Page 1: Grovenor Neighbourhood Renewal - Construction Process

16

CONSTRUCTION PROCESS

BEFORE AFTER

Page 2: Grovenor Neighbourhood Renewal - Construction Process

17

Neighbourhood Renewal

• Contract has been awarded to the lowest qualifiedbidder.

• Two-year contractor warranty period.

Page 3: Grovenor Neighbourhood Renewal - Construction Process

18

Construction Staging• Construction will be

staged over two years (2013-14).

• Ultimate staging is dependant on weather conditions, coordination with utilities, and unforeseen design and construction issues.

Page 4: Grovenor Neighbourhood Renewal - Construction Process

19

Preconstruction Activities• Underground utility work

• Pruning of existing trees

• Installation of new streetlights

Page 5: Grovenor Neighbourhood Renewal - Construction Process

20

Photo Record of Neighbourhood

Page 6: Grovenor Neighbourhood Renewal - Construction Process

Removal of Sidewalk

Page 7: Grovenor Neighbourhood Renewal - Construction Process

Setting Sidewalk Forms

Page 8: Grovenor Neighbourhood Renewal - Construction Process

Placement of Granular Base

Page 9: Grovenor Neighbourhood Renewal - Construction Process

Hand Poured Sidewalk

Page 10: Grovenor Neighbourhood Renewal - Construction Process

Machine Poured Sidewalk

Page 11: Grovenor Neighbourhood Renewal - Construction Process

Mature Trees and Roots

Page 12: Grovenor Neighbourhood Renewal - Construction Process

Curb Ramps at Corners

Page 13: Grovenor Neighbourhood Renewal - Construction Process

Private Connector Sidewalks & Crossings

28

Page 14: Grovenor Neighbourhood Renewal - Construction Process

29

Gravel Driveway Access• Improve gravel driveway access to concrete

• Costs:

• City: Base preparation• Property owner:

• Concrete only• Curb Crossing Permit

•Advantages:• Easier snow removal• Enhanced drainage• Reduction of gravel tracking

Page 15: Grovenor Neighbourhood Renewal - Construction Process

30

Gravel Driveway Access

Before construction After construction

Page 16: Grovenor Neighbourhood Renewal - Construction Process

31

Concrete Driveway Access

Page 17: Grovenor Neighbourhood Renewal - Construction Process

32

Landscaping

Page 18: Grovenor Neighbourhood Renewal - Construction Process

33

Road Reclamation

Page 19: Grovenor Neighbourhood Renewal - Construction Process

34

Ready for Paving

Page 20: Grovenor Neighbourhood Renewal - Construction Process

35

Paving

Page 21: Grovenor Neighbourhood Renewal - Construction Process

36

Quality Assurance

Page 22: Grovenor Neighbourhood Renewal - Construction Process

37

Defeated Local ImprovementAsphalt patching

Page 23: Grovenor Neighbourhood Renewal - Construction Process

38

Defeated Local ImprovementGrinding

Page 24: Grovenor Neighbourhood Renewal - Construction Process

39

Defeated Local ImprovementMud-jacking

Page 25: Grovenor Neighbourhood Renewal - Construction Process

40

Completed Project

Page 26: Grovenor Neighbourhood Renewal - Construction Process

41

Construction Communications• Construction bulletins provided:

• Beginning of construction season• 7-10 days before start of construction

adjacent to your property• 48 hours before construction:

no parking

• Contact us for:• Access needs• Scheduling information

Page 27: Grovenor Neighbourhood Renewal - Construction Process

42

More Information

Contact: Adnan Akram, P.Eng.

Phone: (780) 423-6728

Email: [email protected]

Website: www.edmonton.ca/BuildingGreatNeighbourhoods