Grid Impact of PEV Charging. Possible Consequences. Jan Berman Sr. Director, Policy & Integrated Planning Integrated Demand Side Management Customer Care 06 August 2010. PEV Charging Creates a Significant Increase In Load. Customers will prefer a 240V charge to shorten recharge times. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Grid Impact of PEV Charging

1

Grid Impact of PEV ChargingPossible Consequences

Jan BermanSr. Director, Policy & Integrated PlanningIntegrated Demand Side Management Customer Care06 August 2010

Page 2: Grid Impact of PEV Charging

2

PEV Charging Creates a PEV Charging Creates a Significant Increase In LoadSignificant Increase In Load

0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0

BEV @ 240V/30A

San Ramon

Rocklin

Fresno

Vacaville

Berkeley

San Francisco

kW

Customers will prefer a 240V charge to shorten recharge times

PEV charging is a large load for PG&E customers, comparable to average peak summer load of a single home

240V/30A

4 hours

240V/15A

8 hours

120V/12A

Rate of chargeRate of charge

BE

V R

ech

arg

e ti

me

BE

V R

ech

arg

e ti

me 16 hours

Page 3: Grid Impact of PEV Charging

3

The Existing Grid

SubstationCustomer

Customer

Customer

Customer

CustomerCustomer

Generation

Transmission

Customer

Switching Device

Page 4: Grid Impact of PEV Charging

4

Scenario 1: Two PEVs in Berkeley, Two Circuits

SubstationCustomer

Customer

Customer

Customer

CustomerCustomer

Transmission

Customer

Generation

Switching Device

Page 5: Grid Impact of PEV Charging

5

Scenario 2: Two PEVs in Berkeley - Single Circuit

SubstationCustomer

Customer

Customer

Customer

CustomerCustomer

Transmission

Customer

Generation

Switching Device

Page 6: Grid Impact of PEV Charging

6

Zip code level

Specific Notification Drives Proper Upgrade Planning

SubstationCustomer

Customer

Customer

Customer

CustomerCustomer

Transmission

CustomerAddress level

Switching Device

Generation

Page 7: Grid Impact of PEV Charging

7

24 Hour Total Loading of Single Feeder - July 27, 2007

4000

5000

6000

7000

8000

9000

10000

11000

12000

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hours

To

tal L

oad

ing

at

Su

bst

atio

n (

KW

)

Base Load Scenario (no PHEV)

Case 1:- Do nothing (charge @6pm)

Case 2:- TOU rates only (charge @9pm)

Case 3:- TOU rates and Smart Charging (charge @9pm-1am)

When most customers

arrive home

When most customers

arrive homeoff-peak load

Left Unmanaged, PEV Load Will Left Unmanaged, PEV Load Will Add to Peak Electric DemandAdd to Peak Electric Demand

Source: EPRI.

Note: Feeder of Northeastern utility feeder during urban summer peak with 2,778 residential customers. PEV penetration = 10%.

Case 1 – 3 charge @ 240V, 12A

Source: EPRI.

Note: Feeder of Northeastern utility feeder during urban summer peak with 2,778 residential customers. PEV penetration = 10%.

Case 1 – 3 charge @ 240V, 12A

Page 8: Grid Impact of PEV Charging

8Bay Area EV Adoption and Load Bay Area EV Adoption and Load Forecasts CorrelateForecasts Correlate

Cities with most hybrids per zip code

No CityHybrid

registration*Hybrids per

zip code Transformers1 MENLO PARK 1,139 1139 1,476 2 CUPERTINO 1,114 1114 2,140 3 SAN CARLOS 694 694 1,366 4 ORINDA 693 693 1,674 5 EAST PALO ALTO 681 681 513 6 FOSTER CITY 623 623 700 7 SONOMA 602 602 579 8 MILL VALLEY 1,187 594 825 9 EL DORADO HILLS 554 554 1,595 10 NAPA 1,057 529 3,194 11 PLEASANTON 1,045 523 2,898 12 LIVERMORE 1,551 517 3,531 13 BELMONT 503 503 1,000 14 LINCOLN 491 491 2,151 15 MARTINEZ 483 483 1,801 16 DANVILLE 964 482 2,295 17 PLEASANT HILL 467 467 1,686 18 BURLINGAME 908 454 1,174 19 SAN RAMON 902 451 1,751 20 SARATOGA 868 434 1,923

PG&E EV Load Forecast Nissan Leaf Reservations

* Hybrid registrations from 2004 to 2008, source: Polk & Co.

2007 Outage Density(# of outages per distribution transformer)

Page 9: Grid Impact of PEV Charging

9

PG&E is Committed to PEVs

Page 10: Grid Impact of PEV Charging

10

Thank You