GPMC 7500T-120-WS LIFTBOAT Multipurpose Offshore Well Intervention and Accommodation Support Liftboat Air gap: 20 m Water depth: 60 m Penetration: 12 m Leg length: 105 m HELIPAD 12.8 MT Helicopter 22.2 m ‘D’ value ACCOMMODATION 120 Complements 14x4-men/28x2-men/8x1-man CRANES 50 MT and 120 ft boom 50 MT and 110 ft boom CLASSIFICATION ABS: A1 Self Elevating Drilling Unit AMS DESIGN ENVIRONMENT Max Water Depth : 60m to 75 m Min Water Depth : 8 m Air Gap : 8 m to 20 m Max Wave Height : 11 m Surface Current : 1.5 knots Wind Speed : 70 knots Leg Penetration : 3 m to 12 m GPMC7500T-100-WS Rev A6 MAIN FEATURES Drilling and Well Servicing operations Accommodation support during offshore con- struction and platform maintenance. Offshore Hook-up and Commissioning support GREEN PALM MARINE CONSULTANCY SPUDCAN Area: 70 m² Max bearing pressure : 50 MT/m² in Preload Conditions OVERALL DIMENSIONS Hull Length : 65.55 m Hull Beam : 42.00 m Hull Depth: 6.00 m Transit Draught: ~3.67 m

Upload: buikhuong

Post on 24-Apr-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: GREEN PALM MARINE CONSULTANCY 7500T-120-WSgreenpalmconsultancy.com/wp-content/uploads/2016/... · GPMC 7500T-120-WS LIFTBOAT Multipurpose Offshore Well Intervention and Accommodation

GPMC 7500T-120-WS LIFTBOAT Multipurpose Offshore Well Intervention and Accommodation Support Liftboat

Air gap: 20 m

Wat

er d

epth

: 60

m

Penetration: 12 m

Leg

leng

th: 1

05 m

HELIPAD 12.8 MT Helicopter 22.2 m ‘D’ value

ACCOMMODATION 120 Complements 14x4-men/28x2-men/8x1-man

CRANES 50 MT and 120 ft boom 50 MT and 110 ft boom

CLASSIFICATION ABS: A1 Self Elevating Drilling Unit AMS

DESIGN ENVIRONMENT Max Water Depth : 60m to 75 m Min Water Depth : 8 m Air Gap : 8 m to 20 m Max Wave Height : 11 m Surface Current : 1.5 knots Wind Speed : 70 knots Leg Penetration : 3 m to 12 m

GPMC7500T-100-WS Rev A6

MAIN FEATURES Drilling and Well Servicing operations Accommodation support during offshore con-

struction and platform maintenance. Offshore Hook-up and Commissioning support

GREEN PALM MARINE CONSULTANCY

SPUDCAN Area: 70 m² Max bearing pressure : 50 MT/m² in Preload Conditions

OVERALL DIMENSIONS Hull Length : 65.55 m Hull Beam : 42.00 m Hull Depth: 6.00 m Transit Draught: ~3.67 m

Page 2: GREEN PALM MARINE CONSULTANCY 7500T-120-WSgreenpalmconsultancy.com/wp-content/uploads/2016/... · GPMC 7500T-120-WS LIFTBOAT Multipurpose Offshore Well Intervention and Accommodation

TUNNEL THRUSTERS 2 x 750 kW

JACKING SYSTEM Fixed Type, Rack and Pinion (Electric) Number: 4 x 18 (= 72) Pinions Normal Jacking: 100 MT/pinion Preload Jacking: 125 MT/pinion Normal Holding Capacity: 160 MT/pinion Storm Holding Capacity: 210 MT/pinion Jacking Speed: 3 ft/min for hull 4 ft/min for legs

ENDURANCE 21 days Autonomy for Fuel and Fresh Water

GREEN PALM MARINE CONSULTANCY

MAIN FEATURES Drilling and Well Servicing operations Accommodation support during offshore con-

struction and platform maintenance. Offshore Hook-up and Commissioning support

GPMC 7500T-120-WS LIFTBOAT Multipurpose Offshore Well Intervention and Accommodation Support Liftboat

X-SKIDDING 15.25m (50ft)

Y-SKIDDING 6.096m (20ft)

CANTILEVER PACKAGE Cantilever Reach: 15.24mx6.10m (50ft x 20ft) Hook Load Capacity: 227 MT (500 kips) Cantilever Length x Width: 34.00m x 10.50m Derrick Working Height: 35.05 m (115ft) Draw works: - Power 858 kW (1150 hp) Mud Pump: 552 kW (750 hp), 345 bar (5,000 psi ) (2 Nos) Cementing Unit: 690 bar (10,000 psi) Cementing manifold: 3”; 10,000 psi design pressure

VARIABLE LOADS Transit : 1200 MT Survival: 950 MT Jacking: 1200 MT

DECK AREA 800 m² (useful)

AZIMUTH THRUSTERS 2 x 1200 kW Transit Speed: 6 knots

MUD CLEANING EQUIPMENTS Shale shaker Degasser Desilter Centrifuge

Page 3: GREEN PALM MARINE CONSULTANCY 7500T-120-WSgreenpalmconsultancy.com/wp-content/uploads/2016/... · GPMC 7500T-120-WS LIFTBOAT Multipurpose Offshore Well Intervention and Accommodation

MACHINERY Main Generators: 5 x 1600 kW CAT 3516 TB (Diesel) Emergency Genset: 1 x 480 kW CAT 3412C (Diesel)

Green Palm Marine Consultancy (GPMC) offers new multi-purpose self-elevating, self-propelled platform (Liftboat) designs and customized MODU Jackup solutions (rig conver-sions and upgrades) to serve a wide range of operations related to offshore construction, platform maintenance, accommodation support, well services, coil tubing, etc. The solutions are customized to client requirements, comply-ing with international standards on operations and safety.

For enquiries and further information, please contact us at: [email protected], [email protected], [email protected], [email protected] www.greenpalmconsultancy.com

GPMC LIFTBOAT SERIES

DISCLAIMER: The information contained in this brochure are thought to be correct at the time of going to print. GPMC reserves the right to change, modify or update any such information without prior notice.

GPMC 4500C-150 GPMC 7500T-250 GPMC 6000T-200

GREEN PALM MARINE CONSULTANCY

MAIN FEATURES Drilling and Well Servicing operations Accommodation support during offshore con-

struction and platform maintenance. Offshore Hook-up and Commissioning support

GPMC 7500T-120-WS LIFTBOAT Multipurpose Offshore Well Intervention and Accommodation Support Liftboat

ACTIVE MUD PITS 2x56.4 m³

KILL MUD PIT 96 m³

BULK & CEMENT TANKS 85 m³

MIXING AREA 32 m²

SACK STORAGE ROOM 64 m²

RESERVE MUD PIT 1x57.5 m³ + 1x56.2 m³