greg cademartori great marsh symposium

38
City of Gloucester Climate Change Vulnerability Assessment and Adaptation Planning Update

Upload: greenbelt82

Post on 13-Apr-2017

176 views

Category:

Environment


0 download

TRANSCRIPT

Page 1: Greg Cademartori Great Marsh Symposium

City of Gloucester

Climate Change Vulnerability Assessment and Adaptation Planning

Update

Page 2: Greg Cademartori Great Marsh Symposium

Outline• Successful Development of Vulnerability Assessment

• The Right Team – Coastal Resilience Working Group• Built on Past Efforts

• Multi-Hazard Mitigation Plan (2010) – Critical Asset Inventory• Citywide LIDAR and GIS (2011-2012) – Robust Dataset

• Useful Tools (Critical Elevations, Risk Assessment, Viewer)• Prioritization (Infrastructure Life Cycle vs. Risk)*• Regulatory Review (Risk vs. Economic Development)**

• Adaptation Project Implementation (Green Infrastructure)

• Protecting Critical Infrastructure – Enhancing Natural Resources

• Little River Floodplain and Habitat Restoration• Questions

Page 3: Greg Cademartori Great Marsh Symposium

Outline• Successful Development of Vulnerability Assessment

• The Right Team – Coastal Resilience Working Group• Built on Past Efforts

• Multi-Hazard Mitigation Plan (2010) – Critical Asset Inventory• Citywide LIDAR and GIS (2011-2012) – Robust Dataset

• Useful Tools (Critical Elevations, Risk Assessment, Viewer)• Prioritization (Infrastructure Life Cycle vs. Risk)*• Regulatory Review (Risk vs. Economic Development)**

• Adaptation Project Implementation (Green Infrastructure)

• Protecting Critical Infrastructure – Enhancing Natural Resources

• Little River Floodplain and Habitat Restoration• Questions

Page 4: Greg Cademartori Great Marsh Symposium

AdministrationElected City CouncilPlanning BoardClean Energy Comm.Conservation Comm.DPW/EngineeringPlanning staffHealth DepartmentMembers of Public

Plus Kleinfelder - WHGCZM

Team

Page 5: Greg Cademartori Great Marsh Symposium

Asset Inventory High Res Topo

Page 6: Greg Cademartori Great Marsh Symposium

6

Priority-planning

areas

Project Approach

Phase I

Sea Level Rise/Storm Surge Projections

Scenario Development

Phase II

Mapping Inundation Modeling Results

Vulnerability/Risk Assessment

Phase III

Develop Adaptation Strategies

Probability of occurrence

Con

sequ

ence

of i

mpa

ct

Working Group

Public Meeting Public Meeting Public Meeting

Page 7: Greg Cademartori Great Marsh Symposium

7

• 2013 - Present• 2030 – 15 years out – Near term• 2070 – 55 years out – Long term

• Future Conditions - Not Cause

Planning Horizons

Page 8: Greg Cademartori Great Marsh Symposium

8

Not “worst-case” scenariosbut

“worst-likely” scenarios

A Probability-Based Model

Page 9: Greg Cademartori Great Marsh Symposium

9

Estimate of impactGeneral Strategies

Big Picture Approaches

Adaptation Strategies

Page 10: Greg Cademartori Great Marsh Symposium

Enhanced Critical Asset inventoryAccurate modellingRisk assessmentRecommendations: Policies, Priorities & Projects

Dynamic tools only made possible by grant funding!

What did we get?

Page 11: Greg Cademartori Great Marsh Symposium

Infrastructure

Page 12: Greg Cademartori Great Marsh Symposium

Infrastructure

Page 13: Greg Cademartori Great Marsh Symposium

Infrastructure

MBCR

MassDOT

Page 14: Greg Cademartori Great Marsh Symposium

14

Depth of Flooding above Ground (ft.)

Essex Ave at Western Ave2030: 1% Annual Probability (≈100 yr Recurrence)

Page 15: Greg Cademartori Great Marsh Symposium

15

Depth of Flooding above Ground (ft.)

Essex Ave at Western Ave2070: 1% Annual Probability (≈100 yr Recurrence)

Page 16: Greg Cademartori Great Marsh Symposium

16

Flooding Consequence -Measure of Risk?• Area of service loss• Duration of service loss• Cost of damage• Impacts to public safety and emergency

services• Impacts to economic activities• Impacts to public health and the environment

Page 17: Greg Cademartori Great Marsh Symposium

17

RESULTS

Facilities/BuildingsAll are at or above 1% Flood Elevation in 2030Some facilities subject to extreme flooding in 2030

Waste Water Treatment PlantPump Stations at highest risk:Thatcher Rd, Good Harbor

Senior CenterA number of facilities buildings subject to some degree of flooding in 2070

Page 18: Greg Cademartori Great Marsh Symposium

18

RESULTS

Facilities/BuildingsAll are at or above 1% Flood Elevation in 2030Some facilities subject to extreme flooding in 2030

Waste Water Treatment PlantPump Stations at highest risk:Thatcher Rd, Good Harbor

Senior CenterA number of facilities buildings subject to some degree of flooding in 2070

Page 19: Greg Cademartori Great Marsh Symposium

19

LONG TERM THOUGHTS

Recommendation:Install lock gates at Blynman Canal, and Rt 128 at Annisquam River or Rail causeway, in concert with strategically raising roadway elevations and/or adding roadside walls

Protects City Assets:• WWTP• High School/Emergency

Dispensing Site• Riverside Ave PS• Leslie O Johnson Rd• Centennial Ave• Kent Circle• PLUS Rt 133, Rt 127

Blynman Canal

Page 20: Greg Cademartori Great Marsh Symposium

20

Outer Harbor – Hurricane Barrier?

Page 21: Greg Cademartori Great Marsh Symposium

Natural Resources

Page 22: Greg Cademartori Great Marsh Symposium

Adaptation Project Implementation

Page 23: Greg Cademartori Great Marsh Symposium
Page 24: Greg Cademartori Great Marsh Symposium
Page 25: Greg Cademartori Great Marsh Symposium
Page 26: Greg Cademartori Great Marsh Symposium
Page 27: Greg Cademartori Great Marsh Symposium
Page 28: Greg Cademartori Great Marsh Symposium
Page 29: Greg Cademartori Great Marsh Symposium
Page 30: Greg Cademartori Great Marsh Symposium
Page 31: Greg Cademartori Great Marsh Symposium
Page 32: Greg Cademartori Great Marsh Symposium
Page 33: Greg Cademartori Great Marsh Symposium
Page 34: Greg Cademartori Great Marsh Symposium
Page 35: Greg Cademartori Great Marsh Symposium

• City of Gloucester• Department Ecological Restoration• NOAA and Gulf of Maine Council for the

Marine Environment• Mass Audubon• Wellspring House• US Fish and Wildlife• Engineer: Milone and MacBroom, Inc.• Contractor RC&D Providence• COASTAL ZONE MANAGEMENT

Partnerships

Page 36: Greg Cademartori Great Marsh Symposium

Funding to date$54,815 Department of Ecological Restoration (Design)$43,000 Gulf of Maine Council for the Marine Environment, NOAA (Design and Fish Monitoring)$50,000 USFWS (Construction and monitoring)Coastal Zone Management Green Infrastructure Grant: $400,000 (Construction)

City of Gloucester: $150,000* (Construction)Volunteers (monitoring - fish counting) - Priceless

Page 37: Greg Cademartori Great Marsh Symposium

Finding the right funding fit – change grant priorities Support for Project - City FundingIdentify Cash or BondBond Authorization:

MGL Chapter 44, Section 7(1)Sets project type, eligibility, duration

Surface drainage improvement New explicit category needed?Always offer food at public meetings!

Challenges and Lessons

Page 38: Greg Cademartori Great Marsh Symposium

Thank You! Questions?

[email protected]