green sites - gsmafirst step to go green 20% indus site to be green by mar’13 high efficiency...
TRANSCRIPT
![Page 1: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/1.jpg)
High efficient products
Green Cities
Green Sites
our committed journey continues!
Shachidevi TK CTO, indus Towers 13th April 2012
17/04/2012 1
![Page 2: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/2.jpg)
Telecom tower operation
2
To manage Network Operation and provide 24x7 UPTIME
Some Challenges
1. Distributed cluster of sites and
remote geographies
2. Erratic and Discontinuous
Electricity supply from grid 17/04/2012
![Page 3: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/3.jpg)
First step to go green
20% Indus site to be Green by Mar’13
High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units etc. High temperature withstanding BTS.
Moving sites from indoor to outdoor.
Intelligent devices to sense the load requirement
and supply only as much as needed.
High efficient products & solutions 17/04/2012 3
![Page 4: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/4.jpg)
Second step: Solar hybrid solution 2011-2012
4
Solar power along with the DG to reduce run time.
17/04/2012
![Page 5: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/5.jpg)
Third Step: Consolidation of nearby sites (2011-2012)
20% Indus site to be Green by Mar’13
Consolidate assets of nearby sites.
Opportunity is to use higher rating DG and working at optimized power.
Optimize EB consumption.
High efficient products & solutions 17/04/2012 5
![Page 6: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/6.jpg)
Forth step: 2011-2012
6 17/04/2012
![Page 7: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/7.jpg)
Green city technology
7
Going DG Free
Eliminating DG running at site by augmenting EB or Battery
Enhancing grid power supply
Augmenting Battery Bank
Deployment of FCU
Solar Power
17/04/2012
![Page 8: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/8.jpg)
Green city concept
8
Going DG Free To drive our commitment towards environment
Sites Green City
Our Value System: Commitment towards environment
Elimination of DG running at all sites in the Municipal limits of a given city by using other non polluting sources to reduce carbon foot print
17/04/2012
![Page 9: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/9.jpg)
Green city project journey
Mar-12 Jan-12 & Feb-12
Jan-12 Aug-11 Mar-11
Green City Concept
Ahmedabad Gandhinagar
Palanpur
Chandigarh Mumbai
Patan Kolkata
9 17/04/2012
![Page 10: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/10.jpg)
Green cities
10
Green cities
4500+ sites
w/o DG
Ahmedabad
778 Sites
Chandigarh
110 Sites
Kolkata
925 Sites
Palan, Patan & Gandhi Nagar
82 Sites
Mumbai
2940 Sites
Kota
108 Sites
17/04/2012
![Page 11: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/11.jpg)
Green city add on
Ensuring green environment 17/04/2012 11
![Page 12: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/12.jpg)
Green Experience
12 20% Indus site to be Green by Mar’13
Green Experience
Improved Network Uptime
Reduction in carbon foot print
Reduction in Energy
consumption
Predictable &
Sustainable Model
Living Indus value
every day
17/04/2012
![Page 13: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/13.jpg)
Fifth step :Changing gears
From Green City to Green Site 2012-2013
17/04/2012 13
![Page 14: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/14.jpg)
Green sites journey
Journey Ahead
Mar-12 Jan-12 & Feb-12
Jan-12 Aug-11 Mar-11
Green City Concept
Ahmedabad Gandhinagar
Palanpur
Chandigarh Mumbai
Green Site
Green Site
Green Site
Green Site
Green Site
Patan Kolkata
14
Taking indus Towers’ Green from City to Sites 17/04/2012
![Page 15: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/15.jpg)
Why green sites?
To create a sustainable model which can be
replicated across geographies
A journey towards indus’ bottom of the pyramid
;ajkfd To penetrate green concept
in areas where mass green is currently not feasible
To promote site wise energy solutions due to dynamic
nature of network
17/04/2012 15
![Page 16: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/16.jpg)
Timeline
16
Sites to be converted : basis is on Technical, Business & Environmental Feasibility
Apr’11-Mar’12 : Launch of Green Cities
Apr’12 : Launch of Green Sites
Sept’12 : 15K Green Sites
April’13 : 20K Green Sites
20% of indus Tower site to go Green by April’13 17/04/2012
![Page 17: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/17.jpg)
On news stand for going green
17 20% Indus site to be Green by Mar’13
17/04/2012
![Page 18: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/18.jpg)
Green Sites : Ideas at various stage
18
Solar RESCO. Solar Opex.
Fuel Cell Bio CNG,PNG Li-ion Fe Batteries
• Smart devices, IIPMS, controller, FCU, ID to OD. • Optimize site planning to reduce the DG running. • VRLA+ batteries. • Outdoor BTS
20% Indus site to be Green by Mar’13 Further innovation of the products/solutions needed 17/04/2012
![Page 19: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/19.jpg)
Green Opportunities
Micro grid opportunity
RESCO : 3 phase power model:
• Provide power to primary customers i.e.
telecom tower companies
Phase I
• Provide surplus power to local community helping in advancement of surrounding areas
Phase II
• Feed the excess power to GRID
Phase III
17/04/2012 19
![Page 20: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/20.jpg)
Green challenges
Product Solution
Insufficient grid power availability; National/State governments must focus on 24x7 grid availability to urban and rural areas.
High entry level cost of new technology;
Fuel cell, Li-ion Fe batteries need good manufacturing base in India, need clear life cycle model.
Takers for RESCO model; TAIPA has initiated and is discussing RESCO model.
Investors , renewable energy technology providers, solution providers to tie up together to provide
economically viable solutions with life cycle support model needed.
17/04/2012 20
![Page 21: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/21.jpg)
Green game changers
Any product/solution should be cost viable
• Cost effective micro grids. • Long power storage devices with small foot print. • Self diagnostic and built in healing features.
• Built in redundant feature or fail safe feature to
assure continuous operation. • Predictive maintenance indicators built in. • Anti vandalism features built in.
17/04/2012 21
![Page 22: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7ffbe6ac3cf37672273425/html5/thumbnails/22.jpg)
Thank You !
22 17/04/2012