    JESSELTON WATERFRONTDEVELOPMENT

    EPP 1 : PROJECT 01

    EPP 1 : MODERNIZING

    KOTA KINABALU CITY

    DESCRIPTION

    High-end Residential Developments

    Retail Commercial

    Oce Towers

    Waterront Hotels

    International Cruise Terminal

    ( 2 phase )

    300 berths o multiple lengths Marina

    SABAH INTERNATIONALCONVENTION CENTRE (SICC)

    KOTA KINABALU INTERNATIONALCRUISE TERMINAL AT JESSELTON

    EPP 1 : PROJECT 02 EPP 1 : PROJECT 03

    DESCRIPTION

    The site is located strategically at the tail-end o the proposed

    Jesselton Waterront Development. It is surrounded by the

    sea on 2 sides and the main road Jalan Tun Fuad Stephen. The

    development area o the site is 15 acres (6.07 hectares).

    The Sabah International Convention Centre will be the main centre

    or convention activities and development o the MICE industry in

    the State.

    DESCRIPTION

    Construction o an International Cruise Terminal with

    the ocus o becoming home port or cruise liners

    This project will become the second entry point ortourists coming to Sabah

    KKICT will include real estate property development to

    compliment the international cruise terminal

    WATERFRONT LUXURY VILLA

    Waterront Apartments And Bungalows

    Marina Facilities Clubhouse

    Maritime Museum

    The Aquarium

    MIXED USE DEVS.

    10 Storey Shopping Arcade and Corporate Oces

    10 Storey Luxury Waterront Condominium

    Thematic Retail Outlets

    Boutique Hotel

    International Bazaar

    INTERNATIONAL CRUISE TERMINAL

    International Cruise Terminal Complex

    Marina Facilities

    Duty Free Complex & Entertainment Center

    Challenges Key outcome / beneft o this project

    Market Demand

    Inrastructure to support the development eg.

    Water, sewerage , power supply & broadband

    service.

    Resources during construction

    Increase o material cost

    Increase volume o Trac in CBD area

    Cruise Terminal development which requires

    relocation o general cargo

    Waterfront Development

    Will be a tourism riendly development and center

    o tourism activity, which consists o broad walk,

    marina activities, high-end shopping arcade, 5-star

    hotel and international cruise terminal

    Marina facilities

    To accommodate the need to have more berths

    (parking bays or boats) in Greater KK

    Capacity at Sutera Marina Harbour has already

    reached its maximum (104 berths)

    More economic spillover eect to the local

    economy/retailers

    Enablers Required to make it happen

    To improve the main inrastructure to support this

    new development

    Practical trac system without sacricing Project

    Land area

    Land approval or cruise terminal development

    Challenges

    Trac congestion on Jalan Tanjung Lipat (inbound

    & outbound)

    Restriction on land reclamation

    Enablers Required to make it happen

    The Federal Government nancial assistantthrough Federal Facilitation Fund

    Key outcome / beneft o this project

    MICE create and add high value to tourism product.

    These will generate revenue in terms o quantity

    spending per person:

    - Domestic (leisure) tourists : RM735 million

    - International tourists: RM2,300 million

    - MICE: RM3,147 million

    ECONOMIC IMPACT - or each(1) convention event:

    INTERNATIONAL: RM235 million

    LOCAL: RM4 million

    Challenges

    The land provision by the state government or

    the relocation o the general cargo operation to

    a new cargo port. Current proposal is adjacent to

    Sepanggar Bay Container Port

    The unding or the cost o buil ding a new cargo port The approval or 42 acres land application

    designated or KKICT at existing Kota Kinabalu Port

    area

    Enablers Required to make it happen

    Sabah Ports Authority to acquire land adjacent

    to SBCP in order or Suria Group to invest in

    inrastructure o New General Cargo Port and

    Dedicated International Cruise Terminal

    Key outcome / beneft o this project

    To have a dedicated International Cruise Terminal to

    attract more international cruise arrivals or Sabah

    GREATER KOTA KINABALU

  • 7/31/2019 GreaterKK_EPPs

    2/8

    EPP 1 : PROJECT 04 EPP 1 : PROJECT 05

    EPP 1 : MODERNIZING

    KOTA KINABALU CITY

    INTERNATIONAL TECHNOLOGY &COMMERCIAL CENTRE (ITCC)

    AEROPOD MIXEDCOMMERCIAL &TRANSPORT HUBDEVELOPMENT AT

    TANJUNG ARU

    EPP 1 : PROJECT 06 EPP 1 : PROJECT 07

    KOTA KINABALU CITYWATERFRONT DEVELOPMENT

    KOTA KINABALUCOASTALPEDESTRIANWALKWAY &CYCLEWAY

    DESCRIPTION

    40 acre development or

    residential & commercial

    property

    20 acre will be used to

    develop the open/public space

    including the train station

    Challenges Key outcome / beneft o this project

    Electricity supply & inrastructure

    Sewerage system remains a challenge

    Manpower supply skilled labour during

    construction

    Supply o raw materials cement

    Generate job opportunities in hotel and hospitality

    industry

    Job opportunities or local community

    Enablers Required to make it happen

    To extend the sewerage system and inra (KPI)

    Challenges Key outcome / beneft o this project

    Land availability or walkway & cycleway

    Underground utilities

    Congested trac/bottleneck at Sinsuran and Kg.

    Air area.

    Encourage recreational activities or local

    community and visitor

    Provide connectivity or local community and visitor

    rom Tg. Aru to UMS, Likas via CBD

    Promote a healthy liestyle or the community

    To make the city a saer place

    Enablers Required to make it happen

    To improve the main inrastructure to support this

    new development .

    Practical trac system without sacricing Project

    Land area.

    DESCRIPTION

    Located along Jalan Tun Fuad Stephens with total area o 3.12 acres

    Overall development comprises o:

    i. 4-Levels o retail malls

    ii. 7-Levels o 111 units high-end designer suites

    iii. 14-Levels, 365 rooms 5-Star Hotel with 1,000 seating capacity

    ballroom

    iv. Boardwalk

    DESCRIPTION

    Provision o sae pedestrian walkway & cycleway with total length o

    24km rom Tg. Aru to UMS passing through CBD and heritage sites

    i.e. Australian Place, Atkinson Tower.

    To promote environment riendly living and the cultural heritage o

    Kota Kinabalu.

    Challenges

    Accessibility or contractor to deliver construction

    materials

    Enablers Required to make it happen

    To improve the main inrastructure to support this

    new development

    Key outcome / beneft o this project

    Transorm Jalan Tun Fuad Stephens into people-

    centric city

    Generate job opportunities in hotel and hospitality

    industry

    Challenges

    Development Adequate and timely supply o raw materials (eg.

    Cement, etc), availability o competent and quality

    supply o labour orce aecting timely project

    delivery/completion

    Economics

    Global economy threat/impact to domestic economyand unair market competition

    Enablers Required to make it happen

    Alternative Rear Access Road

    Key outcome / beneft o this project

    Enhancing the commercial activity along Jalan

    Pintas Penampang

    More hotel rooms or the State Capital

    Job opportunity or local community especially

    Penampang (30% - Skilled, 35% - Semi Skilled, 25%

    - Unskilled)

    DESCRIPTION

    ITCCPenampang is a state-o-the-art complex/mall/residential

    constructed on 10.475 acres land along Jalan Pintas Penampang

    consisting o:

    A 4-Storey/536 Units Commercial/Shopping Mall

    17-Storey/295 Units Hotel Suites

    19-Storey/300 Rooms Business Hotel

    16 Storey i-Oce Tower

    Aeropod

    will bethe nextattractionfor thelocalsoutside theCBD area..

    GREATER KOTA KINABALU

  • 7/31/2019 GreaterKK_EPPs

    3/8

    EPP 1 : MODERNIZING

    KOTA KINABALU CITY

    EPP 1 : PROJECT 08

    UPGRADING OF KK CITY - BEAUTIFICATION AND REHABILITATION OFSUNGAI SEMBULAN (PARCEL 2 & PARCEL 3)

    DESCRIPTION

    Located at the vicinity o Central

    Business District (CBD) at Karamunsing

    and Sadong Jaya

    Upgrading o approximately 1.6km stretch

    o Sungai Sembulan which i ncludes

    existing inrastructure and landscaping

    Provision o public amenity, police kiosk,

    CCTV and DBKK management oce

    RM45per sq t

    RM150per sq t

    RM825per sq t

    No beautication With beautication

    2005 2010 2020

    3x ~6x

    GREEN CITY &LANDSCAPING PROJECT

    EPP 1 : PROJECT 09 EPP 1 : PROJECT 10

    Challenges

    Several pockets o land occupied by illegal

    squatters

    Existing on-going development may not blend into

    the project requirement

    Enablers Required to make it happen

    Relocation o illegal squatters

    Cleaning o upstream o Sembulan River and

    sewerage system in order to improve the water

    quality index (WQI)

    Key outcome / beneft o this project

    Enhancing land value o along Sembulan River

    Enhancing the commercial activity o Sadong Jaya

    New hotel being build acing Sungai Sembulan to

    take advantage o the landscape

    Encourage recreational activities or local

    community and visitors

    EXTENSION OF ENTERTAINMENTZONE TO NEW AREASDESCRIPTION

    To have a mix o ne dining, bars (international brand e.g. Hard Rock

    Ca), Karaoke outlets, Discotheques

    To have a similar concept at KK Waterront but with better quality &

    international cuisines (Japanese, Korean, Thailand, Western etc.)

    To have activities e.g. live-cooking station, street party, live

    perormance usion music

    Potential venue or Annual events e.g. Jazz Festival

    Another venue or Musical Fountain in KK

    Challenges

    Promotion

    Maintain cleanliness (esp. public amenities)

    Need to have high security in the area

    Gathering o illegal immigrants / street kids /

    beggars

    Enablers Required to make it happen

    Inormation counters / guides

    Saety & Security (CCTV, Street Lights)

    Enough clean amenities

    Proper waste management

    Ample parking space

    Key outcome / beneft o this project

    Another attraction venue or the locals and

    internationals visitors

    The real estate value alongside theSembulan River has increased by3 fold in the last 5 years and will

    continue to rise by year 2020

    DESCRIPTION

    To transorm KK City into a

    Green City to match the theme

    o Nature Resort City

    To upgrade and build new

    landscape areas within the

    city (total 5 areas have been

    identied)

    To enhance KKs Green

    Linkages

    Challenges Key outcome / beneft o this project

    Insucient development und and insucient

    maintenance und remains a big issue

    The GNI impact is more on spillover eects this

    makes it harder to secure private or public unding

    Prices o materials are relatively higher compared

    to other states

    To achieve the status o Nature Resort City

    To achieve a balanced and sustainable development

    between man-made eatures and nature

    To upgrade living conditions and niches o the city

    Enablers Required to make it happen

    To nd a new CSR model or private sector

    to participate or contribute in the planting /

    beautication programme

    To have an awareness programme to acknowledge

    the indirect benets o landscape contribution in

    our local and national economic development

    To have materials available locally

    GREATER KOTA KINABALU

  • 7/31/2019 GreaterKK_EPPs

    4/8

    EPP 2 : PROJECT 01 EPP 2 : PROJECT 02

    EPP 2 : BOOSTING

    TOURISM ATTRACTIONS

    YTL RESORT IN PULAU GAYA KARAMBUNAIINTEGRATED RESORT

    EPP 2 : PROJECT 03 EPP 2 : PROJECT 04

    RELOCATION & REDEVELOPMENTOF PULAU GAYA

    MAANG HILLRESORT DEVELOPMENT

    DESCRIPTION

    To build 1,400 houses in 3 phases to cater or

    relocation o Pulau Gaya residents

    To allow Pulau Gaya to be developed as a World

    Class Tourism Destination

    DESCRIPTION

    Develop the 1st nature resort within city - overseeing Lok Kawi Bay &

    Mount Kinabalu (land area 70 acres)

    Botanical garden (with 4 seasons dome), Spa Facilities

    To build canopy walks & herbal garden or nature walks or the

    visitors, jungle trekking, mountain biking (adventure sports)

    Location or destination wedding (vs. beach resort setting)

    Resort next to the Lok Kawi Wildlie Park

    Venue or team-building and mini conerences in a green

    environment

    Weekend homes or international / domestic visitors

    DESCRIPTION

    A deluxe amily resort ramed by lush rainorest with views o Mount

    Kinabalu, Pulau Gaya is surrounded by pristine white sand beaches,

    sheltered coral rees and protected mangrove. Just o the coast o

    Kota Kinabalu, this adventure packed resort will integrate elements

    o traditional Sabahan architecture and eature 132 spacious stand-

    alone hill and sea-ront villas and a unique Spa Vill age.

    DESCRIPTION

    Located in the Karambunai

    Peninsula o Kota Kinabalu,

    Sabah, KIRC is envisioned as a

    premier world-class eco-tourismdestination showing Sabahs rich

    & unique bi odiversity. KIRC aims

    to achieve the Governments

    aspirations o a high income

    nation or Malaysia

    Challenges

    Development o the new houses or the illegal

    squatters maybe costly

    The relocation plan may require strong political will

    Identiying the Malaysians and Non-Malaysians

    (some o them claim to have Malaysian IDs)

    Enablers Required to make it happen

    Co-operation rom National Registration

    Department to identiy residents

    Gazetting the vacant land at Kg. Gusi and Pulau

    Gaya

    Key outcome / beneft o this project

    Develop Pulau Gaya into a world class tourism spot Challenges

    General Eective Governance & regulations

    Operations

    Cost to build Botanical Park with 4 season dome

    Skilled workers

    Enablers Required to make it happen

    Bigger Road to allow big buses

    Road, Electricity, Water

    Cost to build Botanical Park with 4 season dome

    Skilled workers

    Key outcome / beneft o this project

    Integrates with current Lok Kawi Wildlie Park (5

    minutes drive)

    Alternative nature resort within the KK city

    (Penampang area)

    Short destination or short stay tourist to Sabahs

    wildlie and botanical garden

    Source:Karambunai, Sabah

    EnergyEfficientBuildings

    Renew-ableEnergy

    Electric/SolarTransport

    Reuse,Reduce,Recycle

    Green Showpiece

    VenetianMarinaBaySands

    ResortsWorld

    Sentosa

    SabahIR

    3049

    121

    500

    Scale Comparison (Acres)

    4-10 times the size ofregional IRs

    Iconic Architecture

    Source:KIRC, TAK Design

    Water Theme Park Mangrove Center Waterfront Living

    GREATER KOTA KINABALU

  • 7/31/2019 GreaterKK_EPPs

    5/8

    EPP 2 : BOOSTING

    TOURISM ATTRACTIONS

    GONDOLA AT INOBONGSUBSTATION, PENAMPANG

    EXPANSION OFDIVING ACADEMY

    EPP 2 : PROJECT 07 EPP 2 : PROJECT 08

    DESCRIPTION

    To project Sabah as Asias Centre o

    Excellence in Scuba Diver Training

    To set up a Proessional Scuba Diver Training

    Academy in Mamutik Island which oers acomplete package o accommodation and

    scuba diver training o all levels

    To oer PADI International Scuba Diving

    Training Certication rom open water to

    Instructors levels

    EPP 2 : PROJECT 05

    SOUTH CHINA SEA PLACE (SCSP)DESCRIPTION

    Located at Sembulan covering area o 12 acres

    Overall Development comprises o:

    i. 174 Rooms Hotel

    ii. 433 units o condotel

    iii. Commercial/Retail 19.544 sq t

    iv. Business Suite 14,542 sq t

    v. Parking acilities or 336

    Challenges

    Entrance to the premise rom Coastal Highway

    Enablers Required to make it happen

    Redesign o junction to entrance

    Construction o elevated entry/exit

    Key outcome / beneft o this project

    Provide alternative accommodation or tourists

    DESCRIPTION

    20 mins rom Donggongon Township

    Current activity jungle trekking, conservation studies

    Future opportunities : Viewing platorm deck towards KK

    city, Study tours (historical, geographical and cultural)

    Potential destination or nature lovers (fora & auna)

    who only have short stays in KK

    Challenges

    Need private operators to operate the place

    (Stakeholders Sabah Parks, Local Community)

    Need to be a well-managed and controlled

    Development that has to be in harmony with the

    environment

    Enablers Required to make it happen Bigger access road to allow big buses

    Road, Electricity, Water

    Skilled workers

    Ample parking space or visitors near the entrance

    o the Sub Station

    Key outcome / beneft o this project

    Economic benet Job, investment opportunities

    or locals

    Package local product (e.g.. trekking to Kg olks

    or homestay & create additional incentives to Kg

    Folks)

    Popularise Salt Track history

    Direct supply to local agro-product

    Showcase part o Sabah culture and promotes eco-

    tourism

    Challenges

    The 3 acres o land lease in Mamutik is too

    restrictive . Need additional 2 acres

    Lack o inrastructure on Island

    Maintenance aspect (ollow ups)

    Enablers Required to make it happen

    To have a ull fedged Academy building which

    houses the classrooms, auditoriums, dive shops,

    management oce, etc

    To have eco riendly generators, sewage and

    organic waste management, water systems, etc

    To have an jetty on the concession zone

    To have good telecommunication system

    To have a institutionalized saety management

    system on island

    Key outcome / beneft o this project

    Project Kota Kinabalu as an International scuba

    diver training center

    To promote KK as an International gateway to

    world class dive destination in Kudat, Sandakan and

    Tawau /Semporna regions

    Increase number o visitors to the islands (both

    High Yield and FITs, Group Travellers)

    Quality training standard improved

    In line with the green nature city concept or KK

    Create awareness (education aspect) to visitors

    EPP 2 : PROJECT 06

    DEVELOPMENT OF KOKOL HILLDESCRIPTION

    To have more eco-green home stays/boutiques/chalets/caes

    To build designated area or marketinglocal products (local ruits, fowers) e.g. like Pekan Nabalu

    To build observation deck + Canopy Walk(ala Langkawi)

    To have link with other tourism activities paragliding, white river rating (Kiulu)

    Challenges

    Accessibility is good, but carrying capacity via the

    village road is limited.

    Need alternative mode to reach Kokol Hill (via cable

    car)

    Fire

    Enablers Required to make it happen

    Bigger Road to allow big buses

    Participation rom the locals to sell ruits/fowers, etc

    Ample parking space at the top o the hill

    Clean water supply

    Key outcome / beneft o this project

    Benet or the MICE tourists or a short day trip or

    mountain viewing and experience agro-tourism

    Attracts another new market to KK - Para gliders

    GREATER KOTA KINABALU

  • 7/31/2019 GreaterKK_EPPs

    6/8

    EPP 2 : PROJECT 09

    EPP 2 : BOOSTING

    TOURISM ATTRACTIONS

    RELOCATION & REDEVELOPMENTOF KK CENTRAL MARKET

    EPP 2 : PROJECT 11

    TANJUNG DUMPIL RESORTAND RESIDENCESDESCRIPTION

    Located 10 minutes away rom KKIA and KK CBD

    10 acres o man-made island, connected to the

    mainland by a 800 meter causeway bridge

    A development with 250 luxury hotel rooms, 56 over-

    water resort bungalows with 1,008 5-star rooms

    Comprehensive tourism development, whichcomprises high-end condominiums, resort-type

    hotels, spas, marina and other resort acilities

    DESCRIPTION

    To enhance the beauty o the coastal o KK walkway

    connecting KKWC to JWC

    To establish a recreation park within the city near the

    coastline o KK

    To have a selected brands/services, luxury branded

    retail outlets (Prada, Gucci, LV, Fendi, etc)

    An area to view the beautiul sunset & a sae indoor

    playground area or kids

    To establish the main inormation centre or KK

    PROPOSED PLAN RELOCATION ANDREDEVELOPMENT OF THE WET MARKET

    Phase 1

    Upgrading works

    Phase 1b

    Redeveloping the KK Central Site

    Phase 2

    Relocating the KK Central Markettenants

    Phase 3

    Demolishing the existing building

    with the designated site

    Phase 4

    Private operators commence withnew development site

    Challenges

    Electricity supply & inrastructure

    Sewerage system remains a challenge

    Manpower supply skilled labour during

    construction

    Land reclamation

    Adequate and timely supply o raw materials (e.g.

    Cement, etc), availability o competent and quality

    supply o labour orce aecting timely project

    delivery/completion

    Enablers Required to make it happen

    To improve the main inrastructure to support this

    new development Road, Electricity, Water

    Skilled workers

    Key outcome / beneft o this project

    Economic benet Jobs, investment opportunities

    or locals

    Alternative luxury accommodation or tourists

    Challenges Key outcome / beneft o this project

    Too many individual operators, with boats in

    deplorable conditions & no xed schedule o

    departure

    Water sport & recreational activities are

    concentrated in TAR islands non-existent in Tg Aru

    Beach & Likas Bay area (within 10-15 minutes rom

    KK City

    Additional tourism receipts or the State

    Adding a maritime character to the city, enhancing

    the tourism attraction

    Current upgrading & beautication works o

    Sembulan River will be urther enhanced

    Enablers Required to make it happen

    New construction & development o 10 13 jetties

    & 2 dry docks, acquisition o boats & water sport

    equipment

    Operating water taxi & water sports activities in Tg

    Aru Aru & Likas Bay Area

    Current upgrading & beautication works o

    Sembulan River will be urther enhanced

    WATER TAXI, SPORTS &MARITIME CENTRE

    EPP 2 : PROJECT 10

    DESCRIPTION

    Alternative transportation,

    lessen trac jams & pollution

    Bringing water sports &

    recreational activities to the

    locals & tourists better

    accessibility

    Challenges

    Location or new central Market or both wet & dry

    market or decentralized to respective market areas

    eg. Lido / Inanam

    Parking issues

    Enablers Required to make it happen

    Control tenants occupying the area / lot i.e. only

    quality & branded names eg. Chillis and local names

    eg. Kak Nong Setting the standard

    Security

    Maintenance to be properly managed especially

    with cleanliness

    Commitment rom both public & private sector

    Key outcome / beneft o this project

    An iconic attraction in the center o the centre

    GREATER KOTA KINABALU

  • 7/31/2019 GreaterKK_EPPs

    7/8

    EPP 3 : PROJECT 01

    EPP 3 : IMPROVE

    MOBILITY AND TRAVEL

    KK SOUTHERNBUS TERMINAL ,

    KEPAYAN

    ONE WAYTRAFFIC SYSTEM

    Proposed one way trac fow (submitted by DBKK)

    EPP 3 : PROJECT 03

    EPP 3 : PROJECT 05

    BUS TERMINAL WAWASAN

    BUS TERMINAL NORTH - INANAM

    EPP 3 : PROJECT 02

    DESCRIPTION

    Open up or Northern Terminal to include all

    types o buses. All types o buses to stop over

    at this terminal. Then to interchange into a

    bigger capacity bus to transer passengers to

    CBD terminal

    Project Description:

    Civil works

    Building works

    M&E services

    Pedestrian link to KKIA Terminal 1

    Traveller Inormation System

    Capacity: 800

    DESCRIPTION

    Open up or Southern Terminal to include all types o buses. All

    types buses to stop over at this terminal. Then to interchange into

    a bigger capacity bus to transer passengers to CBD terminal

    Project Description:

    Civil works:

    drainage

    access to terminal

    sewer line

    water supply

    Building works:

    M&E services

    Pedestrian link to KKIA Terminal 1

    Traveller Inormation System

    Capacity: 800 buses

    DESCRIPTION

    Terminal CBD is to cater or City Bus stopover with a

    total capacity or 40 buses

    Scope of Works:

    Terminal Building

    M & Services

    Inrastructure Works

    Challenges

    Insucient capacity o access road to and rom

    terminal

    Pending unds rom ederal

    Enablers Required to make it happen

    Integrating into KK public transport system

    Key outcome / beneft o this project

    Act as a hub to centralise northern mini buses

    Reduce trac congestion caused by mini buses in

    CBD

    Increase public transport eciency

    BUS RAPID TRANSITSYSTEM (BRT)

    EPP 3 : PROJECT 04

    DESCRIPTION

    To build designated bus way integrated into

    current road system acting like a LRT that

    stops within ~ 1 km

    Constructing bus stops along designated

    bus lane

    Replacing old buses (mini and stage buses)

    with shuttle bus (44-seater)

    Linking Terminal Wawasan, Terminal Inanam

    & Terminal Kepayan

    Priority signalling system

    One way trac fow in CBD

    Distance: ~30km

    DESCRIPTION

    To provide systematic motorised trac route to

    compliment existing road network and BRT system

    Challenges

    To cluster and manage current existing mini bus

    operators

    To align the bus routes

    Construction o the physical bus way

    Allocation o the physical bus way

    Land Acquisition/allocation

    Enablers Required to make it happen

    Buses should be at least 10 years

    Provide rst aid kits & re extinguishers Appropriately trained bus drivers

    Creating a new ticketing system computer (eg.

    Octopus, EZ link)

    Key outcome / beneft o this project

    Integrated public bus system

    Increase public transport delivery and eciency

    Decrease the waiting period

    Increase public bus capacity

    Decrease the over supply o mini buses/vans

    Challenges

    Have to coordinate with the infow and outfow o

    vehicles during physical implementation stage

    Relocation o underground utilities

    Enablers Required to make it happen

    Proper trac management plan within CBD beore

    implementation

    Cooperation within Government Agencies & Utilities

    companies required

    Key outcome / beneft o this project

    Reduce trac congestion

    Increase transportation eciency

    Encourage use o public transport

    Challenges

    Land issue

    Department Civil Aviation (DCA) against linking

    pedestrian bridge to Terminal 1.

    DCA against sharing o fight Inormation.

    Security issue due to close proximity to airport

    security area.

    Enablers Required to make it happen

    Need ull support rom DCA

    Consensus rom key stakeholders to enter land

    Federal Funding (Approved in principle)

    Integrating transport system with KKIA

    Key outcome / beneft o this project

    Provide alternatives mode o transportation to and

    rom KKIA

    Increase transportation eciencies

    Encourage use o public transport

    Provide new employment opportunities

    Challenges

    Construction work to be carried out during operation

    Underground utilities within project boundary

    Enablers Required to make it happen

    Cooperation with utility companies or timely

    relocation o underground services

    Key outcome / beneft o this project

    Increase transportation eciency

    Encourage use o public transport

    Bus Rapid Transit Example in Seoul, South Korea

    GREATER KOTA KINABALU

  • 7/31/2019 GreaterKK_EPPs

    8/8

    EPP 4 : PROJECT 01

    EPP 4 :

    HEALTH TOURISM

    PATIENT (FPP) TO BOOSTREVENUE FOR GOVERNMENTHOSPITALS & PROMOTEHEALTH TOURISM

    KPJ HEALTHCARE-ACQUISITIONOF SMC & DAMAI SPECIALIST

    EPP 4 : PROJECT 04

    EPP 4 : PROJECT 02

    GLENEAGLES MEDICAL CENTRE

    DESCRIPTION

    250 beds and 6 Operating

    Theatres

    152 units Small oce Home

    oce (SoHo)

    247 retail lots 118,350 sq t

    124,408 sq t oce suites

    DESCRIPTION

    KPJ Group acquired Sabah Medical Centre (SMC) and

    KPJ is building a new RM250 million, 200 bed hospital on

    a 1.685 acre land. The land is bought over by KPJ and this

    is a 100% private investment. The new SMC-KPJ hospital

    is only ve minutes to Greater Kota Kinabalu

    Challenges Key outcome / beneft o this project

    High inrastructure cost

    High capital cost and slow return o investment. Not

    attractive to nancier

    Finding reputable Hospital Operator

    Availability o a reliable and reputable Medical

    Centre in Kota Kinabalu. The local Sabahans need

    not fy to Kuala Lumpur and Singapore or critical

    treatment

    Contribute to the State economy via medical

    tourism

    Creating business opportunities, property

    appreciation to investors and substantial job

    creation

    Enablers Required to make it happen

    Facilitation und to cover part o inrastructure cost

    State Government support to the Hospital Project

    Creative development mix with commercial

    components or sale to partly nance the Hospital

    cost

    Challenges

    Delay o work progress due to climate / weather and

    shortage o cement in Sabah

    Unskilled labour shortage or construction

    Recruitment o medical proessionals

    Enablers Required to make it happen

    Basic inrastructure and utilities such as water &

    electricity

    Key outcome / beneft o this project

    Availability o a reliable and reputable Medical

    Centre in Kota Kinabalu. The local Sabahans need

    not fy to Kuala Lumpur and Singapore or critical

    treatment

    Contributes to the State economy via medical

    tourism

    Creating more job opportunities or the locals

    Challenges

    Funding or mass promotion/marketing

    To produce proper detailed bills - ull costs

    which includes equipment, consumables, human

    resources, amenities and the last details

    Classication o poor, hard core poor, government

    pay scales & categories, eligibilities, etc.

    Enablers Required to make it happen

    Mass Communication (TV, Radio, Advertisements)

    Education & awareness to local

    Promote internationally through tourist agents,

    embassies and high commission ocers, etc.

    Awareness as World Class healthcare

    Key outcome / beneft o this project

    Increase GNI or Healthcare sector.

    Create a spill over eect boosting tourists

    condence in Malaysian healthcare eventually

    encourages health tourism

    Could stem brain drain

    Can attract specialists

    PUBLIC HOSPITAL UPGRADES& EXTENSION (4 HOSPITALS)

    EPP 4 : PROJECT 03

    Challenges

    Delay o work progress due to climate / weather and

    shortage o cement in Sabah

    Unskilled labour shortage or construction

    Recruitment o medical proessionals

    Enablers Required to make it happen

    Supply o cements Working with the immigration department to allow

    more oreign workers / labour to expedite the

    construction phase

    Key outcome / beneft o this project

    Increase the bed per population ratio rom 27 to 45

    (67%) by 2013

    To improve the public healthcare services or the

    locals

    DESCRIPTION

    Federal Government has approved RM1.1 billion o

    extension, upgrading and renovating work or our

    public hospitals in Greater KK

    DESCRIPTION

    Full Paying Patients is a separate category o

    patients or both outpatient and inpatient services.

    The charges will be based on the cost and there

    is no subsidy. FFP will use existing acilities within

    the hospital. The targets are locals and oreigners

    including tourists and expatriates.

    GREATER KOTA KINABALU