growspan estate elite attached greenhouses - farmtek · attention: to avoid twisting off or...

55
Revision date: 01.01.16 Photo may show a different but similar model. STK# DIMENSIONS 104711 6'-4" W x 8'-3" H x 8'-6" L 104713 6'-4" W x 8'-3" H x 12'-6" L 104715 6'-4" W x 8'-3" H x 16'-6" L GrowSpanEstate Elite Attached Greenhouses ©2016 Growers Supply All Rights Reserved. Reproduction is prohibited without permission.

Upload: truongthuan

Post on 31-Mar-2018

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

1

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

Photo may show a different but similar model.

STK# DIMENSIONS

104711 6'-4" W x 8'-3" H x 8'-6" L104713 6'-4" W x 8'-3" H x 12'-6" L104715 6'-4" W x 8'-3" H x 16'-6" L

GrowSpan™ Estate Elite Attached Greenhouses

©2016 Growers SupplyAll Rights Reserved. Reproduction is prohibited without permission.

Page 2: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

2 Revision date: 01.01.16

YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE SHELTER.

Thank you for purchasing this GrowSpan™ greenhouse. When properly assembled and maintained, this product will provide years of reliable service. These instructions include helpful hints and important information needed to safely assemble and properly maintain the greenhouse. Please read these instructions before you begin.

If you have any questions during the assembly, contact Customer Service at 1-800-245-9881 for assistance.

SAFETY PRECAUTIONS

• Wear eye protection.

• Wear gloves when handling panels and frame parts.

• Use a portable GFCI when working with power tools and cords.

• Do not climb on the greenhouse or framing during or after construction.

• Do not occupy the greenhouse during high winds, tornadoes, or hurricanes.

• Provide adequate ventilation if the structure is enclosed.

• Do not store hazardous materials in the greenhouse without proper ventilation.

• Provide proper ingress and egress to prevent entrapment.

ANCHORING INSTRUCTIONS

Prior to assembling this greenhouse, please read the MUST READ document included with the shipment.

WARNING: The anchor assembly is an integral part of the greenhouse construction. Improper anchoring may cause greenhouse instability and failure of the structure. Failing to anchor the greenhouse properly will void the manufacturer’s warranty and may cause serious injury and damage.

See additional anchoring information beginning on page 24.

LOCATION

Choosing the proper location is an important step before you begin to assemble the structure.

The following suggestions and precautions will help you determine whether your selected location is the best location.

• Never erect the structure under power lines.

• Identify whether underground cables and pipes are present before preparing the site or anchoring the structure.

• Location should be away from structures that could cause snow to drift on or around the building.

• Do not position the greenhouse where large loads such as snow and ice, large tree branches, or other overhead obstacles could fall.

• Always check local building codes before you begin.

SITE

After choosing a location, proper preparation of the site is essential. The following site characteristics will help ensure the integrity of the structure.

• A level site is required. The site must be level to properly and safely erect and anchor the structure.

• Drainage: Water draining off the structure and from areas surrounding the site should drain away from the site to prevent damage to the site, the structure, and contents of the structure.

WARNING: The individuals assembling this structure are responsible for designing and furnishing all temporary bracing, shoring and support needed during the assembly process. For safety reasons, those who are not familiar with recognized construction methods must seek the help of a qualified contractor.

ASSEMBLY NOTE

The assembly of this greenhouse is not complex; however, it does take time and additional assistance. For best results and an overview of the entire assembly, read through these instructions before you begin. Then, follow these instructions as presented.

Examine all diagrams and photos and verify that you have selected the proper parts from the correct box or boxes. Do not mix parts from different boxes. When checking parts, place the parts back into the same box they were removed from and continue with the next box.

Cover the assembly surface with cardboard or similar material to protect the greenhouse finish during assembly.

Page 3: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

3

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

ASSEMBLY PROCEDURE

Following the instructions as presented will help ensure the proper assembly of your greenhouse. Failing to follow these steps may result in an improperly assembled and anchored greenhouse and will void all warranty and protection the owner is entitled.

The steps outlining the assembly process are as follows:

1. Verify that all parts are included in the shipment. Notify Customer Service for questions or concerns.

2. Read these instructions and all additional documentation included with the shipment before you begin assembling the greenhouse. Use these instructions and the bill of materials list inside each box when assembling the greenhouse.

3. Gather the tools, bracing, ladders (and lifts if applicable), and assistance needed to assemble the greenhouse.

4. Re-evaluate the location and site based on the information and precautions presented in the documentation included with the shipment.

5. Lay out the site (if this has not been completed).

6. Assemble the base frame and greenhouse components in the order they are presented in these instructions.

7. Anchor the greenhouse as instructed. See information beginning on page 24.

8. Read the Greenhouse Care and Maintenance information near the end of these instructions.

9. Complete and return all warranty information as instructed.

REQUIRED TOOLS

The following list identifies the main tools needed to assemble the shelter. Additional tools and supports may be needed depending on the structure, location, and application.

• Tape measure or measuring device

• Marker to mark UV-side of panels during assembly

• Variable speed drill and sockets (cordless with extra batteries works best)

• Small hammer and gloves

• Adjustable pliers and wrench (or ratchet)

• Phillips screwdriver

• Ladders and/or work platforms

• Caulk gun for silicone application

GREENHOUSE PARTS

All greenhouse sections (e.g., roof, sides, end walls, etc.) ship individually in numbered boxes. The quantity of boxes may differ depending on the greenhouse. To prevent mixing the parts while assembling the greenhouse, select the boxes as instructed and open that box only and assemble its contents. OPEN BOXES AS INSTRUCTED TO PREVENT MIXING OF THE CONTENTS.

NOTE: Some photos and diagrams throughout these instructions may show a greenhouse with slightly different dimensions, color, or design. The assembly procedures are identical regardless of these differences. Notable differences are addressed. For a quick overview of this greenhouse, consult the diagrams in the Quick Start section near the back of these instructions.

Those not familiar with the assembly of similar structures and the use of common hand tools must seek the assistance of someone with such experience.

PART IDENTIFICATION NUMBERS

All main parts include a stamped ID number. Use this number when selecting the required parts during the assembly.

17

17

NOTE: The locations of the part numbers on the components may vary. Refer to the Bill of Materials shipped within each box for a description of each part.

WARNING: Do not allow the polycarbonate panels to remain in direct sunlight until they are installed. Doing so will cause the protective film to become difficult if not impossible to remove.

Consult Page 32 for additional polycarbonate information. And, Step 10 on that page, for "how to use vent tape" (additional purchase required) information before installing any polycarbonate panel.

Page 4: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

4 Revision date: 01.01.16

Rafters

Base Rail

Diagonal Strut

Vertical Support: Sidewall

Gutter Rail

OVERVIEW

This section describes assembling your Elite greenhouse. See illustration below to identify main parts of greenhouse.

1. Locate the required parts for each assembly procedure.

2. Preassemble the base frame, end walls and sidewalls.

3. Assemble the frame and install the ridge beam, rafters and vents.

4. Square and anchor the greenhouse.

5. Assemble and install door.

6. Attach gutter rails ends.

7. Install the side, end and roof polycarbonate panels.

8. Assemble and attach door, door stops, down spouts, and ridge beam end covers.

Ridge Beam

ATTENTION: TO AVOID TWISTING OFF OR DAMAGING THE FASTENERS, DO NOT OVERTIGHTEN.

FOR YOUR CONVENIENCE, ADDITIONAL FASTENERS CAN BE FOUND IN THE "EXTRA PARTS" BAG OR BOX. REFER TO THE BILL OF MATERIALS FOR A LIST OF THE FASTENERS CONTAINED IN THAT BAG OR BOX.

Actual strut position may differ from what is shown in this example.

GrowSpan™ Estate Elite Attached Greenhouses

Page 5: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

5

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

BASE FRAME ASSEMBLY (ADDITIONAL PURCHASE)

The optional base frame provides a level, square surface on which to set the greenhouse frame. It is strongly recommended that you use this base. The optional base is assembled and squared and set into the ground. It is then anchored in place using ground posts or other approved anchoring methods described in these instructions. This base is an additional purchase. Contact your sales consultant for additional information and to purchase. NOTE: The frame in the following instructions may differ from the actual frame in size and/or color. The assembly procedures are the same. CONSULT THE BASE DIAGRAM NEAR THE BACK OFTHIS PACKET BEFORE YOU BEGIN. The following steps describe how to assemble the optional base frame for the greenhouse.

1. Unpack the base kit to identify the parts. NOTE: The base is assembled upside down and then is flipped when it is positioned on the site.

2. Identify the base channel lengths used for the ends (width) and the sides (length).

3. Select the first frame support post and the required nuts and bolts and place these at one corner of the base.

ATTENTION: If you plan to place the base on a concrete slab or patio, you must remove the "leg" portion of the frame support posts. Before you assemble the base as shown below, cut the frame support posts so they are the same length as the base channel is wide.

Support Post

Base Channels

Cut these only if you plan to place the frame, and ultimately the greenhouse, on a concrete slab.

4. Insert two bolts through the pre-drilled holes in the post and one base channel and add the nuts.

NOTE: Do not tighten the bolts at this time.

5. Select the remaining bolts and repeat the previous step to attach the remaining base channel to the support post.

Leg portion of frame support postIMPORTANT:

Dashed line shows where to cut when removing the leg for use on concrete only.

Support Post

Page 6: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

6 Revision date: 01.01.16

BASE FRAME ASSEMBLY (CONTINUED)

6. Verify that the post is straight and tighten the bolts.

7. Repeat the procedure to attach the remaining support posts to the base channels.

Dotted line shows an optional location for the support post depending on the site.

8. After the frame is assembled and all bolts are tight, flip the base over and set it on the site.

Insert shows how the support post is attached to the base channel.

9. Continue with the next procedure.

SQUARE THE BASE

Before the support posts of the base are driven into the ground and before the assembled greenhouse frame is set on and secured to the base, you must square the base assembly and anchor the base to the site. This base and greenhouse require a level site. Before setting the base or greenhouse frame (or both) in place, you must level the site. The easiest way to square the base is to measure diagonally from corner to corner. Complete these steps: NOTE: The following procedure describes how to square the base on a prepared site and drive the base support posts into the ground.

1. Position the assembled base on the site as shown in the diagram below.

2. Measure diagonally from corner-to-corner.

NOTE: The frame is square when both measurements are the same. Dashed line shows the structure that the greenhouse is attached to.

3. When the frame is square, tap the support posts into the ground to set the frame in place and recheck the measurements. NOTE: Place a block of wood on top of the base channel and support post and hammer on the wood to protect the frame when driving the posts into place.

4. Continue to drive the posts to the desired depth. NOTE: Use a level (or string a line) to verify that the base remains level when set into the ground. Secure base frame ends to the permanent structure if desired.

5. After setting the base on the site, continue with the greenhouse assembly.

Top of base

Permanent Structure

Greenhouse Base Frame

IMPORTANT: Customer must determine how to attach the assembled greenhouse to the permanent structure. Fasteners for this procedure are not included due to the variety of exterior finishes.

All silicone, fasteners, and weather stripping included with this greenhouse are used during the construction of the greenhouse.

Consult the services of a qualified contractor for suggestions to secure and seal the greenhouse to the permanent structure.

Page 7: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

7

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

ASSEMBLE THE GABLE END WALL FRAMES

The greenhouse has two end walls: one with a door and one without a door. The end walls are packaged separately. Each package includes all the parts required for that end wall. For the best results and to prevent mixing parts, assemble each end wall separately as described below.

NOTE: All bolt tracks in the frame members are installed to the inside of the greenhouse. All diagrams and individual photos shown in these end wall instructions show the inside surface of the frame unless otherwise noted.

Photo shows vertical frame member for end walls. The bolt track is installed to the inside of the greenhouse. IMPORTANT: To prevent loosing parts, assemble all frame components on a flat surface. A concrete driveway or a garage floor works best. Cover surface to protect greenhouse finish. As you assemble the frame sections, the inside of the frame will face up as shown in the photos that follow.

Complete the following steps to assemble the first end wall frame. Consult the End Frame Diagrams near the back of these instructions before you begin.

1. Open the package that includes the parts to assemble the gable end frame that includes the door frame parts. Consult the End Frame Diagram – Door End in the Quick Start section (back) for part identification. Parts may be packed in different poly bags.

2. Locate the top bracket used to join the upper supports to long, lower support at the peak of the end wall.

Bolt Track

3. Locate the two supports for the end wall.

The upper support includes pre-drilled holes and a beveled edge. The long, lower support is attached to the upper support by the top bracket. The long, lower support is the support at the back of the greenhouse and is used to attach the greenhouse to another structure.

4. With the upper supports positioned as shown below, secure the 17 bracket to the supports.

View shows the supports as seen from the inside of the greenhouse.

17

17

15

14A

17

1514A

ATTENTION: TO AVOID TWISTING OFF OR DAMAGING THE FASTENERS, DO NOT OVERTIGHTEN.

Use the fasteners in the extra parts bag or box to replace lost or damaged fasteners.

Search the items in the extra parts bag or box before you call Customer Service to request replacement parts.

Page 8: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

8 Revision date: 01.01.16

5. Locate the remaining angled bracket and attach it to the end of the upper support. Do not tighten bolts at this time.

ASSEMBLE THE END WALL FRAMES (CONTINUED)

ATTENTION: Some upper supports may include a bolt track instead of the pre-drilled holes as shown in the photo. If so, slide bolts into the track and attach bracket.

6. Select the short, lower support, slide two bolts into the bolt track, and attach the lower support to the angled bracket as shown below.

7. Attach the lower support to the angled bracket using nuts and the bolts in the track. Insert bolts through drilled holes of the bracket. Do not tighten bolts at this time.

Upper Support (15)

18

Lower Support (14)

Slide bolt head through here.

18

Lower Support (14)

Upper Support (15)

Attach Strut Here

18

8. Verify that the four bolts are loose and place the template into position as shown in the photos below.

ATTENTION: The template is used to set the proper clearance for the gutter rail. The template slides into the slots in each frame member.

9. With the template in position, tighten the upper bolts to secure the bracket to the upper frame member (15) of the end wall. See the arrows above.

Template

14

15

18

18

template

REMINDER: Brackets are installed on the inside of the shelter.

Page 9: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

9

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

ASSEMBLE THE END WALL FRAMES (CONTINUED)

11. Locate the first diagonal strut, loosen the lower bolt identified by the arrow in the photo below and attach one end of the diagonal strut to the bolt.

Consult the End Frame Diagram for clarification. NOTE: Do not tighten the two bolts that secure the lower support to the angled bracket at this time. The diagonal strut must be allowed to move to align it with the base rail of the end wall frame in a later step. Gable end frame should resemble the photo below.

10. Slightly tighten the lower two bolts and remove the template.

14

15

Clearance set using the template.

18

Diagonal Strut (13)

Lower Bolt

12. Locate the two vertical supports (marked with an X's below) that run between the upper support and the base rail and slide seven (7) bolts into the track of the 12-2 support and four (4) bolts into the track of the shorter 12-1 support.

These bolts are used to attach the vertical supports to the upper support and the base rail. The remaining bolts are used to secure brackets and the horizontal braces of the end frame. See the End Frame Diagram for clarification.

13. Take the header (65), bracket (65-2), and support (12-1). Insert the top bolt of the support through the pre-drilled hole in the upper support (15). Insert four (4) bolts into track of header (65-1). Bracket fits over two (2) bolts in the header and one bolt the 12-1 support. Secure as shown below.

Vertical Support

Bolt Track

X X

15

Short, Vertical Support (12-1)

Header (65)

Inside View

12-2

65-2

12-1

13

17

14

Base Rail Location

Page 10: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

10 Revision date: 01.01.16

ASSEMBLE THE END WALL FRAMES (CONTINUED)

14. Take the longer (12-2) support and the two brackets (110 & 65-1). Insert the top bolt of the 12-2 support through the pre-drilled hole in the upper support. Insert the next 3 bolts into the pre-drilled holes of the 110 bracket. Position the angle of the bracket along the lower edge of 12-2 support. See photo below.

Brackets

110

65-1

110

65-1

12-2

65

15. Select the next bolt in the 12-2 support and insert the bolt into the pre-drilled hole of the 65-1 rectangular bracket. Insert the remaining two (2) bolts in the header (65) track into the remaining holes of the 65-1 bracket. Align Bracket 65-1 with the edge of the 110 bracket.

To this point the end frame should resemble the photo below.

Bolt

12-1

Horizontal Brace

19

16. Locate a remaining bolt in the bolt track of the short 12-1 support and attach one horizontal brace (19) to the bolt. Do not tighten the bolt at this time.

17. Move to the angled bracket (18) and attach the brace using the bolt as shown.

18. Repeat steps to attach the remaining horizontal brace (19) to the 12-2 support and the 14A end frame support.

19

12-2

14A

Upper Support (15)

Diagonal Strut

19

Base Rail Location

19. Attach the remaining diagonal strut (19).

Page 11: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

11

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

ASSEMBLE THE END WALL FRAMES (CONTINUED)

Vertical Support

To the top of the end wall frame.Base Rail (10)

Up to this point, all end wall frame members are attached except for the base rail. The dotted line shows the position of the base rail. See photo below.

20. With the end wall assembled as shown, locate the base rail (10) and position it at the ends of the lower supports and vertical supports.

14A

NOTE: The slot used to attach the base rail to the lower support is positioned to the inside of the greenhouse. The view above is an end view of the base rail. Actual rail may differ slightly in design.

21. With the base rail in position, insert the bolt of one (1) door support through the pre-drilled hole in the base rail and hold the bolt in place. Do not install the nut on the bolt at this time.

22. Take the free end of the diagonal strut and insert the bolt of the door support through the pre-drilled hole in the diagonal strut and install the nut.

ATTENTION: Verify that the bottom of the door support is tightly seated against the top of the base rail before you tighten the bolt and nut.

View is from the outside of the greenhouse looking at the top of the base rail where the door support is attached.

23. With the support tight against the top of the base rail, tighten the nut and repeat the steps to attach the remaining door support and diagonal strut to the end wall base rail.

24. After attaching both struts and door supports to the base rail, move to one end of the base rail and attach the lower end of the vertical support.

Vertical Support 14A

Base Rail (10)

Vertical Support 14A

Base Rail (10)

Notch toward the inside of the greenhouse. Flush to the top

of the base rail.

Page 12: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

12 Revision date: 01.01.16

ASSEMBLE THE END WALL FRAMES (CONTINUED)25. Verify that the vertical support is seated flush with the

top of the base rail and tighten the bolt.

26. Repeat the steps to attach the base rail to the remaining lower support. NOTE: Verify that the horizontal braces are parallel to the base rail. Use a carpenter's square to verify that the assembled frame is square before tightening all bolts. If it appears that the assembled end frame is in a bind or is twisted, loosen a few of the bolts in the angled brackets or vertical supports and allow the frame to settle and shape itself. Retighten the bolts as needed.

27. Repeat the procedure to assemble the remaining gable end wall. ATTENTION: The remaining end wall frame does not include the header. In addition, the small horizontal braces (19) of the first end wall have been replaced by a single, longer horizontal brace (29). Keep these changes in mind as you complete the assembly of the remaining end wall frame. Consult the End Frame Diagram: No Door when assembling the frame if needed.

28. After assembling the last end wall frame, continue with the Sidewall Assembly procedure that follows.

SIDEWALL ASSEMBLYAfter both gable end wall frames are assembled, locate thebox labeled with the roof and sidewall parts. Remove the plastic and assemble its contents as described below.

ATTENTION: Consult the Sidewall Frame Diagram for a description of parts. All vertical supports are installed with the bolt track to the inside of the greenhouse. Photos may show a frame of a different color or length. Greenhouse 104715: Consult the EXPLODED FRAME COMPONENTS diagram near the back of these instructions for important information regarding the assembly of the gutter rail and base rail.

Complete these steps:

1. Unpack the sidewall parts and position them on a flat surface for assembly. Place gutter rail at the top of the sidewall and the base rail at the bottom.

Photo shows the gutter rail as seen from the outside of the sidewall assembly. The dashed line shows where the end wall frame assembly is attached.

2. Select the vertical supports for the sidewall and slide two bolts into the bolt track of each support. NOTE: One bolt is used to attach the vertical support to the gutter rail and the other is used to attach the support to the base rail. For some vertical supports of the sidewall, the bolts are also used to attach the diagonal strut to the frame. IMPORTANT: The longer, red-headed bolts are used to secure the sidewall diagonal struts only. Consult the Roof/Sidewall Frame diagram for bolt and strut locations. Additionally, greenhouse models 104713 and 104715 include a vertical support that has two (2) bolt tracks. Bolts for the sidewall assembly are placed in the track that does not include a slot next to it. See the photo on the next page for additional details.

EXTRA PARTS PROVIDED FOR GREENHOUSE

ATTENTION: TO AVOID TWISTING OFF OR DAMAGING THE FASTENERS, DO NOT OVERTIGHTEN.

FOR YOUR CONVENIENCE, ADDITIONAL FASTENERS AND PLASTIC MOLDING CAN BE FOUND IN THE "EXTRA PARTS" BAG OR BOX.

REFER TO THE BILL OF MATERIALS FOR A LIST OF THE FASTENERS AND MOLDING CONTAINED IN THAT BAG OR BOX.

The plastic profile can be trimmed to the required length if a piece is misplaced or damaged during installation.

IMPORTANT: Consult the "extra parts" for items you need before contacting customer service to request a replacement for damaged or missing parts or fasteners.

14A 10

Gutter Rail

Gable End Frame

Page 13: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

13

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

3. Attach each vertical support (31) to the gutter rail by inserting the bolt through the pre-drilled hole in the gutter rail. Do not tighten at this time. ATTENTION: For the sidewall support (14) with two bolt tracks, the gutter rail (and base rail) will seat into the slot of the support. Insert the bolt through the pre-drilled hole in the frame member. Do not tighten.

Photo shows the double-bolt track support (14) with the base rail seated into its slot. Top of the support is attached to the gutter rail in a similar fashion. NOTE: The slotted hole at each end of the gutter rail is used to attach the end wall frame assembly to the sidewall. Use the diagram to position the first vertical support (31) in the correct location.

The photo above shows the vertical support (31) and diagonal strut (33) as attached to the gutter rail of the sidewall. View shows the inside of the frame.

SIDEWALL ASSEMBLY (CONTINUED)

Gutter Rail

NOTE: Pictures may not reflect actual length. Consult the Roof/Sidewall Frame diagrams near the end of these documents for each length layout.

5. Attach the struts (33) to the gutter rail as shown below. Do not fully tighten the bolts at this time.

4. Insert the remaining bolts, located in the bolt tracks of the vertical supports (31), into the pre-drilled holes of the base rail. Remember to attach diagonals where applicable.

6. Once all vertical supports are attached to the gutter rail and the base rail, tighten all bolts. Use a carpenter's square or similar tool to square the frame as bolts are tightened.

Slot is next to bolt track identified by X.

Applies to 104713 and 104715 frames only. X

14

7. After the final sidewall is assembled, continue with the frame assembly procedure that follows.

Use red-headed bolts to attach struts.

Page 14: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

14 Revision date: 01.01.16

FRAME ASSEMBLY

After assembling both gable end frames and sidewall frames, the assemblies are attached to each other to construct the greenhouse frame.

NOTE: The greenhouse frame must be assembled on a clean, flat surface such as a driveway or patio. An uneven surface will not allow the sides and ends to join properly. In many instances, the greenhouse frame can be moved (with assistance) to the site after it is assembled or onto the optional base if that was purchased. The frame in the following photos may be of a different model. The assembly process is the same. Consult diagrams in the Quick Start section for details.

Complete the following steps.

1. Position the assembled frame sections as shown below.

All inside surfaces are facing up in the above photo.

2. Lift the first end wall and sidewall frames into position.

Photos above and the following photos may be of a similar model. The assembly process is the same for your greenhouse.

3. Slide a red-headed bolt into the bolt track of the end wall frame support (14). See inside view below.

NOTE: Use a small piece of tape to keep the bolt near the top of the bolt track if desired. Place the tape in the same position as the finger in the photo (above) to keep the bolt from sliding down the track.

4. Once the bolt is in the track, seat the gutter rail of the sidewall into the corner of the end wall frame as shown.

View is from the outside of the greenhouse frame and shows the gutter rail as seated into the corner.

Slide red bolt into the track.

Gutter Rail

Page 15: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

15

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

FRAME ASSEMBLY (CONTINUED)

NOTE: If you are unable to seat the gutter rail completely into the end wall frame as shown, loosen the angle bracket bolts. This will allow the frame components to move when the rail is seated in position.

5. After seating the gutter rail in position, retighten the angle bracket bolts (if needed) and slide the bolt shown in the next photo into position and tighten.

Angle Bracket Bolts

To attach a strut, detach the horizontal brace of the end wall frame if needed. After the strut and bolt are secured, reattach the end wall horizontal brace.

Gutter Rail

Strut (33)

Gutter Rail

Horizontal Brace

6. With assistance, place a bolt into the end wall upper support bolt track and slide it down to the gutter rail of the sidewall.

Photo shows sliding the bolt into the track at the peak of the end wall frame where the upper support connects to the top bracket.

7. With the bolt in place, add a nut and tighten all bolts in the location shown below.

8. Move to the lower corner of the two assembled frame sections (the end and sidewall). See photo below.

End Frame Base Rail (10)

Sidewall Base Rail

Photo above shows the end frame to sidewall as seen from the inside of the greenhouse frame assembly.

Peak

Slide bolt into end wall support track.

Gutter Rail

Use bolt with a red head.

Page 16: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

16 Revision date: 01.01.16

FRAME ASSEMBLY (CONTINUED)Photo below shows the corner of the greenhouse as seen from the outside. End wall support is tight to the top of the sidewall base rail.

13. To this point, all gutter rails are secured to the end wall frame assemblies and all angle bracket bolts are tight.

14. Continue with installing the ridge beam of the roof.

End Wall Lower Support

End Wall Base Rail

Sidewall Base Rail

9. Verify that the end wall lower support is seated to the top of the sidewall base rail.

10. Tighten the bolt to secure the sidewall base rail to the end frame lower support.

11. Recheck all bolts to verify they are tight.

12. Repeat the procedure to connect the remaining gutter rail ends to the end wall frame of the greenhouse to complete the assembly of the greenhouse lower frame. IMPORTANT: See the Exploded Frame diagram in the Quick Start section if you are assembling the 104715 home-attached greenhouse. The 104715 frame includes a 2-piece base rail for the sidewall, a 2-piece gutter rail, and a 2-piece ridge beam.

Photo above may be of a similar but different model.

RIDGE BEAM INSTALLATION

The ridge beam connects the two end wall frame assemblies at the peak. Because it is the main support of the roof framing, the ridge beam is installed before the roof rafters. For the 104715 greenhouse, consult the EXPLODED FRAME COMPONENTS diagram in the Quick Start section for important information before you continue.

Complete the following steps to install the ridge beam:

1. Choose a bolt and slide it into the bolt track of the upper support for one end wall.

NOTE: Bolt will slide to the bottom of the track. Use a small piece of tape to keep it near the peak where it is used.

2. Locate roof parts and unwrap them.

3. Select the ridge beam (this will be the longest frame member in the package) and position it between the end wall frames at the peak. Assemble the beam for the 104715 frame. See Exploded Frame diagram. REMEMBER: Photos show the inside of the greenhouse unless otherwise noted. All bolt tracks are positioned to the inside of the greenhouse.

View shows the ridge beam as seen from the outside looking at the end wall frame.

Page 17: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

17

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

RIDGE BEAM INSTALLATION (CONTINUED)

View below shows the ridge beam as seen from the inside looking at the peak of the end wall frame. Bolts are slid into the pre-punched mounting slots in the ridge beam.

4. Add a nut to the bolt installed in Step 1 and slide the bolt toward the peak and into the mounting slot of the ridge beam.

5. Verify that the ridge beam is seated properly and tighten the bolt.

6. Repeat the procedure to secure the remaining end of the ridge beam.

Ridge Beam

7. With the ridge beam in place, install the roof rafters.

INSTALL THE ROOF RAFTERS

The roof rafters are installed with the bolt tracks to the inside of the greenhouse. Longer greenhouses (104713 and 104715) include a support (52) with double bolt tracks.

ATTENTION: Greenhouses 104713 and 104715 include a main support (52) with a double track (see photo below); begin with Step 1 and install this support (52) first.

For greenhouse 104711: If you are assembling the roof for the 104711 greenhouse, begin with Step 11.

Complete the following steps as instructed:

1. Move the double track support (52) to the inside of the assembled frame and locate the required bolts and nuts. NOTE: The double track support (52) is installed in line with the double bolt track vertical support (14) of the sidewall. The double track support (52) is installed so it is attached to the sidewall vertical support (14) as shown below. See Special Note on the Roof/Sidewall Frame diagram in the Quick Start section if you are assembling the 104713 greenhouse.

2. Count the number of bolts needed to mount the 94, 100, and 101 brackets, and slide these into the bolt track of roof support 52 and sidewall support 14.

Upper Bracket (101)

Double-Track Roof Support (52)

Double-Track Sidewall Support (14)

Angled Bracket (94)

Horizontal Support (103)

Diagonal Brace (102)

Lower Bracket(100)

3. Add mounting bolts and one additional bolt to the double-track sidewall support (14) for the horizontal brace (103). Use tape to keep bolts from sliding out of the track.

Page 18: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

18 Revision date: 01.01.16

4. Install the corner bracket (94). After installing all bolts, tighten all nuts.

NOTE: Photo above shows the 104715 frame that includes a 2-piece gutter rail. The 104711 and 104713 do not include the additional gutter rail brackets.

5. Attach the upper bracket (101) to the support (52). (Actual number of bolts for brackets may differ from what is shown in these photos.) Do not tighten bolts.

6. Using four (4) bolts in the double track sidewall support (14), attach the lower bracket (100). Do not tighten.

INSTALL THE ROOF RAFTERS (CONTINUED) 7. Attach the diagonal brace (102) to the support brackets (100 and 101). Tighten bolts.

8. Once the diagonal brace (102) is in place, tighten all nuts and bolts on brackets.

9. Using the remaining bolt in the track of sidewall support (14), attach the horizontal brace (103). Do not tighten; allow brace to freely move along vertical.

NOTE: Frame shown may differ slightly from actual frame; assembly is the same.

10. Secure the remaining end of the horizontal brace (103) to the diagonal brace (102).

11. Verify that the 103 brace is level and tighten the bolts.

Horizontal Brace (103)

Sidewall Support (14)

Diagonal Brace (102)

Lower Support Bracket (100)

Sidewall Base Rail

14

Upper Support Bracket (101)

101

52

Upper Bracket Lower Bracket

Diagonal Brace

Diagonal Brace

100102

101

52 14

94

14

52Gutter Rail

ATTENTION: Verify that you have one additional bolt remaining in the track of the sidewall support (14) to attach the 103 brace. See Step 9 in the next column. Remove bracket and add a bolt if needed.

Page 19: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

19

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

INSTALL THE ROOF RAFTERS (CONTINUED)

ADDITIONAL BOLTS REQUIRED: In addition to the rafter mounting bolts, extra bolts must be slid into the bolt track of some rafters for vents, Z-brackets, and diagonal struts. One (1) extra bolt is needed where a roof diagonal crosses a rafter. (See diagram at back for diagonal strut locations.) One (1) extra bolt per rafter is needed for a roof vent connection. (Vents can span two or three rafters. Consult the Quick Start diagrams.) One bolt is used to attach each Z-bracket. Finally, one (1) bolt is needed for the ridge beam connection.

13. Consult the diagrams in the Quick Start section to determine which rafters require additional bolts. Then slide the required additional bolts into the bolt track of the rafter as needed and attach the remaining end to the ridge beam.

Rafter (51)

Vertical Support Sidewall (31)

Gutter Rail

View is from the inside of the greenhouse.

12. Take a rafter (51), slide one bolt into the bolt track, and attach the rafter to the gutter rail. Do not tighten the bolt at this time.

14. Tighten the rafter mounting bolts to secure the rafter to the gutter rail and ridge beam. Some rafters do not require additional bolts.

15. Repeat steps 12-14 for the remaining rafters.

Extra Bolt

Ridge Beam

16. Following the roof and sidewall diagrams near the back of this document, locate the position of the roof diagonal struts. NOTE: Bolts and nuts on the ridge beam or gutter rail can be removed and reattached when installing the struts. Insert additional bolts into the bolt track to attach the diagonal struts and vents if needed.

17. Where a diagonal strut crosses a rafter, slide one (1) of the extra bolts on the rafter to the diagonal and place in the pre-drilled hole on the diagonal. Loosely twist a nut onto the bolt. Once the diagonal is secured to each rafter that it crosses, tighten the nuts and bolts.

18. After installing all rafters and diagonal struts, assemble and install the roof vents. Consult the Quick Start diagrams for details and vent positions.

Rafter (51) Bolt

Strut (95)

Page 20: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

20 Revision date: 01.01.16

ATTENTION: Greenhouse 104711 includes a single-bay vent. Consult that diagram in the Quick Start section for additional details.

3. Using the small Phillips head bolts and nuts, attach the bottom rail to the side rails. Do not tighten these at this time.

4. Next, attach the top hinge rail to the side rails using the Phillips head bolts.

5. Using a carpenter's square (or other means), verify that the assembled vent frame is square and tighten the bolts.

6. Remove the bolt from the pre-assembled vent support arm (74) and attach the mounting bracket to the frame (72) and reattach the 74 support arm.

NOTE: Attach the mounting bracket to the frame using a small bolt and a self-locking nut. The bracket and arm must be allowed to swivel on the frame rail. When the arm is properly installed, the channel of the support arm will be visible from inside the greenhouse when the arm is properly installed.

7. Repeat the above steps for the remaining support arm.

8. Once the vent frame is assembled, locate the two (2) cross members for the vent frame. The single-bay vent frame has only one (1) cross member (75).

NOTE: All photos show the vent frame assembled with the inside surface facing up. When installed on the greenhouse, the frame surface shown in the photos is seen from inside the greenhouse. Vent frames are either single bay or double bay (shown) and are assembled the same. Complete the steps that follow:

1. Locate and open one (1) vent frame package. Open one package only to avoid mixing parts.

2. Arrange the parts as shown. See the Vent Frame diagram for part identification and complete the assembly.

ROOF VENT ASSEMBLY AND INSTALLATION

Vent frame parts are packaged in separate poly bags. Consult the table below for box numbers for your greenhouse:

Greenhouse Sku Number Vent frames in box:104711 – 104713 – 104715 No. 4-2

Channel is visible when arm is installed correctly.

Photo shows the notched edge of the 75 cross member, which is installed toward the ridge beam (or peak) of the greenhouse roof. The selected hole in the channel of the 74 support arm is placed over the center pin of the notch to hold the vent open.

75

Double-Bay Vent

Page 21: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

21

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

Picture shows the location of cross members. The greenhouse model may differ.

9. Install the two (2) cross members (75) between the three rafters where the vent frame will be installed.

ASSEMBLE AND INSTALL THE ROOF VENTS (CONTINUED)

NOTE: View shows the frame as seen when standing on the inside. Only one (1) cross member (75) is shown in the above photo.

10. Using the additional bolts (rafter assembly) in the bolt tracks, attach the cross members (dashed line below) between the rafters. Do not tighten the bolts at this time. Double-bay vent position shown for 104713.

NOTE: The X's in the above photo show where to attach the Z-brackets (77). The Z-bracket holds the vent support arms in place when the vent is closed. Single-bay vents have a single Z-bracket; each double-bay vent has two (2) Z-brackets–one for each support arm.

Photo below shows one end of the cross member (75) where it is attached to the rafter. The bolt is on the underside of the rafter, which is to the inside of the greenhouse.

To the ridge beam

51

75

View shows the cross member (75) from the outside.

11. After attaching the cross members (75), take the assembled vent frame and insert one end into the C-channel of the ridge beam. See the photos below and vent frame diagram for details.

12. Slide the vent frame into the channel. The side of the vent frame that was facing up during its assembly should now be facing to the inside of the frame.

ATTENTION: You must flip the assembled vent frame over so that the rounded edge of the top hinge rail can be inserted into the channel of the ridge beam.

Cross Member (75)

Rafters (51)

Sidewall Supports (31)

Gutter Rail

Ridge Beam

Top of Hinge Rail

Ridge Beam

Top Hinge Rail of Vent Frame

ATTENTION: Ridge beam design may differ from actual beam. Vent installation is the same.

70

Inset shows the ridge beam of a home-attached greenhouse.

Page 22: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

22 Revision date: 01.01.16

Bottom Rail of Vent

Rafter

Ridge Beam

Bottom Rail of Vent

Cross Member

Support Arm

Support Arm

ASSEMBLE AND INSTALL THE ROOF VENTS (CONTINUED)13. Continue to slide the vent frame into the channel until

the vent frame is aligned between the rafters where the cross members (75) were installed.

14. Once aligned, allow the vent frame to rest in the closed position on the rafters.

15. Loosen the bolts (if needed) and slide the cross members (75) up until these touch the bottom rail of the assembled vent frame. See the photo below.

View is from the outside of the greenhouse. The double-bay vents span two (2) rafter bays; single-bay vent spans a single rafter bay. NOTE: To prevent binding, do not seat the 75 cross members tightly against the bottom rail of the vent frame.

View is from the inside of the greenhouse looking up at the installed vent frame and the cross members (75).

16. With the cross member (75) in position, test the operation of the vent frame and tighten the bolts to secure the cross members (75).

17. Working from inside the greenhouse, close the vent and swivel the vent support arm down and toward a rafter.

NOTE: This a rafter where the remaining "additional" bolt was inserted. If no "additional'' bolt is present, loosen the rafter bolt at the gutter rail, slide a bolt into the bolt track, and retighten the rafter mounting bolt.

18. Slide the remaining bolt up to the support arm as shown and attach the Z-bracket as shown below.

19. With the Z-bracket (77) attached, lift the support arm (74) out of the bracket and remove the vent frame from the greenhouse to install the polycarbonate panel. NOTE: The polycarbonate panels for the vents can be installed with the vent frame attached to the greenhouse roof if desired. This procedure installs the polycarbonate panels with the assembled roof vents removed for easier accessibility.

20. Repeat the steps to assemble and install all remaining vent frames. Consult the Quick Start section.

21. After all vents are assembled, installed, fitted in the frame, and removed, install the vent panels.

Ridge Beam

75

Rafter

Bottom Rail of Vent Bottom Rail of Vent

74 Support Arm

Z-Bracket (77)

77

51

74

Page 23: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

23

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

INSTALL THE POLYCARBONATE VENT PANELS

The steps below describe attaching the polycarbonate vent panels to the assembled vent frames. The panels are lettered for identification. Consult the panel diagrams and the diagrams on the outside of each shipped box to locate and identify parts. See Page 32 for additional information.

The parts needed to complete the vent frame assembly include the following:

• Polycarbonate Panels: Letter X

• U602 U-profile and silicone

2. Carefully peal the protective film away from the edge on both sides of the panel if needed. To prevent scratching the panel, do not completely remove the protective film until the plastic U-strips are installed.

3. Take one U-strip and install it on the top edge of the polycarbonate panel.

NOTE: The top and bottom edges of each panel show the hollow cells inside the panel. When installing the plastic molding, rest the panel on cardboard or other material to protect the edges and surface of the panel.

4. Take the remaining strip and attach it to the bottom edge of the panel.

Plastic U-Strip

Polycarbonate Panel

Photo shows a single panel. Panel cells run vertically and are "capped" by the U-strips.

5. With both U-strips installed on the panel, remove the remainder of the protective film.

X

6. Mark the UV-protected side with a piece of tape or a marker and verify that the panel fits the vent frame. Adjust frame as needed. Set panel aside.

Plastic U-Profile

Install this edge toward the UV-protected side of the panel.

Install this edge on the backside of the panel.

NOTE: The plastic U-strips are precut and are as long as the polycarbonate panel is wide. You do not have to cut any plastic molding. If it appears as though the plastic profile is the incorrect length, verify that you have selected the correct panel and profile. Consult the panel diagrams near the back of these instructions for details. Do not allow panels to remain in direct sunlight with the protective film intact. Complete these steps:

ATTENTION: Install the polycarbonate panels with the UV-protected side to the outside of the greenhouse. If you remove the protective film before installing the panels, mark the panel in a lower corner to identify the UV-protected side.

1. Locate the first X panel and the plastic U-strips for that panel.

Greenhouse Sku Number Panels/U602 in boxes:104711 – 104713 – 104715 No. 4-4

Cells

Page 24: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

24 Revision date: 01.01.16

ANCHORING INSTRUCTIONS

To prevent serious personal injury and property damage, you must anchor the assembled greenhouse frame before continuing. Failing to properly anchor the greenhouse frame will void all warranties.

If you did not purchase one of our recommended anchoring systems and want to now, contact your sales representative.

Customer is responsible for providing materials to seal and secure the greenhouse to the permanent structure. Consult a professional and qualified contractor for suggestions if you have not decided how to attach and anchor the greenhouse.

7. Move to the assembled vent frame, open a tube of silicone, and apply a small bead around the edges of the vent frame on the outside surface.

INSTALL THE POLYCARBONATE VENT PANELS (CONTINUED)

Single-bay vent frame is shown in the example above. ATTENTION: Position the vent frame with the outside facing up. The dashed line shows where to apply the silicone.

8. With the silicone applied, take the prepared panel and set it in the vent frame with the UV-protected surface facing up to the outside.

Photo shows the polycarbonate panel as installed in the vent frame. (In the photo, the protective film was not removed to better show the panel in the frame.)

9. Repeat the above steps for all remaining vent panels.

10. After the silicone sets, slide the vent frames back into to the ridge beam (if they were removed to install the polycarbonate panels). See page 37 for details.

11. Read the anchoring instructions and information that follows and then continue with the door assembly procedures after you anchor the greenhouse frame.

Top

ATTENTION: TO AVOID TWISTING OFF OR DAMAGING THE FASTENERS, DO NOT OVERTIGHTEN.

FOR YOUR CONVENIENCE, ADDITIONAL FASTENERS CAN BE FOUND IN THE "EXTRA PARTS" BAG OR BOX. REFER TO THE BILL OF MATERIALS FOR A LIST OF THE FASTENERS CONTAINED IN THAT BAG OR BOX.

ANCHOR THE GREENHOUSE

The site and whether the optional base is used determine the recommended anchoring methods for the greenhouse.

WARNING: You must anchor the greenhouse (and the base if used) to the site and before installing the panels. Failing to do so may result in property damage and personal injury.

The information below identifies the recommended anchoring methods for your greenhouse. There are four basic scenarios when anchoring the greenhouse. Choose the one that matches your particular application. If none of the following anchoring suggestions is applicable to your greenhouse, you must seek the advice of a professional and qualified contract to anchor your greenhouse to the site.

ATTENTION: Since different applications require different anchoring methods, contact your sales representative for the parts required to anchor the greenhouse and frame. Continue with the following anchoring information on the following page.

UV-Protected Surface

Page 25: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

25

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

ANCHOR THE GREENHOUSE (CONTINUED)SCENARIO #1: Base Frame On Soil (or Gravel) Site

Ground posts are used to anchor the optional base to the site before the assembled greenhouse frame is set on the base.

1. After squaring the base (additional purchase required) and driving the support posts into the ground (see the Base Assembly instructions presented earlier in this packet), select the ground posts for the anchoring system.

2. Determine whether you want the ground posts on the inside or outside of the base assembly. NOTE: Ground posts are driven into the site near each corner of the assembled frame. Ground posts must be ordered. They are not included with the greenhouse.

3. Using the following diagrams, drive each ground post into the site flush with the top of the base channel.

NOTE: When the ground post is on the inside of the base, use as spacer placed between the base channel and ground post to prevent crushing the channel when the bolts are tightened as shown below.

GROUND POST OUTSIDE BASE FRAME

Base Channel (additional purchase)

Carriage Bolt

Ground Post

Diagram shows ground post driven to the top of the base channel on the outside of the base frame.

GROUND POST INSIDE BASE FRAME

Carriage Bolt

Ground Post

Spacer placed between channel and ground post

Base Channel

4. With the ground posts driven into place, use the holes in the ground post as a guide, drill a hole through the base channel, and attach the base to each ground post as shown in the previous diagrams.

5. With the base secured, set the assembled greenhouse frame on the anchored base.

6. Attach the greenhouse frame to the anchored base using self-tapping screws driven through the base rail and into the base channel.

Greenhouse Base Rail

Option

al Bas

e

Photo is used for illustration purposes only. The dashed line shows the lip of the base rail of the greenhouse. NOTE: Count the Tek screws sent with the base kit and install screws evenly around the perimeter of the frame between each vertical support.

7. Continue with the greenhouse assembly procedures as instructed.

EXTRA PARTS PROVIDED FOR GREENHOUSE

ATTENTION: TO AVOID TWISTING OFF OR DAMAGING THE FASTENERS, DO NOT OVERTIGHTEN.

FOR YOUR CONVENIENCE, ADDITIONAL FASTENERS AND PLASTIC MOLDING CAN BE FOUND IN THE "EXTRA PARTS" BAG OR BOX.

REFER TO THE BILL OF MATERIALS FOR A LIST OF THE FASTENERS AND MOLDING CONTAINED IN THAT BAG OR BOX.

The plastic profile can be trimmed to the required length if a piece is misplaced or damaged during installation.

IMPORTANT: Consult the "extra parts" for items you need before contacting customer service to request a replacement for damaged or missing parts or fasteners.

Page 26: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

26 Revision date: 01.01.16

SCENARIO #2: Base Frame On Concrete (Slab or Patio)

Concrete anchor bolts are used to secure the base to the concrete slab before the assembled greenhouse frame is set on the base.

1. After the base is assembled and the frame support posts are cut to the proper length (see the Base Frame Assembly instructions) position the base on the site with the bottom edge of the base facing up.

2. Using a drill bit the same diameter as the concrete anchor bolts, drill holes through the edge of the base channel. NOTE: Use 24" spacing when drilling the holes. You must use concrete wedge anchors for this application.

Photo shows holes for the anchor bolts as drilled in the bottom of the base frame.

3. After all holes are drilled, flip the base frame and reposition it on the site.

4. Square the frame as previously described in the Base Assembly procedure.

5. Using the holes drilled in the base channel (Step 2) as guides, take a marker and mark the hole location on the concrete.

6. Remove the frame, drill the holes in the concrete using the proper bit, and install the anchor bolts in the concrete.

7. Reposition the base frame over the anchor bolts in the concrete and anchor the base to the site using the anchor bolts.

8. Anchor the assembled greenhouse frame to the base as shown in Step 6 of the previous anchoring instructions and continue with the greenhouse assembly procedures as instructed.

SCENARIO #3: No Base Frame: Greenhouse Is On Concrete Slab (or Patio)

If the greenhouse frame is assembled and no base frame is used, the greenhouse is anchored to the concrete using anchor bolts as previously described.

1. Position the assembled greenhouse on the site and square the greenhouse using the technique described in the Base Assembly instructions presented earlier in this packet.

2. After squaring the assembled greenhouse frame, drill a hole through the base rail of the sidewall of the greenhouse frame and install a concrete anchor bolt.

NOTE: Holes for the anchor bolts are drilled through the base rail and into the concrete between each of the vertical supports. Photo above shows the greenhouse frame as seen from the outside of the greenhouse.

3. Move to the opposite side of the frame and repeat the previous step to anchor the frame to the site.

4. Continue by repeating the above steps until the greenhouse frame is anchored.

5. After anchoring the greenhouse frame, continue with the greenhouse assembly instructions.

Drill holes in the center of the base rail.

Page 27: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

27

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

ANCHOR THE GREENHOUSE (CONTINUED)

SCENARIO #4: No Base Frame: Greenhouse Is On Soil (or Gravel)

To anchor the assembled greenhouse frame to a non-concrete site without the optional base frame, you must use a treated-wood base frame to set the greenhouse on.

Ground posts are then driven into the ground on either the inside or outside of the treated-wood base frame. The wood frame is anchored to the ground posts using lag screws inserted through the ground post holes and screwed into the wood.

After securing the treated-wood frame to the ground posts, the assembled greenhouse frame is placed on the wood base, squared, and anchored to the wood base using lag screws inserted through pre-drilled holes in the base rail of the greenhouse frame and screwed into the wood. Use the diagrams below to anchor the greenhouse to a non-concrete site when the optional base frame is not used. Diagram shows lag screws installed through the ground post and into the 4" x 4" treated wood base frame. The dashed line shows where to install the lag screw when a2" x 4" or 2" x 6" treated-wood frame is used.

Diagram may not be to scale. NOTE: Only the top hole in the ground post is used when a 2" x 4" or 2" x 6" treated-wood base is used.

In all instances for the wood base, the ground posts are driven flush to the top of the wood base as shown. After anchoring the treated-wood frame to the site and the greenhouse frame to the wood frame, continue with the greenhouse assembly instructions that follow.

Lag Screw

Install lag screw through per-drilled hole in greenhouse frame and into the treated wood base.

Greenhouse Frame

Ground Post

ASSEMBLE AND INSTALL THE DOORS

After anchoring the greenhouse frame, assemble the door. NOTE: Consult the door diagram near the back of these instructions and the bill of materials (box) for part details.

See the Door Frame Diagram for parts identification. Diagram shows inside/back of door frame.

Complete these steps to assemble and attach the door to the greenhouse frame.

1. Locate all door parts and assemble them on a clean surface. (Place and assemble the parts on cardboard to protect the finish.)

Greenhouse Sku Number Door frames in box:104711 – 104713 – 104715 No. 4-3

Hinge

Hinge

Hinge

Inside Latch

Hinge

Page 28: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

28 Revision date: 01.01.16

ASSEMBLE AND INSTALL THE DOORS (CONTINUED)

2. Slide the bolts into the bolt track of the door cross members (630) and attach the cross members to the vertical side members of each door frame.

NOTE: Seat the side frame members tightly against the cross members (630) to maintain door width.

3. Continue connecting the door components until all door frames are assembled.

4. Locate the door stop frame member (640) and attach it to the inside top of the lower door frame. (Phillips screws to mount this are typically included inside the plastic that the door stop is packaged in.)

The dashed line (below) shows the location of the 640 frame member shown in the photo below.

5. Attach the hinges to the greenhouse end wall frame. (Some hinges may ship attached to the doors.)

ATTENTION: Adjust the header of the end wall if the opening is too small for the door.

To adjust the header, loosen the bolts only in the locations identified by the circles in the above diagram.

NOTE: When attached correctly, the 640 door stop prevents the upper door from swinging into the greenhouse and provides a lip for the inside latch.

View shows the outside surface.

640

Secure hinges to end wall frame.

End Wall Frame

Bolts

630

Inside/Back shown

630

640

Page 29: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

29

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

ASSEMBLE AND INSTALL THE DOORS (CONTINUED)

6. Attach the latch to the inside of the upper door as shown below. Some latches come pre-installed.

7. Attach the door frames to the end frame if this has not been completed.

8. Test the doors. NOTE: After adjusting the header, test the operation of the door to verify that enough clearance is present to allow the doors to open an close smoothly.

16640 Door Stop

Latch Assembly

INSTALL THE POLYCARBONATE DOOR PANELS

The steps to prepare and install the polycarbonate panels for the doors are similar to those described in the vent panel installation procedure. The door panels are lettered for identification. NOTE: The protective film has not been removed in the following photos. You must remove the film as instructed during the assembly process.

The parts needed to complete the door frame assemblyinclude:

• Two (2) Y panels (top/bottom frames)

• Four (4) precut lengths of plastic U-strip profile (U530)

• Silicone

NOTE: The U530 plastic U-strips are precut and are as long as the polycarbonate panel is wide. You do not have to cut any plastic molding. If it appears as though the plastic molding is the incorrect length, search through the remaining molding until you locate the correct length for the panels. Complete these steps: ATTENTION: Install the polycarbonate panels with the UV-protected side to the outside of the greenhouse. If you remove the protective film before installing the panels, mark the panel in a lower corner so that the panel is installed correctly.

1. Locate the first Y panel and two lengths of the plastic U-strips for that panel.

Greenhouse Sku Number Panels/U530 in box:104711 – 104713 – 104715 No. 4-4

2. Carefully peal the protective film away from the edge on both sides of the panel. Do not completely remove the protective film until the plastic U-strips are installed.

Plastic U-Profile

Install this edge toward the UV-protected side of the panel.

Install this edge on the backside of the panel.

In some instances, the end wall frame may need adjusted to square the door opening. Measure the door opening from corner-to-corner. When the distances are equal, the opening for the door is square. (Most adjustment are made by slightly moving the header.)

9. Tighten all header bolts and test the operation of all latches. Adjust header again if needed to allow the doors to open and close without binding.

10. Prepare and install the polycarbonate door panels.

Page 30: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

30 Revision date: 01.01.16

3. Take one section of the U530 profile and install it on the top edge of the polycarbonate panel.

NOTE: The top and bottom edges of each panel show the hollow cells inside the panel. When installing the plastic molding, rest the panel on cardboard or other material to protect the edges and surface of the panel.

Polycarbonate Panel

Plastic U-strip (U530)

4. Take another section of the U530 profile and attach it to the bottom edge of the panel.

INSTALL THE POLYCARBONATE DOOR PANELS (CONTINUED)

6. Mark the UV-protected side with a piece of tape or a marker and remember that it is installed to the outside.

7. Lift each door frame off the hinges and place the frames (inside surface down) on cardboard to protect the door frame finish.

Photo shows the lower corner of one door frame. Dashed lines show where to apply silicone.

8. Verify that the assembled panels fit into the door frame.

9. Apply a bead of silicone around the door frame as shown where the panel is positioned.

10. Place a prepared panel into the door opening. Verify that the UV-protected surface is to the outside.

11. Repeat the previous steps to attach the remaining polycarbonate panel to the remaining door frame.

12. After the silicone sets, the doors can be place back on the hinges, or you can wait until all remaining panels are installed on the greenhouse frame. This will help prevent damage to the door panels during the final stages of assembly.

13. Continue with installing the ends for the gutters.

Cells

5. With both lengths of the plastic U-strip installed on the panel, peal the protective film from the panel.

Page 31: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

31

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

INSTALL THE GUTTER RAIL ENDS

Before installing the remaining polycarbonate panels, install the plastic gutter rail ends as shown below.

Required parts include:

• 84 (left hand fixture)

• 84 (right hand fixture)

1. Locate the fixtures identified above and install these as shown below.

Greenhouse Sku Number Work from this box:104711 – 104713 – 104715 No. 4-2

2. Repeat the steps for the remaining end of the gutter rail.

3. Continue with installing the side, end, and roof polycarbonate panels.

Space reserved for customer notes.

Page 32: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

32 Revision date: 01.01.16

INSTALL THE POLYCARBONATE PANELS

The remaining panels are installed based on the diagram found on the outside of each shipped box. For best results, follow these basic instructions to install the final panels:

1. Consult the panel installation and U-profile diagrams at the back of these instructions and on the boxes that contain the polycarbonate panels.

2. Work from one box only until all panels and U-profile are installed from that box.

3. Do not cut any U-profile or panels!

4. Do not allow panels to remain in direct sunlight until all protective film is removed and the panels are installed.

5. Wipe all frame surfaces with alcohol or other residue-free solvent in locations where silicone will be applied. NOTE: Use solvents or alcohol as directed by those manufacturers. Ensure adequate ventilation.

6. Always rest panels on a clean surface when installing. Do not allow the panels to rest on the ground.

7. Install the UV-protected side to the outside (or toward the sun).

8. Do not install during windy or wet conditions. The installed panels must be protected from the elements to allow the silicone to set.

9. If desired, seal the open cells at the top edge of each panel with tape or with silicone before installing the U-profile to prevent dirt from entering the cells. NOTE: Do not seal the bottom of any panel with silicone. These cells must remain open and free of debris to allow condensation to drain from the panel cells. (See Item 10 for optional vent tape purchase.)

10. Vent tape (additional purchase required): If vent tape was purchased, apply this tape at the bottom of each polycarbonate panel before installing the U-profile. Vent tape is not required but helps keep dirt from inside the cells and allows condensation to drain from the cells.

11. Purchase additional silicone if needed. The size of the bead of silicone used determines the amount of silicone required to secure and seal the remaining panels. It may be necessary to purchase additional silicone locally to complete the panel installation. NOTE: An 1/8" bead is typically sufficient to seal and secure a panel to the greenhouse frame.

12. Consult the previous panel installation steps to review the basic installation steps.

13. Use the diagrams attached to each shipped box as guides when installing the panels.

INSTALL THE SIDE PANELS

All D panels are for the greenhouse sidewalls. The length of the greenhouse determines the quantity of the panels for the sidewall and the roof. Continue with the following steps to prepare and install the sidewall panels: You do not need to cut any plastic molding. To prevent damage or injury, DO NOT install panels on a windy or stormy day. ATTENTION: Install the polycarbonate panel with theUV-protected side to the outside of the greenhouse. If you remove the protective film before installing the panel, mark the panel in a lower corner so that the panel is installed correctly.

Consult the Panel, Profile, and Spring Location Diagrams for your building in the Quick Start section of this guide for additional details.

Complete these steps to install side panels:

1. Locate the first D panel and the plastic U602 U-strips for that panel.

2. Carefully peal the protective film away from the upper/lower edges on both sides of the panel.

Plastic U-Profile

Install this edge toward the UV-protected side of the panel.

Install this edge on the backside of the panel.

Do not completely remove the protective film until the plastic U602 U-strips are installed.

3. Take one section of U602 U-profile and install it on the top edge of the polycarbonate panel. If desired, you can seal the top edge of the panel before the U-profile is installed. NOTE: The top and bottom edges of the panel show the hollow cells inside the panel. When installing the plastic molding, rest the panel on cardboard or other material to protect the edges and surface of the panel.

Page 33: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

33

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

Polycarbonate Panel

U-Profile

4. Take another section of u602 U-profile and attach it to the bottom edge of the panel.

INSTALL SIDE PANELS (CONTINUED)

Photo is used to illustrate the location of the U-profile. The panel size may differ from the actual panel.

5. Move to the frame where the panel will be installed and clean the surfaces where the silicone will be applied. NOTE: The surface for the silicone on the frame must be free of oil and dirt for best results. See the profile and panel diagrams and photo to the right for silicone location.

6. With the plastic U-strip installed and the surface cleaned, dry fit the panel to verify that it fits between the frame members.

7. Remove the protective film from the panel and mark the UV-protected side with a piece of tape or a marker and set the panel aside.

8. Move to the frame and, standing outside the frame, apply a bead of silicone in the channel of each frame member in the areas shown below by the dashed lines.

ATTENTION: Panel is shown in place to better show the location of the silicone, which is applied before the panel is set in the frame.

9. After the silicone is applied, take the prepared panel and set the panel into position as shown above. Panel as seen from the outside. NOTE: Protective film has be left in place to better show the panel.

10. Firmly press the panel against the silicone on the rafter. Panel will sit between the frame members.

11. Continue by installing the metal clips to secure the panel to the frame.

Silicone is between the backside of the panel and the frame members.

U-Profile

Dashed line shows where to apply silicone before installing the panel.

View is from the outside of the greenhouse.

31

Cells

Page 34: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

34 Revision date: 01.01.16

INSTALL THE END WALL PANELS

The end panels are installed and secured in the same manner as the sidewall panels: The U-strip is installed at the top and bottom; the retention clips are installed along each side. Only the panel shape differs.

NOTE: All end panels are cut to the proper size. You do not have to cut any polycarbonate panels.

For the door end of the greenhouse, locate these panels:

• One (1) large, angled panels: Panel A1

• One (1) large, angled panels: Panel B1

• One (1) small angled panels: Panel C1 (Install this panel above the door opening).

For the non-door end of the greenhouse, locate these panels:

• One (1) large, angled panels: Panel A2

• One (1) large, angled panels: Panel B2

• One (1) center, angled panels: Panel C2

NOTE: When installing the panels, install the UV-protected side to the outside of the greenhouse.

Panel Locations: Door End Frame (inside view)

B1 A1

C1

INSTALL METAL RETENTION CLIPS

There are two sizes of wire clips used to secure the panels to the frame (82 and 87). Consult the Panel, Profile, and Spring Location Diagrams near the back of this guide for spring clip installation locations.

Continue with the following steps to install the clips on the outside of the greenhouse.

1. With the panel in place, take a wire clip and place it against the sidewall vertical support and panel.

2. Clip the free ends of the wire spring behind the lip of the frame member and press into place.

CAUTION: Wear eye protection when installing and working with the wire clips.

Place wire clip into position as shown.

Use a pliers if needed to clip the spring in place.

Panel

Panel

Panel

NOTE: Refer to the diagram for the correct wire spring size and to properly space the wire clips.

3. Repeat steps to install and secure all sidewall panels, then install the end panels and roof panels. Panel Locations: Non-Door End Frame (inside view)

B2C2A2

Page 35: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

35

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

INSTALL THE ROOF PANELS

The roof panels are installed and secured in the same manner as the previous panels.

The length of the greenhouse determines the quantity of each required panel. Roof panels consist of the following:

• Long, rectangular panels: Panel E

• Short, rectangular panels: Panel F – These panel are installed in the space below each roof vent.

ATTENTION: Remember to install all panels with theUV-protected surface to the outside.

Photo shows the roof vent with the installed panel (PanelX) and the adjacent, lower roof panel (Panel F). The dashed line shows the location of the U-strip. NOTE: As before, the retention clips are installed along the sides of the panels.

Diagram shows a roof panel (E) and the sidewall panel (D). After installing all panels, install the drain pipes.

F

X

Single-Bay Roof Vent

E

D

INSTALL THE DRAIN PIPES

Consult the following table to locate the parts.

1. Locate the plastic drain pipe clamps (85) and the drain pipes (86) for the gutter.

Greenhouse Sku Number For drain pipes, use box:104711 – 104713 – 104715 No. 4-2

2. Move to one corner, position the bracket as shown, mark the location, and drill the hole through the end wall frame member (if needed).

NOTE: Use two (2) plastic brackets for each drain pipe.

For best results, space the brackets evenly.

NOTE: Some brackets may not require drilling.

End Wall Support

3. Attach the plastic clamps to the end wall lower support using bolts, or use silicone to secure the clamp. Arrow shows where to install bolt for the clamp if bolts are used.

Page 36: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

36 Revision date: 01.01.16

4. Repeat the steps as needed to attach the remaining clamp for the first drain pipe.

5. Once all clamps are in place for one drain pipe, place the pipe in position and connect it to the fixture attached to the gutter rail. Use silicone to seal the fixture-to-downspout connection.

6. Repeat the steps for the remaining drain pipes.

7. After installing the drain pipes, attach the magnetic doorstops to the frame as shown in the next photos.

ATTENTION: Set the doors on the assembled frame at this time (if this has not been competed yet).

INSTALL THE DRAIN PIPES (CONTINUED) ATTACH MAGNETIC DOOR STOPS TO THE FRAME

A magnetic doorstop is attached to the assembled frame for each of the door sections. Parts are located in these boxes:

Complete these steps:

1. Locate the required 691 doorstop and related bracket.

2. Attach the magnetic stop to the vertical support by inserting the mounting bolts through the pre-drilled holes in the vertical support.

Diagram below shows the door stop locations.

Greenhouse Sku Number For door parts, use box:104711 – 104713 – 104715 No. 4-3

691

End Panel

End Wall Base Rail

Wall ofPermanent Structure

Page 37: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

37

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

ATTACH MAGNETIC DOOR STOPS (CONTINUED)

ATTENTION: Attach the doorstop to the end wall vertical support as shown below. Verify that the stop aligns with its mate bracket attached to the door frame before you secure the magnetic door stop to the frame. Fasteners shown may differ from actual fasteners. Choose the installation option that allows the stop to align with the bracket on the door frame.

3. Repeat the steps to attach the remaining doorstop.

4. After the doorstops are in place, locate the weather-stripping (69) and attach it to the door frame of the end wall. See the dashed line below.

Vertical Support

Magnetic Stop

Nut

FastenerOption A

Vertical Support

Magnetic Stop

Nut

Option B

Fastener

NOTE: Use bolts and nuts to secure hardware to frame.

Reinstall the Vents

If the vent frames were removed to install the panels, reinstall the vents.

1. Verify that the silicone has set before moving the vents.

2. With assistance, slide the vent assembly into the C-channel of the ridge beam and center the vent over the open bay or bays where it will be installed.

3. Once it is in place, test the operation of the vent and support arm.

4. Verify that a Z-bracket (77) is installed to secure each support arm when the vent is closed.

NOTE: If no Z-bracket is present, carefully loosen a rafter, install an extra bolt, attach the Z-bracket, and secure the rafter.

5. Install all remaining vents (if present).

6. With all vents installed, locate the aluminum end covers (59) for the ridge beam and install one at each end of the beam. (Fasteners for the covers are packaged with the covers.)

Z-Bracket (77)

77

51

74

Install the end cap (59) here on each end of the ridge beam.

59

Page 38: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

38 Revision date: 01.01.16

CARE AND MAINTENANCE

Proper care and maintenance of the greenhouse will help to ensure years of service. The following items identify areas that should be periodically checked to ensure that your greenhouse is maintained properly:

• Check connections and all fasteners frequently and regularly to verify that they remain tight.

• Check the anchor system regularly. Tighten all bolts and nuts and related hardware (if needed and if applicable).

• Do not climb or stand on the greenhouse at anytime.

• Remove debris and objects that can accumulate on the greenhouse. Use tools that will not damage the greenhouse when removing debris.

• Remove snow to prevent excess accumulation. Use tools that will not damage the greenhouse when removing snow.

• Check the contents of the greenhouse to verify that nothing is touching the sides that could cause damage.

• Depending on the contents and greenhouse location, the potential for condensation exists. GrowSpan™ offers several items that can help to alleviate a condensation condition. Please contact a GrowSpan™ representative for additional information.

• Consult the instructions included with the solar vent openers for proper care and maintenance of these openers (if equipped).

• Check the solar vent opener mounting brackets and screws to see they remain secure (if equipped).

• Replace damaged panels.

• For replacement or missing parts, call 1-800-245-9881 for assistance. For the solar vent openers, consult the documentation included in the packaging of the opener.

EXTRA PARTS PROVIDED FOR GREENHOUSE

ATTENTION: TO AVOID TWISTING OFF OR DAMAGING THE FASTENERS, DO NOT OVERTIGHTEN.

FOR YOUR CONVENIENCE, ADDITIONAL FASTENERS AND PLASTIC MOLDING CAN BE FOUND IN THE "EXTRA PARTS" BAG OR BOX.

REFER TO THE BILL OF MATERIALS FOR A LIST OF THE FASTENERS AND MOLDING CONTAINED IN THAT BAG OR BOX.

The plastic profile can be trimmed to the required length if a piece is misplaced or damaged during installation.

IMPORTANT: Consult the "extra parts" for items you need before contacting customer service to request a replacement for damaged or missing parts or fasteners.

Page 39: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

39

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

QUICK START GUIDE

Estate Elite Attached Greenhouses

Frame shown may differ in length from actual frame. Example above is the 104713 frame.

ATTENTION: Customer is responsible for providing all fasteners and sealing materials needed to secure the greenhouse to the permanent structure. All materials included with this greenhouse are needed for the assembly of the greenhouse only.

In addition, after the greenhouse is fully assembled and secured in place, additional silicone can be purchased to seal all panels from inside the greenhouse. This provides an additional level of protection during severe weather. Call your sales representative for additional information and to purchase additional silicone sealer.

Customer to supply fasteners to secure ridge beam and end wall to permanent structure. See dashed lines below.

Permanent Structure

Ridge Beam

Secure and Seal End Wall

Page 40: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

40 Revision date: 01.01.16

OPT

ION

AL

BA

SE A

SSEM

BLY

*

Afte

r bas

e fra

me

is a

ssem

bled

up

side

-dow

n (a

bove

), it

is s

et

on th

e si

te a

nd s

quar

ed.

7

123

Nut

s ar

e in

stal

led

on th

e in

side

of

the

base

fram

e.

45 6

Driv

e su

ppor

t pos

ts in

to th

e gr

ound

bef

ore

setti

ng th

e gr

eenh

ouse

fram

e on

the

base

.8

Sup

port

Pos

ts

NO

TE: B

ase

may

be

a di

ffere

nt s

ize;

as

sem

bly

proc

edur

e is

the

sam

e. Ste

ps 1

, 2, &

3

Ste

ps 5

& 6

Ste

p 4

*AD

DIT

ION

AL

PU

RC

HA

SE

R

EQ

UIR

ED

FO

R T

HE

BA

SE

Page 41: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

41

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

END

FR

AM

E D

IAG

RA

M -

DO

OR

EN

D

Top

Bra

cket

(17)

Upp

er S

uppo

rt (1

5)

Ang

le

Bra

cket

(18)

Dia

gona

l S

trut (

13)

Dia

gona

l S

trut (

13)

Bas

e R

ail (

10)

Long

, Low

er

Sup

port

(14A

)

*Vie

w s

how

s th

e in

side

sur

face

of t

he e

nd w

all.

ATTE

NTI

ON

: Num

bers

in (

) are

prin

ted

on th

e pa

rt.

Long

Ver

tical

S

uppo

rt (1

2-2)

Hea

der (

65)

Sho

rt, L

ower

S

uppo

rt (1

4)

Sho

rt Ve

rtica

l S

uppo

rt (1

2-1)

(110

)

(65-

1)

(65-

2)

Hor

izon

tal B

race

(1

9)H

oriz

onta

l Bra

ce

(19)

Page 42: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

42 Revision date: 01.01.16

END

FR

AM

E D

IAG

RA

M -

NO

DO

OR

Top

Bra

cket

(17)

Upp

er S

uppo

rt (1

6)

Ang

le

Bra

cket

(18)

Sho

rt Ve

rtica

l S

uppo

rt (1

1-1)

Hor

izon

tal

Bra

ce (2

9)

Long

Ver

tical

S

uppo

rt (1

1-2)

*Vie

w s

how

s th

e in

side

sur

face

of t

he e

nd w

all.

ATTE

NTI

ON

: Num

bers

in (

) are

prin

ted

on th

e pa

rt.Th

e pa

rts th

at a

re n

ot id

entif

ied

abov

e ha

ve th

e sa

me

num

bers

as

thos

e sh

own

on th

e E

nd F

ram

e D

iagr

am: D

oor E

nd.

Sho

rt, L

ower

S

uppo

rt (1

4)

Long

, Low

er

Sup

port

(14B

)

Page 43: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

43

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

EXPL

OD

ED F

RA

ME

CO

MPO

NEN

TS (1

0471

5 O

nly)

ATTE

NTI

ON

: The

info

rmat

ion

pres

ente

d in

thes

e di

agra

ms

appl

ies

to fr

ames

w

here

the

base

rail,

gut

ter r

ail,

and

ridge

be

am c

onsi

st o

f mul

tiple

sec

tions

.

Con

sult

thes

e di

agra

ms

for a

dditi

onal

in

form

atio

n w

hen

asse

mbl

ing

the

fram

e fo

r you

r gre

enho

use.

May

not

app

ly to

all

gree

nhou

se fr

ames

.

Hex

Hea

d B

olts

506

50-4

50-8

Rid

ge B

eam

: Con

nect

ridg

e be

am 5

0-4

and

50-8

usi

ng c

onne

ctin

g pl

ate

506

and

the

M6X

16 h

ex h

ead

bolts

.

RID

GE

BEA

M C

ON

NEC

TIO

N

Phi

llips

Pan

H

ead

Scr

ew

306

30-4

30-8

BA

SE

RA

IL: C

onne

ct b

ase

rail

30-4

and

30-

8 us

ing

conn

ectin

g pl

ate

306

and

the

M6X

6 P

hilli

ps p

an h

ead

scre

ws.

BA

SE R

AIL

CO

NN

ECTI

ON

Hex

Hea

d B

olts

32-4

32-8

326

GU

TTE

R R

AIL

: Con

nect

gut

ter r

ail 3

2-4

and

32-8

usi

ng c

onne

ctin

g pl

ate

326

and

the

M6X

16 h

ex h

ead

bolts

.

GU

TTER

RA

IL C

ON

NEC

TIO

N

Act

ual f

ram

e fo

r the

104

715

is lo

nger

th

an w

hat i

s sh

own

for a

n ex

ampl

e.

Page 44: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

44 Revision date: 01.01.16

RO

OF/

SID

EWA

LL F

RA

ME

DIA

GR

AM

- 10

4711

*Vie

w s

how

s th

e ou

tsid

e su

rface

of t

he ro

of a

nd s

idew

all.

Gut

ter R

ail

(32-

8)

Sid

ewal

l D

iago

nal

Stru

ts (3

3)

Roo

f D

iago

nal

Stru

t (95

)

Roo

f Raf

ter

(51)

Bas

e R

ail (

30-8

)

Sid

ewal

l Ve

rtica

ls (3

1)

ATTE

NTI

ON

: Num

bers

in (

) are

sta

mpe

d on

the

part.

Rid

ge B

eam

(50)

R =

Lon

g bo

lt w

ith a

red

head

. All

bolts

with

a p

aint

ed

red

head

are

use

d ex

clus

ivel

y to

atta

ch a

ll si

dew

all

stru

ts to

the

side

wal

l fra

mes

. Pos

ition

s of

thes

e bo

lts

are

iden

tifie

d by

the

lette

r R in

the

diag

ram

. Thi

s fra

me

uses

four

(4) l

ong

bolts

to s

ecur

e th

e si

dew

all s

truts

.

RR

RR

Page 45: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

45

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

RO

OF/

SID

EWA

LL F

RA

ME

DIA

GR

AM

- 10

4713

*Vie

w s

how

s th

e ou

tsid

e su

rface

of t

he ro

of a

nd s

idew

all.

ATTE

NTI

ON

: Num

bers

in (

) are

sta

mpe

d on

the

part.

Gut

ter R

ail

(32-

8)

Sid

ewal

l D

iago

nal

Stru

ts (3

3)

Roo

f D

iago

nal

Stru

t (95

)

Dou

ble

Trac

k S

uppo

rt R

afte

r (52

)

Rid

ge B

eam

(50)

Bas

e R

ail (

30-8

)

Raf

ter (

51)

Dou

ble

Trac

k S

ide

Sup

port

(14)

SPEC

IAL

NO

TE: D

urin

g as

sem

bly,

the

doub

le tr

ack

of th

e su

ppor

t (52

) mus

t fac

e to

war

d th

e no

n-do

or e

nd w

all t

o al

low

for t

he

inst

alla

tion

of th

e si

ngle

-bay

ven

t fra

me.

Non

-Doo

r End

Wal

l

R =

Lon

g bo

lt w

ith a

red

head

. All

bolts

with

a p

aint

ed

red

head

are

use

d ex

clus

ivel

y to

atta

ch a

ll si

dew

all

stru

ts to

the

side

wal

l fra

mes

. Pos

ition

s of

thes

e bo

lts

are

iden

tifie

d by

the

lette

r R in

the

diag

ram

. Thi

s fra

me

uses

six

(6) l

ong

bolts

to s

ecur

e th

e si

dew

all s

truts

.

RR

R

RR

R

Page 46: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

46 Revision date: 01.01.16

RO

OF/

SID

EWA

LL F

RA

ME

DIA

GR

AM

- 10

4715

Gut

ter R

ail

(32-

4)G

utte

r Rai

l (3

2-8)

Sid

ewal

l D

iago

nal

Stru

ts (3

3)

Rid

ge B

eam

(5

0-4)

Rid

ge B

eam

(5

0-8)

Bas

e R

ail (

30-8

)B

ase

Rai

l (30

-4)

Sid

ewal

l Ve

rtica

ls (3

1)

Roo

f D

iago

nal

Stru

t (95

)

*Vie

w s

how

s th

e ou

tsid

e su

rface

of t

he ro

of a

nd s

idew

all.

ATTE

NTI

ON

: Num

bers

in (

) are

sta

mpe

d on

the

part.

Raf

ter (

52)

Dou

ble

Trac

k S

uppo

rt R

afte

r (52

)

Dou

ble

Trac

k S

ide

Sup

port

(14)

Roo

f D

iago

nal

Stru

t (95

)

R =

Lon

g bo

lt w

ith a

red

head

. All

bolts

with

a p

aint

ed

red

head

are

use

d ex

clus

ivel

y to

atta

ch a

ll si

dew

all

stru

ts to

the

side

wal

l fra

mes

. Pos

ition

s of

thes

e bo

lts

are

iden

tifie

d by

the

lette

r R in

the

diag

ram

. Thi

s fra

me

uses

eig

ht (8

) lon

g bo

lts to

sec

ure

the

side

wal

l stru

ts.

RR

RR

RR

RR

Page 47: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

47

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

SIN

GLE

-BAY

VEN

T FR

AM

E D

IAG

RA

M (1

0471

3 O

nly)

70

71

Vent

Sup

port

Arm

(74)

with

at

tach

ed s

wiv

el b

rack

et

NO

TE: W

hen

inst

alle

d, th

e su

rface

sho

wn

abov

e is

inst

alle

d to

the

insi

de o

f the

ass

embl

ed g

reen

hous

e fra

me

and

will

be

visi

ble

from

in

side

the

gree

nhou

se.

Top

Hin

ge R

ail

Vent

Sup

port

Arm

Sid

e R

ail

Bot

tom

Rai

l

Sid

e R

ail

Sho

wn

with

out P

anel

71

72

70

71

Page 48: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

48 Revision date: 01.01.16

DO

UB

LE-B

AY V

ENT

FRA

ME

DIA

GR

AM

(Thi

s fra

me

mem

ber f

unct

ions

as

the

hing

e w

hen

inse

rted

into

the

ridge

bea

m.)

TOP

70

7474

7171

73-C

73-C

72

71-1

View

sho

ws

the

asse

mbl

ed v

ent f

ram

e fro

m th

e ba

ck o

r und

ersi

de. A

fter t

he v

ent i

s in

stal

led,

this

sur

face

is s

een

whe

n st

andi

ng in

side

the

asse

mbl

ed g

reen

hous

e.

Page 49: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

49

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

DO

OR

DIA

GR

AM

*Vie

w s

how

s th

e ba

ck o

f the

doo

r as

seen

from

insi

de th

e gr

eenh

ouse

. S

ome

parts

may

com

e pr

e-as

sem

bled

on

the

door

fram

e.

Page 50: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

50 Revision date: 01.01.16

PANEL, PROFILE, AND SPRING LOCATION DIAGRAMS - 104711

WIRE SPRING CLIP IDENTIFICATION AND LOCATION

S: Small Wire Spring ClipL: Large Wire Spring Clip Dashed lines (left) show where to apply the silicone before setting the panels into place.

Vent panels are secured in place by silicone only.

SIDE, VENT, AND ROOF PANEL IDENTIFICATION DIAGRAM

Base Rail

50 Ridge Beam

Door End

30-8 Base Rail

32-8 Gutter Rail

50 Ridge Beam

ATTENTION: In the diagrams, the letter U identifies the U-profile.

32-8 Gutter RailATTENTION: During assembly, add one (1) extra bolt in each of these rafter bolt tracks for the vent installation. Add 1 additional bolt to two (2) of these rafters to attach the Z-bracket.

+2 Bolts +1 Bolt +2 Bolts

Vent Location

Page 51: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

51

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

PANEL, PROFILE, AND SPRING LOCATION DIAGRAMS - 104713

WIRE SPRING CLIP IDENTIFICATION AND LOCATION

S: Small Wire Spring ClipL: Large Wire Spring Clip Dashed lines (left) show where to apply the silicone before setting the panels into place.

Vent panels are secured in place by silicone only.

SIDE, VENT, AND ROOF PANEL IDENTIFICATION DIAGRAM

ATTENTION: In the diagrams, the letter U identifies the U-profile.

Base Rail

50 Ridge Beam

Door End

32-8 Gutter Rail

32-8 Gutter Rail

50 Ridge Beam

Double Track Rafter (52)

30-8 Base Rail

ATTENTION: During assembly, add one (1) extra bolt in each of these rafter bolt tracks for the vent installation. Add 1 additional bolt to the identified rafters to attach the Z-bracket.

+2 Bolts+2 Bolts +1 Bolt+1 Bolt +2 Bolts

Vent Location Vent Location

Page 52: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

52 Revision date: 01.01.16

PANEL, PROFILE, AND SPRING LOCATION DIAGRAMS - 104715

WIRE SPRING CLIP IDENTIFICATION AND LOCATION

S: Small Wire Spring ClipL: Large Wire Spring Clip Dashed lines (left) show where to apply the silicone before setting the panels into place.

Vent panels are secured in place by silicone only.

SIDE, VENT, AND ROOF PANEL IDENTIFICATION DIAGRAM

ATTENTION: In the diagrams, the letter U identifies the U-profile.

Vent Location Vent Location

Base Rail

Ridge Beam

Door End

32-8 Gutter Rail32-4 and

32-4 and 32-8 Gutter Rail

50-4 and 50-8 Ridge Beam

30-8 Base Rail

ATTENTION: During assembly, add one (1) extra bolt in each of these rafter bolt tracks for the vent installation. Add 1 additional bolt to the identified rafters to attach the Z-brackets.

+2 Bolts+2 Bolts +2 Bolts +2 Bolts+1 Bolt +1 Bolt

Double Track Rafter (52)

Page 53: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

53

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

END

WA

LL P

AN

EL A

ND

SPR

ING

LO

CAT

ION

DIA

GR

AM

S*V

iew

sho

ws

Doo

r End

Pan

els

- End

Wal

ls a

re th

e sa

me

for a

ll m

odel

s.

S: S

mal

l Wire

Spr

ing

Clip

L: L

arge

Wire

Spr

ing

Clip

Das

hed

lines

sho

w w

here

to a

pply

the

silic

one

befo

re

setti

ng th

e pa

nels

into

pla

ce.

ATTE

NTI

ON

: In

the

diag

ram

s, th

e le

tter

U id

entif

ies

the

U-p

rofil

e. D

oor p

anel

s ar

e se

cure

d by

sili

cone

onl

y. V

iew

is fr

om th

e ou

tsid

e.

Page 54: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

54 Revision date: 01.01.16

END

WA

LL P

AN

EL A

ND

SPR

ING

LO

CAT

ION

DIA

GR

AM

S*V

iew

sho

ws

Doo

r End

Pan

els

- End

Wal

ls a

re th

e sa

me

for a

ll m

odel

s.

S: S

mal

l Wire

Spr

ing

Clip

L: L

arge

Wire

Spr

ing

Clip

Das

hed

lines

sho

w w

here

to a

pply

the

silic

one

befo

re

setti

ng th

e pa

nels

into

pla

ce.

ATTE

NTI

ON

: In

the

diag

ram

s, th

e le

tter

U id

entif

ies

the

U-p

rofil

e. V

iew

is fr

om th

e ou

tsid

e.

Page 55: GrowSpan Estate Elite Attached Greenhouses - FarmTek · attention: to avoid twisting off or damaging the fasteners, do not overtighten. for your convenience, ... growspan estate elite

55

GROWSPAN™ ESTATE ELITE ATTACHED GREENHOUSES

Revision date: 01.01.16

Page reserved for customer notes.