groupproject.doc

3
MTD 6024 Information Systems Development COMPUTING DEPARTMENT UNIVERSITI PENDIDIKAN SULTAN IDRIS MTD 6024: INFORMATION SYSTEMS DEVELOPMENT GROUP PROJECT : Group project carries 25% of the final grade. The project has to be proposed by each group and approved by the lecturer. Each student based on group performance and contribution, will receive a percentage of their final group project grade. Students are encouraged to discuss the project details with the lecturer on a regular basis, during the semester. Project will be evaluated as below: Planning : 30 marks Analysis : 30 marks Design : 20 marks Implementation : 20 marks Presentation : 20 marks A. Project Group Each project must be done in groups of three (3). Each student of a group will be system analysts, and one will serve as the group leader. B. Project Planning [Due: 21 MARCH 201 5 ] A proposal of the project with title, background, problem statement, scope, objective, and feasibility study should be submitted and presented in class. Proposed schedule is compulsory (Gantt Chart). C. Analysis Report [Due : 21 APRIL 201 5 ] Analysis using selected methodology, example: structured approach (Context Diagram, DFD, Process Description). Functional requirements and non functional requirements of the proposed system need to be identified. Non fun The report should have detailed discussions on the analysis. Each diagram involves in analysis phase must be submitted. _____________________________________________ [email protected] 1

Upload: cikgufaiz

Post on 29-Sep-2015

213 views

Category:

Documents


0 download

DESCRIPTION

GroupProject.doc

TRANSCRIPT

MTK 6043 : SYSTEMS DESIGN & OBJECT ORIENTED MODELING

MTD 6024

Information Systems Development

COMPUTING DEPARTMENTUNIVERSITI PENDIDIKAN SULTAN IDRISMTD 6024: INFORMATION SYSTEMS DEVELOPMENT

GROUP PROJECT :

Group project carries 25% of the final grade. The project has to be proposed by each group and approved by the lecturer. Each student based on group performance and contribution, will receive a percentage of their final group project grade. Students are encouraged to discuss the project details with the lecturer on a regular basis, during the semester. Project will be evaluated as below:

Planning

: 30 marks

Analysis

: 30 marks

Design

: 20 marks

Implementation: 20 marks

Presentation

: 20 marks

A. Project Group Each project must be done in groups of three (3). Each student of a group will be system analysts, and one will serve as the group leader. B. Project Planning [Due: 21 MARCH 2015] A proposal of the project with title, background, problem statement, scope, objective, and feasibility study should be submitted and presented in class. Proposed schedule is compulsory (Gantt Chart).

C. Analysis Report [Due : 21 APRIL 2015] Analysis using selected methodology, example: structured approach (Context Diagram, DFD, Process Description). Functional requirements and non functional requirements of the proposed system need to be identified. Non fun The report should have detailed discussions on the analysis. Each diagram involves in analysis phase must be submitted.D. Design Report [ Due : 5 MAY 2015 Suitable framework of the project should be proposed (Data, process and user interface)A design report with user interface design, input, output are compulsory. The report should has detailed discussions on the design including Database Management System. It also reports on the implementation plan and approach with details on language features used. E. Project Demonstration [ Due: 23 MEI 2015]One or more members of the group should demonstrate the project in front of a terminal. The grade for this will be based on the group's answer to questions posed during the presentation.

CONTENT OF THE PROJECT REPORT TABLE OF CONTENT

Planning

Introduction

Organizations Background

Problem statement

Objectives

Scope

Feasibility study

Analysis

Methodology

Techniques

Tools

FR and NFRsContext Diagram

DFD 0, at least one DFD level 1

Process Description Tools

Design

Framework and architecture of the project

Interface design

Input design

Output design (Report design)

Database design

Conclusion

Advantages and Limitation of the project

Discussion and Recommendation

BIBLIOGRAPHY

Appendixes

2_____________________________________________ [email protected]