractor / Agency shall have to deposit ½% of the rate applicable form time to time of the wages. In respect of employees who are a member of the Provident Fund against the contribution towards Deposit linked insurance scheme with r Regional Provident Fund Commissioner, Ahmedabad.
14 The Contractor / Agency should pay prevailing minimum wages to the labours
engaged by him as per the minimum wages Act in presence of the Representative of principal employer.
15 The Contractor / Agency shall deposit fifteen days salary for every completed year of
service in case of each worker towards the liability of gratuity.
16 ADMINISTRATIVE CHARGES : : Administrative charges for maintaining Provident Fund Account shall be deposited by the Contractor / Agency with Regional Provident Fund Commissioner Ahmedabad / Baroda/ Surat at the rates applicable.
17 LABOUR LICENSE FOR LABOUR CONTRACT : :
The Contractor / Agency shall have to obtain the copy of Labour Contract License under contract Labour (Regulation & Abolition) Act from the appropriate authorities before commencement of work.
18 Payment of minimum rates of wages under Minimum wages Act – 1948. The Contractor / Agency shall have to pay to every contract labour/ employees
engaged under him, wages at a rate not less than the minimum rate of wages fixed by such notification / Commissioner of Labour for that class of employment in that employment without any deductions except as may be authorized within such time and subject to such conditions as may be prescribed time to time.
19 Contractor / Agency shall have to issue the contractual appointment letter for a specific
period to their Labour engaged during the contract period each and every instance & should narrated clear out terms & conditions for the liabilities of the concerned employees.
20 After completion of the contract work, the work completion certificate is required to be
produced before the I.R.O. / H.R. Head for the purpose of issuance of NOC for labour laws compliance and cancellation of the gate passes issued to the Contractor’s / Agency workman at the time of execution of the contract work.
21 The Contractor / Agency shall have to maintain all the relevant records under various
Labour Laws as mentioned here in above and keep ready for verification by the Company authority as well as the authority of the Government Officials as and when asked for the checking.
22 RESPONSIBILITY FOR PAYMENT OF WAGES :
It shall be the duty of the Contractor / Agency to ensure the disbursement of wages in the presence of the authorized representative of the principal employer to certify the amounts paid as wages to each worker employed by him in such manner as may be prescribed. The Contractor / Agency shall have to produce / submit the copy of wage Register / Muster Roll / P.F. Deposition Challan / PF Schedule and relevant records under various Labour Laws for the contract work to Head of the H.R. Department for the purpose of issuing the NOC for Labour Laws compliance. (S.V.LADANI) ADD.CHIEF.ENG (G)
GSECL: GBPS :UTRAN
GUJARAT STATE ELECTRICITY
CORPORATION LTD.
UTRAN GAS BASED POWER STATION
UTRAN – SURAT. 394 105GUJARAT- INDIA
Phone: (+91)-0261-2499581. Fax: 2499180
Email: [email protected] Swarnim
Gujarat
AN ISO-
14001:2004
POWER
PLANT
AN ISO-
9001:2000
POWER
PLANT
SCHEDULE -C1
GENERAL TERMS AND CONDITION
(1) AGREEMENT: The contractor will have to execute agreement on Rs.100/- non judicial stamp paper
& Indemnity Bond on Rs100/-non- judicial stamp paper before starting the work at his cost. Incase of
non-execution of the same, payment will be with held.
(2) Income tax as applicable will be deducted from the bill as per I.T. act.
(3) Security deposit: The contractor will pay security deposit 10% of total value of contract before
starting work.
(4) The contractor will be responsible for his working personnel for any injuries or mishap
Caused/occurred to them during the execution of above work. The GSECL will not pay any
compensation in such cases to the contractor’s persons.
(5) The contractor will also be responsible for any damages caused to the GSECL property by his
Personnel during the execution of above work. In such cases, the contractor will arrange to
repair/rectify or will pay such amount to GSECL as may be decided by the competent authority of
GSECL.
(6) The contractor will have to carry out the work as per the instruction of Engineer -in – charge.
(7) If any dispute arise during the execution of work, the decision of the under signed (Addl. Chief Eng.)
will be final and binding to contractor.
(8) The contractor’s personnel will also co-operate to the engineer –in-charge for execution and
satisfactory completion of work.
(9) The contractor shall bring his own special tools and tackles as may be required for carry out the above
work.
(10) The contractor has to re clean the required portion of above work free of cost.
(11) If engineer–in-charge feels that work done by the contractor is not done in satisfactory
manner no extra charge will be payable by the GSECL for such work if carried out again.
(12) The contractor will issue Identity –cards with photographs to his working personnel.
(13) If contractor fails to start the work in time specified or his work is found dissatisfactory and he
defaults In proper execution of work and he fails to improve his working in spite of instruction given
to him, GSECL reserves the right to terminate the contract by serving 7(seven) days notice. The
security deposit Paid by the contractor in such case shall be forfeited. GSECL also reserves the right
to award the contract to any other party or may carry out the work departmentally at the risk and
cost of the contractor.
(14) The contractor will have to submit labour license and documentary proof of payment of provident
fund of concerned employees to their account, with RPFC commissioner after which the necessary
payment will be released.
(15) The party will provide well- experienced and skilled personnel as agreed in main contract form.
(16) The contractor will govern his personnel as per the Government Labor Law, minimum wages act and
other Laws prevailing in Gujarat state. GSECL will not be responsible for any compensation for
such cases.
(17) The party will observe all safety measures for his working personnel.
(18) The contractor shall have to quote his EPF/CPF code no.and have to give the documentory evidence
of EPF/CPF deductced of his employees to PFC commissioner. if the contractor fails to submitt the
evidence of the same, bill will not be proceed for the payment.
(19) The contractor will have to furnish the details of such works executed satisfactory in GSECL or any
other organisation alongwith documentary proof of the same i.e. work orders,exprience certificate
e.t.c.
(S.V.LADANI)
ADD. CHIEF ENG. (G)
GBPS : GSECL : UTRAN
GUJARAT STATE ELECTRICITY
CORPORATION LTD.
UTRAN GAS BASED POWER STATION
UTRAN – SURAT. 394 105GUJARAT- INDIA
Phone: (+91)-0261-2499581. Fax: 2499180
Email: [email protected] Swarnim
Gujarat
AN ISO-
14001:2004
POWER
PLANT
AN ISO-9001:2000
POWER PLANT
IMPORTANT CONDITIONS APPLICABLE TO THIS TENDER.
Tenderers are required to comply following conditions along with the offer, otherwise offer
will be liable to be ignored without any reference.
1. Details of similar job/jobs carried out during last three years along with documentary
evidence.
2. Fresh Bank solvency certificate of about 20% value of the contract issued by
Nationalized Bank.
3. Details of skilled/ semi-skilled persons presently employed by the contractor having
sufficient knowledge of similar jobs.
4. Copy of the latest income tax clearance certificate.
5. Details of the company registration/ partnership deed
6. Details of tools tackles and equipment possessed relevant to the job.
7. Copy of power of Attorney, if any for singing the bid Documents.
8. Two separate Demand Drafts for tender fee and EMD in two separate envelops.
9. Attested copy of registration certificate.
(S. V.LADANI)
ADDL. CHIEF ENGINEER (G)
GBPS: GSECL: UTRAN