Learning Objectives• Understand how the Facility Conservation
Improvement Program (FCIP) works• Assess whether the FCIP is relevant to
your school district’s needs• Acquire helpful hints about making a
potential FCIP implementation more effective for your school district
• Discover how the FCIP can cut utility costs, create convenience, and improve learning conditions
A Little Info about Rock Creek USD 323
• Between Manhattan and Wamego• About 900 Students• Two K-6 schools (St. George and
Westmoreland) and one 7-12 school• 26/26 Standards of Excellence last year• Two National Blue Ribbon Schools in
the past two years
Overview of State Program
• KS Statute 75-37, 125: Facility Conservation Improvement Program (FCIP)
• Energy Services Companies (ESCOs) must be approved by KDHE (we used Trane)
• Process, profit margins, fees, and energy savings measurement options are set by statute
• Financing is a lease-purchase loan, paid out of Capital Outlay, and not counted as debt
• No change orders by the ESCO are allowed
Step I: Preliminary Energy Audit--No Cost
Step 2: Investment Grade Audit--Cost Will Vary
Step 3: Installation
Negotiate Scope & Contract
Authorize Investment Grade Audit
InstallationCommissionin
gAcceptanc
e
Warranty/Performance Guarantees
Detailed Technical &
Financial Investment Grade Audit
Project Approval & Contract Execution
Initial Conceptual Discussion
ESCO Team & the Facility
Team Identify Facility
Opportunities
Preliminary Technical
and Financial Analysis
Preliminary Technical
and Financial Summary
Other Important Info• Energy savings are measured and
guaranteed but maintenance savings are not
• Project costs will be mostly but perhaps not completely paid for with savings.
• Projects are determined by the BOE and costs are negotiable
Our Projects: SGES• Two year-old New Building• Added CO2 sensors• Re-balanced a few HVAC items • Re-set temperature and light schedules• Integrated lighting with HVAC controls• Web-based controls: Other buildings
were routed through SGES controls• Total Cost: $190,000
Our Projects: RCJSHS• Had already replaced metal halide gym
lights with T5 lights• Replaced T12 lights with T8• Added occupancy sensors• Replaced chiller• Replaced water fixtures• Web-based controls and schedules• Total Cost: $900,000
WES Projects• All new Mitsubishi HVAC system• Upgraded electrical system• New doors and windows• New light fixtures and added sensors• New water fixtures• Gym ventilation system• Removed window A/C units, boiler, and
radiators (huge learning environment improvement)
• Web-based controls and schedules• Total Cost: $1.1 million
Results• Utility Bills: Large drop in electricity
costs. Expect to save about $150,000 per year in utility and maintenance costs
• More light with fewer bulbs (lamps)• No noisy window A/C units or hot
radiators at WES• Convenient and efficient controls• Reduced carbon footprint
Carbon FootprintReduction
521 metric tons CO2 / year521 metric tons CO2 / yearAnnual Equivalent Savings:
•111 acres of forest
•2.7 railcars of coal
•99 passenger vehicles