g/scm/n/284/eu/add - commerce · g/scm/n/284/eu/add.1 5 may 2017 (17-2443) page: 1/128 committee on...

128
G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL NOTIFICATION PURSUANT TO ARTICLE XVI:1 OF THE GATT 1994 AND ARTICLE 25 OF THE AGREEMENT ON SUBSIDIES AND COUNTERVAILING MEASURES EUROPEAN UNION Addendum The following addendum to the notification of the European Union relates to subsidy programmes of Austria. _______________

Upload: others

Post on 08-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

5 May 2017

(17-2443) Page: 1/128

Committee on Subsidies and Countervailing Measures Original: English

SUBSIDIES

NEW AND FULL NOTIFICATION PURSUANT TO ARTICLE XVI:1 OF THE GATT 1994 AND ARTICLE 25 OF THE AGREEMENT

ON SUBSIDIES AND COUNTERVAILING MEASURES

EUROPEAN UNION

Addendum

The following addendum to the notification of the European Union relates to subsidy programmes of Austria.

_______________

Page 2: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 2 -

AUSTRIA

TABLE OF CONTENTS

1 ENVIRONMENTAL SUPPORT UNDER THE AUSTRIAN ENVIRONMENTAL SUPPORT ACT FOR INDUSTRIAL ENVIRONMENTAL PROTECTION MEASURES ................... 6

2 GUIDELINES ON AID FOR WASTE WATER MANAGEMENT IN INDUSTRIAL ENTERPRISES................................................................................................................... 7

3 GUIDELINES ON AID FOR ECOLOGICAL MEASURES UNDER THE WATER FRAMEWORK DIRECTIVE FOR ENTERPRISES.................................................................... 8

4 INDEMNITY SCHEME FOR FEDERAL MUSEUMS IN AUSTRIA ......................................... 9

5 GUIDELINES ON AID FOR THE MANAGEMENT OF ABANDONED POLLUTED SITES ............................................................................................................................. 10

6 FUNDING OF ELECTRICITY PRODUCTION FROM RENEWABLE ENERGY SOURCES ........................................................................................................................ 11

7 ZIT 13 PLUS .............................................................................................................. 12

8 PAR. 27 LIT. A OF THE LABOUR MARKET PROMOTION ACT 1969 ............................... 13

9 PAR. 27 LIT. A OF THE LABOUR MARKET PROMOTION ACT 1969 ............................... 14

10 PAR. 35 LIT. A OF THE LABOUR MARKET PROMOTION ACT 1969 ............................. 15

11 PAR. 35 LIT. A OF THE LABOUR MARKET PROMOTION ACT 1969 ............................. 16

12 PAR. 51 LIT. A OF THE LABOUR MARKET PROMOTION ACT 1969 ............................. 17

13 PAR. 51 LIT. A OF THE LABOUR MARKET PROMOTION ACT 1969 ............................. 18

14 GUIDELINE FOR RESCUE AND RESTRUCTURING AID TO SME IN BURGENLAND ................................................................................................................. 19

15 GUIDELINE FOR RESCUE AND RESTRUCTURING AID TO SME IN BURGENLAND ................................................................................................................. 20

16 GUIDELINES CONCERNING THE GRANTING OF VENTURE CAPTITAL........................ 22

17 GUIDELINES CONCERNING THE GRANTING OF NON-REPAYABLE SUBSIDIES ACCORDING TO THE ECONOMIC PROMOTION ACT 1994 ................................................ 23

18 GUIDELINES CONCERNING THE GRANTING OF NON-REPAYABLE SUBSIDIES TO ENTERPRISES IN THE FIELDS OF TRADE AND INDUSTRY ACCORDING TO THE ECONOMIC PROMOTION ACT 1994 ................................................................................. 25

19 GUIDELINES CONCERNING THE GRANTING OF RESEARCH AND DEVELOPMENT PROJECTS .............................................................................................. 26

20 REGIONAL ECONOMIC PROGRAM FOR PLANNING ASSOCIATION 9 "UPPER AND SUPERIOR COURT", SPECIAL PROMOTION PROGRAM 2015 - 2024 ........................ 27

21 TYROLEAN INFRASTRUCTURE PROMOTION PROGRAMME – INFRASTRUCTURAL ADVANCEMENTS IN SMALL AND MIDGET SKI-REGIONS ................. 29

22 TYROLEAN ECONOMIC PROMOTION PROGRAM – IMPULSE PACKAGE ...................... 30

23 AD HOC AID TO PITZTALER GLETSCHERBAHN LTD & CO PARTNERSHIP, TYROL ............................................................................................................................ 31

24 AD HOC AID TO A. LOACKER KONFEKT LTD, TYROL ................................................. 32

25 TYROLEAN ECONOMIC PROMOTION PROGRAM – PROMOTION OF LOW-EMISSION HEAVY TRUCKS AND CARS / BUSES EURO CLASS VI ..................................... 33

26 TYROLEAN INFRASTRUCTURE PROMOTION PROGRAMME – INFRASTRUCTURAL ADVANCEMENTS IN SMALL AND MIDGET SKI-REGIONS ................. 34

27 TYROLEAN ECONOMIC PROMOTION PROGRAM – IMPULSE PACKAGE ...................... 35

Page 3: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 3 -

28 DIRECTIVE OF THE COUNTRY TYROL FOR THE PROMOTION OF SCIENCE, RESEARCH AND DEVELOPMENT ...................................................................................... 37

29 TYROLEAN INFRASTRUCTURE PROMOTION PROGRAM – BIOMASS LOCAL HEATING SYSTEMS ......................................................................................................... 38

30 NON-COMMERCIAL BROADCASTING FUND .............................................................. 39

31 PRIVATE BROADCASTING FUND .............................................................................. 40

32 FUND FOR DIGITALISATION ................................................................................... 41

33 TELEVISION FUND................................................................................................... 42

34 SUBSIDIES FOR THE CONSTRUCTION OF CONNECTING RAILWAY LINES; INFRASTRUCTURE FOR RAILWAY HAULAGE ................................................................... 43

35 SUBSIDIES FOR INTENSIFIED ENERGETIC USE OF BIOMASS .................................. 44

36 GRANTS FOR RESEARCH & DEVELOPMENT .............................................................. 45

37 SUBSIDIES FOR RESEARCH & DEVELOPMENT .......................................................... 46

38 SUBSIDIES FOR STUDIES CONCERNING TECHNICAL RESEARCH &

DEVELOPMENT PROJECTS, MADE BY UNIVERSITIES ET AL TO SUPPORT SME'S IN VORARLBERG ................................................................................................................. 46

39 PROGRAMME FOR BUSINESS DEVELOPMENT IN VORARLBERG 2014 - 2020 ............ 47

40 PROGRAMME FOR BUSINESS DEVELOPMENT IN VORARLBERG 2007 - 2013 ............ 48

41 EUROPEAN RECOVERY PROGRAMME (ERP) REGIONAL PROGRAMME ....................... 49

42 ERP SME PROGRAMME ............................................................................................. 50

43 ERP TECHNOLOGY PROGRAMME .............................................................................. 51

44 ERP TOURISM PROGRAMME .................................................................................... 52

45 ERP TRANSPORT PROGRAMME ................................................................................ 53

46 EUROPEAN RECOVERY PROGRAMME (ERP) AGRICULTURE PROGRAMME ................. 53

47 GRANTING OF GUARANTEES BY AUSTRIA ECONOMY SERVICE (WIRTSCHAFTSSERVICE AWS) ACCORDING TO THE SME PROMOTION ACT ................... 54

48 GUIDELINE FOR GRANTING NON-REPAYABLE GRANTS BY AUSTRIA ECONOMY SERVICE (AWS) ACCORDING TO THE SME PROMOTION ACT ......................... 55

49 GUIDELINE OF THE FEDERAL MINISTRY OF FINANCE FOR THE GRANTING OF GUARANTEES BY AUSTRIA ECONOMY SERVICE (AWS) PURSUANT TO PAR. 1 AND 11 OF THE GUARANTEE ACT AND PRECEDING SCHEME ........................................... 56

50 AUSTRIA ECONOMY SERVICE (AWS) GUIDELINE FOR AID OUT OF MEANS OF THE NATIONAL TRUST FOR RESEARCH, TECHNOLOGY AND DEVELOPMENT .................... 57

51 AUSTRIA ECONOMY SERVICE (AWS) FOUNDING FUND ........................................... 58

52 GUIDELINE FOR THE PROMOTION OF THE FOUNDING AND STRUCTURING OF YOUNG INNOVATIVE TECHNOLOGY-ORIENTED ENTERPRISES .................................. 59

53 GUIDELINE FOR THE PROMOTION OF THE ECONOMIC-TECHNICAL RESEARCH AND TECHNOLOGY DEVELOPMENT, PART PRO TRANS AND PRECEDING SCHEME ...................................................................................................... 60

54 FILM LOCATION AUSTRIA ....................................................................................... 61

55 FRONTRUNNER-INITIATIVE AND PRECEDING SCHEME ........................................... 62

56 STANDARD GUARANTEES FOR INVESTMENT LOANS AND CONSOLIDATION MEASURES WITHIN THE GUARANTEE GUIDELINES OF THE UPPER AUSTRIAN CREDIT GUARANTEEING COMPANY LTD ......................................................................... 63

57 PROMOTION OF ELECTRICITY FROM RENEWABLE SOURCES AND OF COMBINED HEAT AND POWER PLANTS .......................................................................... 64

58 SHARED RESEARCH FACILITIES .............................................................................. 68

59 LOCATION OF SITES INITIATIVES 2013 .................................................................. 69

Page 4: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 4 -

60 VIENNA ECONOMIC STRUCTURE IMPROVEMENT PROGRAMME 1998 ....................... 71

61 VIENNA ECONOMIC STRUCTURE IMPROVEMENT PROGRAMME 2005 ....................... 72

62 ZIT 08 PLUS ............................................................................................................ 73

63 GUIDELINE "ZIT05 PLUS - AID FOR TECHNOLOGY FOR VIENNA 2005–2008", SUBPROGRAMME A: "BEFOR" ......................................................................................... 74

64 GUIDELINE "ZIT05 PLUS - AID FOR TECHNOLOGY FOR VIENNA 2005 – 2008", SUBPROGRAMME G: "START UP VIENNA" ........................................................... 75

65 VIENNA GUIDELINE "ZIT05 PLUS - AID TO TECHNOLOGY FOR VIENNA 2005 - 2008", SUBPROGRAMME B: "VIENNA SPOTS OF EXCELLENCE" (VSOE) ........................ 76

66 INDIVIDUAL AID PURSUANT TO ARTICLE 42 OF THE GENERAL BLOCK EXEMPTION REGULATION .............................................................................................. 77

67 SPECIAL GUIDELINES INNOVATION PROMOTION PROGRAMME COMBINED ROAD TRANSPORT ......................................................................................................... 78

68 ECO SPECIAL PROGRAMME DISTRICT HEATING ...................................................... 79

69 PROGRAMME "DEVELOPMENT MEASURES OF THE LOWER AUSTRIAN BORDER REGION COMPANY LTD." .................................................................................. 80

70 SUBSIDY PROGRAMME TO SUPPORT MEASURES OF THE OPERATIONAL PROGRAMME "STRENGTHENING COMPETITIVENESS OF SALZBURG REGION 2007 -2013" WITHIN THE FRAMEWORK OF REGIONAL COMPETITIVENESS AND EMPLOYMENT OBJECTIVE .............................................................................................. 81

71 GUIDELINE FOR ENVIRONMENTAL AID IN THE REGION OF SALZBURG ................... 82

72 LOWER AUSTRIAN SOCIETY FOR THE FUNDING AND SUPPORT OF SHOPPING IN TOWN AND CITY CENTERS ....................................................................... 83

73 TAX INCENTIVES FOR MID-SIZED BUSINESS FINANCING COMPANIES ................... 84

74 DIRECTIVE FOR GRANTING OF REGIONAL FUNDING FOR THE IMPROVING OF THE ECOLOGICAL STATUS OF SURFACE WATER IN THE PROVINCE OF CARINTHIA .................................................................................................................... 86

75 SUBSIDY FOR NATURE-PROTECTION-MEASURES IN COMMERCE AND INDUSTRY ...................................................................................................................... 87

76 PROGRAMME TO PROMOTE THE DEVELOPMENT OF PRIVATE RAILWAY SIDINGS AND THE TRANSHIPMENT SYSTEMS IN INTERMODAL TRANSPORTATION ......................................................................................................... 88

77 GUIDELINES OF THE PROVINCIAL GOVERNMENT OF LOWER AUSTRIA FOR DAMAGES CAUSED BY NATURAL DISASTERS .................................................................. 89

78 GUIDELINES OF THE PROVINCIAL GOVERNMENT OF LOWER AUSTRIA FOR DAMAGES CAUSED BY NATURAL DISASTERS .................................................................. 91

79 FISA – "FILM LOCATION AUSTRIA" ......................................................................... 92

80 ENERGY TAX REBATE ACCORDING TO AMENDMENT TO ENERGY TAX REBATE LAW, FEDERAL STATE GAZETTE I NO 111/2010 OF 31 DECEMBER 2010 ........................ 93

81 LOWER AUSTRIAN WATER MANAGEMENT FUND AID GUIDELINES 2009 - WATER ECOLOGY FOR ENTERPRISES IN COMPETITION ................................................. 94

82 LOWER AUSTRIAN WATER MANAGEMENT FUND AID GUIDELINES 2009 - WATER ECOLOGY FOR ENTERPRISES IN COMPETITION ................................................. 95

83 GUIDELINES OF THE STYRIAN ECONOMIC PROMOTION AGENCY IN ITS CURRENT VERSION ........................................................................................................ 96

84 REVISED AND PROLONGED VERSION OF THE VENTURE CAPITAL PROGRAMME PROVIDED BY THE PROVINCE OF STYRIA ................................................. 98

85 AID SCHEME FOR THE PROMOTION OF QUALIFICATION OF EMPLOYEES

WITHIN THE SOCIAL FUND (PHASING OUT, FOCAL POINT 1.1) ..................................... 99

Page 5: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 5 -

86 AID SCHEME FOR THE PROMOTION OF QUALIFICATION OF EMPLOYEES WITHIN THE EUROPEAN SOCIAL FUND (OBJECTIVE 2 FOCAL POINT 1) ....................... 100

87 RISK CAPITAL FUND (UPPER AUSTRIAN HIGH-TECH FUND) ................................. 100

88 PROGRAM TO RELEASE A PULSE FOR TOURISM ..................................................... 102

89 PROGRAM TO RELEASE A PULSE FOR ECONOMY .................................................... 103

90 GUIDELINES ON AID TO UPPER AUSTRIAN INDUSTRY FOR ENVIRONMENTAL PROTECTION MEASURES ................................................................. 104

91 THE ETCS – AID SCHEME FOR THE EQUIPMENT OF RAIL VEHICLES WITH ETCS – LEVEL 2 ............................................................................................................ 106

92 THE ETCS – AID SCHEME FOR THE EQUIPMENT OF RAIL VEHICLES WITH ETCS – LEVEL 2 ............................................................................................................ 107

93 AID FOR THE PROVISION OF CERTAIN (COMBINED) TRANSPORT SERVICES BY RAIL IN AUSTRIA .................................................................................................... 108

94 AID FOR THE PROVISION OF CERTAIN (COMBINED) TRANSPORT SERVICES BY RAIL IN AUSTRIA .................................................................................................... 110

95 BROADBAND AUSTRIA 2013.................................................................................. 112

96 INVESTMENT AND GROWTH PROGRAMME 2009 - 2014 BY THE REGIONAL GOVERNMENT OF SALZBURG ........................................................................................ 114

97 GUIDELINES FOR THE GRANTING OF GUARANTEES BY THE REGION OF CARINTHIA FOR DEFENSIVE MEASURES ...................................................................... 115

98 GUIDELINES FOR THE GRANTING OF GUARANTEES BY THE REGION OF CARINTHIA FOR OFFENSIVE MEASURES BY SME .......................................................... 116

99 AID SCHEME OF THE LOWER AUSTRIAN FUNDS FOR ECONOMY AND TOURISM FOR INVESTMENT SUBSIDIES ...................................................................... 118

100 AID SCHEME OF THE LOWER AUSTRIAN FUNDS FOR ECONOMY AND TOURISM FOR RESEARCH, DEVELOPMENT AND INNOVATION ...................................... 118

101 AID SCHEME OF THE LOWER AUSTRIAN FUNDS FOR ECONOMY AND TOURISM FOR INTERNATIONALISATION ..................................................................... 119

102 AID SCHEME OF THE LOWER AUSTRIAN FUNDS FOR ECONOMY AND TOURISM FOR COOPERATION ...................................................................................... 120

103 AID SCHEME OF THE LOWER AUSTRIAN FUNDS FOR ECONOMY AND TOURISM FOR RESTRUCTURING OF ENTERPRISES IN DIFFICULTIES ........................... 121

104 LOWER AUSTRIAN AID SCHEME FOR GUARANTEES FOR PARTICIPATION CAPITAL ....................................................................................................................... 122

105 SPECIAL GUIDELINES OF THE LOWER AUSTRIAN ECONOMIC AND TOURISM FUND FOR THE GRANTING OF GUARANTEES................................................. 123

106 OTHER SOURCE OF ENERGY /DISTRICT HEATING SUPPORT/INVESTMENT GRANTS ....................................................................................................................... 123

107 SUPPORT OF PHOTOVOLTAIC PLANTS – OEMAG .................................................. 124

108 ECO FUND - CONTRIBUTIONS AND SUBSIDIES ................................................... 125

109 CONTRIBUTIONS AND SUBSIDIES, DISTRICT HEATING SUPPORT/INVESTMENT GRANTS -FINE DUST DIMINUTION GRAZ AND ENVIRONS .................................................................................................................... 126

110 AIR QUALITY MANAGEMENT PLAN 2011; AIR QUALITY MANAGEMENT PLAN REVISION 2014: BAN FOR OLD TAXIS IN GRAZ ........................................................... 126

111 AIR QUALITY MANAGEMENT PLAN 2011; AIR QUALITY MANAGEMENT PLAN REVISION 2014: BAN FOR OLD HEAVY DUTY VEHICLES IN POLLUTED AREAS ............. 127

Page 6: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 6 -

1 ENVIRONMENTAL SUPPORT UNDER THE AUSTRIAN ENVIRONMENTAL SUPPORT ACT FOR INDUSTRIAL ENVIRONMENTAL PROTECTION MEASURES

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Environmental support under the Austrian Environmental Support Act for industrial environmental

protection measures. 2. Period covered by the notification 2013; 2014

Set into force on 2 April 2002

No. 530/2001: 6.11.2001 No. 350/2005: 13.9.2005 No. 418/2007: 21.9.2007 Actual guidelines: X814/09: 01.10.2009 SA.32531: 21.03.2012 Duration: acc. Community guidelines on State aid for environmental protection.

3. Policy objective and/or purpose of the subsidy Support of environmental protection measures (all branches). 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Authority in charge of granting the subsidy: Federal Ministry of Agriculture, Forestry, Environment

and Water Management; Legal background: Law on Federal Aid for Environmental Protection 1993, Federal Sheet Edition No. 185/93 (last amendment Federal Law Sheet I. No. 78/2008); Guidelines on the Aid to industry

for environmental protection measures. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants for investment. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are provided especially to enterprises for environmental protection measures with

respect to the environmental benefit. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Subsidy per unit: up to 35% of the environmentally relevant volume of investment; average subsidy of 2013: 9,5% of the environmentally relevant volume of investment average subsidy of

2014: 13,2% of the environmentally relevant volume of investment. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Set into force on 2 April 2002.

No. 530/2001: 6 November 2001 No. 350/2005: 13 September 2005

Page 7: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 7 -

No. 418/2007: 21 September 2007 X814/09: 1 October 2009 SA.32531: 21 March 2012 Actual guidelines: no time limit Duration: acc. Community guidelines on State aid for environmental protection.

9. Statistical data permitting an assessment of the trade effects of the subsidy Not available. 2 GUIDELINES ON AID FOR WASTE WATER MANAGEMENT IN INDUSTRIAL ENTERPRISES

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy

Guidelines on Aid for waste water management in industrial enterprises. 2. Period covered by the notification 2013; 2014

Guidelines were set into force on 15.10.2010 – X401/2010. 3. Policy objective and/or purpose of the subsidy Support of waste water management measures.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Authority in charge of granting the subsidy: Federal Ministry of Agriculture, Forestry, Environment and Water Management; legal background: Law on Federal Aid for Environmental Protection 1993, Federal Sheet Edition No. 185/93 last amendment Federal Law Sheet I. No. 78/2008); Guidelines

"Waste Water Management in industrial enterprises." 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants for investment. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are provided to enterprises for waste water management measures with respect to the

environmental benefit. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Subsidy per unit: up to 35% of the environmentally relevant volume of investment average subsidy of 2013: 25,5% of the environmentally relevant volume of investment; average subsidy of

2014: 23,6% of the environmentally relevant volume of investment. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 2013/14

Guidelines were set into force on 15 October 2010 – X401/2010

Guidelines expired on 30 June 2014

Page 8: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 8 -

9. Statistical data permitting an assessment of the trade effects of the subsidy Not available. 3 GUIDELINES ON AID FOR ECOLOGICAL MEASURES UNDER THE WATER FRAMEWORK DIRECTIVE FOR ENTERPRISES

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Guidelines on Aid for ecological measures under the water framework directive for enterprises. 2. Period covered by the notification

2013/2014 Guidelines were set into force retroactively after notification on 1 January 2009. 3. Policy objective and/or purpose of the subsidy Support of ecological measures under the water framework directive.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted Authority in charge of granting the subsidy: Federal Ministry of Agriculture, Forestry, Environment and Water Management; legal background: Law on Federal Aid for Environmental Protection 1993, Federal Sheet Edition No. 185/93

(last amendment Federal Law Sheet I. No.78/2008); Guidelines "Ecological measures under the water framework directive for enterprises.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants for investment.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are provided to enterprises for ecological measures under the water framework directive with respect to the environmental benefit.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation Subsidy per unit: up to 30%of the environmentally relevant volume of investment average subsidy

of 2013: 20,1% of the environmentally relevant volume of investment; average subsidy of 2014: 17,3% of the environmentally relevant volume of investment. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

2013/2014 Guidelines were set into force retroactively after notification on 1 January 2009 until 30 June 2014. 9. Statistical data permitting an assessment of the trade effects of the subsidy Not available.

Page 9: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 9 -

4 INDEMNITY SCHEME FOR FEDERAL MUSEUMS IN AUSTRIA

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

EC No. 661/2009 - Indemnity scheme for federal museums in Austria.

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013-2014

3. Policy objective and/or purpose of the subsidy

The beneficiaries of the aid measure, eight Austrian federal museums situated in Vienna, carry out tasks in the interest of the Austrian state, aimed at promoting and making accessible to the public national but also European and worldwide cultural heritage. The scheme provides support to those museums in organising exhibitions of works that are usually scattered all over the world, both in museums and private collections. It is a national system of public guarantees for those federal

museums; with this measure the Austrian authorities partly assume liability for damages to objects which those museums borrow from third parties for temporary exhibitions. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) The guarantees are issued by the Federal Minister of Finance. National legal act: Federal Finance

Act 2013 Art. X (1) Z 6 and Federal Finance Act 2014 Art. X (1) Z 6.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Public guarantees for damages to objects which national museums borrow from third parties for temporary exhibitions.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The subsidy is provided to Austrian federal museums; the borrower (the museum) must submit its request for state indemnity to the Federal Ministry of Finance. The guarantees are issued by the

Federal Minister of Finance. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

2013: number of exhibitions: 15; total amount of guarantees: EUR 968.174.514,83. 2014: number of exhibitions: 20; total amount of guarantees: EUR 1.671.789.069,69. As the volume of the cases varied largely, the calculation of the average subsidy per unit is not informative.

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

1 January 2013 – 31 December 2014

Page 10: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 10 -

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

The measure promotes culture and preserves national cultural heritage without adversely affecting international trade.

a. for the three most recent years for which statistics are available;

N.A.

b. for a previous representative year, which, where possible and meaningful, should be the

latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

N.A. 5 GUIDELINES ON AID FOR THE MANAGEMENT OF ABANDONED POLLUTED SITES

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy Guidelines on Aid for the management of abandoned polluted sites. 2. Period covered by the notification 2013; 2014

Guidelines were set into force on 1 February 2009 – No. 383/2008. 3. Policy objective and/or purpose of the subsidy Support rehabilitation of contaminated sites.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Authority in charge of granting the subsidy: Federal Ministry of Agriculture, Forestry, Environment and Water Management; legal background: Law on Federal Aid for Environmental Protection 1993, Federal Sheet Edition No. 185/93.

(last amendment Federal Law Sheet I. No. 78/2008); Guidelines on the Aid to industry for environmental protection measures.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants for investment.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are provided to enterprises and to local authorities for the management of abandoned polluted sites. Priority is given to those contaminated sites which are registered in the national

register of contaminated sites.

Page 11: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 11 -

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Subsidy per unit: 55% up to 100% of the costs.

average subsidy of 2013: 89,2% of the costs average subsidy of 2014: 83,0% of the costs. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

2013/14

Guidelines were set into force on 1 February 2009 – No. 383/2008. 9. Statistical data permitting an assessment of the trade effects of the subsidy Not available.

6 FUNDING OF ELECTRICITY PRODUCTION FROM RENEWABLE ENERGY SOURCES

1. Title of subsidy programme "Funding of electricity production from renewable energy sources." The notified guidelines comprise all green electricity producing installations, especially photovoltaics.

2. Entry into force of the notified guidelines

1 January 2011. Run of validity of the notified "Guidelines for Funding of electricity production from renewable energy sources" was from 1 January 2011 to 31 December 2014. The reference period for this report ranges from 1 January 2013 to 31 December 2014.

3. Policy objective and/or purpose of the subsidy The funding scheme targets the support for electricity production from renewable energy sources by new technologies, excluding hydro power, sewage sludge, meat and bone meal and waste liquor. Additionally funded are also measures to increase energy efficiency and energy saving by energy efficiency programmes.

The granting of a funding shall support new technologies to achieve marketability and provide an incentive for the realization of measures that otherwise would not amortise in due time. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Electricity from renewable sources contributes significantly to achieve climate protection and

environmental goals. A specific legal framework has been set up in Austria to increase the electricity production from renewable energy sources, either by funding the feed in of renewable electricity or by supporting the investment, as it is the case in the described Viennese funding scheme. The subsidy is granted by federal state government of Vienna and executed by the municipal department "Energy Planning".

5. Form of the subsidy is a grant 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The subsidy is provided to private individuals as well as to companies.

Page 12: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 12 -

7. Subsidy per unit Totally bound subsidies from 1 January – 31 December 2013: 2.441.283 EUR Totally bound subsidies from 1 January – 31 December 2014: 905.874 EUR 8. Duration of the subsidy

Unlimited. 1 January 2011 marks the commencement of the guidelines. 9. Statistical data permitting an assessment of the trade effects of the subsidy N/A.

7 ZIT 13 PLUS

8 ZIT 13 PLUS 1. Title of the subsidy programme, if relevant, or identification of the subsidy "ZIT 13 plus".

2. Period covered by the notification 2013 and 2014 Policy objective and/or purpose of the subsidy. Subsidies for research and development and innovation projects. 2. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Authority: Municipal council of Vienna.

National legislation: Guideline "ZIT 13 plus Technology and Innovation promotion for Vienna 2013-2016" based on enactment of the municipal council of Vienna.

EU legislation:

a. Commission Regulation (EC) 800/2008 of 6 August 2008 – General Block Exemption regulation (GBER)

b. De-minimis.

3. Form of the subsidy

Grants. 4. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies to research development and innovation oriented companies.

5. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation.

[mil Euro] / [quantity]

2013 2014

Grantings 9.197 * 10.363 **

Number of cases 97 111

Payments 1.917 4.799

* including mil € 0.989 De minimis. ** including mil € 1.324 De minimis.

Page 13: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 13 -

6. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

1 January 2013 until 31 December 2014 (period of validity ceased ahead of schedule due to changes in EU-Regulation GBER; payments are still pending).

7. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

8 PAR. 27 LIT. A OF THE LABOUR MARKET PROMOTION ACT 1969

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Par. 27 lit. a of the "Labour Market Promotion Act 1969", 93-358. Federal Ministry for Economic Affairs and Labour, BMWA. 2. Period covered by the notification 2013

3. Policy objective and/or purpose of the subsidy Measures to support the labour market. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Federal Ministry for Economic Affairs and Labour, Labour Market Promotion Act 1969; 93-358. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants, loans, guarantees.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The subsidy is provided to producers; individual.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Budget for 2013: --- (§§ 27a, 35a and 51a AMFG Arbeitsmarkförderungsgesetz (Labour

Market Promotion Act)) no more budgeting in the future. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

1994 – unlimited

Page 14: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 14 -

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

Not available.

9 PAR. 27 LIT. A OF THE LABOUR MARKET PROMOTION ACT 1969

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Par. 27 lit. a of the "Labour Market Promotion Act 1969", 93-358, Federal Ministry for Economic Affairs and Labour, BMWA.

2. Period covered by the notification 2014 3. Policy objective and/or purpose of the subsidy Measures to support the labour market.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Federal Ministry for Economic Affairs and Labour, Labour Market Promotion Act 1969; 93-358.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants, loans, guarantees. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The subsidy is provided to producers; individual.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Budget for 2014: --- (§§ 27a, 35a and 51a Arbeitsmarkförderungsgesetz (Labour Market Promotion Act)) no more budgeting in the future. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

1994 – unlimited

Page 15: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 15 -

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

Not available.

10 PAR. 35 LIT. A OF THE LABOUR MARKET PROMOTION ACT 1969

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Par. 35 lit. a of the "Labour Market Promotion Act 1969", 93-358, Federal Ministry for Economic Affairs and Labour, BMWA.

2. Period covered by the notification 2013 3. Policy objective and/or purpose of the subsidy Measures to support the labour market.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Federal Ministry for Economic Affairs and Labour, Labour Market Promotion Act 1969; 93-358.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants, loans, guarantees. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The subsidy is provided to producers; individual.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Budget for 2013: --- (§§ 27a, 35a and 51a AMFG Arbeitsmarkförderungsgesetz (Labour Market Promotion Act)) no more budgeting in the future. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

1994 – unlimited

Page 16: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 16 -

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

Not available.

11 PAR. 35 LIT. A OF THE LABOUR MARKET PROMOTION ACT 1969

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Par. 35 lit. a of the "Labour Market Promotion Act 1969", 93-358, Federal Ministry for Economic Affairs and Labour, BMWA.

2. Period covered by the notification 2014. 3. Policy objective and/or purpose of the subsidy Measures to support the labour market.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Federal Ministry for Economic Affairs and Labour, Labour Market Promotion Act 1969; 93-358.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants, loans, guarantees. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The subsidy is provided to producers; individual.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Budget for 2014 : --- (§§ 27a, 35a and 51a AMFG Arbeitsmarkförderungsgesetz (Labour Market Promotion Act)) no more budgeting in the future. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

1994 – unlimited

Page 17: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 17 -

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

Not available.

12 PAR. 51 LIT. A OF THE LABOUR MARKET PROMOTION ACT 1969

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Par. 51 lit. a of the "Labour Market Promotion Act 1969", 94-058, Federal Ministry for Economic Affairs and Labour, BMWA.

2. Period covered by the notification 2013 3. Policy objective and/or purpose of the subsidy Measures to support the labour market.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Federal Ministry for Economic Affairs and Labour, Labour Market Promotion Act 1969; 94-058.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants, loans, guarantees. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The subsidy is provided to producers and "flag ship"- enterprises in tourism; individual.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Budget for 2013: --- (§§ 27a, 35a and 51a AMFG Arbeitsmarkförderungsgesetz (Labour Market Promotion Act)) no more budgeting; 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

2007-2013

Page 18: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 18 -

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

Not available.

13 PAR. 51 LIT. A OF THE LABOUR MARKET PROMOTION ACT 1969

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Par. 51 lit. a of the "Labour Market Promotion Act 1969", 94-058, Federal Ministry for Economic Affairs and Labour, BMWA.

2. Period covered by the notification 2014 3. Policy objective and/or purpose of the subsidy Measures to support the labour market.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted Federal Ministry for Economic Affairs and Labour, Labour Market Promotion Act 1969; 94-058.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants, loans, guarantees. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The subsidy is provided to producers and "flag ship"- enterprises in tourism; individual.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Expired (§ 51a AMFG Arbeitsmarkförderungsgesetz (Labour Market Promotion Act)) 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

Expired. 9. Statistical data permitting an assessment of the trade effects of the subsidy

Not available.

Page 19: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 19 -

14 GUIDELINE FOR RESCUE AND RESTRUCTURING AID TO SME IN BURGENLAND

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Guideline for Rescue and Restructuring Aid to SME in Burgenland.

2. Period covered by the notification Aid scheme was notified in 2009 (N 670/08). 3. Policy objective and/or purpose of the subsidy

The objective of the aid scheme for the rescuing and restructuring of SMEs in difficulty located in

Burgenland. The scheme is not sector specific. The entities eligible for aid under the scheme are SMEs which qualify as such under the Community definition of SME and which have their centre of business to which aid shall be allocated in Burgenland. Companies active in a market suffering from long-term structural over-capacity and newly created companies in the first three years from the start of their activity are not eligible for aid under the present scheme.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Authority: WIBAG (Wirtschaftsservice Burgenland AG) (Business Services Agency Burgenland) Technologiezentrum A-7000 Eisenstadt

[email protected]

Based on the " economic promotion act 1994 (Wirtschaftsförderungsgesetz 1994 – WiföG)" and a trust agreement between Land Burgenland and WiBAG, WiBAG is the authority which is responsible for the implementation and execution of Aid Schemes for Trade & Industry and

Tourism. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Guarantee, Soft loan, Direct grant, Risk capital. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

All sectors

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

COMMITMENTS

2013 0,00 €

2014 0,00 €

Page 20: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 20 -

PREMIUM

Year Amount

2013 25,21 €

2014 0,00 €

GUARANTEES DUE

Year Amount

2013 24.000,00 €

2014 0,00 €

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

The scheme entered into force on 1 January 2009 and will expire on 9 October 2009. 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the

extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major

change in the subsidy.

15 GUIDELINE FOR RESCUE AND RESTRUCTURING AID TO SME IN BURGENLAND

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Guideline for Rescue and Restructuring Aid to SME in Burgenland.

2. Period covered by the notification Aid scheme was notified in 2009 (N 548/09); Prolongation (SA.36051 (2013/N)). 3. Policy objective and/or purpose of the subsidy

The objective of the aid scheme for the rescuing and restructuring of SMEs in difficulty located in Burgenland. The scheme is not sector specific. The entities eligible for aid under the scheme are SMEs which qualify as such under the Community definition of SME and which have their centre of business to which aid shall be allocated in Burgenland. Companies active in a market suffering from long-term structural over-capacity and newly created companies in the first three years from the start of their activity are not eligible for aid under the present scheme.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Authority: WIBAG (Wirtschaftsservice Burgenland AG) Business Services Agency Burgenland Technologiezentrum

A-7000 Eisenstadt +43 2682 05 9010 – 210

[email protected]

Page 21: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 21 -

Based on the "economic promotion act 1994 (Wirtschaftsförderungsgesetz 1994 – WiföG)" and a trust agreement between Land Burgenland and WiBAG, WiBAG is the authority which is responsible for the implementation and execution of Aid Schemes for Trade & Industry and Tourism. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Guarantee, Soft loan, Direct grant, Risk capital. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

All sectors.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

COMMITMENTS

Year Amount

2013 0,00 €

2014 975.000,00 €

PREMIUM

Year Amount

2013 19.873,40 €

2014 18.383,71 €

GUARANTEES DUE

Year Amount

2013 0,00 €

2014 320.000,00 €

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

The scheme entered into force on 10 October 2009 and will expire on 9 October 2012. The aid

scheme has been prolonged until 31 December 2013 (SA.36051 (2013/N)). 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

Page 22: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 22 -

16 GUIDELINES CONCERNING THE GRANTING OF VENTURE CAPITAL

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Guidelines concerning the Granting of Venture Capital.

2. Period covered by the notification 1 January 2010 – 30 June 2014 3. Policy objective and/or purpose of the subsidy

The aim of the aid scheme is to strengthen the competitiveness of companies – SME - in

Burgenland, to obtain the maximum of regional economic growth. The venture capital should enable the companies to finance projects during the seed, start up and the expansion period. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Authority: WIBAG (Wirtschaftsservice Burgenland AG) Business Services Agency Burgenland Technologiezentrum A-7000 Eisenstadt +43 5 9010 – 210 [email protected]

Based on the "economic promotion act 1994 (Wirtschaftsförderungsgesetz 1994 – WiföG)" and a trust agreement between Land Burgenland and WiBAG, WiBAG is the authority which is

responsible for the implementation and execution of Aid Schemes for Trade & Industry and Tourism. BRB Burgenländische Risikokapital Beteiligungen AG

Technologiezentrum A-7000 Eisenstadt +43 5 9010 – 28250 [email protected] The BRB Burgenländische Risikokapital Beteiligungen AG is the operative body executing the investments.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Venture Capital.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined) According to the ÖNACE classification WiBAG offers subsidies in following areas/units: D - Manufacturing of goods E - Supply of Electricity, Gas and Water

F - Building industry G - Wholesale and Retail trade I – Transportation K – Company related services, consulting Subsidies in E only after notification (no subsidy up to date)

There is no fixed proportion or amount of aid given to a special unit. There is only a budget for the whole aid scheme as mentioned under point 2.

Page 23: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 23 -

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

The annual budget for 2013: € 2.850.175,00

The annual budget for 2014: € 2.850.175,00 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement In general the earliest exit is a priority. Due to investment strategies it can be assumed that the

venture capital will be provided to the SME for a period from 5 to 8 years.

The date of inception is the day of application (in general standardized form; exceptionally formless application). 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the

extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change

in the subsidy.

There are no substantial effects on trade. 17 GUIDELINES CONCERNING THE GRANTING OF NON-REPAYABLE SUBSIDIES ACCORDING TO THE ECONOMIC PROMOTION ACT 1994

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy Guidelines concerning the granting of non-repayable subsidies according to the Economic Promotion Act 1994. 2. Period covered by the notification

1 January 2007 – 31 December 2013.

3. Policy objective and/or purpose of the subsidy The aim of the aid scheme is to strengthen the competitiveness of companies in Burgenland, to obtain the maximum of regional economic growth and to create and safeguard employment. These goals shall be achieved by setting the focus of the aid scheme to following areas:

Strengthening of economic structures

Environment and Ecology

Improvement of the economic structure of SME

Infrastructure

The subsidies are non-repayable grants.

Page 24: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 24 -

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Authority: WIBAG (Wirtschaftsservice Burgenland AG) Business Services Agency Burgenland Technologiezentrum

A-7000 Eisenstadt [email protected] Based on the " economic promotion act 1994 (Wirtschaftsförderungsgesetz 1994 – WiföG)" and a trust agreement between Land Burgenland and WiBAG, WiBAG is the authority which is responsible for the implementation and execution of Aid Schemes for Trade & Industry and

Tourism.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

According to the ÖNACE classification WiBAG offers subsidies in following areas/units: D - Manufacturing of goods E - Supply of Electricity, Gas and Water

F - Building industry G - Wholesale and Retail trade I – Transportation

K – company related services, consulting Subsidies in E only after notification (no subsidy up to date).

There is no fixed proportion or amount of aid given to a special unit. There is only a budget for the whole aid scheme as mentioned under question 1. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation The annual budget for 2013: € 120.000,00 The annual budget for 2014: € 120.000,00

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

In general the project has to be realized within a period of two years after application. The date of inception is the day of application (in general standardized form; exceptionally formless application).

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

Page 25: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 25 -

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

There are no substantial effects on trade. 18 GUIDELINES CONCERNING THE GRANTING OF NON-REPAYABLE SUBSIDIES TO

ENTERPRISES IN THE FIELDS OF TRADE AND INDUSTRY ACCORDING TO THE ECONOMIC PROMOTION ACT 1994

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Guidelines concerning the granting of non-repayable subsidies to enterprises in the fields of trade

and industry according to the economic promotion act 1994. 2. Period covered by the notification 1 September 2009 – 30 June 2014 3. Policy objective and/or purpose of the subsidy

The aim of the aid scheme is to strengthen the competitiveness of companies in Burgenland, to obtain the maximum of regional economic growth and to create and safeguard employment. The subsidies are non-repayable grants. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Authority: WIBAG (Wirtschaftsservice Burgenland AG) Business Services Agency Burgenland Technologiezentrum A-7000 Eisenstadt +43 2682 05 9010 – 210

[email protected] Based on the " economic promotion act 1994 (Wirtschaftsförderungsgesetz 1994 – WiföG)" and a trust agreement between Land Burgenland and WiBAG, WiBAG is the authority which is responsible for the implementation and execution of Aid Schemes for Trade & Industry and Tourism.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined) According to the ÖNACE classification WiBAG offers subsidies in following areas/units: D - Manufacturing of goods E - Supply of Electricity, Gas and Water

F - Building industry G - Wholesale and Retail trade I – Transportation K – Company related services, consulting

Subsidies in E only after notification (no subsidy up to date)

Page 26: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 26 -

There is no fixed proportion or amount of aid given to a special unit. There is only a budget for the whole aid scheme as mentioned under point 2.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

The annual budget for 2013: € 10.400.000,00 The annual budget for 2014: € 10.400.000,00

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

In general the project has to be realized within a period of two years after application.

The date of inception is the day of application (in general standardized form; exceptionally formless application).

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

There are no substantial effects on trade.

19 GUIDELINES CONCERNING THE GRANTING OF RESEARCH AND DEVELOPMENT PROJECTS

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Guidelines concerning the granting of research and development projects.

2. Period covered by the notification

24 December 2009 – 30 June 2014

3. Policy objective and/or purpose of the subsidy

The aim of the aid scheme is to strengthen the competitiveness of companies in Burgenland, to

obtain the maximum of regional economic growth and to create and safeguard employment. Simultaneously the aid scheme should contribute to an important input to increase industrial and experimental research, to strengthen innovation activities and to realize and optimize research findings.

The subsidies are non-repayable grants.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Authority: WIBAG (Wirtschaftsservice Burgenland AG) Business Services Agency Burgenland Technologiezentrum

A-7000 Eisenstadt +43 5 9010 – 210 [email protected]

Page 27: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 27 -

Based on the "economic promotion act 1994 (Wirtschaftsförderungsgesetz 1994 – WiföG)" and a trust agreement between Land Burgenland and WiBAG, WiBAG is the authority which is responsible for the implementation and execution of Aid Schemes for Trade & Industry and Tourism. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

According to the ÖNACE classification WiBAG offers subsidies in following areas/units:

D - Manufacturing of goods E - Supply of Electricity, Gas and Water F - Building industry G - Wholesale and Retail trade

I - Transportation K - Company related services, consulting Subsidies in E only after notification (no subsidy up to date). There is no fixed proportion or amount of aid given to a special unit. There is only a budget for the whole aid scheme as mentioned under question 7.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

The annual budget for 2013: € 600.000,00 The annual budget for 2014: € 600.000,00 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement In general the project has to be realized within a period of two years after application.

The date of inception is the day of application (in general standardized form; exceptionally formless application). 9. Statistical data permitting an assessment of the trade effects of the subsidy

There are no substantial effects on trade.

20 REGIONAL ECONOMIC PROGRAM FOR PLANNING ASSOCIATION 9 "UPPER AND SUPERIOR COURT", SPECIAL PROMOTION PROGRAM 2015 - 2024

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Regional Economic Program for Planning Association 9 "Upper and Superior Court", Special Promotion Program 2015 – 2024. Case Number: SA.40308 (2014/X)

Page 28: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 28 -

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014. The promotion program was registered from 1 January 2015 to 31 December 2020.

3. Policy objective and/or purpose of the subsidy Tyrolean Regional Government supports the economic development of the region "Upper and Superior Court" eligible for regional state aid. Promotion program shall stimulate sustainable regional development by promoting tourism, competitiveness of enterprises, projects to increase

innovation, environmental projects and projects in order to counteract predicted population decline.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Subsidy program was approved by the Tyrolean Regional Government and is administered by the

Office of the Tyrolean Government Department of Economy and Labour. The European Commission has registered this promotion program on 18 December 2014 (SA.40308 2014/X) based on the General Block Exemption Regulation. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

This subsidy is granted in form of grants, interest rate subsidies and loans. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Depending on the measure, beneficiaries are individuals, companies, cooperatives, associations and communities. Subsidy is provided through an application mechanism with a predetermined amount per project. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation The annual amount budgeted for this promotion program is about € 1 million. Subsidy per unit/per project depends on the measure and beneficiary. State aid is limited to a 10% to 20% maximum of the eligible costs.

In 2013 and 2014 no subsidies were granted.

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Period of validity of the subsidy is from 1 January 2015 to 31 December 2024.

9. Statistical data permitting an assessment of the trade effects of the subsidy No statistical data available.

Page 29: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 29 -

21 TYROLEAN INFRASTRUCTURE PROMOTION PROGRAMME – INFRASTRUCTURAL ADVANCEMENTS IN SMALL AND MIDGET SKI-REGIONS

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Tyrolean Infrastructure Promotion Programme – Infrastructural Advancements in Small and Midget

Ski-Regions. Case Number: SA.39454 (2014/X) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified

2013; 2014 The promotion program was registered from 1 July 2014 to 30 June 2021. 3. Policy objective and/or purpose of the subsidy

Tyrolean Regional Government supports the advancement of small and midget ski-regions, in the context of communal and regional progress. Furthermore the program should improve the access of youth to the ski sport in general and should strengthen the school and club sports. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Subsidy program was approved by the Tyrolean Regional Government and is administered by the Office of the Tyrolean Government Department of Economy and Labour.

The European Commission has registered this promotion program on 4 September 2014 (SA.39454 2014/X) based on the General Block Exemption Regulation.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) This subsidy is granted in form of grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidy is provided to communities, associations of communities, tourism associations, associations and SMEs through an application mechanism with a predetermined amount per project.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Subsidy per unit / per project is limited to a 20% maximum of the eligible costs for small enterprises and 10% maximum of the eligible costs for medium-sized enterprises.

The eligible costs must be at least € 0.02 mio. and are limited to € 2.5 mio. The subsidy program started in 2014. In 2014 an amount of € 0.097 mio. was granted for two projects with total investment costs of € 0.204 mio. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

Period of validity of the subsidy is from 1 July 2014 to 30 June 2021.

Page 30: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 30 -

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

No statistical data available.

22 TYROLEAN ECONOMIC PROMOTION PROGRAM – IMPULSE PACKAGE

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Tyrolean Economic Promotion Program – Impulse Package Case Number: SA.39453 (2014/X) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 The promotion program was registered from 1 July 2014 to 31 December 2020.

3. Policy objective and/or purpose of the subsidy The Tyrolean Regional Government supports the financing of projects to stimulate regional economy, sustainable growth and secure employment in Tirol by providing grants. Aid shall be granted for business relocations or business expansions, product innovations or process innovations.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) The promotion program was approved by the Tyrolean Regional Government and is administered by the Office of the Tyrolean Government Department of Economy and Labour.

The European Commission has registered this promotion program on 3 September 2014

(SA.34129 2011/X) based on the General Block Exemption Regulation. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) This subsidy is granted in form of grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries are SMEs and large enterprises in regions eligible for regional aid. Subsidy is provided to producers and in some special cases other companies (tourism industry, telecommunications

and broadcasting companies) through an application mechanism with a predetermined amount per project.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

Page 31: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 31 -

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Subsidy per unit/per project is limited to a 15% maximum of the eligible costs and consists of an investment grant in the amount of 5% of the eligible costs or in the amount of 10% of the eligible costs in regions eligible for regional aid and additionally of an employment grant, environmental

grant and/or a grant for gender-sensitive measures. The eligible costs must be at least € 0,5 million and are limited to € 30 million. The promotion program started in 2014. In 2014 an amount of € 0,119 million was granted for one project with total investment costs of € 2,994 million.

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Period of validity of the subsidy is from 1 July 2014 to 31 December 2020. 9. Statistical data permitting an assessment of the trade effects of the subsidy

No statistical data available. 23 AD HOC AID TO PITZTALER GLETSCHERBAHN LTD & CO PARTNERSHIP, TYROL

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Ad hoc aid to Pitztaler Gletscherbahn Ltd. & Co. Partnership, Tyrol.

Case Number: SA.38282 (2014/X) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified 2013; 2014 The ad hoc aid was registered by the European Commission on 31 January 2014. 3. Policy objective and/or purpose of the subsidy

The beneficiary Pitztaler Gletscherbahn Gesellschaft m. b. H. & Co. KG sets up a photovoltaic plant in an area above the restaurant on the Pitztal glacier at a height of about 2850 meters. Because of the height and the reflection of the snow the plant shall work with a higher efficiency, than standard photovoltaic plants. The project shall amortize the growing costs for energy.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

The ad hoc aid was approved by the Tyrolean Regional Government and is administered by the Office of the Tyrolean Government Department of Economy and Labour. The European Commission has registered this ad hoc aid on 31 January 2014 (SA.38282 2014/X) based on the General Block Exemption Regulation.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) This ad hoc aid is granted in form of grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined)

Page 32: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 32 -

Ad hoc aid was granted to the beneficiary Pitztaler Gletscherbahn Gesellschaft m. b. H. & Co. KG through an application mechanism with a predetermined amount per project. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation In 2014 an ad hoc aid of € 0.519 was granted. The extra investment costs necessary to promote the production of energy from renewable sources amount to € 2.215 mio. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

The project period starts on 1 July 2014 and shall end on 31 October 2015. 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information

include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

No statistical data available.

24 AD HOC AID TO A. LOACKER KONFEKT LTD, TYROL

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Ad hoc aid to A. Loacker Konfekt Ltd., Tirol Case Number: SA.37034 (2013/X) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014

The ad hoc aid was registered by the European Commission on 10 July 2013. 3. Policy objective and/or purpose of the subsidy The beneficiary A. Loacker Konfekt Ges.m.b.H. sets up a new establishment or rather extends an

existing establishment in Eastern Tyrol to diversify the output into new additional products, like cookies or chocolate waffles. In the new establishment new production process-steps will be applied and production will be highly automated. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

The ad hoc aid was approved by the Tyrolean Regional Government and is administered by the Office of the Tyrolean Government Department of Economy and Labour.

The European Commission has registered this ad hoc aid on 10 July 2013 (SA.37034 2013/X) based on the General Block Exemption Regulation.

Page 33: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 33 -

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) This ad hoc aid is granted in form of grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined) Ad hoc aid was granted to the company A. Loacker Konfekt Ges.m.b.H through an application mechanism with a predetermined amount per project. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation In 2013 an ad hoc aid was granted in the amount of € 1 million. The eligible costs amount to € 62 million.

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

The project period starts on 8 May 2013 and shall end on 31 December 2015. 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the

extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the

latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

No statistical data available. 25 TYROLEAN ECONOMIC PROMOTION PROGRAM – PROMOTION OF LOW-EMISSION HEAVY TRUCKS AND CARS / BUSES EURO CLASS VI

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy

Tyrolean Economic Promotion Program – Promotion of low-emission heavy trucks and cars / buses Euro Class VI. Case Number: SA.36613 (2013/X)

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 The promotion program was registered from 1 January 2013 to 30 September 2013.

3. Policy objective and/or purpose of the subsidy Tyrolean Regional Government supports Tyrolean economy in the process of renewing their vehicle

pool by promoting the purchase of low-emissions heavy trucks or buses in order to reduce ambient air pollution and other negative effects of traffic.

Page 34: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 34 -

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

The promotion program was approved by the Tyrolean Regional Government and is administered by the Office of the Tyrolean Government Department of Economy and Labour. The European Commission has registered this promotion program on 30 April 2014

(SA.36613 2013/X) based on the General Block Exemption Regulation. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) This subsidy is granted in form of grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined) Beneficiaries are companies (particularly SMEs) with a commercial licence and an establishment in Tyrol. Subsidy is provided through an application mechanism with a predetermined amount per project. The grant amount to € 5.000 per vehicle, but a maximum of 45% of eligible costs.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Subsidy per unit (vehicle) in form of a fixed grant amount to € 5.000, but a maximum of 45% of

eligible costs. In 2013 an amount of € 0,301 million was granted for 53 cases with total investment costs of

about € 7,1 million. In 2014 no subsidy was granted. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Period of validity of the subsidy is from 1 January 2013 to 30 September 2013. 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information

include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

No statistical data available. 26 TYROLEAN INFRASTRUCTURE PROMOTION PROGRAMME – INFRASTRUCTURAL ADVANCEMENTS IN SMALL AND MIDGET SKI-REGIONS

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Tyrolean Infrastructure Promotion Programme – Infrastructural Advancements in Small and Midget Ski-Regions

Case Number: SA.34130 (2011/X)

Page 35: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 35 -

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 Subsidy program was notified from 1 January 2012 to 30 June 2014.

3. Policy objective and/or purpose of the subsidy Tyrolean Regional Government supports the advancement of small and midget ski-regions, in the context of communal and regional progress. Furthermore the promotion program shall improve the access of youth to the ski sport in general and shall strengthen the school and club sports.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Subsidy program was approved by the Tyrolean Regional Government and is administered by the Office of the Tyrolean Government Department of Economy and Labour.

The European Commission has registered this promotion program on 20 December 2011 (SA.34130 2011/X) based on the General Block Exemption Regulation. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) This subsidy is granted in form of grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries are communities, associations of communities, tourism associations, associations and SMEs. Subsidy is provided through an application mechanism with a pre-determined amount per

project. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Subsidy per unit/per project is limited to a 20% maximum of the eligible costs for small enterprises and 10% maximum of the eligible costs for medium-sized enterprises. Eligible costs must be at least € 0,02 million and are limited to € 2,5 million.

In 2013 no subsidy was granted. In 2014 an amount of € 0,068 million was granted for 1 project with total investment costs of € 0,378 million.

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Period of validity of the subsidy is from 1 January 2012 to 30 June 2014.

9. Statistical data permitting an assessment of the trade effects of the subsidy No statistical data available. 27 TYROLEAN ECONOMIC PROMOTION PROGRAM – IMPULSE PACKAGE

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy

Tyrolean Economic Promotion Program – Impulse Package.

Page 36: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 36 -

Case Number: SA.34129 (2011/X) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 The promotion program was registered from 1 January 2012 to 30 June 2014. 3. Policy objective and/or purpose of the subsidy Tyrolean Regional Government supports the financing of projects to stimulate regional economy,

sustainable growth and secure employment in Tirol by providing grants. Aid shall granted for business relocations or business expansions, product innovations or process innovations.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) The promotion program was approved by the Tyrolean Regional Government and is administered

by the Office of the Tyrolean Government Department of Economy and Labour. The European Commission has registered this promotion program on 20 December 2011 (SA.34129 2011/X) based on the General Block Exemption Regulation. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) This subsidy is granted in form of grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined) Beneficiaries are SMEs and large enterprises in regions eligible for regional aid. Subsidy is provided

to producers and in some special cases to tourism industry through an application mechanism with a predetermined amount per project. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Subsidy per unit/per project is limited to a 10% maximum of the eligible costs and consists of an investment grant in the amount of 5% of the eligible costs or in the amount of 10% of the eligible costs in regions eligible for regional aid and additionally of an employment grant and/or a grant for gender-sensitive measures.

The eligible costs must be at least € 0.5 million and are limited to € 30 million.

In 2013 an amount of € 5.530 million was granted for 25 projects with total investment costs of about € 119,280 million. In 2014 an amount of € 3,231 million was granted for 19 projects with total investment costs of € 58,224 million.

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Period of validity of the subsidy is from 1 January 2012 to 30 June 2014. 9. Statistical data permitting an assessment of the trade effects of the subsidy

No statistical data available.

Page 37: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 37 -

28 DIRECTIVE OF THE COUNTRY TYROL FOR THE PROMOTION OF SCIENCE, RESEARCH AND DEVELOPMENT

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Directive of the Country Tyrol for the Promotion of Science, Research and Development.

Case Number: SA.32100 (X/2010) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 The promotion program was registered from 1 January 2011 to 31 December 2013. 3. Policy objective and/or purpose of the subsidy Tyrolean Regional Government supports the expansion of economic and technological research and

technology development in Tyrol. Furthermore subsidy program shall encourage scientific-location, research-location and business-location Tyrol and shall improve international competitiveness of business- and industrial-location Tyrol. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

The promotion program was approved by the Tyrolean Regional Government and is administered by the Office of the Tyrolean Government Department of Economy and Labour.

The European Commission has registered this promotion program on 20 December 2011 (SA.32100 X/2010) based on the General Block Exemption Regulation. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

This subsidy is granted in form of grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries are SMEs, large enterprises and research facilities. Subsidy is provided through an application mechanism with a predetermined amount per project. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Subprogram 1: subsidy per unit/per project is granted up to 100% of the eligible costs and is limited to a maximum of € 0.100 million per year. Subprogram 2: subsidy per unit/project is granted up to 50% of the eligible costs and is limited to a maximum of € 0.050 million.

Subprogram 3: subsidy per unit/project is granted up to 45% (100% for research facilities) of the eligible costs and is limited to a maximum of € 0,300 million per year. In 2013 an amount of € 3,1 million was granted for 18 projects with total investment costs of € 3,458 million.

In 2014 an amount of € 0,708 million was granted for 2 projects with total investment costs of € 0,916 million.

Page 38: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 38 -

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

Period of validity of the subsidy is from 1 January 2011 to 30 June 2014. 9. Statistical data permitting an assessment of the trade effects of the subsidy

No statistical data available. 29 TYROLEAN INFRASTRUCTURE PROMOTION PROGRAM – BIOMASS LOCAL HEATING SYSTEMS

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy

Tyrolean Infrastructure Promotion Program – Biomass Local Heating Systems. Case Number: X 357/2009 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 Subsidy program was registered from 1 March 2009 to 30 June 2014. 3. Policy objective and/or purpose of the subsidy

Tyrolean Regional Government supports the use of renewable energy by promoting construction of

biomass local heating systems. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Subsidy program was approved by the Tyrolean Regional Government and is administered by the Office of the Tyrolean Government Department of Economy and Labour. The European Commission has registered this promotion program on 23 March 2009 (X357/2009) based on the General Block Exemption Regulation.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) This subsidy is granted in form of grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries are corporations, communities, associations of communities and enterprises in agriculture and forestry. Subsidy is provided through an application mechanism with a predetermined amount per project. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Subsidy per unit/per project is granted to the extent of 40% of the eligible costs.

In 2013 an amount of € 1,437 million was granted for 10 projects with total investment costs of

about € 28,292 million.

Page 39: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 39 -

In 2014 an amount of €0,241 million was granted for 2 projects with total investment costs of € 5,736 million. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

Period of validity of the subsidy is from 1 March 2009 to 30 June 2014. 9. Statistical data permitting an assessment of the trade effects of the subsidy No statistical data available.

30 NON-COMMERCIAL BROADCASTING FUND

1. Title of the subsidy programme, if relevant, or identification of the subsidy Non-Commercial Broadcasting Fund EU/State aid decision No.73/2010 and SA.35614. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified 2013 and 2014 3. Policy objective and/or purpose of the subsidy The Fund is intended to promote private non-commercial broadcasting within the Austrian media

landscape and to support non-commercial broadcasting in providing a varied and high-quality offer of channels, which, in particular, contribute to promoting Austrian culture, Austrian and European

awareness and the information and education of the population. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

The Austrian Regulatory Authority for Broadcasting and Telecommunications (RTR) administers the fund. RTR is responsible for investing the funds and awarding grants for the purpose of promoting (non-commercial) private broadcasters. Legal provisions: §§ 29, 31, 32 KommAustria Act.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Direct grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Private broadcasters are eligible to apply for grants. The decisions on funding are made by the managing director of RTR with due attention to the legal provisions, the Guidelines for the allocation of funds and the comments of the review board, which consists of five members with years of experience in the broadcast business.

Fluctuating amount; depends on the application and to what extent the requirements according to the Guidelines are met. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation

Page 40: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 40 -

2013: 3 million EUR 2014: 3 million EUR 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

Duration: approved until 31 December 2014 9. Statistical data permitting an assessment of the trade effects of the subsidy No data available.

31 PRIVATE BROADCASTING FUND

1. Title of the subsidy programme, if relevant, or identification of the subsidy Private Broadcasting Fund EU/State aid decision No. 72/2010 and SA.36127 (2013/N) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014 3. Policy objective and/or purpose of the subsidy

The Fund is intended to promote a dual broadcasting system in Austria and the variety of private, as well as local and regional, channels offered within the Austrian media landscape and to support

the provision of a varied and high-quality offer of channels, which, in particular, contribute to promoting Austrian culture, Austrian and European awareness and the provision of information to and education of the population.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

The Austrian Regulatory Authority for Broadcasting and Telecommunications (RTR) administers the fund. RTR is responsible for investing the funds and awarding grants for the purpose of promoting (commercial) private broadcasters.

Legal provisions: §§ 30- 32 KommAustria Act 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Direct grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Private broadcasters are eligible to apply for grants. The decisions on funding are made by the managing director of RTR with due attention to the legal

provisions, the Guidelines for the allocation of funds and the comments of the review board, which consists of five members with years of experience in the broadcast business. Fluctuating amount; depends on the application and to what extent the requirements according to the Guidelines are met.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

Page 41: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 41 -

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

2013: 15 million EUR 2014: 15 million EUR

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

Duration: approved until 31 December 2014 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information

include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the

latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

No data available. 32 FUND FOR DIGITALISATION

1. Title of the subsidy programme, if relevant, or identification of the subsidy

Fund for Digitalisation EU/State aid decision No. 622/2003 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014 3. Policy objective and/or purpose of the subsidy The measure is set up to support the introduction of digital television transmission technologies and applications for broadcasting and to facilitate the switchover from analogue to digital television

in Austria. The measure is intended to renew and strengthen all platforms for the transmission of broadcasting signals. The objectives and bases of the Austrian Digitization Fund are derived from

the intentions of the Europe 2005 Action Plan, which aims to accelerate the transition to digital television. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

The Austrian Regulatory Authority for Broadcasting and Telecommunications (RTR) administers the fund. RTR is responsible for investing the funds and awarding grants for the purpose of promoting digital transmission technologies and digital applications based on European standards in connection with broadcasting programmes.

Legal provisions: §§ 21-25 KommAustria Act 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Direct grant.

Page 42: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 42 -

The scheme aims at supporting projects in five categories, as outlined in the Guidelines for grant allocation: I. Pilot projects and research activities regarding the digital transmission of broadcasting II. Development of programs and innovative services III. Financial interventions in order to comfort the digital switchover

IV. Financial incentives for consumers to switch to digital reception at an early stage V. Subsidies for low-income consumers purchasing terminal equipment 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The Guidelines for the allocation of funds foresee specific requirements for each funding category.

Beneficiaries of the measures I and II will be, inter alia, broadcasters, network operators, equipment manufacturers, technology companies or service providers but also research institutes. Grants under sub-measure III can only be awarded to broadcasters as specified in the relevant Austrian legal framework. Beneficiaries of sub-measures I to III are citizens, legal entities or commercial-law partnerships whereas sub-measures IV and V are targeted specifically at citizens.

Funds will be allocated following the Guidelines for the allocation of funds via calls for proposals. These calls will ask for the submission of projects in the specific areas addressed by the measure. Grants will be awarded for innovative projects which are in line with the objectives of the Fund. Funding can only be awarded where a project would not be sustainable without a grant from the Fund.

Fluctuating amount; depends on the application and to what extent the requirements according to the Guidelines are met.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation 2013: 0.5 million EUR 2014: 0.5 million EUR 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

Date of inception: 1 July 2005 Duration: no deadline fixed 9. Statistical data permitting an assessment of the trade effects of the subsidy

No data available.

33 TELEVISION FUND

1. Title of the subsidy programme, if relevant, or identification of the subsidy

Television Fund.

EU/State aid decision No.348/2009 and SA 33878 (2011/N)

2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014

Page 43: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 43 -

3. Policy objective and/or purpose of the subsidy

The Fund is intended to make a contribution to improving the quality of television production and the capacity of the Austrian film industry, as well as reinforcing Austria as a media location and

ensuring the diversity of the cultural landscape. In addition, the grants are also intended to contribute to the strengthening of the audiovisual sector in Europe.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

The Austrian Regulatory Authority for Broadcasting and Telecommunications (RTR) administers the fund. RTR is responsible for investing the funds and awarding grants for the purpose of promoting television productions.

Legal provisions: §§ 26-28 KommAustria Act

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Direct grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Independent producers and production companies with the appropriate professional qualifications are eligible to apply for grants.

The decisions on funding are made by the managing director of RTR with due attention to the

objectives of the Fund and to the comments of the review board, which consists of five members with years of experience in the film industry.

Fluctuating amount; depends on the application and to what extent the requirements according to the Guidelines are met.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

2013: 13.5 million EUR 2014: 13.5 million EUR

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

Duration: approved until 31 December 2015

9. Statistical data permitting an assessment of the trade effects of the subsidy No data available.

34 SUBSIDIES FOR THE CONSTRUCTION OF CONNECTING RAILWAY LINES; INFRASTRUCTURE FOR RAILWAY HAULAGE

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Subsidies for the construction of connecting railway lines; infrastructure for railway haulage. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

Page 44: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 44 -

Recent period (unrestricted); calendar years 2014 and 2015; date of approval by the Commission 15. July 1996 (permission of GD VII; SG (96) D/6300) 3. Policy objective and/or purpose of the subsidy Infrastructure of rail haulage.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Based on Guidelines of the Regional Government of Vorarlberg.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Subsidy. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Private companies. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

2013 € 251.181,75 2014 € 0

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

9. Statistical data permitting an assessment of the trade effects of the subsidy n/a 35 SUBSIDIES FOR INTENSIFIED ENERGETIC USE OF BIOMASS

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy Subsidies for intensified energetic use of biomass.

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

1 July 2010 until 31 December 2013 3. Policy objective and/or purpose of the subsidy Reduction of carbon dioxide-emissions.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Based on Guidelines of the Regional Government of Vorarlberg.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Subsidy.

Page 45: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 45 -

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Municipality; cooperative house building society; agriculture cooperation; others who built and run biomass district heating systems.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

2013 € 2.169.000,00 2014 € 2.068.000,00

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 9. Statistical data permitting an assessment of the trade effects of the subsidy

n/a 36 GRANTS FOR RESEARCH & DEVELOPMENT

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Grants for research & development, Vorarlberg R & D Project Promotion.

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

Recent period (unrestricted); calendar year; date of approval by the Commission 2 March 1994. 3. Policy objective and/or purpose of the subsidy To create new products and processes. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Based on Guidelines of the Regional Government of Vorarlberg.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Access is possible for any enterprise of the manufacturing or service sector.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

2013 contributions: € 0.692 mio. / loans: € 0.858 mio.

2014 contributions: € 0.785 mio. / loans: € 1.030 mio.

Page 46: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 46 -

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

9. Statistical data permitting an assessment of the trade effects of the subsidy n/a

37 SUBSIDIES FOR RESEARCH & DEVELOPMENT

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Subsidies for research & development, Vorarlberg Business Research Promotion; SA.39434

(2014/X).

2. Period covered by the notification Recent period: 1 July 2014 until 31 December 2014 3. Policy objective and/or purpose of the subsidy

To create new products and processes. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Based on Guidelines of the Regional Government of Vorarlberg.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Subsidy. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

SME's 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

2013 € 0

2014 € 26.981,00 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 9. Statistical data permitting an assessment of the trade effects of the subsidy n/a

38 SUBSIDIES FOR STUDIES CONCERNING TECHNICAL RESEARCH & DEVELOPMENT PROJECTS, MADE BY UNIVERSITIES ET AL TO SUPPORT SME'S IN VORARLBERG

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Subsidies for studies concerning technical research & development projects, made by Universities et al to support SME's in Vorarlberg, Promotion of Technology Transfer (Förderung von

Technologietransfer); SA.39435 (2014/X).

Page 47: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 47 -

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

Recent period: 1 July 2014 until 31 December 2014.

3. Policy objective and/or purpose of the subsidy Studies concerning technical research & development projects. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Based on Guidelines of the Regional Government of Vorarlberg.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Subsidy.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

SME's. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

2013 € 0 2014 € 14.820,00

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 9. Statistical data permitting an assessment of the trade effects of the subsidy n/a

39 PROGRAMME FOR BUSINESS DEVELOPMENT IN VORARLBERG 2014 - 2020

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Programme for business development in Vorarlberg 2014 - 2020 Economy Promotion Programme Vorarlberg 2014 – 2020; SA.38520 (2014/X)

2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

Recent period is from 1 July 2014 to 31 December 2014.

3. Policy objective and/or purpose of the subsidy Supporting SME's in Vorarlberg to ensure their competitiveness and to save workplaces. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Based on Guidelines of the Regional Government of Vorarlberg.

Page 48: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 48 -

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Subsidy.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

SME's

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

2013 € 0 2014 € 2.607 mio.

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

9. Statistical data permitting an assessment of the trade effects of the subsidy

n/a

40 PROGRAMME FOR BUSINESS DEVELOPMENT IN VORARLBERG 2007 - 2013

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Programme for business development in Vorarlberg 2007 – 2013.

Economy Promotion Programme Vorarlberg 2007 - 2013 (XS148/2007; X682/2009)

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified

Recent period is from 1 July 2007 to 30 June 2008; extended to 31 December 2013.

3. Policy objective and/or purpose of the subsidy

Supporting SME's in Vorarlberg to ensure their competitiveness and to save workplaces.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) based on Guidelines of the Regional Government of Vorarlberg

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Subsidy.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

SME's

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

2013 € 3.182 mio. 2014 € 0

Page 49: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 49 -

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information

include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change

in the subsidy.

41 EUROPEAN RECOVERY PROGRAMME (ERP) REGIONAL PROGRAMME

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

ERP Regional programme (ERP-Regionalprogramm)

(registered SA. 39524) and preceding scheme (registered SA.32294) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014

3. Policy objective and/or purpose of the subsidy Regional investment aid – aid for investment in disadvantaged regions. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) ERP Fund (ERP-Fonds), ERP Fund Act (ERP-Fonds-Gesetz 1962), state aid scheme "ERP-Regionalprogramm" 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Soft loan.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries may be manufacturing and industrial companies as well as production-related service

companies, mechanism of granting the subsidies: application via an intermediary bank; decision on the provision of aid by an independent commission (depending on the quality of the project related to the criteria given in the guidelines on ERP-Regionalprogramm); payment after cost-approval - generally in two parts. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation:

Average loan per unit: € 2.603.858 Average GGE (gross grant equivalent) per unit: € 65.361

Page 50: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 50 -

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

State Aid Scheme, current version from July 2014 till December 2020. 9. Statistical data permitting an assessment of the trade effects of the subsidy

Not available. 42 ERP SME PROGRAMME

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

ERP SME Programme (ERP-KMU-Programm) (registered SA.32293) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 3. Policy objective and/or purpose of the subsidy Investment realised by small or medium enterprises according to the rules and definition laid down by EC to stimulate growth, innovation and creation of new jobs.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

ERP Fund (ERP-Fonds), ERP Fund Act (ERP-Fonds-Gesetz 1962), state aid scheme "ERP-KMU-Programm"

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Soft loan. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries may be manufacturing and industrial companies as well as production-related service companies and have to meet SME-definition, mechanism of granting the subsidies: application via an intermediary bank; decision on the provision of aid by an independent commission (depending

on the quality of the project related to the criteria given in the guidelines on ERP-KMU-Programm); payment after cost-approval - generally in two parts.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Average loan per unit: € 1.481.933

Average GGE (gross grant equivalent) per unit: € 31.698

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

State Aid Scheme, current version from January 2009 till December 2014.

Page 51: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 51 -

9. Statistical data permitting an assessment of the trade effects of the subsidy Not available. 43 ERP TECHNOLOGY PROGRAMME

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy ERP Technology Programme (registered X79/2009). 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified

2013; 2014 3. Policy objective and/or purpose of the subsidy Enhancement of R&D projects.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) ERP Fund (ERP-Fonds), ERP Fund Act (ERP-Fonds-Gesetz 1962), state aid scheme "ERP-Technologieprogramm"

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Soft loan. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined) Beneficiaries may be manufacturing and industrial companies as well as production-related service companies and have to meet R&D requirements defined by EC, mechanism of granting the subsidies: application via an intermediary bank; decision on the provision of aid by an independent commission (depending on the quality of the project related to the criteria given in the guidelines on ERP-Technologieprogramm); payment after cost-approval - generally in two parts.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation Average loan per unit: € 4.059.545

Average GGE (gross grant equivalent) per unit: € 136.813 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement State Aid Scheme, current version from January 2009 till December 2014.

9. Statistical data permitting an assessment of the trade effects of the

subsidy Not available.

Page 52: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 52 -

44 ERP TOURISM PROGRAMME

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

ERP Tourism Programme (ERP-Tourismusprogramm) (registered SA.39523) and preceding scheme (registered X 115/2008).

2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014

3. Policy objective and/or purpose of the subsidy Aid to improve quality and diversity of tourism industry, especially in the field of wellness, health (spa) and activity holidays, and realised by small or medium enterprises or in disadvantaged regions according to the rules and definition laid down by EC (regional aid and SME aid).

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

ERP Fund (ERP-Fonds), ERP Fund Act (ERP-Fonds-Gesetz 1962), state aid scheme "ERP-Tourismusprogramm" 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Soft loan.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries may be companies in the tourism sector; mechanism of granting the subsidies: application via an intermediary bank; decision on the provision of aid by an independent commission (depending on the quality of the project related to the criteria given in the guidelines on ERP-Tourismusprogramm); payment after cost-approval - generally in two parts. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Average loan per unit: € 1.586.316 Average GGE (gross grant equivalent) per unit: € 11.215

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

State Aid Scheme, current version from July 2014 till December 2020 9. Statistical data permitting an assessment of the trade effects of the

subsidy Not available.

Page 53: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 53 -

45 ERP TRANSPORT PROGRAMME

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

ERP Transport Programme (ERP-Verkehrsprogramm) (registered SA.33669).

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014

3. Policy objective and/or purpose of the subsidy

Support of measures for enhancement of multimodal transport, relocation to train and shipping of goods traffic and of positive environmental developments. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

ERP Fund (ERP-Fonds), ERP Fund Act (ERP-Fonds-Gesetz 1962), state aid scheme "ERP-Verkehrsprogramm" 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Soft loan.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries may be companies of the transport sector as well as carriers (forwarding company),

mechanism of granting the subsidies: application via an intermediary bank; decision on the provision of aid by an independent commission (depending on the quality of the project related to the criteria given in the guidelines on ERP-Verkehrsprogramm); payment after cost-approval - generally in two parts. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation:

Average loan per unit: € 1.109.571

Average GGE (gross grant equivalent) per unit: € 27.189 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement State Aid Scheme, current version January 2009 till December 2016. 9. Statistical data permitting an assessment of the trade effects of the

subsidy

Not available. 46 EUROPEAN RECOVERY PROGRAMME (ERP) AGRICULTURE PROGRAMME

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy

ERP Agriculture Programme (ERP-Landwirtschaftsprogramm) (registered X207/2009).

Page 54: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 54 -

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014

3. Policy objective and/or purpose of the subsidy Soft loans to small or medium enterprises for investment in processing of agricultural products to stimulate growth, innovation and creation of new jobs. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

ERP Fund (ERP-Fonds), ERP Fund Act (ERP-Fonds-Gesetz) 1962, state aid scheme "ERP-Landwirtschaftsprogramm" 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Soft loan. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries may be manufacturing and industrial companies as well as production-related service

companies and have to meet SME-definition, mechanism of granting the subsidies: application via an intermediary bank; decision on the provision of aid by an independent commission (depending on the quality of the project related to the criteria given in the guidelines on

ERP-Landwirtschaftsprogramm); payment after cost-approval - generally in two parts. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Average loan per unit: € 1.202.091 Average GGE (gross grant equivalent) per unit: € 22.721

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

State Aid Scheme, current version from January 2009 till December 2014

9. Statistical data permitting an assessment of the trade effects of the subsidy

Not available. 47 GRANTING OF GUARANTEES BY AUSTRIA ECONOMY SERVICE (WIRTSCHAFTSSERVICE AWS) ACCORDING TO THE SME PROMOTION ACT

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Granting of Guarantees by the Austrian Economy Service according SME Promotion Act (Garantieübernahmen der aws gemäß KMU-Förderungsgesetz) (registered SA. 39569) and preceding scheme (registered SA.34190)

Page 55: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 55 -

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014

3. Policy objective and/or purpose of the subsidy Promotion of Young Entrepreneurs and SME. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Federal Law on SME-Promotion.

Guidelines by Federal Ministry of Science, Research and Economy. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Guarantee. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries are small and medium sized companies/SME (EU-definition) of all sectors, excluding

tourism Mechanism of granting: individual application via an intermediary bank; Fluctuating amount per unit: guarantee for loans, connected to eligible projects.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation:

Average amount of guarantee per unit: € 181.352 Average GGE (gross grant equivalent) per unit: € 21.875 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement State Aid Scheme, current version from July 2014 till December 2016. 9. Statistical data permitting an assessment of the trade effects of the subsidy

Not available.

48 GUIDELINE FOR GRANTING NON-REPAYABLE GRANTS BY AUSTRIA ECONOMY SERVICE (AWS) ACCORDING TO THE SME PROMOTION ACT

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Guideline for Granting Non-Repayable Grant by Austria Economy Service (AWS) according to the SME Promotion Act (Zuschussrichtlinie der aws gemäß KMU-Förderungsgesetz), (registered SA. 39568) and preceding scheme (registered SA.34189) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified

2013; 2014

Page 56: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 56 -

3. Policy objective and/or purpose of the subsidy Promotion of Young Entrepreneurs and SME. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Federal Law on SME-Promotion. Guidelines by Federal Ministry of Science, Research and Economy. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries are small and medium sized companies/SME (EU-definition) of all sectors, excluding

tourism Mechanism of granting: individual application via an intermediary bank; Fluctuating amount per unit: subsidy is granted as a percentage of eligible project costs 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation Average amount of grant per unit: € 19.440

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

State Aid Scheme, current version from July 2014 till December 2016 9. Statistical data permitting an assessment of the trade effects of the subsidy Not available.

49 GUIDELINE OF THE FEDERAL MINISTRY OF FINANCE FOR THE GRANTING OF GUARANTEES BY AUSTRIA ECONOMY SERVICE (AWS) PURSUANT TO PAR. 1 AND 11 OF THE GUARANTEE ACT AND PRECEDING SCHEME

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy Guideline of the Federal Ministry of Finance for the Granting of Guarantees by AWS pursuant to

Par. 1 and 11 of the Guarantee Act and preceding Scheme. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 3. Policy objective and/or purpose of the subsidy Support to project financing by taking over part of the financial risk (Regional, SME, R&D&I as well as environmental aid)

Page 57: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 57 -

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Federal Law on Guarantees, Guidelines by Federal Ministry of Finance. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Guarantee. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries may be all kind of companies

Mechanism of granting: Individual application via an intermediary bank Fluctuating amount per unit: Guarantee for loans, determined by financing needs, project assessment and eligible project costs 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Average amount of guarantee per unit: € 2.056.454 Average GGE (gross grant equivalent) per unit: € 102.308

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

State Aid Scheme, current version from July 2014 till December 2016. 9. Statistical data permitting an assessment of the trade effects of the subsidy

Not available. 50 AUSTRIA ECONOMY SERVICE (AWS) GUIDELINE FOR AID OUT OF MEANS OF THE NATIONAL TRUST FOR RESEARCH, TECHNOLOGY AND DEVELOPMENT

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

aws Guideline for Aid out of Means of the National Trust for Research, Technology and Development, registered SA.39567

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 3. Policy objective and/or purpose of the subsidy Support to R&D and innovation projects

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Federal Law establishing an R&D foundation Guidelines for project financing by Austria Economy Service (Austria Wirtschaftsservice, AWS)

Page 58: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 58 -

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined) Beneficiaries are enterprises, qualifying for specific R&D and innovation programmes. Mechanism of granting: Individual applications. Fluctuating amount per unit: Depending on eligible costs; aid intensity based on project assessment and EU state aid rules for R&D and/or investment projects.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Average amount of grant per unit: € 81.333

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Aid scheme: January 2014 till December 2020 9. Statistical data permitting an assessment of the trade effects of the subsidy

Not available.

51 AUSTRIA ECONOMY SERVICE (AWS) FOUNDING FUND

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

aws Founding Fund, participation investment - registered SA.35891 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 3. Policy objective and/or purpose of the subsidy

Provision of risk capital to SME from their early development up to growth stages. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Based on EC guidelines for risk finance; funds managed by Austria Economy Service (Austria Wirtschaftsservice, AWS). 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Risk capital. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries are small and medium enterprises. Fluctuating amount per unit: Individual applications, due diligence assessment.

Page 59: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 59 -

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Average amount of risk capital (public share) per unit: € 824.443

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Aid scheme: July 2013 till 2018

9. Statistical data permitting an assessment of the trade effects of the subsidy

Not available. 52 GUIDELINE FOR THE PROMOTION OF THE FOUNDING AND STRUCTURING OF YOUNG INNOVATIVE TECHNOLOGY-ORIENTED ENTERPRISES

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy Guideline for the Promotion of the Founding and Structuring of young innovative technology-oriented Enterprises, registered SA.38872 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified

2013; 2014 3. Policy objective and/or purpose of the subsidy

Support to rapidly growing innovative start-ups and high-tech companies (gazelles). 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Federal Law on Research & Technology Guidelines by Federal Ministry of Science, Research and Economy

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined) Beneficiaries are start-ups or young high-tech companies Mechanism of granting: Individual application from company or founders Fluctuating amount per unit: Aid decision upon recommendation of an independent international commission (project evaluation and financial needs); payment according to committed milestones.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Average subsidy per unit: € 606.945

Page 60: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 60 -

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

Aid scheme since 2007 till 31 December 2014 9. Statistical data permitting an assessment of the trade effects of the subsidy

Not available. 53 GUIDELINE FOR THE PROMOTION OF THE ECONOMIC-TECHNICAL RESEARCH AND TECHNOLOGY DEVELOPMENT, PART PRO TRANS AND PRECEDING SCHEME

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy

Guideline for the Promotion of the Economic-Technical Research and Technology Development, Part Pro TRANS (registered SA.38926) and preceding scheme (registered No. 486/2007). 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified: 2013; 2014 3. Policy objective and/or purpose of the subsidy Promotion of product identification strategies and Technology Transfer.

- Strengthening innovative capacities of small and medium enterprises through technology

transfer.

- Optimising of product identification strategies of SME.

- Stimulation of R&D and cooperation and better use of external sources.

ProTRANS supports technology R&D- and transfer projects of individual SMEs targeted on the efficient use of outside resources (universities, non-university research institutions, polytechnic colleges). 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Federal Law on Research & Technology. Guidelines by Federal Ministry of Science, Research and Economy.

Measures are covered by EC state aid rules for R&D&I. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grants. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries are SME's. Mechanism of granting: Individual applications or calls Fluctuating amount per unit: Aid decisions cover either the phase of concept definition or the implementation phase with different aid intensities and eligible costs.

Page 61: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 61 -

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Average subsidy per unit: € 91.638

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Aid scheme: January 2008 to December 2014.

9. Statistical data permitting an assessment of the trade effects of the subsidy

Not available. 54 FILM LOCATION AUSTRIA

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Film location Austria - registered SA.37679 (2013/N) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014

3. Policy objective and/or purpose of the subsidy Promotion of cinematographic production referring to Austrian and European cultural contents and maintenance of cultural heritage.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Guidelines by Federal Ministry of Science, Research and Economy, notified in line with EC state aid rules (Cinema Communication).

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries are film producers. Eligible projects have to fulfil the quantitative and qualitative criteria, i.e. specific cultural content. Mechanism of granting: Individual applications are checked by authorised institutions. Fluctuating amount per unit: Subject of support are production costs, the grant is limited by 25% of eligible costs.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Average amount of grant per unit: € 263.048

Page 62: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 62 -

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

Aid scheme since 2010, prolonged till 31 December 2014. 9. Statistical data permitting an assessment of the trade effects of the subsidy

Not available. 55 FRONTRUNNER-INITIATIVE AND PRECEDING SCHEME

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Frontrunner-Initiative (registered SA.39716) and preceding scheme, (registered SA.36899) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 3. Policy objective and/or purpose of the subsidy Support to innovation projects of lead enterprises.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Guidelines by Federal Ministry for Transport, Innovation and Technology. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Beneficiaries are enterprises, qualifying by leadership in specific fields of technology or innovation. Mechanism of granting: Individual applications checked by authorised institutions. Fluctuating amount per unit: Depending on eligible costs; aid intensity based on project assessment and EU state aid rules for investment and/or R&D projects.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Average amount of grant per unit: € 494.138 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Aid scheme since 2013, prolonged till 31 December 2014. 9. Statistical data permitting an assessment of the trade effects of the subsidy

Not available.

Page 63: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 63 -

56 STANDARD GUARANTEES FOR INVESTMENT LOANS AND CONSOLIDATION MEASURES WITHIN THE GUARANTEE GUIDELINES OF THE UPPER AUSTRIAN CREDIT GUARANTEEING COMPANY LTD

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

a. Standard Guarantees for Investment Loans within the Guarantee Guidelines of the Upper Austrian Credit Guaranteeing Company Ltd (UA CGC) – SA.30020 (X945/2009)

b. Consolidation Measures within the Guarantee Guidelines of the Upper Austrian Credit Guaranteeing Company Ltd (UA CGC) – SA.35527 (2012/N) and SA.38317 (2014/N) respectively

2. Period covered by the notification

The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified. 2013 and 2014 3. Policy objective and/or purpose of the subsidy

a. support of Upper Austrian SME's by issuing guarantees to obtain a loan for investments

b. support of Upper Austrian SE's by issuing guarantees to obtain a loan for consolidation purposes.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

a. and b.: Upper Austrian Credit Guaranteeing Company Ltd, Adresse: 4020 Linz, Bethlehemstrasse 3 (Oberösterreichische Kreditgarantiegesellschaft m.b.H). 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.). a) and b): issue of guarantees for Upper Austrian companies

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

a. small and medium enterprises (all economic sectors) in Upper Austria, by issuing a

guarantee for a loan, amount per unit ranging from € 25.000 to € 1.000.000, dependent

on the amount to be invested

b. small enterprises (all economic sectors except steel production industry) in Upper Austria, by issuing a guarantee for a loan, amount per unit ranging from € 25.000 to € 250.000, dependent on the amount needed for consolidation

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation

a. guarantees for loans from € 25.000 to max. € 1.000.000 per enterprise

b. guarantees for loans from € 25.000 to max. € 250.000 per enterprise

Page 64: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 64 -

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

a. max. 15 years

b. max. 7 years

9. Statistical data permitting an assessment of the trade effects of the subsidy

Our data refer exclusively to companies in the category trading. 2014: guarantees for 13 enterprises, guaranteed loans € 1.170.000, 20 new jobs created by investment, 24 jobs ensured.

2013: guarantees for 9 enterprises, guaranteed loans € 464.306, 16 new jobs created by

investment, 72 jobs ensured.

2012: guarantees for 13 enterprises, guaranteed loans € 957.800, 18 new jobs created by investment, 62 jobs ensured.

(b) for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

No data available. 57 PROMOTION OF ELECTRICITY FROM RENEWABLE SOURCES AND OF COMBINED HEAT AND POWER PLANTS

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Promotion of electricity from renewable sources and of combined heat and power plants. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

The period covered by the notification includes 2013 and 2014. 3. Policy objective and/or purpose of the subsidy The scope of these subsidies is to increase the share of electricity from renewable sources and to increase the efficiency in the production of power and heat by promoting combined heat and power

plants. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) The promotion of electricity from renewable sources and combined heat and power plants is operated by the Green Electricity Clearing and Settlement Agency (OeMAG Abwicklungsstelle für

Ökostrom AG). The competent public authority in this case is the Federal Ministry of Science, Research and Economy. The legal basis for the promotion of electricity from renewable sources is the Green Electricity Act 2012 (Ökostromgesetz 2012) and for the combined heat and power plants the Cogeneration Act (KWK-Gesetz).

The feed-in tariffs are determined through a regulation (ÖSET-VO 2012) of the Minister of Science,

Research and Economy for the purchase of electricity from renewable energy plants on the basis of contracts to whose conclusion the Clearing and Settlement Agency is obligated.

Page 65: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 65 -

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Green electricity is supported through a feed-in tariff or investment grants for hydro plants. The combined heat and power plants are also subsidised by investment grants. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation

According to 6 and 7: The natural or legal persons entitled to the tariff or the investment grants are the operators of the energy plants.

Feed-in tariff: In principle, the feed-in tariff scheme applies to all renewable energy technologies. However, the plant must be officially notified as a "green electricity plant". Plants generating electricity from wind, solid and liquid biomass, biogas or geothermal energy are eligible regardless of their capacities. PV installations shall exceed 5 kWp, hydro-power plants are

eligible up to a capacity of 2 MW. The amount of tariff is determined for each source of energy by the Minister of Science, Research

and Economy. The tariffs are fixed each or each two years and are granted for a fixed period to the operators of the power plants that apply for the aid in the respective year. But there is also a quota for the yearly growth of plants (cost limit). If this quota is fulfilled the plants have to wait

until they fit in a new yearly quota.

WIND ENERGY 2013: €CT 9.45 PER KWH 2014: €CT 9.36 PER KWH

Solar energy 2013: €ct 18.12 per kWh only for PV installations on buildings with capacities over 5 kWp, up to 500 kWp 2013: €ct 16.59 per kWh Other PV installations with capacities over 5 kWp, up to 500 kWp 2014: €ct 12.50 per kWh only for PV installations on buildings with capacities over 5 kWp, up to 350 kWp 2014: €ct 10.00 per kWh Other PV installations with capacities over 5 kWp, up to 350 kWp

Geothermal energy

2013: €ct 7.43 per kWh 2014: €ct 7.36 per kWh

Biogas Biogas plants: 2013: €ct 12.93 – 19.5 per kWh, depending on the maximum capacity 2014: €ct 12.80 – 19.31 per kWh, depending on the maximum capacity Deduction of 25% for biogas from non-agricultural substratum. Sewage gas plants: 2013: €ct 5.94 per kWh 2014: €ct 5.88 per kWh Landfill gas plants: 2013: €ct 4.95 per kWh 2014: €ct 4.90 per kWh

Page 66: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 66 -

Hydro-power New or revitalised hydro-power plants which have increased their efficiency by at least 50% 2013: €ct 4.97 – 10.55 per kWh, depending on the amount of electricity fed into the grid. 2014: €ct 4.92 – 10.44 per kWh, depending on the amount of electricity fed into the grid. Revitalised hydro-power plants which have increased their efficiency by at least 15%: 2013: €ct 3.23 – 8.26 per kWh, depending on the amount of electricity fed into the grid. 2014: €ct 3.20 – 8.18 per kWh, depending on the amount of electricity fed into the grid.

Biomass Solid biomass: 2013: €ct 10.94 – 19.90 per kWh According to maximum capacity 2014: €ct 10.83 – 19.70 per kWh According to maximum capacity Liquid biomass:

2013: €ct 5.74 per kWh 2014: €ct 5.68 per kWh

Investment grant:

The construction or revitalisation of small and medium-sized hydro-power plants can be supported through investment grants. Revitalisation projects are eligible if the investment leads to an increase of the standard capacity by at least 15 %. For plants with a maximum capacity of 500 kW, the amount of the investment subsidy shall

not exceed 30% of the investment volume immediately needed for the construction or revitalisation of the plant, with a maximum of € 1,500 per kW.

For plants with a maximum capacity of 2 MW, the amount of the investment subsidy shall not exceed 20% of the investment volume, with a maximum of € 1,000 per kW.

For plants with a maximum capacity of 10 MW, the amount of the investment subsidy shall not exceed 10% of the investment volume, with a maximum of € 400 per kW.

For plants with a maximum capacity from 500kW to 2 MW and from 2 MW and 10 MW, the

amount of the investment volume is calculated via linear interpolation

For plants with a maximum capacity from 10 MW to 20 MW, the amount of the investment subsidy shall not exceed 10% of the investment volume, with a maximum of € 400 per kW

The total of all subsidies must not exceed the maximum grant (percentage of the environment-related higher cost), according to the European Guidelines on State aid for environmental protection and energy 2014-2020

The construction or revitalisation of combined heat and power plants can also be supported

through investment grants. In the requested period the amount of the investment subsidy shall not exceed 10% of the investment volume immediately needed for the construction or revitalisation of the plant For plants with a minimum capacity of 2 MW and maximum capacity of 100 MW, with a

maximum of € 100 per kW.

For plants with a capacity of more than 100 MW, with a maximum of € 60 per kW.

For plants with a capacity of more than 400 MW, with a maximum of € 40 per kW.

The total of all subsidies must not exceed the maximum grant (percentage of the environment-related higher cost), according to the European Guidelines on State aid for

environmental protection and energy 2014-2020

Page 67: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 67 -

The support programme for the construction or revitalisation of combined heat and power plants expired with 30 September 2012 and was relaunched in February 2015. No applications were possible in 2013 and 2014. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

Feed-in tariff: A given operator of a plant fuelled by solid or liquid biomass or biogas is entitled to the purchase of all electricity he exports to the grid and to the payment of the tariff applicable on the date on which the contract is concluded, for 15 years starting on the date on which the green power is

being sold to OeMAG. A given operator of any other renewable energy plant is entitled to the purchase of electricity exported and to the payment of the tariff applicable on the date on which

the contract is concluded, for 13 years starting on the date on which the green power is being sold to OeMAG. Investment grant:

The investment grant shall be paid as soon as the plant has been commissioned at its full capacity and the final report has been submitted and examined. 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized

product(s) or sector(s):

a. for the three most recent years for which statistics are available;

Green electricity total support paymentsaverage feed-in tariff

€ Ct/kWh

small hydro plants 1 095 400 431 kWh 57 326 983,76 5,23

other green power plants 5 056 352 722 kWh 599 646 743,64 11,86

wind 2 386 002 660 kWh 189 767 920,74 7,95

solid biomass 1 982 961 370 kWh 275 643 414,20 13,90

biogas 554 329 823 kWh 95 444 666,43 17,22

liquid biomass 343 112 kWh 42 544,55 12,40

photovoltaics 101 303 990 kWh 36 812 475,39 36,34

sewage and landfill gas 30 734 427 kWh 1 902 876,71 6,19

geothermal 677 340 kWh 32 845,61 4,85

total 6 151 753 153 kWh 656 973 727,40 10,68

Supported electricity from renewable sources

2012

Page 68: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 68 -

Green electricity total support paymentsaverage feed-in tariff

€ Ct/kWh

small hydro plants 1 371 315 206 kWh 66 639 273,88 4,86

other green power plants 5 769 167 730 kWh 680 438 631,10 11,79

wind 2 970 038 701 kWh 247 635 351,35 8,34

solid biomass 2 013 029 449 kWh 272 839 139,50 13,55

biogas 544 326 060 kWh 96 811 128,40 17,79

liquid biomass 190 132 kWh 22 488,64 11,83

photovoltaics 215 241 718 kWh 61 707 967,90 28,67

sewage and landfill gas 26 035 883 kWh 1 410 792,73 5,42

geothermal 305 787 kWh 11 762,59 3,85

total 7 140 482 936 kWh 747 077 904,98 10,46

Supported electricity from renewable sources

2013

Green electricity total support paymentsaverage feed-in tariff

€ Ct/kWh

small hydro plants 1 703 078 800 kWh 81 374 354,48 4,78

other green power plants 6 495 953 381 kWh 764 601 263,51 11,77

wind 3 639 874 813 kWh 315 498 310,57 8,67

solid biomass 1 941 155 722 kWh 259 695 317,62 13,38

biogas 542 689 110 kWh 95 134 748,62 17,53

liquid biomass 93 958 kWh 12 413,09 13,21

photovoltaics 351 367 580 kWh 93 313 834,25 26,56

sewage and landfill gas 20 387 741 kWh 933 278,40 4,58

geothermal 384 457 kWh 13 360,96 3,48

total 8 199 032 181 kWh 845 975 617,99 10,32

2014

Supported electricity from renewable sources

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

58 SHARED RESEARCH FACILITIES

1. Title of the subsidy programme, if relevant, or identification of the subsidy

Shared Research Facilities. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2014

Page 69: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 69 -

3. Policy objective and/or purpose of the subsidy Establishing internationally visible and competitive research infrastructure centers with pioneering thematic research focuses for joint utilisation at various locations in Vienna, developing innovative concepts and models for services and utilisation.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Authority: Municipal council of Vienna.

National legislation: Guideline "Shared Research Facilities" valid from 1 December 2014 until 31 December 2015 based on enactment of the municipal council of Vienna.

EU legislation:

Commission Regulation (EU) 651/2014 of 17 June 2014 – General Block Exemption Regulation (GBER). 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies to consortiums, consisting of at least two partners (companies and institutions like universities) investing in shared research facility centers in Vienna.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

[mil Euro] / [quantity] 2014

Grantings 0

Number of cases 0

Payments 0

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 1 December 2014 until 31 December 2015

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

59 LOCATION OF SITES INITIATIVES 2013

1. Title of the subsidy programme, if relevant, or identification of the subsidy

Location of Sites Initiative 2013 (Standortinitiative 2013).

Page 70: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 70 -

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014

3. Policy objective and/or purpose of the subsidy Setting incentives for Viennese SMEs (GBER-Regulation) and large enterprises (De-minimis-Regulation) to invest in the erection respectively in the extension of operation buildings in Vienna. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Authority: Municipal council of Vienna.

National legislation: Guideline "Standortinitiative 2013" valid from 1 July 2013 until 30 June 2014 – prolonged until 31 December 2014, based on enactment of the municipal council of Vienna.

EU legislation:

a. Commission Regulation (EC) 800/2008 of 6 August 2008 – General Block Exemption regulation (GBER).

b. Commission Regulation (EC) 1998/2006 of 15 December 2006 – De-minimis.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies to Viennese SMEs and large enterprises – mainly producers

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

[mil Euro] / [quantity] 2013 2014

Grantings 1.411 1.568 *

Number of cases 4 8

Payments 0 0.162

* including mil € 0.2 De-minimis

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

1 July 2013 until 31 December 2014 (payments are still pending). 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the

extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available;

Page 71: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 71 -

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

60 VIENNA ECONOMIC STRUCTURE IMPROVEMENT PROGRAMME 1998

1. Title of the subsidy programme, if relevant, or identification of the subsidy

Vienna Economic Structure Improvement Programme 1998 (Wiener Strukturverbesserungsaktion 1998) 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014 3. Policy objective and/or purpose of the subsidy Setting incentives for Viennese SME's to invest in the extension respectively in the erection of operation buildings in Vienna.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Authority: Municipal council of Vienna.

National legislation: Guideline "Wiener Strukturverbesserungsaktion" valid from 1 July 1998 until 31 December 2002 – prolonged until 31 December 2004, based on enactment of the municipal

council of Vienna.

EU legislation: "Notification in 1997". 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies to Viennese SMEs – mainly producers.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

[mil Euro] / [quantity] 2010 2011 2012 2013 2014

Grantings 0 0 0 0 0

Number of cases 0 0 0 0 0

Payments 0.377 0 0 0 0

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Application period:

1 January 1998 until 31 December 2004 (payments are still pending).

Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include

Page 72: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 72 -

statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change

in the subsidy.

61 VIENNA ECONOMIC STRUCTURE IMPROVEMENT PROGRAMME 2005

1. Title of the subsidy programme, if relevant, or identification of the subsidy Vienna Economic Structure Improvement Programme 2005 (Wiener Strukturverbesserungsaktion

2005)

2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014

3. Policy objective and/or purpose of the subsidy Setting incentives for Viennese SMEs to invest in the extension respectively in the erection of operation buildings in Vienna. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Authority: Municipal council of Vienna.

National legislation: Guideline "Wiener Strukturverbesserungsaktion" valid from 1 January 2005 until 31 December 2008 based on enactment of the municipal council of Vienna.

EU legislation: "SME block exemption regulation" No. 70/2001".

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies to Viennese SMEs – mainly producers. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

[mil Euro] / [quantity] 2010 2011 2012 2013 2014

Grantings 0 0 0 0 0

Number of cases 0 0 0 0 0

Payments 4.175 0.403 0.119 0. 434 0. 116

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

Application period:

Page 73: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 73 -

1 January 2005 until 31 December 2007 (period of validity – ceased ahead of schedule; payments are still pending). 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information

include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change

in the subsidy.

62 ZIT 08 PLUS

1. Title of the subsidy programme, if relevant, or identification of the subsidy ZIT 08 plus. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified 2013 and 2014 3. Policy objective and/or purpose of the subsidy

Subsidies for research and research and development projects. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Authority: Municipal council of Vienna.

National legislation: Guideline "ZIT 08 plus Technology and Innovation Promotion for Vienna 2008-2011 (ZIT 08 plus Technologie- und Innovationsförderungen für Wien 2008–2011), valid from 1 January 2008 until 31 December 2011 – prolonged until 31 December 2012, based on enactment of the municipal council of Vienna based on enactment of the municipal council of Vienna.

EU legislation:

a. Community Framework for State Aid for Research and Development and Innovation (2006/C323/01).

b. De-minimis.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies to research and research development oriented companies.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

Page 74: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 74 -

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

[mil Euro] / [quantity] 2010 2011 2012 2013 2014

Grantings 8.473* 10.679** 11.152***

Number of cases 89 85 95

Payments 5.180 7.704 8.571 6.706 3.717

* including mil € 0.230 De-minimis ** including mil € 0.380 De-minimis *** including mil € 0.851 De-minimis

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

1 January 2008 until 31 December 2012 (payments are still pending) 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the

extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change

in the subsidy.

63 GUIDELINE "ZIT05 PLUS - AID FOR TECHNOLOGY FOR VIENNA 2005–2008",

SUBPROGRAMME A: "BEFOR"

1. Title of the subsidy programme, if relevant, or identification of the subsidy Guideline "ZIT05 plus - Aid for Technology for Vienna 2005–2008", Subprogramme A: "Befor".

2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014

3. Policy objective and/or purpose of the subsidy Subsidies for research and research and development projects.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Authority: Municipal council of Vienna. 5. National legislation: Guideline "ZIT05 plus - Aid for Technology for Vienna 2005–2008" (ZIT05 plus. Technologieförderungen für Wien 2005-2008) based on enactment of the municipal council of Vienna.

EU legislation: Community Framework for State Aid for Research and Development and Innovation (2006/C323/01). 6. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grants.

Page 75: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 75 -

7. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies to research and research development oriented companies.

8. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

[mil Euro] / [quantity] 2010 2011 2012 2013 2014

Grantings 0 0 0 0 0

Number of cases 0 0 0 0 0

Payments 0.766 0.878 0.47 0 0

9. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

Application period: 2005 until 31 December 2007 (no more payments are pending).

10. Statistical data permitting an assessment of the trade effects of the subsidy n/a. 64 GUIDELINE "ZIT05 PLUS - AID FOR TECHNOLOGY FOR VIENNA 2005 – 2008", SUBPROGRAMME G: "START UP VIENNA"

1. Title of the subsidy programme, if relevant, or identification of the subsidy Guideline "ZIT05 plus - Aid for Technology for Vienna 2005 – 2008", Subprogramme G: "Start Up Vienna". 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified 2013 and 2014 3. Policy objective and/or purpose of the subsidy

Subsidies for corporate research projects in Start-up companies.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Authority: Municipal council of Vienna.

5. National legislation: Guideline "ZIT05 plus - Aid for Technology for Vienna 2005 – 2008" (ZIT05 plus. Technologieförderungen für Wien 2005-2008) based on enactment of the municipal council of Vienna. EU legislation: SME Block exemption 70/2001 modified by Regulation 364/2004 of 25 February 2004 6. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grants.

Page 76: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 76 -

7. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies to High-Tech-Start-up-companies.

8. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

[mil Euro] / [quantity] 2010 2011 2012 2011 2012

Grantings 0 0 0 0 0

Number of cases 0 0 0 0 0

Payments 0.49 0.47 0 0 0

9. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

Application period: 2005 until 31 December 2008 (no more payments are pending).

Statistical data permitting an assessment of the trade effects of the subsidy. n/a 65 VIENNA GUIDELINE "ZIT05 PLUS - AID TO TECHNOLOGY FOR VIENNA 2005 - 2008", SUBPROGRAMME B: "VIENNA SPOTS OF EXCELLENCE" (VSOE)

1. Title of the subsidy programme, if relevant, or identification of the subsidy

Vienna Guideline "ZIT05 plus - Aid to technology for Vienna 2005 – 2008", Subprogramme B: "Vienna Spots of Excellence" (VSOE). 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014. 3. Policy objective and/or purpose of the subsidy Subsidies for enterprises and research institutions concerning excellent cooperation projects based

on basic research and industrial research.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Authority: Municipal council of Vienna.

National legislation: Guideline "ZIT05 plus - Aid to technology for Vienna 2005 – 2008 (ZIT05 plus.

Technologieförderungen für Wien 2005-2008) based on enactment of the municipal council of Vienna.

EU legislation: Community Framework for State Aid for Research and Development and Innovation (2006/C323/01). 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grants.

Page 77: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 77 -

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies to High-Tech- companies and research institutions.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

[mil Euro] / [quantity] 2010 2011 2012 2013 2014

Grantings 0 0 0 0 0

Number of cases 0 0 0 0 0

Payments 3.198 1.265 0.738 1.124 0

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

Application period: 2005 until 31 December 2007 (payments are still pending).

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

66 INDIVIDUAL AID PURSUANT TO ARTICLE 42 OF THE GENERAL BLOCK EXEMPTION REGULATION

1. A subsidy was granted to "Wien Work Integrative Betriebe und Ausbildungs gmbH" for the

partial financing of the construction of a production building and contribution to basic- and building-costs for rental space in Vienna's urban lakeside "Aspern". Pursuant to Art. 42 General Block Exemption Regulation (No. 800/2008) an exemption notice was sent to the European Commission [SA.36382 (2013/1O)]

2. Period 2013 and 2014. 3. The purpose of the subsidy was to enable the merger of various locations at the new location in the urban development area "Aspern". 4. The subsidy was approved by the decision of the Vienna City Council from 1 of March 2013 (r.Z. 00448-2013/0001-GFW).

5. Subsidy (cash allowance) 6. "Wien Work Integrative Betriebe und AusbildungsgmbH"; the subsidy was granted in the amount of max. EUR 5.000.000.00 against accounting in relation to the total projected costs of EUR 8.830.000,00.

7. From this subsidy EUR 358.720,00 were paid in 2013 and EUR 2.600.389,08 in 2014. 8. From 2013 to (expected) 2016 (depending on the progress of construction).

Page 78: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 78 -

9. None (through the merger of the locations no impacts on trade etc. are expected). 67 SPECIAL GUIDELINES INNOVATION PROMOTION PROGRAMME COMBINED ROAD TRANSPORT

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Special Guidelines Innovation Promotion Programme Combined Road Transport 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014 3. Policy objective and/or purpose of the subsidy Strengthening the increase and innovation of combined transport.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Federal Ministry of Transport, Innovation and Technology Notification by the European Commission under No. 415/2008 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grants.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Addresses transport and logistic enterprises settled in Austria Mechanism: open call for proposals with 3 evaluations yearly Fluctuating amounts determined by amount and kind of transported goods, innovation and economic criteria Mechanisms:

Open calls for proposal Evaluation of proposals by national experts

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation Amount of subsidy approved: 2013: € 1,968.000, 2014: € 2,750.000, Amount of subsidy paid:

2013: € 1,535.000, 2014: € 2,434.000, 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

Project period: 2 years

Page 79: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 79 -

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

The program stimulates the shift from road transport to rail.

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

68 ECO SPECIAL PROGRAMME DISTRICT HEATING

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Eco Special Programme District Heating First Notification on 2 March 1994; unlimited

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014 3. Policy objective and/or purpose of the subsidy

The aim of the subsidy is the compensation of fossil fuel, promotion the use of Woodchips, increase local added value, reduction of CO2-emission. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Decision of the government of Lower Austria from 3 July 1992; handled by: Office for Energy Economy (Geschäftsstelle für Energiewirtschaft) 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant, annual grant for a period of 10 years, and loan, but the loan has not been granted

since 2000; the latest annual grant was granted in 1997 (for a period of 10 years)

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The subsidy is provided to investors, who are installing a district heating plant. The subsidy is a

fixed amount, either one time or annual for 10 years. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Total annual amount 2013: € 0,00 Total annual amount 2014: € 0,00

Page 80: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 80 -

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

No time limits. 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

not available

b. for a previous representative year, which, where possible and meaningful, should be the

latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

The subsidy was introduced in 1992; there are no useable statistic data available for the years before 1992

69 PROGRAMME "DEVELOPMENT MEASURES OF THE LOWER AUSTRIAN BORDER REGION COMPANY LTD."

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Programme "Development Measures of the Lower Austrian Border Region Company Ltd."

EU Reg. Number X884/2009 2. Period covered by the notification 2013 and 2014

3. Policy objective and / or purpose of the subsidy The support is given essentially to projects in trade and industry in the border area of Lower Austria. It is a subsidy scheme aiming at regional development and addressed to assisted areas at NUTS 3 level. Aid is granted in the form of soft loans.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

NÖG company contract of 25 June 1975 between the Federal Government of Austria and the Regional Government of Lower Austria. The contract has an unlimited duration. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Essentially the subsidies are given in form of low interest loans. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The support is given essentially to projects in trade and industry in the border area of Lower Austria in form of low interest loans. It is a subsidy with regional orientation, region "Nommenclature des unites territoriales statistiques 3".

Page 81: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 81 -

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

The annual amount budgeted for the subsidy: is around € 2.2 mio. per year in form of low interest

loans. 2013: For 6 projects with total expenditures of € 10.089 mio. were given 6 low interest loans, together € 2.540 mio. (gross cash grant equivalent € 30,526) 2014: For 4 projects with total expenditures of € 4.948 mio. were given 4 low interest loans,

together € 1.411 mio. (gross cash grant equivalent € 13,545.60)

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

The company contract (see above) has an unlimited duration. The low interest loans, that are given for the investment projects, have a duration around eight

years, the first two years without repayment. 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

Such statistical data on trade effects of the NÖG subsidy is not available (NÖG subsidy is given

mostly to small and medium sized projects / companies; so there is (nearly) no effect on trade) 70 SUBSIDY PROGRAMME TO SUPPORT MEASURES OF THE OPERATIONAL PROGRAMME "STRENGTHENING COMPETITIVENESS OF SALZBURG REGION 2007 -2013" WITHIN THE FRAMEWORK OF REGIONAL COMPETITIVENESS AND EMPLOYMENT OBJECTIVE

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Subsidy programme to support measures of the Operational Programme "Strengthening

competitiveness of Salzburg region 2007 -2013" within the framework of regional competitiveness and employment objective. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified 2013 and 2014 3. Policy objective and/or purpose of the subsidy

The subsidy programme supports the measures/activities no. 1, 2, 4 and 6 within the priority axis 1 "Enhancement of innovation- and knowledge-based economy" of the above mentioned EU-Programme; the measure/activity no. 4 only in cooperation with the European Recovery Programme-funds. The subsidy programme supports also the measures/activities no. 1, 2 and 3

within the priority axis 2 "Innovation-oriented development of southern regions" of the above mentioned EU-Programme; the measure/activity no. 2 only in cooperation with the Austria Economy Service (Austria Wirtschaftsservice GmbH, AWS).

Page 82: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 82 -

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Regional government of Salzburg, notification no. XR3/2007, XS50/2007 and XT14/2007 till 31 December 2008. Since 1 January 2009 notification no. X31/2009. Since 1 January 2011 SA.32257(2011/X).

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the later, how determined)

The subsidy programme supports the measures/activities no. 1, 2, 4 and 6 within the priority axis 1 "Enhancement of innovation- and knowledge-based economy" of the above mentioned EU-Programme; the measure/activity no. 4 only in cooperation with the ERP-funds. The subsidy programme supports also the measures/activities no. 1,2 and 3 within the priority axis 2

"Innovation-oriented development of southern regions" of the above mentioned EU-Programme; the measure/activity no. 2 only in cooperation with the Austria Economy Service (Austria Wirtschaftsservice GmbH, AWS). Most of the grants are provided as fixed %-amounts of the eligible costs as mentioned in the Regional Competitiveness Guideline (RWF-Richtlinie). The fluctuating grant per unit in the case of enterprise-investments is measured after the contribution to reach the goals of the above mentioned EU-Programme.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation Average subsidy per unit in 2013: € 52.356,-

Average subsidy per unit in 2014: € 104.642,- 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 1 January 2007 until 31 December 2014

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

- b. for a previous representative year, which, where possible and meaningful, should be the

latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

-

71 GUIDELINE FOR ENVIRONMENTAL AID IN THE REGION OF SALZBURG

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Guideline for Environmental Aid in the Region of Salzburg.

Page 83: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 83 -

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 11 January 2011 to 31 December 2013

3. Policy objective and/or purpose of the subsidy The subsidy program aims the reduction of CO2-emissions and energy efficiency. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Regional government of Salzburg, registration 2011/004092, since 11 January 2011 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Private households and companies; depending on the amount of reduced CO2-emissions; partly de minimis.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation.

5-50 euro/t reduced CO2; maximum 25.000 euro / unit 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 11 January 2011 to 31 December 2013

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

72 LOWER AUSTRIAN SOCIETY FOR THE FUNDING AND SUPPORT OF SHOPPING IN TOWN AND CITY CENTERS

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy Lower Austrian Society for the funding and support of shopping in town and city centers (abbreviated: NAFES)

Page 84: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 84 -

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014

3. Policy objective and/or purpose of the subsidy - Support of measures that are appropriate to sustainably increase the local and town centers as locations of retail and service businesses. - Maintenance of local supply of daily goods through community investments.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Background: NAFES-funding guideline Authority: Office of the Lower Austrian Government in cooperation with the Lower Austrian Chamber of Commerce (Lower Austrian Society for the funding and support of shopping in town and city centres)

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined) To founder companies according to the NAFES-guidelines / a one-off grant

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Maximum € 200.000,- per project possible (maximum annual amount budgeted: € 1,2 Mio., but not only for this subsidy topic) - on average 1 project of this type per year is supported. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Duration: 19 October 2010 till 30 June 2013 and subsequently from 1 July 2013 till 31 December 2017

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the

extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available; -

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy. -

73 TAX INCENTIVES FOR MID-SIZED BUSINESS FINANCING COMPANIES

1. Title of the subsidy programme, if relevant, or identification of the subsidy State Aid No. 621/2007 – Austria "Tax Incentives for Mid-Sized Business Financing Companies"

Page 85: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 85 -

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013-2014

3. Policy objective and/or purpose of the subsidy The objective of the measure is to facilitate the provision of risk capital to small and medium-sized enterprises (SMEs) in their early and expansion stages in Austria by providing tax advantages to special purpose investment vehicles (Mittelstandsfinanzierungsgesellschaften (hereinafter "MiFiGs") and the investors in the MiFiGs.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) The legal basis of the scheme is the Small and the Medium Enterprise Finance Act 2007 (Mittelstandsfinanzierungsgesellschaften-Gesetz 2007), Law on Corporation Tax 1988 (Körperschaftsteuergesetz 1988) and Income Tax Act 1988 (Einkommensteuergesetz 1988).

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) The MiFiGs are eligible for a preferential tax treatment in relation to eligible investments (Finanzierungsbereich) under the scheme. The earnings derived from bank deposits and bonds (Veranlagungsbereich) are not eligible for the tax relief. The MiFiGs are entitled to the following tax relief, as concerns the eligible investments under the notified scheme:

Profits derived from the eligible investments under the measure in question are fully

exempted from the corporate income tax.

The MiFiGs are exempted from the capital duty and stamp duty which has to be paid when the MiFiGs purchase equity interests in the target SMEs.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The subsidy is provided only to special private equity fund vehicles (MiFiGs, see above), created for the sole purpose of carrying out eligible investments under this measure. The MiFiGs must carry out eligible investment activities for at least 7 years following the year of registration and are prevented from diversifying into other activities. The subsidy is provided by tax relief.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

The subsidy is sunset with the last business year beginning after 31 December 2012. Thus,

for 2013, we estimate a tax loss of below one million euros. Theoretically, for special private equity fund vehicles created after 31 December 2007, a later date is applicable. However, no fund created after 31 December 2012 was still subject to the subsidy regime in 2013. Therefore, the subsidy is effectively sunset with 2014. With current information, we estimate the tax loss for 2014 below half a million euros.

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

The relevant law was published in the Federal Law Gazette on 28 December 2007. The notification covers duration from the date of the Commission approval until the first business year beginning

after 31 December 2018 for MiFiGs established after 31 December 2007, and until the first business year beginning after 31 December 2012 for older MiFiGs. The Austrian authorities

confirmed that no new participations shall be acquired after 31 December 2012. The Austrian

Page 86: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 86 -

authorities have committed themselves to notify the extension of the measure after the expiry date. The MiFiGs and the investors will be entitled to receive the tax advantage under the measure in question until the first business year beginning after 31 December 2012 and 31 December 2018 respectively. 9. Statistical data permitting an assessment of the trade effects of the subsidy

Statistical data on trade effects is not available since due to the size and scope of the subsidy no trade effects are to be expected.

a. for the three most recent years for which statistics are available;

N.A.

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

N.A.

74 DIRECTIVE FOR GRANTING OF REGIONAL FUNDING FOR THE IMPROVING OF THE ECOLOGICAL STATUS OF SURFACE WATER IN THE PROVINCE OF CARINTHIA

1. Title of the subsidy programme, if relevant, or identification of the subsidy

Directive for granting of regional funding for the improving of the ecological status of surface water in the province of Carinthia. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

The described directive came on the 6th of July 2010 with the notification of the European commission (registration no X290/2010) into force. 3. Policy objective and/or purpose of the subsidy

The main objective of the present directive is the funding of measures to enhance the ecological status of surface water and the reduction of hydromorphological pressures in order to achieve environmental objectives surface water according to the European Water Framework Directive and the corresponding national law (§ 30a Austrian water right act 1959). 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

The background for the funding of the measures for improving of the ecological status of surface water is the Water Frame Work Directive (WFD) and the requirement of achieving the good ecological status in all waters (Article 4.1 WFD, § 30a Austrian water right act). According to the WFD, Austria has made a river basin management plan, in order to ensure a full and consistent implementation of the objectives of the WFD. Basically the granting is complied with ecological priorities, with particular regard to water management planning and the requirements of the water

management plan (§ 55c Austrian water right act). The granting of the province of Carinthia constitutes a co-financing of measures, which are granted by national subsidies according to UFG 1993. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Page 87: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 87 -

The grant is provided for i) legal bodies or natural persons operating a hydro power plant or ii) legal bodies or natural persons operating another installation, which causes hydromorphological pressure by carrying on economic activity and providing products or services on the market and are therefore underlying the EU laws on state aid Art. 87. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

In general, the subsidy is a non-refundable grant of a percentage of the investment costs, excepting those applicants do not fulfilling the conditions described in Attachment 1 of the EU

block exemption regulations. For those applicants only a total amount of 1,000.00 EURO is granted.

In contrast, "small enterprises" according to the EU block exemption regulations get an investment grant of 10% and for all other applicants the investment grant of 5%of the investment costs.

Since 2009, 184,078.00 EURO was granted for 25 applicants. 2011-2012: 3,000.00 EURO for 3 applicants. 2013-2014: 181,078.00 EURO for 22 applicants.

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement As mentioned above, the grant constitutes a co-funding to the Austrian subsidies according to UFG 1993 and granting demands funding approval of the Austrian subsidy according to UFG 1993. The Austrian subsidy according to UFG 1993 should be ended with the end of 2013, but was extended

until 30.06.2014. The regional funding for river restoration will end at the same time

(30 June 2014). 9. Statistical data permitting an assessment of the trade effects of the subsidy Due to the low amount of funding and/or small number of applicants no statistical data is available

to assess significant influence on the trade effect. 75 SUBSIDY FOR NATURE-PROTECTION-MEASURES IN COMMERCE AND INDUSTRY

1. Title of the subsidy programme, if relevant, or identification of the subsidy Subsidy for nature-protection-measures in commerce and industry.

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified 2013 3. Policy objective and/or purpose of the subsidy

The objective of the subsidy is to support Enterprises in environmental designing of their open spaces. This subsidy can be either a grant for advice or a grant for investment in nature-protecting measures in Upper Austria.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Regional Act on Maintenance and Preservation of Nature (Upper Austrian Nature and Landscape Conservation Act 2001) (Landesgesetz über die Erhaltung und Pflege der Natur (Oö. Natur- und Landschaftsschutzgesetz 2001 - Oö. NSchG 2001));

Page 88: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 88 -

Guideline on the Promotion of Environmental Protection Measures in Trade and Industry (Förderungsrichtlinie: Förderung von Naturschutz-Maßnahmen in Gewerbe und Industrie) 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Members of the Upper Austrian Chamber of economy and Commerce.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year)

Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation.

Euro 12.785,84 per unit; Total amount: Euro 63.929,18 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 31 December 2013

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information

include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available; None.

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy. None.

76 PROGRAMME TO PROMOTE THE DEVELOPMENT OF PRIVATE RAILWAY SIDINGS AND THE TRANSHIPMENT SYSTEMS IN INTERMODAL TRANSPORTATION

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy

Programme to promote the development of private railway sidings and the Transhipment Systems in Intermodal Transportation. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified Period covered by the notification: A: 2013 B: 2014

3. Policy objective and/or purpose of the subsidy Promotion of railway and intermodal transport systems (cargo)

Page 89: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 89 -

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Federal Ministry of Transport, Innovation and Technology, Railway Act, General Framework Guidelines for Granting Aid from the Federal State Budget (Allgemeine Rahmenrichtlinien für die Förderung aus Bundesmitteln) Art. 88 para 3 of the EC Treaty.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

"Producers", running a railway siding or undertakings running a transhipment facility, fixed amount per project. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Total amount of "A" (2013): € 8 mio. on average per year. Project subsidies range from €79,000.- to € 738,000, average subsidy is at about € 248,000

Total amount of "B" (2014): 8.000 k€ on average per year. Project subsidies range from € 15,000 to €300,000, average subsidy is at about €171,000

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

"Duration" is fixed within a contract (period of realisation of the project (1.5 Years on average) and period of "transport obligation"(a- at least - five years obligation to operate the siding and tranship a certain amount of goods (gross-tons, TEU) per year (contract) 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information

include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

Statistics for the past notification periods and further documentations of evaluation are part of the application for the extension of notification of the state aid programmes to DG Competition 77 GUIDELINES OF THE PROVINCIAL GOVERNMENT OF LOWER AUSTRIA FOR DAMAGES CAUSED BY NATURAL DISASTERS

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy Guidelines of the provincial government of Lower Austria for damages caused by natural disasters, No. 564/B/2004

Page 90: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 90 -

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013

3. Policy objective and/or purpose of the subsidy Grant for rebuilding the infrastructure of the enterprises into the original status before the natural disaster. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Guidelines of the provincial government of Lower Austria for damages caused by natural disasters based on the Catastrophe Fund Act 1996 (Katastrophenfondsgesetz 1996). 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Direct grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

All enterprises independent of their size.

The amount of public aid may not extend 50% of the total damage, which was determined by a local commission of the municipality. The grant will be fixed by the provincial government,

depending on the individual circumstances of the enterprise 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

EUR 5.528.090,-- in the year 2013 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Duration unlimited 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information

include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change

in the subsidy.

Page 91: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 91 -

78 GUIDELINES OF THE PROVINCIAL GOVERNMENT OF LOWER AUSTRIA FOR DAMAGES CAUSED BY NATURAL DISASTERS

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Guidelines of the provincial government of Lower Austria for damages caused by natural disasters,

No. 564/B/2004 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2014

3. Policy objective and/or purpose of the subsidy Grant for rebuilding the infrastructure of the enterprises into the original status before the natural disaster.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Guidelines of the provincial government of Lower Austria for damages caused by natural disasters based on the Catastrophe Fund Act 1996 (Katastrophenfondsgesetz 1996). 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Direct grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

All enterprises independent of their size. The amount of public aid may not extend 50% of the total damage, which was determined by a local commission of the municipality. The grant will be fixed by the provincial government, depending on the individual circumstances of the enterprise

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

EUR 1.305.800,-- in the year 2014

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

Duration unlimited 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

Page 92: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 92 -

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

79 FISA – "FILM LOCATION AUSTRIA"

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

FISA – "Film Location Austria" 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 3. Policy objective and/or purpose of the subsidy Culture/Film

4. Background and authority for the subsidy (including identification of the legislation under which it is granted) Filmstandortgesetz (Film Location Act, Austrian Federal Law Gazette I No. 40/2014) Film Location Austria - Guidance Notes for Support Schemes issued by the Federal Minister of Science, Research and Economy in agreement with the Federal Minister of Finance

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Film producers, subsidy determined by cultural test, fluctuating amount determined by production costs 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Subsidy per unit: Max. 25%of the eligible production costs, Annual amount budgeted in 2013, 2014: € 7.5 mio.

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

Commencement of the program: 2010, Current Guidelines in effect until 31 December 2015 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

Page 93: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 93 -

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

No impact. 80 ENERGY TAX REBATE ACCORDING TO AMENDMENT TO ENERGY TAX REBATE LAW,

FEDERAL STATE GAZETTE I NO 111/2010 OF 31 DECEMBER 2010

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Energy Tax Rebate according to the Amendment to Energy Tax Rebate Law, Federal State Gazette I No. 111/2010 of 31 December 2010 (reimbursement of previously paid energy taxes)

2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014

3. Policy objective and/or purpose of the subsidy The basic idea of the tax refund was to relieve "energy-intensive businesses" (Art. 17 of CD 2003/96/EC), which are more burdened by the energy taxes than others by implementing an upper limit of the tax burden (in relation to their net production value). From the 1st January 2011, only businesses whose activity consists in the production of goods may apply for reimbursement.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) The scheme is operated by the national tax authority which is responsible for collecting the sales tax of the requesting enterprise (as the executive body of the federal ministry of finance).

National legal act: Energy Tax Rebate according to Amendment to Energy Tax Rebate Law, Federal State Gazette I, No. 111/2010 of 13 December 2010 (Bundesgesetz über die Vergütung von Energieabgaben (Energieabgabenvergütungsgesetz) BGBl. Nr. 201/1996 in der Fassung BGBl. I Nr. 111/2010 vom 30.12.2010). 5. Form of the subsidy. (i.e. grant, loan, tax concession, etc.)

The reimbursement is granted in the form of reduction of environmental taxes in accordance with Art. 17 of the Council Directive 2003/96/EC of 27 October 2003 restructuring the Community framework for the taxation of energy products and electricity.

The tax refund is granted retrospectively upon request for already paid environmental taxes for full calendar years. 6. To whom and how the subsidy is provided (whether to producers, to exporters or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The reimbursement only applies to "energy-intensive business" (Art. 17/1/a of 2003/96/EC) whose business is mainly the production of goods. These measures have to be proven. But no claim of remuneration for these enterprises,

as far as the energy source for the production of heat, steam or hot water is used,

except directly for business purposes,

as far as the energy source or the produced heat (stream, hot water) is supplied

Page 94: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 94 -

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year or both) is not possible, a full explanation

The annual overall amount of the budget planned under the scheme amounts to EU 500,00

(in millions). 8. Duration of the subsidy and/or any other time limits attached to it, including date or

inception/commencement The reimbursement as an environmental aid is in accordance with the Commission regulation

(EC) No 800/2008 of 6 August 2008 declaring certain categories of aid compatible with the common market in application of Articles 87 and 88 of the Treaty (General block exemption

Regulation). The approval of the amendment by the European Commission took place in the Official Journal of the European Union, No. C 288, from the 30 September 2011, p. 21. The approval and the regulation (EC) No 800/2008 as union legal basis for the approval were limited to 31 December 2013. The scheme itself was exempted from the expiry date of the

regulation (EC) No. 800/2008 during an adjustment period of six months (Art. 44, para. 3 regulation (EC) No. 800/2008) up to and including 30 June 2014. The validity of the regulation (EC) No 800/2008 (General Block Exemption Regulation) was extended by the Commission Regulation (EU) No. 1224/2013 of 29 November 2013 to 30 June 2014, whereby the adjustment period falling within the scope of the regulation (EC) No. 800/2008 restrictive rules in §§ 2 and 3 Energy Tax Rebate (Energieabgabenvergütung) were

extended for another six months and were applicable to 31 December 2014. (The remuneration is based on a request from the affected enterprise for a whole year in

retrospect. The request can be placed not later than 5 years after the end of the mentioned calendar year.)

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

The measure only applies to national, already paid environmental taxes without adversely affecting

international trade. 81 LOWER AUSTRIAN WATER MANAGEMENT FUND AID GUIDELINES 2009 - WATER ECOLOGY FOR ENTERPRISES IN COMPETITION

1. Title of the subsidy programme, if relevant, or identification of the subsidy Lower Austrian Water Management Fund Aid Guidelines 2009 - Water Ecology for

Enterprises in Competition. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 Guidelines were set into force on 19 May 2009 (X594/2009) 3. Policy objective and/or purpose of the subsidy The aim is the assistance to measures improving the ecological status of water sources by

reducing the hydromorphological burden thus reaching the environmental goals for surface water.

Page 95: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 95 -

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Aid provider is the Lower Austrian Water Management Fund. The legal basis for the Fund is the Lower Austrian Water Management Fund Act, Regional Gazette 1300 as amended, and the pertinent Decision by the Lower Austrian Water Management Fund.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Non-repayable cash grants for investments. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

For enterprises in competition whose facilities cause hydromorphological burden to rivers, in as much they are eligible under the General Block Exemption Regulation. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

In 2013 total subsidies of € 2.596.968,00 were committed in favour of a total investment volume of € 24.850.516,00.

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

From 19 May 2009 until 30 June 2014 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the

latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

It is assumed that the scheme designed for enabling investment in environmental protection has

got only minimal effects on the international trade. 82 LOWER AUSTRIAN WATER MANAGEMENT FUND AID GUIDELINES 2009 - WATER ECOLOGY FOR ENTERPRISES IN COMPETITION

1. Title of the subsidy programme, if relevant, or identification of the subsidy Lower Austrian Water Management Fund Aid Guidelines 2009 - Water Ecology for Enterprises in Competition. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2014

Guidelines were set into force on 19 May 2009 (X594/2009)

Page 96: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 96 -

3. Policy objective and/or purpose of the subsidy The aim is the assistance to measures improving the ecological status of water sources by reducing the hydromorphological burden thus reaching the environmental goals for surface water. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Aid provider is the Lower Austrian Water Management Fund. The legal basis for the Fund is the Lower Austrian Water Management Fund Act, Regional Gazette 1300 as amended, and the pertinent Decision by the Lower Austrian Water Management Fund.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Non-repayable cash grants for investments. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

For enterprises in competition whose facilities cause hydromorphological burden to rivers, in as much they are eligible under the General Block Exemption Regulation. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation In 2014 total subsidies of € 2.008.935,00 were committed in favour of a total investment volume

of € 19.730.354,00. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement From 19 May 2009 until 30 June 2014 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information

include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

It is assumed that the scheme designed for enabling investment in environmental protection has got only minimal effects on the international trade. 83 GUIDELINES OF THE STYRIAN ECONOMIC PROMOTION AGENCY IN ITS CURRENT VERSION

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy Guidelines of the Styrian Economic Promotion Agency in its current version Guideline for the Styrian Economic Promotion, GZ: A14-10-2/2010-218 dated 4 October 2010

Guideline for the Styrian Economic Promotion, GZ: WT-WP.01-83/2013-221 dated 5 December 2013

Page 97: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 97 -

Guideline for the Styrian Economic Promotion 2014 - 2020, GZ: LAD-18.00-58/2006-22 dated 3 July 2014 2. Period covered by the notification. The period to be covered by the notification should be

the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014 3. Policy objective and/or purpose of the subsidy The main objective is to support entrepreneurs and enterprises.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Styrian Economic Promotion Act 2001. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grant, guarantee. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Primarily to enterprises in the manufacturing or services sector. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

2013: regional budget: EUR 25.309.991,39,- European Fund for Regional Development (ERDF)/ EAFRD-funds: EUR 5.197.624,81,- 2014: regional budget: EUR 20.241.194,55,- ERDF / EAFRD -funds: EUR 3.377.341,27,-

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

1 January 2007 to 30 June 2014 3 July 2014 to 31 December 2020

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

Statistical data is available under http://www.wibis-steiermark.at

Page 98: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 98 -

84 REVISED AND PROLONGED VERSION OF THE VENTURE CAPITAL PROGRAMME PROVIDED BY THE PROVINCE OF STYRIA

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Revised and prolonged version of the venture capital programme provided by the province of

Styria. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014

3. Policy objective and/or purpose of the subsidy The main objective is to support small enterprises (less than 10 employees) in the seed phase (foundation must be less than 3 years ago) by providing them with risk capital.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Decision by the Regional Government of Styria. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Risk capital.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Risk Capital can be provided to innovative small enterprises in the seed phase (foundation must be less than 3 years ago) in the manufacturing or services sector. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Year 2013 2014

Number of Units 0 1

Amount/unit € 0,00 € 300,000

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 8 October 2007 – 31 December 2020 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the

extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available;

Page 99: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 99 -

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

http://www.avco.at/upload/medialibrary/PE_VC_Industry_2013.pdf http://www.wibis-steiermark.at

85 AID SCHEME FOR THE PROMOTION OF QUALIFICATION OF EMPLOYEES WITHIN THE SOCIAL FUND (PHASING OUT, FOCAL POINT 1.1)

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Aid Scheme for the Promotion of Qualification of Employees within the European Social Fund (Phasing Out, Focal Point 1.1) 2. Period covered by the notification. The period to be covered by the notification should be

the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014 3. Policy objective and/or purpose of the subsidy Training aid. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Labour Market Service (Arbeitsmarktservice) on behalf and for the account of the Republic of Austria; § 34 Labour Market Service Act (Arbeitsmarktservicegesetz) (AMSG). 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.):

Grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are provided to SMEs and large enterprises in all sectors according to the conditions laid down in the above mentioned aid scheme "Qualification for employees".

Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation.

Annual amount: 2013: € 719.527,08 2014: € 254.828,84 Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement: 2007 – 2014

Page 100: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 100 -

86 AID SCHEME FOR THE PROMOTION OF QUALIFICATION OF EMPLOYEES WITHIN THE EUROPEAN SOCIAL FUND (OBJECTIVE 2 FOCAL POINT 1)

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Aid Scheme for the Promotion of Qualification of Employees within the European Social Fund

(Objective 2 Focal Point 1). 2. Period covered by the notification. The period to be covered by the notification should be

the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014

3. Policy objective and/or purpose of the subsidy Training aid. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Labour Market Service (Arbeitsmarktservice) on behalf and for the account of the Republic of Austria; § 34 Labour Market Service Act (Arbeitsmarktservicegesetz) (AMSG) 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined):

Subsidies are provided to SMEs and large enterprises in all sectors according to the conditions laid down in the above mentioned aid scheme "Qualification for employees". 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Annual amount: 2013: € 19.342.563,20

2014: € 18.573.201,51 Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement: 2007 – 2014

87 RISK CAPITAL FUND (UPPER AUSTRIAN HIGH-TECH FUND)

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy Risk capital fund (Upper Austrian High-Tech Fund).

Page 101: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 101 -

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014

3. Policy objective and/or purpose of the subsidy The program is a support in financing small and medium technology-oriented enterprises. The goal is to support local innovative High-tech enterprises by seed/start-up financing and expansion financing.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Authority in charge of granting the subsidy: Government of Upper Austria. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Investments, Loans. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are provided especially to small and medium enterprises (SME's) by provision of equity

or other forms of risk capital. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Total commitment 2013: 0,00 Euro 2014: 0,00 Euro 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 30 June 2014 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information

include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change

in the subsidy.

Not available.

Page 102: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 102 -

88 PROGRAM TO RELEASE A PULSE FOR TOURISM

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Program to release a pulse for tourism (TIP).

2. Period covered by the notification 2013-2014 3. Policy objective and/or purpose of the subsidy

To stimulate tourism activities and innovation of medium and small-sized companies. The key

aspects of activities are the innovation incentives and the continual improvement of corporate structures. Another goal is to provide new jobs and to upgrade human capital. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Authority in charge of granting the subsidy: Government of Upper Austria. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants for investments. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are provided especially to enterprises for improvement in quality and innovation incentives.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Total payment:

2006: 2,908.574 Euro 2007: 2,065.315 Euro 2008: 3,454.251 Euro 2009: 2,607.065 Euro

2010: 2,371.980 Euro 2011: 2,125.609 Euro 2012: 2,680.000 Euro

2013: 2,459.623 Euro 2014: 2,498.567 Euro 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

30 June 2014 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized

product(s) or sector(s)

a. for the three most recent years for which statistics are available;

Page 103: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 103 -

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

Not available. 89 PROGRAM TO RELEASE A PULSE FOR ECONOMY

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Program to release a pulse for economy (WIP). 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013; 2014 3. Policy objective and/or purpose of the subsidy

Encouragement of trade, export and development, innovation of medium and small-sized companies. The key aspects of activities are the innovation incentives and the continual improvement of corporate structures. Another goal is to provide new jobs and to upgrade human capital. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Authority in charge of granting the subsidy: Government of Upper Austria. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants for investments

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are provided especially to enterprises for innovation incentives

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the

notification, for the previous year, or both) is not possible, a full explanation Total payment:

2013: 8,467.600,00 Euro 2014: 5,367.787,96 Euro 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

30 June 2014 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information

include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

Page 104: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 104 -

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

Not available

90 GUIDELINES ON AID TO UPPER AUSTRIAN INDUSTRY FOR ENVIRONMENTAL PROTECTION MEASURES

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Guidelines on Aid to Upper Austrian industry for environmental protection measures.

Guidelines on Aid for environmental protection measures in the Upper Austrian industry sector. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014

1st Guidelines 2002 for environmental support in Upper Austria (based on 2002 guidelines for environmental support in Austria) in force between 20 February 2002 and 30 September 2009 (earlier Number: N530/2001 and 350/2005) 2nd Guidelines 2009 for environmental support in Upper Austria (based on 2009 guidelines for environmental support in Austria) in force since 01.10.2009. These guidelines are open-ended until

the next change (recent Number for Upper Austria 418/2007 or.X814/09 or Nr.SA.32531).

3. Policy objective and/or purpose of the subsidy Support of environmental protection measures (all branches). 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Authority in charge of granting the subsidy: Government of Upper Austria. Legal background: Law on Upper Austria on Aid for environmental protection 1996, Sheet Edition No. 84/1996; Guidelines on Aid for national industry for environmental protection measures 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grants (subsidies) for investments. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are provided especially for enterprises for environmental protection measures with respect to the environmental benefit.

Page 105: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 105 -

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

2013 2014

Sector (ÖNACE) Result Sector (ÖNACE) Result C1320 6.026 C13 100.000 C20 12.657 C20 130.430 C222 27.308 C2229 30.070 C22231 12.787 C2434 29.101 C2311 41.174 C25 1.071 C3109 1.748 C28 2.165 D35 249.517 C2815 46.000 D3511 52.344 C289 33.989 D353 614.958 C31 13.172 D3530 356.633 C3109 6.799 E37 6.113 D35 490.321 F41209 1.766 D353 22.507 F432 10.343 D3530 1.292.729 F43322 10.667 F43911 3.471 F439 24.458 G45 13.257 G4613 38.382 G4621 6.648 G466 4.970 G4771 25.755 G4674 8.329 H4941 6.521 H4941 6.375 I56 4.101 I55202 4.308 K6419 5.902 L6820 174.433 L6820 103.187 L683 15.633 M70 6.282 N7731 58.033 N7731 58.480 08411 59.145 08411 12.339 Q8610 46.000 Q8610 7.099 S9499 6.910 S 10.933 S96042 95.003 S941 6.240 T970 40.498 S9491 255.905 Total result 1.986.518 T970 13.125 Total result 2.737.598

ÖNACE refers to a classification of economic activities in Austria which is based on of the NACE (Statistical classification of economic activities in the European Community) but which includes a more detailed subdivision of economic sectors in order to consider Austrian specifics.

The code contains 5 figures and matches until the fourth figure with NACE. Subsidy per unit: up to 40% of the environmentally relevant

volume of investment;

average subsidy of 2013: 8,2% of the environmentally relevant volume of investment average subsidy of 2014: 8,3% of the environmentally

relevant volume of investment 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 1st Guidelines 2002 of environmental support in Upper Austria (based on 2002 guidelines for environmental support in Austria) in force between 20 February 2002 and 30 September 2009

(earlier Number: N530/2001 and 350/2005).

Page 106: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 106 -

2nd Guidelines 2009 of environmental support in Upper Austria (based on 2009 guidelines for environmental support in Austria) in force since 01.10.2009. This guidelines are open-ended until the next change (recent Number for Upper Austria 418/2007 and X814/09 or Nr.SA.32531). 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To

the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the

latest year preceding the introduction of the subsidy or preceding the last major change

in the subsidy.

Not available. 91 THE ETCS – AID SCHEME FOR THE EQUIPMENT OF RAIL VEHICLES WITH ETCS – LEVEL 2

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy The European Train Control System (ETCS) – Aid scheme for the equipment of rail vehicles with ETCS – Level 2 [SA.33381 (2011/N)] has been notified to the Commission in July 2011 and has been considered to be compatible with the internal market under Article 93 TFEU on 20.09.2011 [K(2011)6487].

2. Period covered by the notification 2013 3. Policy objective and/or purpose of the subsidy

Several railway lines, which have been equipped with ETCS – Level 2, have been put into service in 2012 and the following years or will be put into service during the next years in Austria. In order to make the best use of these railway lines, it is necessary that the railway undertakings have enough rail vehicles, which are equipped with ETCS – Level 2-suitable systems. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

The authority for the subsidy is the Federal Ministry for Transport, Innovation and Technology. The

national legal basis of the notified aid scheme are the Special Guidelines on Subsidies from State budget for the equipment of rail vehicles with ETCS – Level 2 (Sonderrichtlinien für die Gewährung von Förderungen aus Bundesmitteln für die Ausrüstung von Schienenfahrzeugen mit ETCS-Level 2) and the General Guidelines on Subsidies from State budget (Allgemeine Richtlinien für die Gewährung von Förderungen aus Bundesmitteln (ARR 2004).

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Direct grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The aid could have been applied during the validity of the scheme by any railway undertaking or

vehicle owner or keeper. It is a fixed amount per unit.

Page 107: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 107 -

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

The subsidy amounts 50% of the installation-costs of the ETCS-equipment but a maximum of

EUR 150.000,- for the installation in an existing vessel and EUR 100.000,- for the installation in a new vessel. The total amount budgeted over the whole period for this aid scheme is EUR 45 million. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

This subsidy programme runs from 21 September 2011 to 31 December 2014. The payments of

the aid granted until 31 December 2014 will probably be made until 31 December 2017. 9. Statistical data permitting an assessment of the trade effects of the subsidy No trade effects are expected, as the subsidy merely serves to create incentives for the equipment

of rail vehicles with ETCS – Level 2. Therefore it can be assumed that the subsidy causes no shift of trade flows or relocation of production facilities. There are no statistics available. 92 THE ETCS – AID SCHEME FOR THE EQUIPMENT OF RAIL VEHICLES WITH ETCS – LEVEL 2

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

The ETCS – Aid scheme for the equipment of rail vehicles with ETCS – Level 2 [SA.33381

(2011/N)] has been notified to the Commission in July 2011 and has been considered to be compatible with the internal market under Article 93 TFEU on 20.09.2011 [K(2011)6487]. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2014 3. Policy objective and/or purpose of the subsidy

Several railway lines, which have been equipped with ETCS – Level 2, have been put into service in 2012 and the following years or will be put into service during the next years in Austria. In order to make the best use of these railway lines, it is necessary that the railway undertakings have enough rail vehicles, which are equipped with ETCS – Level 2-suitable systems.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) The authority for the subsidy is the Federal Ministry for Transport, Innovation and Technology. The national legal basis of the notified aid scheme are the Special Guidelines on Subsidies from State budget for the equipment of rail vehicles with ETCS – Level 2 (Sonderrichtlinien für die Gewährung von Förderungen aus Bundesmitteln für die Ausrüstung von Schienenfahrzeugen mit ETCS-Level 2)

and the General Guidelines on Subsidies from State budget (Allgemeine Richtlinien für die Gewährung von Förderungen aus Bundesmitteln (ARR 2004).

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Direct grant.

Page 108: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 108 -

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The aid could have been applied during the validity of the scheme by any railway undertaking or vehicle owner or keeper. It is a fixed amount per unit.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

The subsidy amounts 50%of the installation-costs of the ETCS-equipment but a maximum of EUR 150.000,- for the installation in an existing vessel and EUR 100.000,- for the installation in a

new vessel. The total amount budgeted over the whole period for this aid scheme is EUR 45 million. 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

This subsidy programme runs from 21 September 2011 to 31 December 2014. The payments of the aid granted until 31 December 2014 will probably be made until 31 December 2017. 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information

include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change

in the subsidy.

No trade effects are expected, as the subsidy merely serves to create incentives for the equipment of rail vehicles with ETCS – Level 2. Therefore it can be assumed that the subsidy causes no shift of trade flows or relocation of production facilities. There are no statistics available. 93 AID FOR THE PROVISION OF CERTAIN (COMBINED) TRANSPORT SERVICES BY RAIL IN AUSTRIA

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

The Aid for the provision of certain (combined) transport services by rail in Austria [SA.33993 (2011/N)] has been notified to the Commission in December 2011 and has been considered to be compatible with the internal market under Article 93 TFEU on 25.07.2012 [C(2012) 5067].

2. Period covered by the notification. The period to be covered by the notification should be the most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013

3. Policy objective and/or purpose of the subsidy The objectives of the aid scheme are to support rail services in the following three forms of freight rail transport: single wagonload traffic ("SWT"), unaccompanied combined transport ("UCT") and

accompanied combined transport ("RoLa") and to compensate additional costs faced by rail transport but not by road transport. The aid should affect these forms of freight rail transport, which are, due to higher production costs, most exposed to competition by the road.

Page 109: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 109 -

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) The authority for the subsidy is the Federal Ministry for Transport, Innovation and Technology. The national legal basis of the notified aid scheme are the Special Guidelines on aid to certain types of

rail freight transport in Austria (Sonderrichtlinien Beihilfeprogramm für die Erbringung von Schienengüterverkehrsleistungen in bestimmten Produktionsformen in Österreich) and the General Guidelines on Subsidies from State budget (Allgemeine Richtlinien für die Gewährung von Förderungen aus Bundesmitteln (ARR 2004). 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Direct grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

The aid could have been applied during the first scheme for the period from 3.12.2012 to 31.12.2013 by any rail carrier offering or planning to offer cargo services in Austria. A carrier registered in any other EEA state is able to benefit from the same treatment as those registered in Austria without any discrimination. For the years 2014 to 2017 further calls have been/will be made. It is a fixed amount per unit but depends also on following criteria:

In the case of SWT, the aid is computed per net tonne-kilometre and differentiated by type of traffic (domestic transport or import/export).

In the case of UCT, the aid is computed per intermodal transport unit carried. The aid is determined by the size and weight of the unit, the distance covered by rail in Austria and the

special production factor of mountainous terrain. In case of RoLa the aid is calculated per lorry carried and varies according to the route used and whether the transport takes place by day or by night. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the

previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

SWT: for domestic transport EUR 12.20 / net tonne-kilometre for import/export EUR 5.60 / net tonne-kilometre

UCT: for domestic transport between EUR 12.50 and 55.80 /

intermodal transport unit for import/export between EUR 10.70 and 48.30 /

intermodal transport unit for transit between EUR 6.50 and 28.70 /

intermodal transport unit for transport over mountainous terrain the above stated subsidy-rates increase by between EUR 1.80 and 3.60 / intermodal transport unit

RoLa: on the Brenner route EUR 94,- / lorry by day

EUR 47,- / lorry by night on the Tauern route EUR 82,- / lorry on the Pyhrn-Schober route EUR 78,- / lorry

The maximum total budget over the 5-year period is EUR 220 million per year (total budget: EUR 1118 million) but due to constraints in the Austrian central budget, the actual aid amounts disbursed under the scheme will be clearly below the maximum of EUR 220 million per year.

Page 110: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 110 -

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

This subsidy programme runs from 3 December 2012 to 31 December 2017 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s)

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the

latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy

No trade effects are expected, as the subsidy merely affects the choice of the mode of transport and has no influence on the destination and origin of traffic flows and production sites. There are no statistics available.

94 AID FOR THE PROVISION OF CERTAIN (COMBINED) TRANSPORT SERVICES BY RAIL IN AUSTRIA

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

The Aid for the provision of certain (combined) transport services by rail in Austria [SA.33993 (2011/N)] has been notified to the Commission in December 2011 and has been considered to be

compatible with the internal market under Article 93 TFEU on 25.07.2012 [C(2012) 5067]. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2014 3. Policy objective and/or purpose of the subsidy The objectives of the aid scheme are to support rail services in the following three forms of freight rail transport: single wagonload traffic ("SWT"), unaccompanied combined transport ("UCT") and accompanied combined transport ("RoLa") and to compensate additional costs faced by rail

transport but not by road transport. The aid should affect these forms of freight rail transport, which are, due to higher production costs, most exposed to competition by the road.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) The authority for the subsidy is the Federal Ministry for Transport, Innovation and Technology. The

national legal basis of the notified aid scheme are the Special Guidelines on aid to certain types of rail freight transport in Austria (Sonderrichtlinien Beihilfeprogramm für die Erbringung von Schienengüterverkehrsleistungen in bestimmten Produktionsformen in Österreich) and the General Guidelines on Subsidies from State budget (Allgemeine Richtlinien für die Gewährung von Förderungen aus Bundesmitteln (ARR 2004).

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Direct grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Page 111: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 111 -

The aid could have been applied during the second call for the period from 1.1.2014 to 31.12.2014 by any rail carrier offering or planning to offer cargo services in Austria. A carrier registered in any other EEA state is able to benefit from the same treatment as those registered in Austria without any discrimination. For the years 2015 to 2017 further calls have been/will be made.

It is a fixed amount per unit but depends also on following criteria: In the case of SWT, the aid is computed per net tonne-kilometre and differentiated by type of traffic (domestic transport or import/export). In the case of UCT, the aid is computed per intermodal transport unit carried. The aid is

determined by the size and weight of the unit, the distance covered by rail in Austria and the special production factor of mountainous terrain.

In case of RoLa the aid is calculated per lorry carried and varies according to the route used and whether the transport takes place by day or by night. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

SWT: for domestic transport EUR 12.,20 / net tonne-kilometre for import/export EUR 5.60 / net tonne-kilometre

UCT: for domestic transport between EUR 12.50 and 55.80 /

intermodal transport unit for import/export between EUR 10.70 and 48.30 /

intermodal transport unit for transit between EUR 6.50 and 28.70 /

intermodal transport unit for transport over mountainous terrain the above stated subsidy-rates increase by between EUR 1.80 and 3.60 / intermodal transport unit

RoLa: on the Brenner route EUR 94,- / lorry by day

EUR 47,- / lorry by night on the Tauern route EUR 82,- / lorry on the Pyhrn-Schober route EUR 78,- / lorry

The maximum total budget over the 5-year period is EUR 220 million per year (total budget:

EUR 1118 million) but due to constraints in the Austrian central budget, the actual aid amounts disbursed under the scheme will be clearly below the maximum of EUR 220 million per year.

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

This subsidy programme runs from 3 December 2012 to 31 December 2017.

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change

in the subsidy.

Page 112: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 112 -

No trade effects are expected, as the subsidy merely affects the choice of the mode of transport and has no influence on the destination and origin of traffic flows and production sites. There are no statistics available. 95 BROADBAND AUSTRIA 2013

1. Title of the subsidy programme, brief description of the subsidy

The title of the subsidy programme is "BBA_2013" = "Breitband-Austria 2013". It is an investment promotion programme that stimulates the infrastructure based competition among telecom operators in the rural regions of Austria and has thereby improved the competitiveness of the local economy and employment. This programme expired at the end

of 2013.

2. Period covered by the notification The period covered by the notification of this subsidy programme is the year 2013. 3. Policy objective and purpose of the subsidy

The policy objective of this subsidy programme was on the one hand the disappearance of "white spots" (i.e. regions without any broadband infrastructure available in the foreseeable future) and on the other hand the creation of next-generation access infrastructures (i.e. with data rates of at least 25 Mbit/s). Concretely the purposes of the subsidy were the complete supply of data rates of at least 2 Mbit/s,

the provision of next-generation access infrastructure for 30% of the population and the reduction of the construction costs of passive broadband infrastructure by 50%.

4. Background and authority for the subsidy "BBA_2013" was launched 2010 since it was a subsidy programme for the period from 01.01.2010

until 31.12.2013. The competent federal authorities in this context were the Federal Ministry for Transport, Innovation and Technology as well as the Federal Ministry of Agriculture, Forestry, Environment and Water Management. Furthermore also regional authorities were involved. Within the applicable legislation under which the subsidy is granted has to be mentioned European Law and National (Austrian) law:

- Several Regulations: No. 1290/2005, No. 1698/2005, No. 1974/2006, No. 1975/2006 - Commission Decisions: C (2007) 5163 and C (2010) 9171 - Austrian Telecommunications Act - Austrian Special Directive "BBA_2013"

5. Form of the subsidy

The form of the subsidy is a grant. In addition the subsidy is a single funding and takes the form of non-repayable grants. 6. To whom and how the subsidy is provided The subsidy was provided to telecommunication operators.

The delimitation of the geographical areas in this investment promotion was based on a broadband map established after an operator consultation (about the question where there would be in the next 3 years no powerful or not sufficiently available high-quality, but yet affordable, broadband infrastructure without the subsidies) by the regulatory authority in Austria (RTR) and after consultation with the authorities in the federal states.

Page 113: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 113 -

The fixed amount of a concrete subsidy depended on the eligibility and the funding needs of the project in question. After the evaluation of each project by a review jury in a procedure established, inter alia by means of quality criteria, the amount of the subsidy was defined. The management of the subsidies was performed by the regional authorities. 7. Subsidy per unit, or in cases where this is not possible, the total amount

BBA_2013 was composed of fundings from the federal government, the federal states and the EU. The European Agricultural Fund for Rural Development (EAFRD) share amounted to 15.03 million euros and that of the federal government to 7.74 million euros (Note: 5: 3 by the Federal Ministry for Transport, Innovation and Technology (BMVIT) and the Federal Ministry of Agriculture, Forestry, Environment and Water Management). The shares of the federal states involved totalled

together 7.74 million euros, giving so a total funding volume of around 30.51 million euros.

Furthermore the provinces of Styria, Tyrol, Upper Austria and Vorarlberg had taken on the basis of strategic considerations the possibility of an increase in regional support for broadband and thus expanded the total funding to 36.9 million euros. Then the division of the subsidies was made by linking the population statistics with the forecast

data from the operator consultation. This led to the broadband and NGA availability per household or company, on which the distribution key was established after consultation with the regional authorities.

BURGENLAND KÄRNTEN LOWER AUSTRIA

UPPER AUSTRIA

SALZBURG STEIERMARK TIROL VORARLBERG

3.34% 9.64% 29.66% 16.20% 2.29% 23.77% 11.34% 3.76%

Regional distribution key in context of the subsidy programme BBA_2013

8. Duration of the subsidy The provisions of this subsidy programme shall be valid from 1 January 2010 to

31 December 2013 (without prejudice to the special billing, payment and control requirements). Due to the limitation of two calendar years for a project period, the payment period runs until the end of the year 2015.

Page 114: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 114 -

9. Statistical data permitting an assessment of the trade effects of the subsidy

There are no such statistical data available. The subsidy programme "BBA_2013" is not aimed at direct trade effects. 96 INVESTMENT AND GROWTH PROGRAMME 2009 - 2014 BY THE REGIONAL GOVERNMENT OF SALZBURG

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Investment and Growth Programme 2009 - 2014 by the Regional Government of Salzburg It is a subsidy programme to support in particular SME, which invest in important business

projects of regional significance, especially in less developed regions of Salzburg. The funding approval is indicated as a single decision within this framework and within the general block exemption regulation. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014 3. Policy objective and/or purpose of the subsidy As mentioned above it is a subsidy programme to support in particular SME, which invest in important business projects of regional significance, especially in less developed regions of

Salzburg.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Basic decision of the regional government of Salzburg of 22.6.2009. As under 1. mentioned the

funding approval is indicated as a single decision within this framework. These are the EC-notification numbers of the single decisions: EC-no. SA.37192 (2013/X) and SA.39889. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the later, how determined)

The subsidy programme supports regional important projects of SME, especially in less developed regions of Salzburg.

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Average subsidy per unit in 2013: € 320.290,- (just one case)

Average subsidy per unit in 2014: € 374.112,- (just one case) 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

22 June 2009 to 31 December 2014

Page 115: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 115 -

9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific nature and scope of such statistics is left to the judgement of the notifying Member. To the extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change in the subsidy.

97 GUIDELINES FOR THE GRANTING OF GUARANTEES BY THE REGION OF CARINTHIA FOR DEFENSIVE MEASURES

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Guidelines for the Granting of Guarantees by the Region of Carinthia for Defensive Measures. 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates

of the fiscal year should be specified 2013 and 2014 3. Policy objective and/or purpose of the subsidy This program of action pursues the target to promote little and middle companies with

development potential – that are in difficulties – with the possibility to grant a guarantee. Restructuring firms in difficulties. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Decision of the Carinthian state parliament (Landtag) from 27.09.2012 (51. session) and the Carinthian government (Landesregierung) from 11.09.2012 at the recommendation of the supervisory committee of the Carinthian Restructring Company (Carinthian Sanierungsgesellschaft) m.b.H. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Guarantee.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Target group are so called KMUs (little and middle companies) that operate in the sector

manufacturing industry, industry and tourism. The company headquarter has to be located in Carinthia. The companies have to form a scheme and to take action that pursue the target of restructuring (compatibility with the rules of the Carinthian Economic Assistance Act (Kärntner Wirtschaftsförderungsgesetz)). Further the company has to employ 15 full-time equivalents (25 in the region Klagenfurt am

Wörthersee and Villach), KMUs in the touristic sector are also eligible for grants if they employ less staff. The guarantees of Carinthia shield only economic incentives. The rate of the guarantee has to be determinated individually (maximum 80%).

Page 116: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 116 -

7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Decision of the Carinthian state parliament (Landtag) from 27.09.2012:

Guarantees at the maximum of € 2.5 Mio. from 10.10.2012 till 31.12.2014 with a maximum of € 0.5 Mio. in the year 2012 and respectively € 1 Mio. in the years 2013 and 2014. In individual cases with a guarantee of more than € 1 Mio. the Carinthian state parliament takes the decision (that guarantee is not to be added on the maximum values of the year).

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

10 October 2012 till 31 December 2014 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the

extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized product(s) or sector(s):

a. for the three most recent years for which statistics are available;

Not available.

b. for a previous representative year, which, where possible and meaningful, should be the

latest year preceding the introduction of the subsidy or preceding the last major change

in the subsidy.

Not available.

98 GUIDELINES FOR THE GRANTING OF GUARANTEES BY THE REGION OF CARINTHIA FOR OFFENSIVE MEASURES BY SME

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy Guideline for the Granting of Guarantees by the Region of Carinthia for Offensive Measures by SME 2. Period covered by the notification. The period to be covered by the notification should be the

most recently completed calendar or fiscal year. In the latter case, the start and end dates of the fiscal year should be specified

2013 and 2014 3. Policy objective and/or purpose of the subsidy This program of action pursues the target to promote little and middle companies in the sectors and industries ("Gewerbe" and "Industrie") that invest in promising projects or are part of the

tourism sector and invest in the tourism infrastructure with the possibility to grant a guarantee. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Decision of the Carinthian state parliament (Landtag) from 19.12.2008 (66. session) and the

Carinthian government (Landesregierung) from 18.12.2012 at the recommendation of the supervisory committee of the Carinthian Sanierungsgesellschaft m.b.H.

Page 117: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 117 -

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Guarantee. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined) Target group are so called KMUs (little and middle companies) with promising projects that operate in the sector manufacturing industry, industry, commerce and tourism (also KMUs) - that provide touristic infrastructure in the region. There has to be compatibility with the rules of the Carinthian Economic Assistance Act (Kärntner Wirtschaftsförderungsgesetz).

Further there must be relevance in case of economic development and regional policy and

environmental compatibility of the project, an over-average growth orientation, positive chances of success, and competitive ability respectively value of the product and a feasible and auditable concept for the output range and the area of finance. Carinthia promotes companies with the possibility to grant a guarantee (§ 1356 ABGB) in

accordance (referencing to the agreement of the European commission [block exemption]). The help takes place in form of a financing guarantee towards a credit institute with headquarters in the European economic area (to finance an investment program) or in form of a guarantee toward an organization of the government of Austria (determinate durations). The maximum rate of the guarantee is 50%. The maximum duration is 12 years. 7. Subsidy per unit, or in cases where this is not possible, the total amount or the annual

amount budgeted for that subsidy (indicating, if possible, the average subsidy per unit in the previous year). Where provision of per unit subsidy information (for the year covered by the notification, for the previous year, or both) is not possible, a full explanation

Decision of the Carinthian state parliament (Landtag) from 19 December 2008:

Guarantees at the maximum of € 13.5 Mio. from 01.10.2008 till 30.06.2014 with a maximum of € 1.5 Mio. in the years 2013 and 2014. In individual cases with a guarantee of more than € 1 Mio. the Carinthian state parliament takes the decision (that guarantee is not to be added on the maximum values of the year). 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

1 October 2008 till 30 June 2014 9. Statistical data permitting an assessment of the trade effects of the subsidy. The specific

nature and scope of such statistics is left to the judgement of the notifying Member. To the

extent possible, relevant and/or determinable, however, it is desirable that such information include statistics of production, consumption, imports and exports of the subsidized

product(s) or sector(s):

a. for the three most recent years for which statistics are available;

Not available.

b. for a previous representative year, which, where possible and meaningful, should be the latest year preceding the introduction of the subsidy or preceding the last major change

in the subsidy.

Not available.

Page 118: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 118 -

99 AID SCHEME OF THE LOWER AUSTRIAN FUNDS FOR ECONOMY AND TOURISM FOR INVESTMENT SUBSIDIES

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Aid scheme of the Lower Austrian Funds for Economy and Tourism for investment subsidies

(X80/2010, from 01.07.2014 Nr. SA.39578). 2. Period covered by the notification 2013 - 2014

3. Policy objective and/or purpose of the subsidy

Investment subsidies. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Department for economy, tourism & technology at the Office of the Lower Austrian Government. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) a) loan b) grant 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are granted to endeavours investing in Lower Austria in the form of loans bearing a reduced interest-rate and/ or grants. Within the scheme, there are two types of investment aid, "BASIS" and "TOP", the latter offering a higher amount of aid given (within the gross grant

equivalent threshold). The amount of total aid is determined by content and quality of the project, judged by the authority. 7. Subsidy per unit, or in cases where this is not possible, the total amount a) 2013: € 33.480.600; 2014: € 31.442.500,00; b) 2013: € 14.118.092,43; 2014: € 7.268.087,91; Average subsidy per endeavour cannot be validly calculated (amount of aid is

calculated for the specific case and differs strongly from case to case) 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

31 December 2020

9. Statistical data permitting an assessment of the trade effects Minimal effects on the international trade. 100 AID SCHEME OF THE LOWER AUSTRIAN FUNDS FOR ECONOMY AND TOURISM FOR RESEARCH, DEVELOPMENT AND INNOVATION

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Aid scheme of the Lower Austrian Funds for Economy and Tourism for research, development and innovation (N 100/2007, from 01.07.2014 Nr. SA.39579).

Page 119: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 119 -

2. Period covered by the notification 2013 - 2014 3. Policy objective and/or purpose of the subsidy

Fostering Innovation in Lower Austria by supporting research and development projects. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Department for economy, tourism & technology at the Office of the Lower Austrian Government

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

a) loan b) grant 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are granted to endeavours investing in Lower Austria in the form of loans bearing a reduced interest-rate and/ or grants. Aid is granted for innovative projects in the field of research and development, the amount depends on the nature and quality of the project which are judged by the authorities.

7. Subsidy per unit, or in cases where this is not possible, the total amount

a) 2013: € 500.000,00; 2014: € 0,00 b) 2013: € 2.565.485,03; 2014: € 3.958.149,26; Average subsidy per endeavour cannot be validly calculated (amount of aid is calculated for the specific case and differs strongly from case to case)

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 31 December 2020. 9. Statistical data permitting an assessment of the trade effects

Minimal effects on the international trade. 101 AID SCHEME OF THE LOWER AUSTRIAN FUNDS FOR ECONOMY AND TOURISM FOR INTERNATIONALISATION

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Aid scheme of the Lower Austrian Funds for Economy and Tourism for internationalisation (X36/2009) 2. Period covered by the notification

2013 - 2014 3. Policy objective and/or purpose of the subsidy Supporting local enterprises taking the first steps in a (locally) new market

Page 120: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 120 -

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Department for economy, tourism & technology (WST3) at the Office of the Lower Austrian Government

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grants 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined)

Subsidies are granted to Lower Austrian endeavours in the form of grants, covering a maximum of 50% of costs related to the internationalisation project, i.e. market analysis, market studies, participation in trade fairs. No aid is given to exports. 7. Subsidy per unit, or in cases where this is not possible, the total amount

2013: € 208.100,00; 2014: € 101.125,00; Average subsidy per endeavour cannot be validly calculated (amount of aid is calculated for the specific case and differs strongly from case to case) 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

31 December 2020 9. Statistical data permitting an assessment of the trade effects

Minimal effects on the international trade.

102 AID SCHEME OF THE LOWER AUSTRIAN FUNDS FOR ECONOMY AND TOURISM FOR COOPERATION

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Aid scheme of the Lower Austrian Funds for Economy and Tourism for cooperation (X32/2009, from 01.07.2014 Nr. SA.39580)

2. Period covered by the notification 2013 - 2014

3. Policy objective and/or purpose of the subsidy

Fostering cooperation between SMEs 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Department for economy, tourism & technology at the Office of the Lower Austrian Government

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant

Page 121: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 121 -

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are granted to Lower Austria SMEs establishing cooperations amongst each other. The aid covers only costs directly related to the cooperation itself, not the outcomes.

7. Subsidy per unit, or in cases where this is not possible, the total amount 2013: € 114.281,50; 2014: € 256.748,30; Average subsidy per endeavour cannot be validly calculated (amount of aid is calculated for the specific case and differs strongly from case to case)

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

31 December 2020 9. Statistical data permitting an assessment of the trade effects

Minimal effects on the international trade. 103 AID SCHEME OF THE LOWER AUSTRIAN FUNDS FOR ECONOMY AND TOURISM FOR RESTRUCTURING OF ENTERPRISES IN DIFFICULTIES

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Aid scheme of the Lower Austrian Funds for Economy and Tourism for restructuring of enterprises in difficulties (N 499/2007; Prolongation via N534/2009.

2. Period covered by the notification 2013 - 2014

3. Policy objective and/or purpose of the subsidy Helping Lower Austrian endeavours in restructuring their business. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Department for economy, tourism & technology (WST3) at the Office of the Lower Austrian Government.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are granted to Lower Austrian endeavours that face difficulties and fall under

guideline 244/02 (Rescue and Restructuring of Enterprises in difficulties) in the form of grants. 7. Subsidy per unit, or in cases where this is not possible, the total amount 2013: € 52.684; 2014: € 8.224; Average subsidy per endeavour cannot be validly calculated (amount of aid is calculated for the specific case and differs strongly from case to case)

Page 122: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 122 -

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

30 June 2014 9. Statistical data permitting an assessment of the trade effects

Minimal effects on the international trade. 104 LOWER AUSTRIAN AID SCHEME FOR GUARANTEES FOR PARTICIPATION CAPITAL

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Lower Austrian aid scheme for guarantees for participation capital (X 104/2010, from 01.07.2014 Nr. SA.39581) 2. Period covered by the notification 2013 - 2014

3. Policy objective and/or purpose of the subsidy Providing a sound financial structure for regional SMEs. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Department for economy, tourism & technology at the Office of the Lower Austrian Government.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Combination of guarantee and grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are granted to endeavours investing in Lower Austria in the form of guarantees for participation capital. In addition, interest paid for the capital is subsidized for the first three years.

7. Subsidy per unit, or in cases where this is not possible, the total amount 2013: € 7.364.000,00; 2014: € 4.840.000,00; Average subsidy per endeavour cannot be validly

calculated (amount of aid is calculated for the specific case and differs strongly from case to case). 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement 31 December 2020 9. Statistical data permitting an assessment of the trade effects

Minimal effects on the international trade.

Page 123: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 123 -

105 SPECIAL GUIDELINES OF THE LOWER AUSTRIAN ECONOMIC AND TOURISM FUND FOR THE GRANTING OF GUARANTEES

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Special Guidelines of the Lower Austrian Economic and Tourism Fund for the Granting of

Guarantees (SA.39582). 2. Period covered by the notification 2013 - 2014

3. Policy objective and/or purpose of the subsidy

Providing a sound financial structure for regional SMEs. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Department for economy, tourism & technology at the Office of the Lower Austrian Government. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Guarantees. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Subsidies are granted to endeavours investing in Lower Austria in the form of guarantees. 7. Subsidy per unit, or in cases where this is not possible, the total amount

2014: € 510.240,00; Average subsidy per endeavour cannot be validly calculated (amount of aid is calculated for the specific case and differs strongly from case to case). 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

31 December 2020 9. Statistical data permitting an assessment of the trade effects

Minimal effects on the international trade. 106 OTHER SOURCE OF ENERGY /DISTRICT HEATING SUPPORT/INVESTMENT GRANTS

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Other source of energy /district heating support/investment grants. 2. Period covered by the notification

2013 - 2014 3. Policy objective and/or purpose of the subsidy

Cooperation in financing with the Kommunalkredit Public Consulting - KPC for the national environmental support of district heating.

Page 124: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 124 -

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Styrian government in cooperation with the Kommunalkredit Public Consulting - KPC / Support guideline.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant. 6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how

determined)

Enterprises, producers/fixed amount. 7. Subsidy per unit, or in cases where this is not possible, the total amount 2013: €230,186

2014: € 2,348,900 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Several years depends on project completion dates.

9. Statistical data permitting an assessment of the trade effects 2013: connection capacity 1.338 kW (district heating due to biomass) and 1.500 kW (industrial

waste heat) 2014: connection capacity 11.678 kW (district heating due to biomass) and 45.850 kW (industrial

waste heat) 107 SUPPORT OF PHOTOVOLTAIC PLANTS – OEMAG

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Support of photovoltaic plants – OeMAG.

2. Period covered by the notification 2013 - 2014

3. Policy objective and/or purpose of the subsidy

Supported rate in the context of the environment-friendly power law. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Federal government in cooperation with the styrian government / environment-friendly power law.

5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant.

Page 125: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 125 -

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Enterprises, producers/fluctuating amount dependent on current generation.

7. Subsidy per unit, or in cases where this is not possible, the total amount 2013: €187256.27 2014: €212439.29 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

2008-2023 9. Statistical data permitting an assessment of the trade effects 221 building projects

108 ECO FUND - CONTRIBUTIONS AND SUBSIDIES

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Eco Fund - contributions and subsidies

2. Period covered by the notification

2013 - 2014

3. Policy objective and/or purpose of the subsidy Support of innovative projects

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Federal government / environment-friendly power law 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Enterprises/fixed amount 7. Subsidy per unit, or in cases where this is not possible, the total amount 2013: n/a 2014: € 1341116.34

8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement Several years depends on project completion dates.

Page 126: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 126 -

9. Statistical data permitting an assessment of the trade effects No statistics available. 109 CONTRIBUTIONS AND SUBSIDIES, DISTRICT HEATING SUPPORT/INVESTMENT GRANTS -FINE DUST DIMINUTION GRAZ AND ENVIRONS

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Contributions and subsidies, district heating support/investment grants -fine dust diminution Graz and environment.

2. Period covered by the notification

2013 - 2014 3. Policy objective and/or purpose of the subsidy Development of district heating supply to the support of the fine dust diminution Graz Eggenberg.

4. Background and authority for the subsidy (including identification of the legislation under

which it is granted) Styrian government /resolution. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Enterprises/fixed amount. 7. Subsidy per unit, or in cases where this is not possible, the total amount 2013: €2940000

8. Duration of the subsidy and/or any other time limits attached to it, including date of inception/commencement

2013-2014

9. Statistical data permitting an assessment of the trade effects

No statistics available. 110 AIR QUALITY MANAGEMENT PLAN 2011; AIR QUALITY MANAGEMENT PLAN REVISION 2014: BAN FOR OLD TAXIS IN GRAZ

1. Title of the subsidy programme, if relevant, or brief description or identification of the subsidy

Air Quality Management Plan 2011; Air Quality Management Plan Revision 2014: Ban for old taxis in Graz 2. Period covered by the notification

2013 - 2014

Page 127: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 127 -

3. Policy objective and/or purpose of the subsidy Support of the quick renewal of the taxi fleet in Graz in addition to traffic ban. 4. Background and authority for the subsidy (including identification of the legislation under

which it is granted)

Styrian government/resolution. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.) Grant.

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others;

through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Enterprises/fixed amount.

7. Subsidy per unit, or in cases where this is not possible, the total amount 2013: €100,000 2014: €7000 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

2012-2016

9. Statistical data permitting an assessment of the trade effects No statistics available on trade effects

data concerning air pollutants: http://www.umwelt.steiermark.at/cms/beitrag/11874595/69765542/ 111 AIR QUALITY MANAGEMENT PLAN 2011; AIR QUALITY MANAGEMENT PLAN REVISION 2014: BAN FOR OLD HEAVY DUTY VEHICLES IN POLLUTED AREAS

1. Title of the subsidy programme, if relevant, or brief description or identification of the

subsidy Air Quality Management Plan 2011; Air Quality Management Plan Revision 2014: Ban for old heavy duty vehicles in polluted areas.

2. Period covered by the notification

2013 - 2014 3. Policy objective and/or purpose of the subsidy Support of the quick renewal of truck fleets in addition to traffic bans.

4. Background and authority for the subsidy (including identification of the legislation under which it is granted)

Styrian government /resolution. 5. Form of the subsidy (i.e., grant, loan, tax concession, etc.)

Grant.

Page 128: G/SCM/N/284/EU/Add - Commerce · G/SCM/N/284/EU/Add.1 5 May 2017 (17-2443) Page: 1/128 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL

G/SCM/N/284/EU/Add.1

- 128 -

6. To whom and how the subsidy is provided (whether to producers, to exporters, or others; through what mechanism; whether a fixed or fluctuating amount per unit; if the latter, how determined)

Enterprises/fixed amount.

7. Subsidy per unit, or in cases where this is not possible, the total amount 2013: €505,000 2014: €330,000 8. Duration of the subsidy and/or any other time limits attached to it, including date of

inception/commencement

2013-2014 9. Statistical data permitting an assessment of the trade effects No statistics available.

__________