green sites - gsmafirst step to go green 20% indus site to be green by mar’13 high efficiency...

22
High efficient products Green Cities Green Sites our committed journey continues! Shachidevi TK CTO, indus Towers 13 th April 2012 17/04/2012 1

Upload: others

Post on 22-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

High efficient products

Green Cities

Green Sites

our committed journey continues!

Shachidevi TK CTO, indus Towers 13th April 2012

17/04/2012 1

Page 2: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Telecom tower operation

2

To manage Network Operation and provide 24x7 UPTIME

Some Challenges

1. Distributed cluster of sites and

remote geographies

2. Erratic and Discontinuous

Electricity supply from grid 17/04/2012

Page 3: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

First step to go green

20% Indus site to be Green by Mar’13

High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units etc. High temperature withstanding BTS.

Moving sites from indoor to outdoor.

Intelligent devices to sense the load requirement

and supply only as much as needed.

High efficient products & solutions 17/04/2012 3

Page 4: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Second step: Solar hybrid solution 2011-2012

4

Solar power along with the DG to reduce run time.

17/04/2012

Page 5: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Third Step: Consolidation of nearby sites (2011-2012)

20% Indus site to be Green by Mar’13

Consolidate assets of nearby sites.

Opportunity is to use higher rating DG and working at optimized power.

Optimize EB consumption.

High efficient products & solutions 17/04/2012 5

Page 6: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Forth step: 2011-2012

6 17/04/2012

Page 7: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Green city technology

7

Going DG Free

Eliminating DG running at site by augmenting EB or Battery

Enhancing grid power supply

Augmenting Battery Bank

Deployment of FCU

Solar Power

17/04/2012

Page 8: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Green city concept

8

Going DG Free To drive our commitment towards environment

Sites Green City

Our Value System: Commitment towards environment

Elimination of DG running at all sites in the Municipal limits of a given city by using other non polluting sources to reduce carbon foot print

17/04/2012

Page 9: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Green city project journey

Mar-12 Jan-12 & Feb-12

Jan-12 Aug-11 Mar-11

Green City Concept

Ahmedabad Gandhinagar

Palanpur

Chandigarh Mumbai

Patan Kolkata

9 17/04/2012

Page 10: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Green cities

10

Green cities

4500+ sites

w/o DG

Ahmedabad

778 Sites

Chandigarh

110 Sites

Kolkata

925 Sites

Palan, Patan & Gandhi Nagar

82 Sites

Mumbai

2940 Sites

Kota

108 Sites

17/04/2012

Page 11: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Green city add on

Ensuring green environment 17/04/2012 11

Page 12: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Green Experience

12 20% Indus site to be Green by Mar’13

Green Experience

Improved Network Uptime

Reduction in carbon foot print

Reduction in Energy

consumption

Predictable &

Sustainable Model

Living Indus value

every day

17/04/2012

Page 13: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Fifth step :Changing gears

From Green City to Green Site 2012-2013

17/04/2012 13

Page 14: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Green sites journey

Journey Ahead

Mar-12 Jan-12 & Feb-12

Jan-12 Aug-11 Mar-11

Green City Concept

Ahmedabad Gandhinagar

Palanpur

Chandigarh Mumbai

Green Site

Green Site

Green Site

Green Site

Green Site

Patan Kolkata

14

Taking indus Towers’ Green from City to Sites 17/04/2012

Page 15: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Why green sites?

To create a sustainable model which can be

replicated across geographies

A journey towards indus’ bottom of the pyramid

;ajkfd To penetrate green concept

in areas where mass green is currently not feasible

To promote site wise energy solutions due to dynamic

nature of network

17/04/2012 15

Page 16: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Timeline

16

Sites to be converted : basis is on Technical, Business & Environmental Feasibility

Apr’11-Mar’12 : Launch of Green Cities

Apr’12 : Launch of Green Sites

Sept’12 : 15K Green Sites

April’13 : 20K Green Sites

20% of indus Tower site to go Green by April’13 17/04/2012

Page 17: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

On news stand for going green

17 20% Indus site to be Green by Mar’13

17/04/2012

Page 18: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Green Sites : Ideas at various stage

18

Solar RESCO. Solar Opex.

Fuel Cell Bio CNG,PNG Li-ion Fe Batteries

• Smart devices, IIPMS, controller, FCU, ID to OD. • Optimize site planning to reduce the DG running. • VRLA+ batteries. • Outdoor BTS

20% Indus site to be Green by Mar’13 Further innovation of the products/solutions needed 17/04/2012

Page 19: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Green Opportunities

Micro grid opportunity

RESCO : 3 phase power model:

• Provide power to primary customers i.e.

telecom tower companies

Phase I

• Provide surplus power to local community helping in advancement of surrounding areas

Phase II

• Feed the excess power to GRID

Phase III

17/04/2012 19

Page 20: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Green challenges

Product Solution

Insufficient grid power availability; National/State governments must focus on 24x7 grid availability to urban and rural areas.

High entry level cost of new technology;

Fuel cell, Li-ion Fe batteries need good manufacturing base in India, need clear life cycle model.

Takers for RESCO model; TAIPA has initiated and is discussing RESCO model.

Investors , renewable energy technology providers, solution providers to tie up together to provide

economically viable solutions with life cycle support model needed.

17/04/2012 20

Page 21: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Green game changers

Any product/solution should be cost viable

• Cost effective micro grids. • Long power storage devices with small foot print. • Self diagnostic and built in healing features.

• Built in redundant feature or fail safe feature to

assure continuous operation. • Predictive maintenance indicators built in. • Anti vandalism features built in.

17/04/2012 21

Page 22: Green Sites - GSMAFirst step to go green 20% Indus site to be Green by Mar’13 High efficiency equipment : DC Power Plant. Reduce usage of Air conditioner using Fan Cooling Units

Thank You !

22 17/04/2012