Greeley Colorado June 30, 2009Dan Perry – Wyoming/Colorado Equipment
AGENDA
• About Endurance
• Endurance Products
• Wind Working For You
About Endurance
• Surrey BC – Manufacturing
• R&D - Spanish Fork Utah
• Sales and Distribution – BTI Wind Energy – Greensburg KS
• Colorado Equipment - CO
Points of Interest!
Company Background• Dean Davis and David Laino – Founding Engineers
(Won DOE Grant to design and build this machine original Turbine)
• Formation of Company - Endurance Wind Power
(Partnered with Financial and Marketing Executives to become Endurance)
• Commercialize S250 5 kw Turbine
(Turbine designed to offset needs of home owner: Designed to large wind specs for safety/production)
• BTI Wind Energy – Greensburg
(Partnered with BTI Wind Energy to form tight Network of Sales/Service distributors from John Deere dealers)
• Acquire Energy PGE – 35 and 50 kw Turbine
(Bought larger turbine manufacturer to fill the needs of our customer base…Schools, Municipalities, Farmers, Ranchers, Small
Commercial, Small Industrial)
• 100 + S250 Installations
• G and E Series – 14 World Wide
Our vision:
World leader in distributed wind turbines.
Our mission:
Develop, manufacture and market, through a network of effective
and reputable dealers, a product line of reliable, high performance
wind turbines, specifically engineered to meet our customers’
needs.
Company Vision and Mission
Why Wind Power?
• Save money on electricity
• Hedge against ever increasing electricity prices
• Independence from the grid
• Impact on the environment
1.5 lbs CO2 emission p/kwh of power – US average
• Make a Statement
Why Endurance?
•Engineering
•Aesthetics
•Safety
•Efficiency
•High Production in Low Wind
•Quiet
•Excellent support network – BTI
Product Line-up
- S-343 5 kw model- E-3120 50 kw 3-phase*- G-3120 50 kw single phase*
*Power output can be reduced for states where net-metering regulation is limited to 40 kW
- Main application: Grid-tied
G and E Series Description and Features
• Main principles that governed the design
• The highest energy production in its category.
• Swept area of 3120 ft² (290 m²).
• The blade aerodynamic profile is optimized for low wind sites.
• Quiet sound and aesthetically sound
• 20-year lifetime design (meets applicable IEC standards).
• Ease of installation to reduce costs.
• Designed for grid-tied connection (Three and single phase).
Wind – Working for YouSite Assessment and Feasibility
•Power profile
Match production to consumption!
•Wind resource evaluation
Firstlook, Windpro and others
•Turbine selection
Match carefully ..Do Not Try to Overproduce
•Site assessment
Data, Pictures, Measurments,Complete
•Interconnection
Provide complete and accurate technical data
•Incentives
Dsireusa.org, DOE – State Energy Office
•ROI
Must make sense for customer!
Wind – Working for YouThe “Paperwork”
•Interconnection
Request from your utility company, complete in full!
•Net Metering
Complete and return net metering agreement to utility!
•Incentives
Complete loan or grant paperwork or hire someone who has experience.
Must be VERY Thorough!
•Permits
Apply through municipality and follow steps.
Wind – Working for You
Installation and Commissioning
•Foundation
•Electrical
•Commissioning
•Start producing power
•Tell your friends!