green city, clean waters green streets, complete streets delaware direct partnership march 31, 2010

32
Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Upload: dale-little

Post on 17-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Green City, Clean Waters

Green Streets, Complete Streets

Delaware Direct PartnershipMarch 31, 2010

Page 2: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

For more information, visit www.phillywatersheds.org.

• $290 million to Restore and Preserve Stream Corridors

• $320 million to Upgrade Water Pollution Control Plants

• $1.01 billion to ‘Green’ 34% of the combined sewer area by managing stormwater at the source

Page 3: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

8 Green Programs

Private Lands– Industrial/Commercial/Institutional– Homes– Parking– Alleys, Driveways and Walkways

Public Lands– Streets– Schools– Public Facilities– Open Spaces Springside School “Water Wall”

and Rain GardenPhiladelphia, PA

Saylor Grove Stormwater WetlandPhiladelphia, PA

Friends Center Green RoofPhiladelphia, PA

Page 4: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

A range of soil-water-plant systems that intercept stormwater, infiltrate a portion of it into the ground, evaporate a portion of it into the air, and in some cases slowly release a portion of it back into the sewer system

Green Stormwater Infrastructure

Acknowledges the symbiotic relationship between land use and water resources

Page 5: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Green Stormwater Infrastructure Tools

Page 6: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010
Page 7: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010
Page 8: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010
Page 9: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

What is a good green street?

• Minimal utility conflicts • Few to no obstructions upslope of inlets • No existing street trees upslope of inlets• Wide sidewalks • Building setback • Relatively flat street • Large drainage areas

Page 10: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Fewer Design / Implementation Challenges

Page 11: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

More Design / Implementation Challenges

Page 12: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Site Selection Process

• Identification• Investigation• Selection based upon:

– Feasibility and cost-effectiveness– Neighborhood planning– Concurrent projects

Page 13: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Complete StreetsPolicy directive that streets and roads should

provide for all transportation mode users.

True Complete Streets require multiple partners and funding sources

Page 14: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Rhawn / PennypackPrincetonUnruhLevickComlyBridgeBuckiusOrthodoxCastorAllegheny / Delaware

Page 15: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Rhawn Street / Pennypack Street

Pros:• Link Holmesburg Junction Station to

Pennypack Park & East Coast GreenwayCons:• Some steep slopes• Limited ROW

Cartway: 36 feetROW: 50-60 feet

Rhawn Street looking east from rail station

Intersection of Rhawn & State Rd.

Page 16: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Levick Street

Cartway: 64 feetROW: 80 feet

Pros:• Provide link to Lardner Point Park &

East Coast Greenway• Right lane striped for no travelCons:• Slopes• Traffic patterns create conflicts with

pedestrians and bicyclists

Levick Street looking east from Tulip St.

Levick at entrance to Tacony-Palmyra Bridge

Page 17: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Buckius Street

Pros:• Adjacent to Bridesburg Rec CenterCons:• Riverside trail / park not yet created• Some separate / non-contributing areas

Cartway: 32 feetROW: 44 feet

Buckius looking east toward river at Bridesburg Rec Center

Page 18: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

E. Allegheny Ave. / N. Delaware Ave.

Pros:• Link Monkiewicz Playground, Pulaski

Park, & East Coast Greenway• Project awarded TIGER fundingCons:• Potential conflicts with industrial uses• Some separate / non-contributing areas

Cartway: 60-75 feetROW: varies, max 122 feet

Allegheny Ave. looking east from I-95

Corner of Allegheny & Delaware at Pulaski Park

Page 19: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Are we missing any priority connector streets?

All of these streets present unique design and implementation challenges. Which should be

our highest priority to move forward? Rhawn / Pennypack

Levick Buckius

Allegheny / Delaware

Page 20: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

AnnLehighCumberlandColumbiaMarlboroughShackamaxonFrankfordGermantown / LaurelBrownFairmountSpring GardenCallowhill

Page 21: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

E. Columbia Avenue

Pros:• Link Palmer Park, Hetzell Playground

& Penn Treaty Park• Some projects already in designCons:• Very limited ROW• Tree-lined in certain blocks

Cartway: 26 feetROW: 50 feet

Columbia looking east from Girard

Columbia looking east from I-95

Page 22: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Frankford Avenue

Cartway: 36 feetROW: 58 feet

Pros:• NKCDC streetscape projectCons:• Limited ROW• Some drainage areas are small

Frankford looking east from Girard

Columbia looking east to intersection with Delaware Ave.

Page 23: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Germantown Avenue / Laurel Street

Pros:• PWD Storm Flood Relief

project in designCons:• Limited ROW

Cartway: 30-32 feetROW: 50-60 feet

Germantown Ave. looking east

Laurel St. looking east toward Delaware Ave.

Page 24: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Spring Garden Street

Cartway: 88 feetROW: 120 feet

Pros:• Vision for Delaware to

Schuylkill greenway connector

Cons:• Many utility conflicts have

been identified

Spring Garden St. looking east from 2nd St.

Spring Garden St. looking east from I-95

Page 25: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Are we missing any priority connector streets?

All of these streets present unique design and implementation challenges. Which should be

our highest priority to move forward? Columbia Frankford

Germantown / Laurel Spring Garden

Page 26: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

RaceWashingtonReedTaskerSnyder

Page 27: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Race Street

Cartway: varies from 26-46 ftROW: varies, approx. 74 ft

Pros:• Connection to Race Street PierCons:• Traffic patterns create conflicts

with pedestrians and bicyclists• Some separate / non-contributing

areas

Race St. looking east from 2nd St.

Race St. at Columbus Blvd.

Page 28: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Washington Avenue

Cartway: 120-144 feetROW: 142-176 feet

Pros:• Connection to Pier 53• PWD Storm Flood Relief

project in designCons:• Some existing trees

Washington Ave. looking east from 2nd St.

Washington Ave. at Columbus Blvd.

Page 29: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Tasker Street

Pros:• Direct connection from

Pennsport to riverfrontCons:• Limited ROW• Small drainage areas

Cartway: 26 feetROW: 52 feet

Tasker St. looking east to Front St.

Tasker St. at Columbus Blvd.

Page 30: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Snyder Avenue

Cartway: 44 feetROW: 74 feet

Pros:• Already striped for bike lanes• PWD Storm Flood Relief project

in designCons:• Multiple ownership / residential

blocks• Some small drainage areas

Snyder Ave. looking east from 2nd St.

Snyder Ave. looking east from I-95

Page 31: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Are we missing any priority connector streets?

All of these streets present unique design and implementation challenges. Which should be

our highest priority to move forward? Race

Washington Tasker Snyder

Page 32: Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

Green City Clean Waters