Local Energy & Microgrids ConferenceApril 2016
Stockland ShellharbourSolar Power Station
Greg Johnson
National Sustainability
Manager,
Commercial Property
The Stockland Shellharbour Solar Power Station
Our first solar PV installations
3
Stockland Green Hills, NSW - 67 kWInstalled September 2012Design annual output 100,500 kWhCost per kW after STC’s = $3,446
Stockland Jimboomba, QLD - 31 kWInstalled March 2013Design annual output 46,500 kWhCost per kW after STC’s = $2,303
Stockland Nowra, NSW - 50 kWInstalled July 2013Design annual output 75,000 kWhCost per kW after STC’s = $1,724
Pre Shellharbour installed capacity – 148kW
Solar power as a proportion of FY13 Retail grid energy use222,000 kWh / 63,500,000 kWh = 0.35%
Stockland FY17 renewable energy targetEquivalent of 3% of FY13 Retail energy use = 2,025,000kWhprovided through solar energy or 1.35MW installed capacity
System Facts
• Partnered with Todae Solar & Canadian Solar to supply, install, maintain and provide ongoing
performance guarantee.
• Largest rooftop solar PV system in Australia @ 1.22 MW at the time of commissioning.
• 7 systems comprising 3,991 Canadian Solar 305w Modules over approximately 7,650 m2 of roof area
• 43 SMA Sunny Tripower inverters and Cluster Controllers located in 7 inverter stations
• Sunlock commercial clamping roof brackets tilted at 15 degrees
• Installation time from site establishment and procurement to commissioning in May/June 2015 – 11
weeks
• Project cost $2.19 million excluding roof sheeting replacement works; Cost per kW $1,795 (no STC’s).
• Total annual output – 1,740,000 kWh; Annual carbon emissions reduction – 1,700 tonnes/CO2e
System Configuration
How does this project fulfil a need or desire?
6
The project sought to address a number of challenges
• Identify new sources of income for the
business through non traditional channels.
• Diversify the energy mix in our Retail portfolio
through alternative and renewable energy.
• Reduce energy intensity of the Retail portfolio
by 10% by the end of FY17
• Achieve a target of 3% of Retail energy
consumption supplied by renewables by the
end of FY17.
• Utilise Australia’s first ‘Green Bond’ to finance
the project to deliver environmental benefits
to the community.
• The combination of revenue generating
infrastructure and technology allowed us to
achieve income, project financing and
environmental objectives concurrently.
How does this project provide value to the business?
7
The project created a number of opportunities
• Performance Warranty guarantees output and income. The PW is 97.5% of the agreed output figure that the system must achieve or penalties may be applied.
• Improved intellectual property for Stockland and growing a team of trusted consultants and contractor partners for future solar projects.
• Contribution to local job creation with over 50 staff employed on the project with half from the Illawarra region.
• Highly visible renewable energy demonstration project in the Shellharbour community.
• Lessons learned from the project have helped identify opportunities for efficiencies, time and cost savings for future projects.
• Multiple regional television and newspaper media and national marketing opportunities to showcase the project in the Illawarra region and promoting Stockland’s commitment to sustainability.
How does this project deliver a commercial outcome?
8
The project will deliver a solid commercial return
• Total capital budget = $2.5M
• Initial yield = 12.8% (Income = $280k; Savings =
$28k)
• 10 year IRR = 12.9%
• Valuation uplift = $2.4M
• Additional and diversified income stream from on
selling solar electricity to retailers outside of
traditional income streams.
• In addition the Large Scale Generation
Certificates (LGC) spot price has been trending
upwards since initial project feasibility (from $40 to
$79/MWh)
• This has netted an additional $39/MWh ($67.8K)
of income compared to the feasibility; nearly
double the forecast.
• Other reputational and non-financial intangible
benefits from the positive coverage this project
9
Challenges and lessons learnedChallenges
• Scale and logistics of the site – knowns and unknowns, inverter
locations took time and cost to identify after construction
commenced; more time on this up front would have been
productive.
• Centre layout, varying roof heights and large roof area - different
access points made traversing the site difficult and time
consuming.
• Working with a ‘live’ shopping centre – drilling constraints, on site
storage, cranage, varying orientations, roof mounted plant and
equipment impediments. Managed well by Todae Solar 10/10.
• Program – lengthy contract T&C’s negotiations and revenue
commencement objectives compressed the program.
Lessons
• Identify structurally sound inverter locations early and before
tender documentation stage.
• Early discussions with authorities on network approvals and grid
connections was hugely valuable.
• Allow more time for final design once at preferred contractor
status, and for mobilisation and orientation on site.
• Keeping embedded network and solar infrastructure separate;
having solar connection points made interface simpler.
• Using trusted sub contractors familiar with the site saved time and
Pushing live output data to external management systems
10
System Performance to Date
• Total annual output – 1,740,000 kWh; Commissioned May/June 2015
• Total generation output to 31 March 2016 – 1,452,765 kWh; (Target
1,417,540 kWh)
• Value of electricity generated since commissioning - $261,500; Annually
- $295,800 (@ $0.18 c/kWh)
• Value of Large Scale Generation Certificates (LGC’s) annually at current
price of $79.60 per MWh - $138,504
Awards and what’s next?
12
• NSW 2015 Green Globe Awards - Winner
(Energy Efficiency)
• Clean Energy Council 2015 Solar Design and
Installation Awards - Finalist (Systems over
100kW).
• Stockland Chairman’s Award for Innovation
2015 - Winner (New Product and Revenue
Enhancement).
• Solar feasibilities being undertaken across
entire Retail portfolio with embedded
networks.
• 700 kW system to be installed as part of
Stockland Green Hills redevelopment (2018).
• 900 kW system to be installed at another
centre not yet announced (2016).
Stockland Corporation Limited
ACN 000 181 733
Stockland Trust Management Limited
ACN 001 900 741
25th Floor
133 Castlereagh Street
SYDNEY NSW 2000
Disclaimer Of Liability
While every effort is made to provide accurate and complete information, Stockland does not warrant or
represent that the information in this presentation is free from errors or omissions or is suitable for your
intended use. The information provided in this presentation may not be suitable for your specific
situation or needs and should not be relied upon by you in substitution of you obtaining independent
advice. Subject to any terms implied by law and which cannot be excluded, Stockland accepts no
responsibility for any loss, damage, cost or expense (whether direct or indirect) incurred by you as a
result of any error, omission or misrepresentation in information in this presentation.
All information in this presentation is subject to change without notice.