    January 18, 2017   GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE  REGULAR MEETING  Thursday, January 19, 2017 9:00 am 2 nd  Floor Boardroom, 4330 Kingsway, Burnaby, British Columbia   R E V I S E D    A G E N D A 1    1. ADOPTION OF THE AGENDA  1.1 January 19, 2017 Regular Meeting Agenda That the Utilities Committee adopt the agenda for its regular meeting scheduled for January 19, 2017 as circulated.  2. ADOPTION OF THE MINUTES  2.1 November 10, 2016 Regular Meeting Minutes That the Utilities Committee adopt the minutes of its regular meeting held November 10, 2016 as circulated.  3. DELEGATIONS  4. INVITED PRESENTATIONS  5. REPORTS FROM COMMITTEE OR STAFF  5.1 2017 Utilities Committee Priorities and Work Plan Designated Speakers:   Tim Jervis and Simon So That the Utilities Committee endorse the work plan as presented in the report dated January 5, 2017 titled “2017 Utilities Committee Priorities and Work Plan”.  5.2 2017 GVWD and GVS&DD Capital Projects Designated Speakers:  Frank Huber and Mark Ferguson That the Utilities Committee receive for information the report dated January 4, 2017, titled “2017 GVWD and GVS&DD Capital Projects”.                                                               1 Note: Recommendation is shown under each item, where applicable.

Upload: others

Post on 14-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

    

 

January 18, 2017 

 

 

GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE 

 

REGULAR MEETING  

Thursday, January 19, 2017 9:00 am 

2nd Floor Boardroom, 4330 Kingsway, Burnaby, British Columbia   

R E V I S E D    A G E N D A1   1. ADOPTION OF THE AGENDA  

1.1 January 19, 2017 Regular Meeting Agenda That the Utilities Committee adopt the agenda for its regular meeting scheduled for January 19, 2017 as circulated. 

 2. ADOPTION OF THE MINUTES 

 2.1 November 10, 2016 Regular Meeting Minutes 

That  the  Utilities  Committee  adopt  the  minutes  of  its  regular  meeting  held November 10, 2016 as circulated. 

 3. DELEGATIONS 

 4. INVITED PRESENTATIONS 

 5. REPORTS FROM COMMITTEE OR STAFF 

 5.1 2017 Utilities Committee Priorities and Work Plan 

Designated Speakers:   Tim Jervis and Simon So That the Utilities Committee endorse the work plan as presented in the report dated January 5, 2017 titled “2017 Utilities Committee Priorities and Work Plan”.  

5.2 2017 GVWD and GVS&DD Capital Projects Designated Speakers:  Frank Huber and Mark Ferguson That the Utilities Committee receive for information the report dated January 4, 2017, titled “2017 GVWD and GVS&DD Capital Projects”.  

   

                                                            1 Note: Recommendation is shown under each item, where applicable.

Page 2: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Utilities Committee Regular Agenda January 19, 2017 

Agenda Page 2 of 2 

5.3 Fisherman’s Trail/Riverside Drive Bridges ‐ Status Update Designated Speaker:   Mike Mayers That the Utilities Committee receive for information the report dated January 5, 2017 titled “Fisherman’s Trail/Riverside Drive Bridges ‐ Status Update”. 

 5.4 Award  of  Phase  B,  Construction  Engineering  Services  for  the  Sapperton  Pump 

Station Replacement Project Designated Speakers:    Tracey Husoy and Colin Meldrum That the GVS&DD Board authorize: a) Award of Phase B, Construction Engineering Services, in the amount of $4,372,585 

(exclusive  of  taxes)  to  the  Phase  A  consultant,  AECOM  Canada  Ltd.  for  the Sapperton Pump Station Replacement Project; and 

b) The  Commissioner  and  the  Corporate  Officer  to  execute  the  required documentation. 

 5.5 Managers’ Report 

Designated Speakers:  Tim Jervis and Simon So That the Utilities Committee receive for  information the “Managers’ Report” dated January 10, 2017.  

6. INFORMATION ITEMS  7. OTHER BUSINESS 

 8. BUSINESS ARISING FROM DELEGATIONS 

 9. RESOLUTION TO CLOSE MEETING  

 10. ADJOURNMENT/CONCLUSION 

That the Utilities Committee adjourn/conclude its regular meeting of January 19, 2017.  

 

Membership:     Mussatto, Darrell (C) – North Vancouver CityJordan, Colleen (VC) ‐ Burnaby Becker, John – Pitt Meadows Clay, Mike – Port Moody Fox, Charlie – Langley Township  

Gambioli, Nora –West VancouverHicks,  Robin  – North  Vancouver  District Johnstone, Patrick – New Westminster McDonald, Bruce –  Delta  

Speirs, Craig – Maple RidgeStevenson, Tim – Vancouver Steves, Harold ‐ Richmond Woods, Dave – Surrey  

 

Withdrawn   

Page 3: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, November 10, 2016       Page 1 of 8 

GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE 

 Minutes  of  the  Regular Meeting  of  the Greater  Vancouver  Regional District  (GVRD) Utilities Committee  held  at  9:00  a.m.  on  Thursday, November  10,  2016  in  the  2nd  Floor  Boardroom, 4330 Kingsway, Burnaby, British Columbia.  MEMBERS PRESENT: Chair, Mayor Darrell Mussatto, North Vancouver City Councillor Craig Cameron, West Vancouver (departed at 10:10 a.m.) Councillor Charlie Fox, Langley Township Councillor Bill Harper, New Westminster Councillor Robin Hicks, North Vancouver District Councillor Colleen Jordan, Burnaby Councillor Bruce McDonald, Delta (arrived at 9:04 a.m.) Councillor Craig Speirs, Maple Ridge Councillor Tim Stevenson, Vancouver Councillor Harold Steves, Richmond Councillor Dave Woods, Surrey  MEMBERS ABSENT: Vice Chair, Mayor John Becker, Pitt Meadows Mayor Mike Clay, Port Moody  STAFF PRESENT: Tim Jervis, General Manager, Water Services Simon So, General Manager, Liquid Waste Services Carol Mason, Chief Administrative Officer Janis Knaupp, Assistant to Regional Committees, Board and Information Services    1. ADOPTION OF THE AGENDA  

1.1 November 10, 2016 Regular Meeting Agenda  It was MOVED and SECONDED That  the Utilities Committee adopt  the  revised agenda  for  its  regular meeting scheduled for November 10, 2016 as circulated. 

CARRIED       

UC - 3

Page 4: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, November 10, 2016       Page 2 of 8 

2. ADOPTION OF THE MINUTES  2.1 October 13, 2016 Regular Meeting Minutes 

 It was MOVED and SECONDED That  the  Utilities  Committee  adopt  the minutes  of  its  regular meeting  held October 13, 2016 as circulated. 

CARRIED  3. DELEGATIONS 

No items presented.  

4. INVITED PRESENTATIONS No items presented.  

5. REPORTS FROM COMMITTEE OR STAFF  

5.1 Water Wagon Program & Water Restrictions Communications 2016 Update Report dated September 30, 2016 from Larina Lopez, Corporate Communications Division Manager, External Relations, providing an update on Metro Vancouver 2016 engagement activities related to communications about water restrictions and the Water Wagon and Tap Water Team.  Comments were offered about current regional and municipal water wagons in Metro Vancouver, and about the status of the Water Wagon Program.  

9:04 a.m. Councillor McDonald arrived at the meeting.      Request of Staff 

Staff was requested to recirculate to the Utilities Committee the June 2016 staff report  regarding  efforts  to  investigate  implications  of  purchasing  and implementing a second Metro Vancouver water wagon for use at events across the region.  It was MOVED and SECONDED That  the GVWD Board receive  for  information  the report  titled “Water Wagon Program  &  Water  Restrictions  Communications  2016  Update”  dated September 30, 2016. 

CARRIED  

5.2 Regional Water Conservation Campaign 2016 Update Report dated September 30, 2016 from Larina Lopez, Corporate Communications Division Manager, External Relations, providing an update on the 2016 Regional Water  Conservation  Campaign  supported  in  part  by  the Water  Sustainability Innovation Fund.   

UC - 4

Page 5: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, November 10, 2016       Page 3 of 8 

Members were provided a presentation on the 2016 Regional Water Conservation Campaign  highlighting  alignment  with  the  Board  Strategic  Plan,  focus  group results on the new logo, post‐summer campaign testing, social media, sprinkling images,  municipal  campaign  materials,  #welcomewaterMV,  post‐summer campaign  awareness,  media,  and  the  fall  2016  campaign  media  and  print material.  Presentation  material  titled  “Regional  Water  Conservation  Campaign  2016 Update” is retained with the November 10, 2016 Utilities Committee agenda.  It was MOVED and SECONDED That the GVWD Board receive for information the report titled “Regional Water Conservation Campaign 2016 Update” dated September 30, 2016.  

CARRIED  

5.3 Water Shortage Response Plan Review – Update Report dated November 2, 2016 from Inder Singh, Policy, Planning and Analysis Director,  and  Nermine  Tawfik,  Acting  Program Manager,  Public  Involvement, Water  Services,  providing  an  update  on  the  status  of  the  Water  Shortage Response  Plan  (WSRP)  review  and  seeking  authorization  to  consult  on  the proposed changes.  Members were provided a presentation on the review of the WSRP highlighting purpose, consultation and input, proposed changes in Stages 1 to 3, rationale for restrictions, consultation, and next steps.   In response to questions, members were informed about: 

consultation with commercial power washers and golf courses 

agricultural water use considerations included in the Comprehensive Regional Water System Plan 

rationale  for  sports  fields  sprinkling  restrictions  and  the proposed May 1st start date for Stage 1 

permitting related to new  lawns and nematode application; exemptions for new landscaping 

WSRP proposed implementation guidelines to be presented to Committee in Spring 2017 

challenges with a standard, regional approach to water restrictions  for golf courses given different irrigation and water management practices 

opportunities for golf courses with self‐storage water supply  Comments were offered about: 

discussing the use of drinking water versus non‐potable water for agricultural food crops, particularly for implications in Stage 3 

presenting the Board with the current Plan  including restrictions, as well as the 2016 amendments 

UC - 5

Page 6: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, November 10, 2016       Page 4 of 8 

the feasibility of a presentation to the Utilities Committee from Hugh Fraser, Corporation  of Delta,  on  the  issue  of  Fraser  River  salinity  and  impacts  to irrigation water supply 

 Request of Staff Staff was requested to: a)  forward to the November 25, 2016 GVWD Board meeting the current Water 

Shortage  Response  Plan,  which  includes  current  restrictions  and  2016 amendments,  together  with  the  November  2,  2016  report  titled  “Water Shortage Response Plan Review – Update“; and 

b)  explore the feasibility of a presentation to the Utilities Committee from Hugh Fraser, Corporation of Delta, on the issue of Fraser River salinity and impacts to irrigation water supply. 

 10:10 a.m. Councillor Cameron departed the meeting.  

Presentation material titled “Water Shortage Response Plan Review” is retained with the November 10, 2016 Utilities Committee agenda.  It was MOVED and SECONDED That the GVWD Board: a) Receive  for  information  the  report  titled  “Water  Shortage  Response  Plan 

Review ‐ Update”, dated November 2, 2016; and b) Direct  staff  to  consult  on  the  proposed  changes  to  the Water  Shortage

Response Plan.  CARRIED 

 5.4 Lower Seymour Conservation Reserve ‐ Public Consultation Program Update 

Report dated November 3, 2016 from Mike Mayers, Watershed/Environmental Management and Quality Control Acting Director, Water Services, providing an update  on  the  recent  Lower  Seymour  Conservation  Reserve  public  event  and providing information on the future strategies for public engagement.  It was MOVED and SECONDED That  the Utilities  Committee  receive  for  information  the  report  titled  “Lower Seymour  Conservation  Reserve  ‐  Public  Consultation  Program Update”,  dated November 3, 2016.  

CARRIED  

5.5 Liquid Waste Public Outreach Program – 2016 Regional Wipes Campaign Report dated October 28, 2016  from Larina Lopez, Corporate Communications Division Manager, External Relations, providing an update on the results of the 2016 regional campaign to reduce the flushing of wipes conducted in the spring and summer of 2016.  

UC - 6

Page 7: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, November 10, 2016       Page 5 of 8 

Members were provided a presentation on the 2016 Regional Wipes Campaign highlighting media and campaign elements, municipal collaboration, evaluation, media  coverage  and  responses, messaging  retention,  new  behaviour  results, wipes count, and next steps.  Presentation material titled “2016 Regional Wipes Campaign” is retained with the November 10, 2016 Utilities Committee agenda.  It was MOVED and SECONDED That the GVS&DD Board receive for information the report titled “Liquid Waste Public Outreach Program – Regional Wipes Campaign”, dated October 28, 2016.  

CARRIED  

5.6 Award  of  Contract  Resulting  from  RFP  No.  16‐083:  Consulting  Engineering Services for Northwest Langley Wastewater Treatment Plant Expansion Report  dated  October  26,  2016  from  Tracey  S.  Husoy,  Purchasing  and  Risk Management Division Manager, Financial Services, advising of the results of RFP No. 16‐083: Consulting Engineering Services for Northwest Langley Wastewater Treatment Plant Expansion Project, and seeking award of a contract for Phase 1 ‐ Project Definition and Staging in the amount of $6,675,530 (exclusive of taxes) to CH2M Hill Canada Limited.  It was MOVED and SECONDED That the GVS&DD Board authorize: a) Award of a contract in the amount of $6,675,530 (exclusive of taxes) to CH2M 

Hill Canada Limited resulting from RFP No. 16‐083 for Consulting Engineering Services  for  Northwest  Langley  Wastewater  Treatment  Plant  Expansion, Phase 1 – Project Definition and Staging; and 

b) The Commissioner and the Corporate Officer to execute the contract. CARRIED 

 5.7 Award of Contract Extension for Utility Residuals Hauling Services  

Report  dated  October  18,  2016  from  Tracey  S.  Husoy,  Purchasing  and  Risk Management  Division  Manager,  Financial  Services,  seeking  GVS&DD  Board authorization to amend the current contract to exercise the possible three‐year extension with  Arrow  Transportation  Systems  Inc.  for  utility  residuals  hauling services in the amount of $10,800,000 (exclusive of taxes) as allowed for in the contract.  It was MOVED and SECONDED That the GVS&DD Board authorize: a) A contract amendment in the amount of $10,800,000 (exclusive of taxes) to 

the current contractor, Arrow Transportation Systems Inc., for utility residuals hauling services; and 

b) The Commissioner and the Corporate Officer to execute the contract. CARRIED 

UC - 7

Page 8: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, November 10, 2016       Page 6 of 8 

5.8 Greater Vancouver  Sewerage  and Drainage District  Sewer Use Bylaw –  Staff Appointment   Report  dated October  5,  2016  from  Ray  Robb,  Environmental  Regulation  and Enforcement  Division Manager,  Legal  and  Legislative  Services,  seeking  Board approval of staff appointments pursuant to the Environmental Management Act and Greater Vancouver Sewerage and Drainage District Sewer Use Bylaw No. 299, 2007.  It was MOVED and SECONDED That  the GVS&DD Board, pursuant  to  the Environmental Management Act and Greater  Vancouver  Sewerage  and  Drainage  District  Sewer  Use  Bylaw No. 299, 2007, appoint Kristen Beattie as a Municipal Sewage Control Officer. 

CARRIED  

5.9 Port  Moody/Coquitlam  Drainage  Area:  The  Chines  Integrated  Stormwater Management Plan Report dated October 11, 2016 from Mark Wellman, Policy Planning and Analysis Senior  Project  Engineer,  Liquid  Waste  Services,  seeking  Board  adoption  of objectives  and  GVS&DD  actions within  the  Port Moody/Coquitlam  Integrated Stormwater Management  Plan  to  prioritize  future works within  this GVS&DD Drainage Area.  It was MOVED and SECONDED That the GVS&DD Board adopt the objectives and GVS&DD actions as identified in  the  Port  Moody/Coquitlam  Integrated  Stormwater  Management  Plan  as presented  in  the October 11, 2016  report  titled “The Chines, Backyard Habitat Alive”. 

CARRIED  

5.10 Liquid Waste Development Cost Charge Program Review   Report dated November 4, 2016 from Phil Trotzuk, Chief Financial Officer, seeking feedback on the report from the Utilities Committee, and direction to forward the report to the Intergovernment and Finance Committee, prior to consideration of consultation activities with the public, community stakeholders and the Province.  Members were provided a presentation on the Liquid Waste Development Cost Charge (DCC) Program review highlighting:  content; infrastructure in the 10‐Year Capital Plan; 2017‐2026 growth‐related liquid waste infrastructure projects; DCC process;  policy  framework;  draft  updated  DCC  rates  in  two  scenarios,  one including interest on borrowing, and one without; interest, both based on growth impacts over 30 years, transition options, and next steps.  In response to questions, members were informed about: 

DCC Review Committee consideration of: o provincial best practices o likelihood of ministry approval to include interest in the rates 

UC - 8

Page 9: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, November 10, 2016       Page 7 of 8 

o a phased approach to address significant increases o dwelling size and sewer impact in terms of setting residential rates as the 

rationale for the per‐unit framework 

consideration of DCC rates at the 2017 Board Strategic Workshop as part of the  5‐Year  Financial  Plan  review  to  ensure  potential  levy  increases  are considered in the decision process 

plans for consultation and efforts to date 

how DCC revenues currently being used to pay only the principal portion of borrowing costs for growth related projects 

the definition of a townhouse under the existing bylaw 

challenges in establishing residential rates due to differing approaches within municipal bylaws 

the need for municipal feedback and proposed timing for next steps  Concerns were expressed about: 

the cost for some municipalities to separate existing sewer systems 

a loss of DCC revenue to date and continued loss due to the phased approach  

rate disparity among residential per‐unit rates given the difference in size and sewer impact 

 Comments were offered about consideration being given to: 

reconsidering the phased approach to implementing levies 

exploring  other methods  to  determine  per‐unit  rates,  such  as  number  of bedrooms, bathrooms, square footage, or water use 

further defining property types, particularly residential 

DCC waivers for non‐market housing 

implications for laneway housing and secondary suites 

using  water  consumption  rates  to  determine  sewer  allocation  (at  the discretion of local government, not regional) 

 Presentation material  titled  “Liquid Waste Development Cost Charge Program Review” is retained with the November 10, 2016 Utilities Committee agenda.  It was MOVED and SECONDED That the Utilities Committee: a)  Receive for information the report titled “GVS&DD Development Cost Charge 

Program Review”, dated November 4, 2016; and b)  Forward  the  report  to  the  Intergovernment  and  Finance  Committee  for 

consideration prior to directing staff to proceed with public and stakeholder consultation on the proposed changes. 

CARRIED  

5.11 Managers’ Report Report dated October 27, 2016 from Tim Jervis, General Manager, Water Services, and  Simon  So, General Manager,  Liquid Waste  Services, updating  the Utilities 

UC - 9

Page 10: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, November 10, 2016       Page 8 of 8 

Committee on  the Cleveland Dam Drum Gate Recoating Project,  2016 Grease Behaviour Change Pilot Project, and the Utilities Committee 2016 work plan. In response to a question, members were updated on the status of the Lions Gate Wastewater Treatment Plant Secondary Upgrade.  It was MOVED and SECONDED That  the Utilities  Committee  receive  for  information  the  “Managers’  Report” dated October 27, 2016. 

CARRIED  

6. INFORMATION ITEMS No items presented.  

7. OTHER BUSINESS No items presented.  

8. BUSINESS ARISING FROM DELEGATIONS No items presented.  

9. RESOLUTION TO CLOSE MEETING   

  It was MOVED and SECONDED That the Utilities Committee close its regular meeting scheduled for November 10, 2016 pursuant to the Community Charter provisions, Section 90 (1) (e) as follows: “90 (1)   A part of the meeting may be closed to the public if the subject matter being 

considered relates to or is one or more of the following: (e)  the acquisition, disposition or expropriation of land or improvements, if 

the board or committee considers that disclosure could reasonably be expected to harm the interests of the regional district.” 

CARRIED  

10. ADJOURNMENT/CONCLUSION  

It was MOVED and SECONDED That the Utilities Committee adjourn its regular meeting of November 10, 2016. 

CARRIED (Time:  11:14 a.m.) 

   ____________________________      ____________________________ Janis Knaupp,            Darrell Mussatto, Chair Assistant to Regional Committees    19930880 FINAL 

UC - 10

Page 11: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

To:  Utilities Committee   From:  Tim Jervis, General Manager, Water Services   Simon So, General Manager, Liquid Waste Services  Date:  January 5, 2017  Meeting Date:  January 19, 2017  Subject:  2017 Utilities Committee Priorities and Work Plan 

 RECOMMENDATION That  the Utilities Committee endorse  the work plan as presented  in  the  report dated  January 5, 2017 titled “2017 Utilities Committee Priorities and Work Plan”.  

 PURPOSE To provide the Utilities Committee with the priorities and work plan for the year 2017.  BACKGROUND At  its October 13, 2016 meeting,  the Utilities Committee endorsed  the 2017 Business Plans and Budget  for  the Water and Liquid Waste  functions, which served as  the basis  for  the 2017 Budget approved by the GVWD and GVS&DD Board on October 28, 2016.  The 2017 Business Plans included a list of key actions that has been used to develop the Utilities Committee’s work plan presented in this report.   The  work  plan  presented  in  this  report  is  consistent  with  the  Utilities  Committee’s  Terms  of Reference (Attachment 2) and with the Board Strategic Plan and  is being brought forward for the Committee’s information and endorsement.   2017 WORK PLAN The Utilities Committee  is  the  standing  committee of  the Metro Vancouver Board  that provides advice and  recommendations on policies, bylaws, plans, programs, budgets and  issues  related  to the Water and Liquid Waste functions.  Key actions  in the 2017 work plan for the Committee are described below and  listed according to the Committee responsibilities in its Terms of Reference.    Water  

Complete Water Shortage Response Plan update; 

Continue  targeted  regional  water  conservation  campaign  focused  on  indoor  and outdoor water use; 

Undertake a regional assessment of residential water metering; 

Complete a Comprehensive Regional Water System Plan that aligns with the Board’s strategic objectives including enhancing resiliency to changing climates; 

5.1

UC - 11

Page 12: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Implement the Joint Water Use Plan for the Capilano and Seymour Watersheds; 

Secure  additional water  allocation  for  the  Coquitlam  source  as  per  the  Coquitlam Water Use Plan; 

Complete project definition for infrastructure improvements necessary to store, treat and convey additional supply from the Coquitlam source; 

Complete construction of South Delta Main No. 1 Replacement, Phases 2 and 3; 

Complete preliminary design of Capilano Main No. 5 (South Shaft to Lost Lagoon); 

Continue construction of Clayton Reservoir; 

Complete preliminary design and commence detailed design of Capilano Raw Water Pump Station Backup Power; 

Continue design of the Second Narrows and Annacis Water Supply Tunnel projects; 

Commence construction of the Mackay Creek Debris Flow Mitigation project; 

Continue development of an Asset Management Plan for Water Services; 

Develop  a  10‐year  trail management  strategy  for  the  Lower  Seymour  Conservation Reserve (LSCR); 

Complete environmental assessment to determine potential  impacts associated with future raising of Seymour Falls Dam; 

Optimize operation of the Capilano Raw Water Pump Station; 

Commission the new sodium hypochlorite system at the Coquitlam Water Treatment Plant. 

   Liquid Waste 

 

Complete  development  of  regulatory  requirements  for  sewage  discharge  from hospitals, acute care facilities, post‐secondary and research laboratories; 

Continue behaviour change campaigns on unflushables and grease; 

Award Lions Gate Secondary WWTP Design‐Build‐Finance contract; 

Commence project definition phase for the Iona Island WWTP secondary upgrade; 

Commence dewatering of the Iona Island WWTP sludge lagoons and continue with the removal and beneficial use of the stockpiled; 

Commence construction of Annacis Island WWTP Stage 5 Expansion ‐Phase 1; 

Commence construction of the Annacis Island WWTP Cogeneration Back‐Up Power; 

Complete detailed design of Annacis Island WWTP Outfall System; 

Complete construction and commissioning of new Iona Island WWTP Solids Handling, Screening and Degritting facility; 

Complete project definition of Northwest Langley WWTP Expansion; 

Commence a detailed assessment of  the  impacts of  climate change on  liquid waste and stormwater infrastructure and develop climate change adaptation strategies; 

Continue development of an Asset Management Plan for Liquid Waste Services; 

Implement environmental monitoring program to establish baseline concentrations of contaminants of emerging concern; 

Develop  water  reuse  and  optimization  opportunities  in  the wastewater  treatment plants; 

Complete studies on standby power requirements for sewer collection and treatment facilities to enhance system resiliency.   

UC - 12

Page 13: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

 The 2017 work plan for the Utilities Committee is provided in Attachment 1, including the expected time  frame  for  reports  to  this Committee.   The Committee will be updated on  the  status of  the actions and projects in this work plan on a monthly basis per the Committee’s schedule.   ALTERNATIVES 1. That the Utilities Committee endorse the work plan as presented in the report dated January 5, 

2017, titled “2017 Utilities Committee Priorities and Work Plan”.  

2. That the Utilities Committee endorse the work plan as presented in the report dated January 5, 2017, titled “2017 Utilities Committee Priorities and Work Plan” with the amendments provided at the Utilities Committee January 19, 2017 meeting.  

FINANCIAL IMPLICATIONS The priorities in the 2017 work plan of the Utilities Committee are consistent with the 2017 Budget approved by the GVWD and GVS&DD Board on October 28, 2016 and with key actions included in the 2017 Business Plans.   SUMMARY / CONCLUSION The work plan presented  in  this  report conveys  the priorities  for  the Utilities Committee  in 2017 and  is  consistent with  its Terms of Reference and  the 2017 Budget approved by  the GVWD and GVS&DD Board.  Staff recommends that Alternative 1 be adopted.   Attachments and References: 1.  Utilities Committee 2017 Work Plan 2.  Utilities Committee Terms of Reference  

UC - 13

Page 14: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Attachment 1 Utilities Committee 2017 Work Plan  

Priorities 

1st Quarter   Status 

2017 Committee Priorities and Work Plan  In Progress 

2017 GVWD and GVS&DD Capital Projects  In Progress Fisherman’s Trail/Riverside Drive Bridges ‐ Status Update  In Progress 

Seymour Salmonid Society ‐ 2016 Annual Report  In Progress 

Seymour River Rockslide Mitigation Update  In Progress Drinking Water Treatment Plant Residuals – Results of Cement Plant Trials  In Progress 

Collaborative Agreement with Thompson Rivers University for Biosolids Research  In Progress Authorization to Execute Project Agreement for Construction of Lions Gate Secondary Wastewater Treatment Plant Project 

In Progress

Region‐wide Baseline for Onsite Stormwater Management ‐ Consultation Findings and Recommendations 

In Progress

Wastewater Industry Position Statement on ‘Unflushable’ and 'Flushable' Labelled Products  In Progress 2017 Unflushables – Regional Campaign Update  Pending Liquid Waste Services Environmental Management and Monitoring Initiatives  In Progress Municipal Requests for Sewerage Area Boundary Amendments (as applicable)  Pending Contract Approvals – Contracts > $5M (as applicable)  In Progress Utility Policies (as applicable)  In Progress  

2nd Quarter   

Regional Water Conservation Campaign – 2017 Update  In Progress 2017 Water Wagon Schedule & Sprinkling Regulations Education Materials  Pending Water Supply Forecast and Consumption Update for Summer 2017  Pending 

Status of Utilities Capital Expenditures   In Progress GVWD Quality Control Annual Report for 2016  In Progress Comprehensive Regional Water System Plan Update  In Progress 

Coquitlam Intake No. 2 – Project Definition Update  In Progress 

Water Shortage Response Plan Review  In Progress 

Seymour Salmonid Society Contribution Agreement  In Progress 

Iona Island WWTP Secondary Upgrade Project Definition  Pending 

Integrated Liquid Waste and Resource Management Plan Biennial Report (2015‐2016)  In Progress 

Liquid Waste Development Cost Charge Bylaw Update  In Progress 

Municipal Requests for Sewerage Area Boundary Amendments (as applicable)  Pending 

Contract Approvals – Contracts > $5M (as applicable)  Pending 

Utility Policies (as applicable)  Pending 

  

UC - 14

Page 15: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

3rd Quarter  Status 

LSCR Public Consultation Annual Update  Pending 

Joint Water Use Plan Approval – Capilano and Seymour Watersheds  In Progress Status of Utilities Capital Expenditures  Pending 

APEGBC Public Health and Environmental System Risk Management Plans  In Progress 

GVS&DD Environmental Management & Quality Control Annual Report 2016  Pending Long Term Water Supply  In Progress Special Meeting to Receive Public Input on the Integrated Liquid Waste and Resource Management Plan Biennial Report (2015‐2016) 

Pending 

Northwest Langley Wastewater Treatment Plant Expansion Project Update – Sustainability and Community Integration 

Pending 

2017 Regional Grease Campaign – Update  Pending 

2017 Unflushables Regional Campaign – Update  Pending 

Municipal Requests for Sewerage Area Boundary Amendments (as applicable)  Pending 

Contract Approvals – Contracts > $5M (as applicable)  Pending 

Utility Policies (as applicable)  Pending 

   

4th Quarter   

Update on Fisheries Initiatives in the Capilano, Seymour and Coquitlam Watersheds  Pending Summer 2017 Water Supply Performance  Pending 2018 Budget – Water & Liquid Waste  Pending Status of Utilities Capital Expenditures   Pending 

Water Conservation:  2017 Campaign Results  Pending 

Water Wagon Program & Water Restrictions Communications 2017 Results  Pending 

Comprehensive Regional Water System Plan Update  Pending 

Coquitlam Intake No. 2 – Project Definition Update  Pending Regional Assessment of Regional Water Metering  Pending Northwest Langley Wastewater Treatment Plant Project Update ‐Project Definition  Pending 

2017 Behaviour Change Project on Unflushables and Grease Update  Pending 

2017 Regional Grease Campaign – Results  Pending 

Municipal Requests for Sewerage Area Boundary Amendments (as applicable)  Pending 

Contract Approvals – Contracts > $5M (as applicable)  Pending 

Utility Policies (as applicable)  Pending 

   

      

 

UC - 15

Page 16: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

10595510    December 21, 2016 

Utilities Committee Terms of Reference 

 The Utilities Committee  is  the  standing  committee of  the Metro Vancouver Board  that provides advice and  recommendations on policies, bylaws, plans, programs, budgets and  issues  related  to water and liquid waste management under the GVWD and GVS&DD services.  Committee Responsibilities Within the scope of the Board Strategic Plan, Drinking Water Management Plan, Integrated Liquid Waste  and  Resource  Management  Plan,  and  Metro  Vancouver  Financial  Plan,  the  Committee provides  guidance  and  oversight  to  staff  on  the  implementation  of  the  annual  work  plan  and business plans for each service. Specific Committee responsibilities include the following: 

Review  and  approve  annual business plans  and budgets  for  the Water  and  Liquid Waste utilities; 

Oversee and monitor implementation of strategic utility plans including the Drinking Water Management Plan and Integrated Liquid Waste and Resource Management Plan; 

Oversee  implementation of GVWD and GVS&DD  (liquid waste) capital programs,  including award  of  contracts  (over  $5  million)  for  engineering  services,  materials  supply,  and construction; 

Review and receive annual Quality Control reports for GVWD and GVSⅅ 

Oversee implementation of the water conservation program and tap water campaign; 

Monitor  water  supply  forecasts,  water  consumption  trends  and  annual  system performance; 

Review and make recommendations with respect to municipal requests for sewerage area boundary expansions; 

Review and recommend amendments to the GVS&DD Sewer Use Bylaw; and 

Review and approve Integrated Stormwater Management Plan for GVS&DD drainage areas. 

 Committee Membership and Meetings The Chair, Vice Chair, and members are appointed annually by the Chair of the Metro Vancouver Board. The Utilities Committee meets monthly, except  for August and December, and has special meetings  as  required. Members  of  the  Committee must  be members  of  both  the  GVWD  and GVS&DD.  A  quorum  of  50%  plus  one  of  the  Committee  membership  is  required  to  conduct committee business.  Committee Management  The Committee Chair, or  in  the absence of  the Chair,  the Vice‐Chair  is  the chief spokesperson on matters  of  public  interest  within  the  Committee’s  purview.  For  high  profile  issues  the  role  of spokesperson  should  rest with  the  Board  Chair  or  Vice‐Chair.  On  technical matters  or  in  cases where an  initiative  is  still at  the  staff proposal  level,  the Commissioner or a  senior  staff member 

UC - 16

Page 17: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

may be  the appropriate chief spokesperson. Where necessary and practical,  the Board Chair,  the Committee Chair and the Commissioner confer to determine the most appropriate representative to speak.  The Chief Administrative Officer assigns a Committee Manager for the Committee. The Committee Manager  is  responsible  for  coordinating  agendas  and  be  the  principal  point  of  contact  for Committee members. 

UC - 17

Page 18: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

5.2

To:  Utilities Committee  From:  Frank Huber, Director, Major Projects, Management Systems and Utility Services, Water 

Services   Mark Ferguson, Director, Project Delivery, Liquid Waste Services  Date:  January 4, 2017  Meeting Date:  January 19, 2017  Subject:  2017 GVWD and GVS&DD Capital Projects 

 RECOMMENDATION That the Utilities Committee receive for information the report dated January 4, 2017, titled “2017 GVWD and GVS&DD Capital Projects”.   

 PURPOSE The purpose of this report is to inform the Committee of the GVWD and GVS&DD capital projects under its purview for 2017, as approved by the Board on October 28, 2016.  BACKGROUND As part of the capital projects reporting process, an annual report summarizing the capital projects under  the  Utilities  Committee’s  purview  has  historically  been  brought  forward  to  the  Utilities Committee at its first meeting of the year.  The 2017 Annual Work Plans and Budget for Water and Liquid Waste were reviewed and endorsed at the October 13, 2016 meeting of the Utilities Committee.  This report summarizes the individual capital projects included in the above‐noted budgets.   CAPITAL PLANNING PROCESS As part of the Long Range Capital Plan and annual budget process, a determination is made of the capital  projects  that  are  required  in  order  to  continue  to  meet  Metro  Vancouver’s  service obligations.   This  is done through senior  level capital planning teams which prioritize each project on  the basis of  several  criteria  including environmental  impact, health  and  safety,  and  ability  to meet service delivery requirements and regulations.   Typically  in May or June of each year, when the complete updated draft Long Range Capital Plan is prepared, each local government member is provided  with  copies  for  their  review  and  comment.    Comments  received  are  considered  in finalizing the draft plan commencing in late July, for incorporation into the annual budget.  The  projects  within  the  GVWD  and  GVS&DD  capital  budgets  are  referenced  in  the  financial information provided  to  the Committee and Board  in  the  fall of each year as part of  the annual budget process.   GVWD  capital projects expected  to  commence  in 2017, and  “Approved Projects  in Progress” are summarized  for  reference purposes on Attachments 1 and 2,  respectively.   GVS&DD  liquid waste 

UC - 18

Page 19: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

20129880

capital  projects  expected  to  commence  in  2017  and  “Approved  Projects  in  Progress”  are summarized for reference purposes on Attachments 4 and 5, respectively.   In accordance with the capital expenditure reporting process approved by the Board, interim status reports  are  provided  to  the  Utilities  and  Performance  and  Audit  Committees  in  June/July  and October/November, with a final year‐end report to the Committees and Board in April.  ALTERNATIVES This is an information report.  No alternatives are presented.  FINANCIAL IMPLICATIONS For 2017, water capital projects account for approximately $163.1 million and  liquid waste capital projects account for approximately $163.7 million of the 2017 capital budget.  Proposed 2017 expenditures and total project budget, for each individual project, are tabulated in Attachments 3 (GVWD) and 6 (GVS&DD), respectively.  SUMMARY / CONCLUSION The 2017 capital budgets  for GVWD and GVS&DD  (Liquid Waste) were approved by  the Board  in October 2016.   This report provides a high  level overview of the capital programs and projects for the Committee’s reference throughout 2017.  Attachments and References:  1.  2017 Water Capital New Projects Map  2.  2017 Water Capital Approved Projects in Progress Map  3.  GVWD Capital Programs and Project Details, Water Services, 2017 Budget 4.  2017 Liquid Waste Capital New Projects Map  5.  2017 Liquid Waste Capital Approved in Progress Projects Map  6.  GVS&DD Capital Programs and Project Details, Liquid Waste Services, 2017 Budget 

UC - 19

Page 20: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

BowenIsland P I

T T

L A K

E

BelcarraAnmore

Cityof

Langley

City ofNorth Vancouver

MapleRidge

PortMoody

District ofNorth Vancouver

NewWestminster

Vancouver

Richmond

Delta

Whiterock

Surrey

Townshipof

Langley

Coquitlam

PortCoquitlam

District ofWest Vancouver

INDIANAR

M

F R ASER RIVER

COQU

ITLAM

LAKE

Burnaby

South Delta Mains28th Ave Crossover Construction

SCFP- Concrete Coatings Construction- UPS Reconfig Construction

Central Park PSSeismic Upgrade Construction

Capilano ReservoirBoat Wharf Construction

Seymour Falls Dam Buttress AnchorRehab and Bridge Repair Construction

Lynn Valley Main PRV ChamberUpgrade Construction

Fisherman's Trail / Riverside Dr.Bridges Construction

CWTP Ozone Generation UpgradesUnits 2 & 3 Construction

Haney Main No.2 Valve ChamberUpgrade Construction

Lulu Island - Delta MainBridgeport Rd RelocationDetailed Design & Construction

Burnaby Mt. ReservoirSeismic Upgrade Construction

ElectoralArea A

PittMeadows

Tsawwassen FirstNation

Capilano Raw Water PSBackup Power Construction

Cleveland Dam PumphouseSeismic Upgrade Construction

Seymour Lake DebrisBoom Design & Construction

ElectoralArea A

Sunnyside Reservoir Unit 1Upgrades Detailed Design

Westburnco PS BackupPower Detailed Design and Equipment Purchase

South Delta Main No.3 - 12th Ave.to Pebble Hill Detailed Design Sunnyside Reservoir Units 1 and 2

Seismic Upgrade Detailed Design

South Surrey Main No.2Detailed Design

Hellings Tank No.2Property Purchase

Fleetwood Reservoir No.1 Construction

Jericho Reservoir No.1 Construction

Sasamat ReservoirJoint Upgrade Detailed Design

Capilano Main No. 5(South Shaft to Lost Lagoon) Detailed Design

Lulu Island - Delta Main - Scour Protection Phase 1 Construction

Annacis Main No. 5 (South)Detailed Design

Annacis Main No. 5 (North)Detailed Design

Capilano Mid-Lake DebrisBoom Design & Construction

Cleveland Dam - Lower Outlet HBV Rehab Prelim Design

Cleveland Dam - Spillway Concrete Repairs Construction

Burnaby Mountain Tank UpgradesPreliminary Design

LCOC Metal Shop Expansion andDry Storage Development Detailed Design

Port Mann Main No.1(Fraser River Crossing Removal)Detailed Design

Haney Main No.4(West Section) Pre Design

Riverside Drive Watermain Retaining Wall & Access Construction

Cape Horn PS 1 & 2Seismic Upgrade Detailed Design

Lower Seymour Conservation ReserveLearning Lodge Replacement Detailed Design

Burwell Alpine ReservoirValve Improvements Construction

Seymour Falls Dam - Relief Wells inspection & Rehab Detailed Design

Cape Horn Pump Station No. 3 Predesign

BowenIsland P I

T T

L A K

E

BelcarraAnmore

Cityof

Langley

City ofNorth Vancouver

MapleRidge

PortMoody

District ofNorth Vancouver

NewWestminster

Vancouver

Richmond

Delta

Whiterock

Surrey

Townshipof

Langley

Coquitlam

PortCoquitlam

District ofWest Vancouver

INDIANAR

M

F R ASER RIVER

COQU

ITLAM

LAKE

Burnaby

South Delta Mains28th Ave Crossover Construction

SCFP- Concrete Coatings Construction- UPS Reconfig Construction

Central Park PSSeismic Upgrade Construction

Capilano ReservoirBoat Wharf Construction

Seymour Falls Dam Buttress AnchorRehab and Bridge Repair Construction

Lynn Valley Main PRV ChamberUpgrade Construction

Fisherman's Trail / Riverside Dr.Bridges Construction

CWTP Ozone Generation UpgradesUnits 2 & 3 Construction

Haney Main No.2 Valve ChamberUpgrade Construction

Lulu Island - Delta MainBridgeport Rd RelocationDetailed Design & Construction

Burnaby Mt. ReservoirSeismic Upgrade Construction

ElectoralArea A

PittMeadows

Tsawwassen FirstNation

Capilano Raw Water PSBackup Power Construction

Cleveland Dam PumphouseSeismic Upgrade Construction

Seymour Lake DebrisBoom Design & Construction

ElectoralArea A

Sunnyside Reservoir Unit 1Upgrades Detailed Design

Westburnco PS BackupPower Detailed Design and Equipment Purchase

South Delta Main No.3 - 12th Ave.to Pebble Hill Detailed Design Sunnyside Reservoir Units 1 and 2

Seismic Upgrade Detailed Design

South Surrey Main No.2Detailed Design

Hellings Tank No.2Property Purchase

Fleetwood Reservoir No.1 Construction

Jericho Reservoir No.1 Construction

Sasamat ReservoirJoint Upgrade Detailed Design

Capilano Main No. 5(South Shaft to Lost Lagoon) Detailed Design

Lulu Island - Delta Main - Scour Protection Phase 1 Construction

Annacis Main No. 5 (South)Detailed Design

Annacis Main No. 5 (North)Detailed Design

Capilano Mid-Lake DebrisBoom Design & Construction

Cleveland Dam - Lower Outlet HBV Rehab Prelim Design

Cleveland Dam - Spillway Concrete Repairs Construction

Burnaby Mountain Tank UpgradesPreliminary Design

LCOC Metal Shop Expansion andDry Storage Development Detailed Design

Port Mann Main No.1(Fraser River Crossing Removal)Detailed Design

Haney Main No.4(West Section) Pre Design

Riverside Drive Watermain Retaining Wall & Access Construction

Cape Horn PS 1 & 2Seismic Upgrade Detailed Design

Lower Seymour Conservation ReserveLearning Lodge Replacement Detailed Design

Burwell Alpine ReservoirValve Improvements Construction

Seymour Falls Dam - Relief Wells inspection & Rehab Detailed Design

Cape Horn Pump Station No. 3 Predesign

0 84 Kilometers

New Projects

Legend

2017 Water Capital New Projects

g:projects\wa02\00\CapitalWorks\mxds\watercapitalworks_2017_red.mxd Last Modified: Dec 2016

Water Meter UpgradesConstruction

GVWD Water Main

GVWD Water Pump Station

Municipal Boundary

Capilano Watershed

Seymour Watershed

Coquitlam Watershed

GVWD Water Treatment Facilities

GVWD Re-Chlorination Station

GVWD Reservoirs

Rechlorination Stations- Backup Power Prelim Design- Upgrades Prelim Design- Chemical Refill Kiosk Corrosion Repairs Construction

Supplementary SecondaryDisinfection Detailed Design

Relocation and Protection for TransLink Expansion Projects Detailed Design

Attachment 1

UC - 20

Page 21: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

BowenIsland

BelcarraAnmore

Cityof

Langley

City ofNorth Vancouver

Maple Ridge

PortMoody

District ofNorth Vancouver

NewWestminster

Vancouver

Richmond

Delta

Whiterock

Surrey

Townshipof

Langley

Coquitlam

PortCoquitlam

PittMeadows

District ofWest Vancouver

F R ASER RIVER

Burnaby

Port Mann Main No.2 Fraser River Crossing Construction

Coquitlam Intake No. 2 /Tunnel - Conceptual Design

Coquitlam CommunicationImprovements Design and Construction

Coquitlam Main No.4(Central, South and Cape Horn Section) Predesign

Central Park PS Starters ReplacementPort Mann Main No. 2 (North) - Construction

E2 Shaft Phase 3 Production Well Construction

Capilano Main No.9 North Section Construction

Fleetwood ReservoirDetailed Design

Mackay Cr. Debris FlowMitigation Detailed Designand Construction

Annacis Main No. 5 (North) Predesign

Second Narrows Tunnel Detailed Design

Tilbury Junction ChamberValves Replacement with Actuators

Annacis Main No.5 (Marine Crossing) Predesign and Detailed Design

Annacis Main No.5(South) Predesign

Central Park Main Replacement Preliminary Design (2 Sections) and Detailed Design (1 Section)

Kennedy NewtonMain Detailed Design

Port Mann Main No.2 (South) - Design

Cleveland Dam Seismic Stability Assessment

South Delta Main No. 1Upgrade Construction

Convert to Bulk Sodium Hypochloriteat Coquitlam WTP

Capilano Power Preliminary Design

Hellings Tank No.2Detailed Design

Jericho Reservoir No.1 Detailed Design

Whalley Main Detailed Design

Electoral Area A

Electoral Area A

LionsBay

Tsawwassen First Nation

CWTP Ops and Safety Enhancements Designand Construction

Coquitlam Intake TowerSeismic Upgrade Design

Burwell Alpine ReservoirValve Improvements Design

Seymour Falls Dam Turbine Upgrade Project Design

Douglas Rd. Main No.2 (Vancouver Heights Section) Predesign / Detailed Design

Capilano Main No. 5 (South Shaft to Lost Lagoon) Predesign

South Delta Main No.128 Ave to 34B Ave Construction

South Delta Main No. 312th Ave. to Pebble Hill Preliminary Design

Sapperton Main No. 1Line Valve & Chamber Detailed Design

Douglas Rd. Main No. 213th Ave, Kincaid and Stage 1 Construction

Douglas Rd. Main No.2 Still Creek Design and Construction

Queensborough Main Ewen Ave - Construction Phase 2

Barnston/Maple Ridge P/S Power Generationand Backup Power Prelim & Detailed Design

South Surrey Main No.2 Preliminary Design

Boundary Rd Main No.5 Phase 3

Clayton Reservoir Construction

Seymour Main No. 5 NorthDetailed Design

SCFP- Filter Underdrain Repairs- Site Entrance Improvements Construction- Clearwell Columns Remediation Construction

Cleveland Dam Bridge Girder Recoating Construction

Annacis Main No. 2 (River Crossing Removal) Design

Newton Pump Station No. 2Preliminary Design

Fisherman's Trail / Riverside Dr.Bridges Detailed Design

Seymour Main No.2 JointImprovements Construction

Braid St. Main No. 2 Construction

Cleveland Dam East Abutment Additional GV Series Pump Wells Design & Construction

Capilano Raw Water PS Backup Power Preliminary & Detailed Design

Westburnco PS Backup Power Preliminary Design

Lulu Island - Delta Main Scour Protection Detailed Design

Douglas Rd Main No. 2Delta Ave. Section

BowenIsland

BelcarraAnmore

Cityof

Langley

City ofNorth Vancouver

Maple Ridge

PortMoody

District ofNorth Vancouver

NewWestminster

Vancouver

Richmond

Delta

Whiterock

Surrey

Townshipof

Langley

Coquitlam

PortCoquitlam

PittMeadows

District ofWest Vancouver

F R ASER RIVER

Burnaby

Port Mann Main No.2 Fraser River Crossing Construction

Coquitlam Intake No. 2 /Tunnel - Conceptual Design

Coquitlam CommunicationImprovements Design and Construction

Coquitlam Main No.4(Central, South and Cape Horn Section) Predesign

Central Park PS Starters ReplacementPort Mann Main No. 2 (North) - Construction

E2 Shaft Phase 3 Production Well Construction

Capilano Main No.9 North Section Construction

Fleetwood ReservoirDetailed Design

Mackay Cr. Debris FlowMitigation Detailed Designand Construction

Annacis Main No. 5 (North) Predesign

Second Narrows Tunnel Detailed Design

Tilbury Junction ChamberValves Replacement with Actuators

Annacis Main No.5 (Marine Crossing) Predesign and Detailed Design

Annacis Main No.5(South) Predesign

Central Park Main Replacement Preliminary Design (2 Sections) and Detailed Design (1 Section)

Kennedy NewtonMain Detailed Design

Port Mann Main No.2 (South) - Design

Cleveland Dam Seismic Stability Assessment

South Delta Main No. 1Upgrade Construction

Convert to Bulk Sodium Hypochloriteat Coquitlam WTP

Capilano Power Preliminary Design

Hellings Tank No.2Detailed Design

Jericho Reservoir No.1 Detailed Design

Whalley Main Detailed Design

Electoral Area A

Electoral Area A

LionsBay

Tsawwassen First Nation

CWTP Ops and Safety Enhancements Designand Construction

Coquitlam Intake TowerSeismic Upgrade Design

Burwell Alpine ReservoirValve Improvements Design

Seymour Falls Dam Turbine Upgrade Project Design

Douglas Rd. Main No.2 (Vancouver Heights Section) Predesign / Detailed Design

Capilano Main No. 5 (South Shaft to Lost Lagoon) Predesign

South Delta Main No.128 Ave to 34B Ave Construction

South Delta Main No. 312th Ave. to Pebble Hill Preliminary Design

Sapperton Main No. 1Line Valve & Chamber Detailed Design

Douglas Rd. Main No. 213th Ave, Kincaid and Stage 1 Construction

Douglas Rd. Main No.2 Still Creek Design and Construction

Queensborough Main Ewen Ave - Construction Phase 2

Barnston/Maple Ridge P/S Power Generationand Backup Power Prelim & Detailed Design

South Surrey Main No.2 Preliminary Design

Boundary Rd Main No.5 Phase 3

Clayton Reservoir Construction

Seymour Main No. 5 NorthDetailed Design

SCFP- Filter Underdrain Repairs- Site Entrance Improvements Construction- Clearwell Columns Remediation Construction

Cleveland Dam Bridge Girder Recoating Construction

Annacis Main No. 2 (River Crossing Removal) Design

Newton Pump Station No. 2Preliminary Design

Fisherman's Trail / Riverside Dr.Bridges Detailed Design

Seymour Main No.2 JointImprovements Construction

Braid St. Main No. 2 Construction

Cleveland Dam East Abutment Additional GV Series Pump Wells Design & Construction

Capilano Raw Water PS Backup Power Preliminary & Detailed Design

Westburnco PS Backup Power Preliminary Design

Lulu Island - Delta Main Scour Protection Detailed Design

Douglas Rd Main No. 2Delta Ave. Section

0 84 Kilometers

LegendApproved ProjectsIn Progress

2017 Water CapitalApproved ProjectsIn Progress

g:projects\wa02\00\CapitalWorks\mxds\watercapitalworks_2017_blue Last Modified: Dec 2016

Water Optimization Automation and Instrumentation - Various Locations

GVWD Water Main

GVWD Water Pump Station

Municipal Boundary

Capilano Watershed

Seymour Watershed

Coquitlam Watershed

GVWD Water Treatment Facilities

GVWD Re-Chlorination Station

Emergency Power Strategyfor Regional Water FacilitiesConceptual Design

GVWD Reservoirs

Water Meter UpgradesDetailed Design

Reservoir Isolation Valve Automation Design andConstruction

Attachment 2

UC - 21

Page 22: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Attachment 3

PROJECT

LOCATION

2017

CAPITAL

BUDGET

TOTAL

PROJECT

COSTS

New West/Surrey $3,000,000 $28,000,000

New West/Surrey 1,500,000 8,000,000

New Westminster 300,000 600,000

Surrey 400,000 750,000

Burnaby/Vancouver 400,000 39,800,000

Vancouver 300,000 550,000

Coquitlam 3,000,000 7,230,000

Coquitlam 450,000 1,000,000

Coquitlam 1,000,000 1,670,000

Coquitlam 600,000 1,350,000

Surrey 400,000 1,400,000

Delta 800,000 2,200,000

Surrey 500,000 1,500,000

Surrey 2,100,000 7,500,000

Surrey 1,200,000 1,200,000

Coquitlam 3,000,000 24,100,000

Surrey 1,700,000 2,300,000

Delta 4,740,000 14,400,000

Surrey 500,000 1,500,000

Surrey 900,000 1,200,000

New Westminster 100,000 2,000,000

Surrey 100,000 2,850,000

Coquitlam 200,000 1,200,000

Vancouver 2,000,000 4,650,000

Surrey 3,000,000 32,500,000

Maple Ridge 300,000 1,900,000

Delta 2,200,000 2,200,000

Surrey 3,000,000 31,600,000

Surrey 3,500,000 14,500,000

$41,190,000 $239,650,000

New West/Surrey 400,000 400,000

Burnaby 250,000 250,000

Burnaby 1,500,000 3,600,000

Burnaby 800,000 1,800,000

Burnaby 2,400,000 5,300,000

North Vancouver 425,000 525,000

Burnaby 600,000 16,700,000

GREATER VANCOUVER WATER DISTRICT

CAPITAL PROGRAMS & PROJECT DETAILS

WATER SERVICES

2017 BUDGET

CAPITAL EXPENDITURES

Water Infrastructure Growth Capital

2017 - Approved Projects in Progress

Annacis Main No. 5 (North) Predesign

Annacis Main No. 5 (South) Predesign

Annacis Main No. 5 (Marine Crossing) Detailed Design

Annacis Main No. 5 (Marine Crossing) Predesign

Coquitlam Intake No. 2 & Tunnel Conceptual

Coquitlam Main No. 4 (Cape Horn) Pre Design

Boundary Rd Main No 5 Phase 3

Capilano Main No.5 (South Shaft to Lost Lagoon) Predesign

Fleetwood Reservoir Detailed Design

Hellings Tank No. 2 Detailed Design

Coquitlam Main No. 4 (Central Section) Predesign

Coquitlam Main No. 4 (South Section) Predesign

Newton Pump Station No. 2 Preliminary Design

Port Mann Main No. 2 (North) Construction

Jericho Reservoir No. 1 Detailed Design

Kennedy Newton Main Detailed Design

South Surrey Main No. 2 Preliminary Design

Whalley Main Detailed Design

Port Mann Main No. 2 (South) Design

South Delta Main No. 1 Upgrade Construction

Annacis Main No. 5 (South) Detailed Design

Cape Horn Pump Station No. 3 Predesign

2017 - New Projects

Annacis Main No. 5 (North) Detailed Design

Haney Main No. 4 (West Section) Predesign

Hellings Tank No. 2 Property Purchase

Capilano Main No.5 (South Shaft to Lost Lagoon) Detailed Design

Fleetwood Reservoir Construction

Jericho Reservoir No. 1 Construction

South Surrey Main No. 2 Detailed Design

Annacis Main No. 2 (River Crossing Removal) Design

Central Park Main Replacement (10th Ave to Westburnco) Preliminary Design

Water Infrastructure Maintenance Capital

2017 - Approved Projects in Progress

Central Park WPS Starters Replacement

Cleveland Dam Bridge Girder Recoating Construction

Central Park Main Replacement (Patterson to 10th Ave) Detailed Design

Central Park Main Replacement (Patterson to 10th Ave) Predesign

Douglas Road Main No. 2 - 13th Ave ConstructionUC - 22

Page 23: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Attachment 3

PROJECT

LOCATION

2017

CAPITAL

BUDGET

TOTAL

PROJECT

COSTS

GREATER VANCOUVER WATER DISTRICT

CAPITAL PROGRAMS & PROJECT DETAILS

WATER SERVICES

2017 BUDGET

CAPITAL EXPENDITURES

Burnaby 2,500,000 12,300,000

Burnaby 700,000 1,500,000

Burnaby 170,000 480,000

Burnaby 1,000,000 16,600,000

Burnaby 1,000,000 12,500,000

Burnaby 1,200,000 40,500,000

Burnaby 2,500,000 4,400,000

North Vancouver 5,000,000 12,000,000

North Vancouver 50,000 250,000

Richmond/Delta 50,000 250,000

North Vancouver 1,475,000 2,000,000

North Vancouver 1,200,000 6,000,000

Burnaby 1,500,000 3,700,000

North Vancouver 100,000 100,000

North Vancouver 800,000 2,000,000

North Vancouver 1,900,000 2,300,000

Richmond 3,000,000 6,600,000

Richmond 900,000 900,000

Ricmond/Delta 1,350,000 1,750,000

North Vancouver 1,000,000 3,300,000

Coquitlam/Surrey 500,000 500,000

Regional 300,000 300,000

Regional 400,000 500,000

Regional 900,000 900,000

North Vancouver 300,000 375,000

Vancouver 75,000 75,000

North Vancouver 2,600,000 6,250,000

North Vancouver 620,000 1,320,000

North Vancouver 100,000 100,000

$39,565,000 $168,325,000

Maple Ridge 1,500,000 2,000,000

Maple Ridge 300,000 500,000

New Westminster 5,000,000 7,800,000

North Vancouver 2,000,000 29,000,000

North Vancouver 1,500,000 2,500,000

North Vancouver 100,000 500,000

Surrey 8,000,000 30,000,000

Coquitlam 2,200,000 8,300,000

Coquitlam 560,000 1,000,000

Douglas Road Main No. 2 (Vancouver Heights Section) Detailed Design

Douglas Road Main No. 2 (Vancouver Heights Section) Predesign

Douglas Road Main No. 2 - Kincaid Section Construction

Douglas Road Main No. 2 Still Creek Construction

Douglas Road Main No. 2 Still Creek Design

Douglas Road Main No. 2 Delta Section

Douglas Road Main No. 2 Stage 1 Construction

Lulu Island - Delta Main - Scour Protection Detailed Design

SCFP Clearwell Columns Remediation Construction

E2 Shaft Phase 3 Production Well Construction

Fisherman's Trail/Riverside Drive Bridges Detailed Design

Central Park PS Seismic Upgrade Construction

Cleveland Dam - Lower Outlet HBV Rehabilitation Preliminary Design

SCFP Filter Underdrain Repairs Construction

2017 - New Projects

Lulu Island - Delta Main - Bridgeport Road Relocation Construction

Lulu Island - Delta Main - Bridgeport Road Relocation Detailed Design

Cleveland Dam - Spillway Concrete Repairs Construction

Fisherman's Trail/Riverside Drive Bridges Construction

Port Mann Main No. 1 (Fraser River Crossing Removal) Detailed Design

Rechlorination Station Upgrades Preliminary Design

Lulu Island - Delta Main - Scour Protection Phase 1 Construction

Lynn Valley Main PRV Chamber Upgrade Construction

Riverside Drive Watermain Retaining Wall & Access Construction

Sasamat Reservoir Joint Upgrades Detailed Design

Rechlorination Stations Chemical Refill Kiosk Corrosion Repairs Construction

Relocation and Protection for Translink Expansion Projects Detailed Design

Seymour Falls Dam-Relief Wells Inspection & Rehab Detailed Design

SCFP Concrete Coatings Construction

Seymour Falls Dam Buttress Anchor Rehab and Bridge Repair Construction

2017 - Approved Projects in Progress

Barnston/Maple Ridge Pump Station - Back-up Power Detailed Design

Water Infrastructure Resilience Capital

Capilano Main No 9 North Section Construction

Capilano Raw Water Pump Station - Back-up Power Detailed Design

Barnston/Maple Ridge Pump Station - Back-up Power Preliminary Design

Braid St. Main No.2 Construction

Convert to Bulk Sodium Hypochlorite from Chlorine Gas at Coquitlam WTP

Coquitlam Intake Tower Seismic Upgrade Design

Capilano Raw Water Pump Station - Back-up Power Preliminary Design

Clayton Reservoir Construction

UC - 23

Page 24: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Attachment 3

PROJECT

LOCATION

2017

CAPITAL

BUDGET

TOTAL

PROJECT

COSTS

GREATER VANCOUVER WATER DISTRICT

CAPITAL PROGRAMS & PROJECT DETAILS

WATER SERVICES

2017 BUDGET

CAPITAL EXPENDITURES

Coquitlam 500,000 2,300,000

Coquitlam 100,000 200,000

Regional 350,000 400,000

North Vancouver 3,000,000 7,000,000

North Vancouver 200,000 1,000,000

Coquitlam/Surrey 3,000,000 239,000,000

Regional 750,000 2,250,000

Regional 340,000 700,000

North Vancouver 250,000 500,000

North Vancouver/Burnaby 4,000,000 15,000,000

North Vancouver 500,000 775,000

North Vancouver 100,000 7,000,000

Delta 200,000 400,000

New Westminster 100,000 500,000

Burnaby 3,000,000 5,000,000

Burnaby 150,000 400,000

Coquitlam 300,000 300,000

North Vancouver 750,000 750,000

North Vancouver 4,000,000 12,000,000

North Vancouver 750,000 750,000

North Vancouver 1,500,000 2,500,000

Regional 300,000 500,000

North Vancouver 350,000 1,070,000

North Vancouver 800,000 800,000

Delta 500,000 1,500,000

Surrey 300,000 300,000

Surrey 300,000 600,000

New Westminster 2,000,000 5,000,000

$49,550,000 $390,095,000

North Vancouver 40,000 150,000

North Vancouver 300,000 750,000

North Vancouver 160,000 350,000

Coquitlam 1,300,000 1,650,000

Coquitlam 145,000 151,000

New Westminster 1,000,000 3,600,000

New Westminster 200,000 450,000

North Vancouver 80,000 100,000

Delta 9,000,000 12,300,000

Richmond 3,000,000 3,900,000

Emergency Power Strategy for Regional Water Facilities Conceptual Design

Mackay Creek Debris Flow Mitigation Construction

CWTP Operational and Safety Enhancements Construction

CWTP Operational and Safety Enhancements Design

Reservoir Isolation Valve Automation Construction

Reservoir Isolation Valve Automation Detailed Design

Mackay Creek Debris Flow Mitigation Detailed Design

Port Mann No.2 Fraser R. Crossing (Construction)

Seymour Main No. 2 Joint Improvements Construction

Seymour Main No. 5 III ( North ) Detailed Design

SCFP Site Entrance Improvements Construction

Second Narrows Crossing (Tunnel) Detailed Design

2017 - New Projects

Burnaby Mountain Reservoir Seismic Upgrade Construction

South Delta Main No. 3 - 12th Ave to Pebble Hill Preliminary Design

Westburnco Pump Station - Back-up Power Preliminary Design

Capilano Mid-Lake Debris Boom Design & Construction

Capilano Raw Water Pump Station - Back-up Power Construction

Burnaby Mountain Tank Upgrades Preliminary Design

Cape Horn PS 1 & 2 Seismic Upgrade Detailed Design

Rechlorination Sites - Back-Up Power Preliminary Design

SCFP UPS Reconfiguration Construction

Capilano Reservoir Boat Wharf Construction

Cleveland Dam Pump House Seismic Upgrade Construction

Sunnyside Reservoir Unit 1 Upgrades Detailed Design

Sunnyside Reservoir Units 1 and 2 Seismic Upgrade Detailed Design

Seymour Lake Debris Boom Design & Construction

South Delta Main No. 3 - 12th Ave to Pebble Hill Detailed Design

Water Infrastructure Upgrade Capital

Westburnco Pump Station - Back-up Power Detailed Design and Equipment Purchase

Cleveland Dam East Abutment Additional GV Series Pump Wells Design and Construction

Cleveland Dam Seismic Stability Assessment

2017 - Approved Projects in Progress

Burwell Alpine Reservoir Valve Improvements Design

Queensborough Main - Ewen Ave Replacement Construction Phase 2

Sapperton Main No. 1 New Line Valve and Chamber Detailed Design

Coquitlam Communication Improvements Constr.

Coquitlam Communication Improvements Design

Tilbury Junction Chamber Valves Replacement with Actuators

Seymour Falls Dam Turbine Upgrade Project Design

South Delta Main No. 1 - 28 Ave to 34B Ave Construction

UC - 24

Page 25: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Attachment 3

PROJECT

LOCATION

2017

CAPITAL

BUDGET

TOTAL

PROJECT

COSTS

GREATER VANCOUVER WATER DISTRICT

CAPITAL PROGRAMS & PROJECT DETAILS

WATER SERVICES

2017 BUDGET

CAPITAL EXPENDITURES

Regional 400,000 1,800,000

Regional 1,200,000 9,540,000

North Vancouver 500,000 500,000

Coquitlam 7,000,000 11,000,000

Maple Ridge 700,000 1,300,000

Burnaby 120,000 120,000

North Vancouver 150,000 400,000

Delta 3,500,000 7,500,000

Regional $300,000 $300,000

Regional 2,000,000 10,100,000

$31,095,000 $65,961,000

Maple Ridge 200,000 2,500,000

North Vancouver 1,500,000 4,000,000

$1,700,000 $6,500,000

$163,100,000 $870,531,000

Water Meter Upgrades Detailed Design

Burwell Alpine Reservoir Valve Improvements Construction

Water Optimization Automation & Instrumentation

2017 - New Projects

TOTAL CAPITAL EXPENDITURES

Capilano Hydropower Preliminary Design

2017 - Approved Projects in Progress

Barnston/Maple Ridge Pump Station Power Generation

CWTP Ozone Generation Upgrades for Units 2 & 3 Construction

Lower Seymour Conservation Reserve Learning Lodge Replacement Detailed Design

South Delta Mains - 28 Ave Crossover Construction

Haney Main No. 2 Valve Chamber Upgrade - Abernethy Way and 232nd St Construction

LCOC Metal Shop Expansion and Dry Storage Development Detailed Design

Water Opportunity Capital

Water Meter Upgrades Construction

Supplementary Secondary Disinfection Detailed Design

UC - 25

Page 26: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Iona Island WWTP- Biosolids Dewatering Facility - Design Build Phase 1

Annacis Island WWTP- Automation of Influent Gates - Construction- Effluent Pump Station - Preliminary Design- Fibre Optic Infrastructure - Detailed Design- Hydrothermal Processing Pilot - Design- Influent Pump Station - VFD Replacement (Pumps 1-3) - Construction- Outfall System Construction - Outfall Property Acquisition- Outfall System Construction - Surge Control- Purchase of High Performance Liquid Chromatography - Mass Spectrometer- Trickling Filter VFD Replacement (Pumps 1-4) - Construction

Lulu Island WWTP- CDAC Component Upgrade - Detailed Design- FIbre Optic Infrastructure - Detailed Design- Power Reliability - Detailed Design

Vancouver Sewerage AreaWastewater Meter Upgrades - Detailed Design

Hastings Sanitary Trunk Sewer No. 2- Detailed Design- Cassiar Intake Design

Cloverdale Pump Station- Upgrade - Preliminary Design

Westridge Pump Station 1 & 2- Upgrades - Detailed Design

Burnaby Lake North Interceptor- Piper to Phillips Section - Detailed Design

Baynes Road Pump Station- VFD Replacement - Construction

North Surrey Interceptor- Flow Management - Preliminary Design- Rehab or Replacement - Phase 1 - Detailed Design

Gleneagles Pump StationsPhase 1 - Detailed Design

Lions Gate Secondary WWTP - Construction

Westridge Forcemain- Replacement - Preliminary Design

New Westminster Interceptor- Section 2 Improvement - Preliminary Design

Harbour West & East Interceptors Relocation - Design and Construction

Collingwood Trunk Sewer - Construction

Lozells Sanitary Trunk Golf Course Section - Preliminary Design

North Road Trunk Sewer - Construction

Albert Street Trunk Sewer - Preliminary Design

Port Moody PS Upgrade - Detailed Design

Northwest Langley WWTP- Ground Improvements Phase A - Construction

- Golden Ears SSO Storage Detailed Design & Property Acquisition- Golden Ears Forcemain and River Crossing -Preliminary Design- Golden Ears Pump Station - Preliminary Design

City ofVancouver

City ofRichmond

Corporationof Delta

City ofSurrey

Cityof White

Rock

Townshipof Langley

City ofLangley

City ofMaple Ridge

City ofPitt

Meadows

City of PortCoquitlam

City ofCoquitlam

City of NewWestminster

City ofBurnaby

City ofPort Moody

Villageof Anmore

Village ofBelcarra

City ofNorth

Vancouver

Bowen IslandMunicipality

Electoral Area A

Districtof North

Vancouver

Districtof West

Vancouver

Tsawwassen FirstNation

g:\projects\se08\01\2017work\mxds\2017_LiquidWasteCapitalNewProjects Oct 2016

2017 Liquid Waste Capital New Projects

0 2 4 6 81Kilometers

Sewer Pump

Treatment Plants

Annacis Island

Iona Island

Lulu Island

Lions Gate

Northwest Langley

GVS&DD Sewer Mains

Force Main

Gravity Main

Fraser Sewerage Area

Lulu Island Sewerage Area

North Shore Sewerage Area

Vancouver Sewerage Area

Legend

2017 Liquid Waste Capital Projects

Attachment 4

UC - 26

Page 27: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

NW Langley WWTP - 25 kV Substation Replacement - Design Phase 2- CDAC System Hardware Upgrade - Design & Construction- Disinfection System - Design- Options - Conceptual Design- Outfall Relocation

Sapperton Pump Station- Connections - Design- Design- Equipment & Construction

Marshend Pump Station- Capacity Upgrade - Preliminary Design

Iona Island WWTP- Biogas Dewatering Facility - Preliminary Design- Biogas Lines Relocation - Detailed Design- Control & Instrumentation Replacement 2011- Digester 4 Roof Replacement & Mixing Upgrade Construction- Grit Channel Effluent Gates and Pre-Aeration Influent Channel Gates - Construction- Grit System Upgrade - Construction- Maintenance & Admin Building HVAC - Construction- MCC/Power Distribution Assess/Replace - Provision of a Redundant 12.5 kV Feeder to Switch House - Construction- Replacement of Cogen Control System - Design & Construction- Secondary Treatment Upgrade - Project Definition- Sedimentation Tank Effluent Gates - Construction- Sedimentation Tank Trough Replacement - Construction- Sludge Thickener #1 Refurbishment - Construction- Solids Handling Upgrade - Construction- Water Supply - Preliminary Design

Lions Gate WWTP- Control and Instrumentation Replacement 2011- MCC / Power Distribution - Replace- Sludge Thickener No.2

Gilbert / Brighouse Trunk Pressure Sewer Twinning- Phase 2 - Design & Construction- Phase 3 - Design & Construction- Phase 4 - Design & Construction

Sperling Pump Station - Increase Pump Capacity Construction & Property Acquisition- Upgrade - Construction

Lulu Island WWTP- Biogas Clean Up - Digester No.3 - Predesign- Power Reliability - Preliminary Design- Process Waste Drain Replacement - Construction- Raw Sewage Pump Isolation Gates - Construction

Annacis Island WWTP- Automation of Influent Gates - Design- Ammonia Removal - Preliminary Design- CDAC Component Replacement and Upgrade Program- Cogeneration Backup Power - Design, Prepurchase & Construction- Gravity Thickener and Dissolved Air Flotation Steel Repair and Recoating- IPS VFD Replacement (Pumps 1 to 3)- Motor Control Center Replacement- Outfall System Design - Outfall & Surge Control- Primary Sedimentation Tank Area Walkway & Column Remediation - Construction- Replacement of CDAC Equipment in Galleries - Detailed Design & Construction- Replacement of Protective Relays - Design, Equipment Prepurchase & Construction- Secondary Bypass - Construction- Secondary Clarifier Corrosion Repair and Leveling Phase 2 - Design, Prepurchase & Construction - Secondary Clarifier Flow Balancing - Construction- Stage 5 Expansion- Station Battery Replacement - Phase 1 - Design & Construction- TF VFD Replacement (Pumps 1 to 4)

North Surrey Interceptor- 104th Ave Extension

Highbury Interceptor - Air Treatment Facilities- North Arm Crossing - Upgrades of Siphons - Construction

Fraser Sewerage Area - Cost Allocation Billing Network- Easement Acquisition- Integrated Resource Recovery (IRR) Study- Power Quality Monitoring and Outage Alarming Network - Pre Purchase, Design & Construction- Sewer Seismic Upgrades - Design- Waste Water Meter Upgrades- WWTP Electrical System Upgrades - Detailed Design

Lulu Island Sewerage Area- Integrated Resource Recovery Study

North Shore Sewerage Area- Waste Water Meter Upgrades

Gleneagles - Forcemain Replacement - Construction- Phase 2 - Detailed Design

South Surrey Interceptor, Johnston Section- Detailed Design & Property Purchase- Construction (Pre-Build)

South Surrey Interceptor, King George Section- Odour Control Facility and Grit Chamber

Queensborough Pump Station Replacement- Detailed Design

New Westminster Interceptor- Repair Columbia St Section - Design & Construction

Burnaby Lake North Interceptor-Philips to Sperling Section - Design & Construction

Electoral Area A

Vancouver Sewerage Area- Easement Acquisition Program- Emergency Backup Power Design & Construction Phase 1

Hastings Sanitary Trunk Sewer - Design & Construction

8th Ave Interceptor- Air Treatment Facilities - Design

Ocean Park Trunk Sewer- Crescent Section Pipe Rehab/Replacement - Design

Langley Pump Station Upgrade - Prelim Design

South Surrey Interceptor- Delta Section Rehab - Design & Construction- Influent Control Chamber Repair and Replace Gates - Design- Odour and Corrosion Study - Detailed Design

Katzie Pump Station- Genset Assessment Design- Pump Upgrade - Design- SSO Treatment

North Road Trunk Sewer - Detailed Design- Phase 2 Detailed Design

Royal Ave Pump Station- Building Expansion & Electrical Upgrades - Design & Construction

Lions Gate Secondary Treatment Plant - Design

NW Langley Outfall - Conceptual Design

Cloverdale Pump Station - VFD Replacement - Construction

Crescent Beach Forcemain- Replacement - Preliminary Design

Big Bend Forcemain- Gate Replacement - Preliminary Design

Westridge PS 1 & 2 Upgrade - Preliminary Design

North Vancouver Interceptor- Lynn Branch Pre-Build Construction- Lynn Branch Pre-Build Design

North Surrey Interceptor - Port Mann Section- Odour Control Prelim Design

Port Moody PS - Upgrade Prelim Design

North Surrey Interceptor AnnievilleChannel Crossing Scour Protection

City ofVancouver

City ofRichmond

Corporationof Delta

City ofSurrey

Cityof WhiteRock

Townshipof LangleyCity ofLangley

District ofMaple Ridge

City ofPittMeadows

City ofCoquitlam

City of NewWestminster

City ofBurnaby

City ofPort Moody

Villageof AnmoreVillage ofBelcarra

City ofNorthVancouver

Bowen IslandMunicipality

ElectoralArea A

Districtof NorthVancouver

Districtof WestVancouver

G:\projects\se08\01\2017_projects\mxds\2017_LiquidWasteCapitalApprovedinProgressProjects Oct 2016

2017 Liquid Waste Capital Approved in Progress Projects

0 2 4 6 81Kilometers

Sewer Pump

Treatment PlantsAnnacis Island

Iona Island

Lulu Island

Lions Gate

Northwest Langley

GVS&DD Sewer MainsForce Main

Gravity Main

Fraser Sewerage Area

Lulu Island Sewerage Area

North Shore Sewerage Area

Vancouver Sewerage Area

Legend

Projects "Approved in Progress"

Attachment 5

UC - 27

Page 28: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

B8 Attachment 6

PROJECT

LOCATION

TOTAL

PROJECT

COSTS

Delta $14,000,000

Delta 3,000,000

Burnaby 26,690,000

Burnaby 3,200,000

Maple Ridge 500,000

Maple Ridge 200,000

Maple Ridge 2,000,000

Langley 300,000

Burnaby 1,000,000

Burnaby/Coquitlam 664,000

Burnaby/Coquitlam 938,000

Surrey 6,800,000

Township of Langley 5,000,000

Port Moody 600,000

New Westminster 1,500,000

New Westminster 1,000,000

New Westminster 5,600,000

New Westminster 76,400,000

Surrey 18,000,000

Surrey 6,600,000

Burnaby 3,000,000

Surrey 13,500,000

Richmond 600,000

District of North Vancouver 3,500,000

District of North Vancouver 450,000

Burnaby 13,300,000

Burnaby 1,304,000

Delta 1,000,000

Port Moody 250,000

Delta 36,000,000

Delta 22,000,000

Burnaby 2,100,000

Surrey 700,000

Maple Ridge/Township of Langley 5,000,000

Maple Ridge 900,000

Burnaby 650,000

Township of Langley 24,000,000

Burnaby/Coquitlam 7,000,000

Surrey 2,500,000

Port Moody 800,000

Vancouver 5,090,000

Burnaby 5,000,000

Vancouver 100,000

$322,736,000

VSA - Hastings-Cassiar Intake Connection Design 100,000

$50,747,000

VSA - Collingwood Trunk Sewer Construction 90,000

VSA - Hastings Sanitary Trunk Sewer No. 2 Detailed Design 3,500,000

FSA - NSI Flow Management Preliminary Design 500,000

FSA - Port Moody PS Upgrade Detailed Design 400,000

FSA - NLWWTP Ground Improvements Phase A Construction 1,000,000

FSA - North Road Trunk Sewer Construction 1,000,000

FSA - Golden Ears Pump Station Preliminary Design 450,000

FSA - Lozells Sanitary Trunk Golf Course Section Preliminary Design 150,000

FSA - Cloverdale PS Upgrade Preliminary Design 250,000

FSA - Golden Ears Forcemain and River Crossing Preliminary Design 1,000,000

FSA - Annacis Outfall System Construction - Surge Control 1,500,000

FSA - Burnaby Lake North Interceptor Piper to Philips Section Detailed Design 300,000

FSA - Albert Street Trunk Sewer Preliminary Design 250,000

FSA - Annacis Outfall System Construction - Outfall Property Acquisition 7,000,000

2017 - New Projects

FSA - AIWWTP Effluent Pump Station Preliminary Design 100,000

VSA - Hastings Sanitary Trunk Sewer Construction 500,000

VSA - Hastings Sanitary Trunk Sewer Design 530,000

NSA - North Vancouver Interceptor - Lynn Branch Pre-build Construction 1,000,000

NSA - North Vancouver Interceptor - Lynn Branch Pre-build Design 150,000

FSA - SSI - King George Section - Odor Control Facility (OCF) and Grit Chamber 800,000

LSA - Lulu Island WWTP Digester No 3 Pre Design 520,000

FSA - South Surrey Interceptor Johnston Section Det Design & Property Purchase 1,500,000

FSA - Sperling PS Increase Pump Capacity Constr & Propery Acquisition 500,000

FSA - Sapperton Pump Station Equipment & Construction 12,050,000

FSA - South Surrey Interceptor Johnston Section Construction (Pre Build) 4,000,000

FSA - Sapperton Forcemain Pump Station Connections Design 200,000

FSA - Sapperton Pump Station Design 127,000

FSA - Port Moody PS Upgrade Preliminary Design 400,000

FSA - Queensborough Pump Station Replacement Detailed Design 400,000

FSA - NSI 104th Ave Extension 1,500,000

FSA - NWLWWTP Options Conceptual Design 3,500,000

FSA - North Road Trunk Sewer Detail Design 200,000

FSA - North Road Trunk Sewer Phase 2 Detailed Design 300,000

FSA - Langley Pump Station Upgrade Prelim Design 100,000

FSA - Marshend Pump Station Capacity Upgrade Prelim Des 300,000

FSA - Katzie Pump Upgrade Design 130,000

FSA - Katzie Pump Upgrade Design Phase II 100,000

FSA - Burnaby Lake North Interceptor Phillips to Sperling Section Detailed Design 300,000

FSA - Katzie Genset Assessment Design 50,000

FSA - Annacis Outfall System Design - Surge Control 450,000

FSA - Burnaby Lake North Interceptor Phillips to Sperling Section Construction 50,000

FSA - Annacis Outfall System Design - Outfall $3,500,000

SD Infrastructure Growth Capital

GREATER VANCOUVER SEWERAGE & DRAINAGE DISTRICT

CAPITAL PROGRAMS & PROJECT DETAILS

LIQUID WASTE SERVICES

2017 BUDGET

2017

CAPITAL

BUDGET

CAPITAL EXPENDITURES

2017 - Approved Projects in Progress

UC - 28

Page 29: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

B9 Attachment 6

PROJECT

LOCATION

TOTAL

PROJECT

COSTS

GREATER VANCOUVER SEWERAGE & DRAINAGE DISTRICT

CAPITAL PROGRAMS & PROJECT DETAILS

LIQUID WASTE SERVICES

2017 BUDGET

2017

CAPITAL

BUDGET

CAPITAL EXPENDITURES

Delta 243,500,000

Delta 17,000,000

Delta 5,000,000

Delta 180,000,000

$445,500,000

Delta 2,000,000

Delta 2,500,000

Delta 395,000

Delta 549,000

Delta 251,000

Delta 1,500,000

Delta 2,844,000

Delta 12,000,000

Delta 10,000,000

Surrey 800,000

Regional 5,230,000

Surrey 500,000

Surrey/Delta 995,000

Township of Langley 650,000

Township of Langley 850,000

Township of Langley 650,000

New Westminster 3,450,000

New Westminster 430,000

Regional 750,000

Richmond 17,700,000

Richmond 3,700,000

Richmond 13,400,000

Richmond 1,000,000

Richmond 28,200,000

Richmond 1,000,000

Richmond 600,000

Richmond 600,000

West Vancouver 600,000

West Vancouver 830,000

Richmond 550,000

Richmond 1,000,000

Richmond 2,000,000

Richmond 470,000

Richmond 1,550,000

Richmond 2,000,000

Richmond 600,000

Richmond 8,100,000

Richmond 2,750,000

Richmond 953,000

Richmond 1,965,000

Richmond 26,000,000

VSA - Iona MCC/Power Distribution Assess/Replace Future Years 550,000

VSA - Iona Solids Handling Upgrade Project Construction 2,000,000

VSA - Iona Island Control & Instrumentation Replacement 2011 750,000

VSA - Iona MCC/Power Distribution Assess/Replace 2010 310,000

VSA - IIWWTP Water Supply Preliminary Design 300,000

VSA - Iona Grit System Upgrade Constr 100,000

VSA - IIWWTP Sed Tank Trough Replacement Construction 1,050,000

VSA - IIWWTP Sludge Thickener #1 Refurbishment Construction 100,000

VSA - IIWWTP Replacement of CoGen Control System Constr 750,000

VSA - IIWWTP Replacement of CoGen Control System Des 170,000

VSA - IIWWTP Maintenance and Administration Building HVAC Construction 75,000

VSA - IIWWTP MCC/Power Distribution Assess/Replace - Phase 2 300,000

NSA - Lions Gate Control and Instrumentation Replacement 2011 100,000

NSA - Lions Gate Power Dist. MCC Replace/Transformers 2009 250,000

LSA - LIWWTP - Process Waste Drainage (PWD) Replacement Construction 100,000

LSA - LIWWTP RSP Isolation Gates Construction 250,000

LSA - Gilbert/Brighouse Trunk Pressure Sewer Twinning Phase 4 Construction 200,000

LSA - Gilbert/Brighouse Trunk Pressure Sewer Twinning Phase 4 Design 500,000

LSA - Gilbert/Brighouse Trunk Pressure Sewer Twinning Phase 3 Construction 500,000

LSA - Gilbert/Brighouse Trunk Pressure Sewer Twinning Phase 3 Design 500,000

LSA - Gilbert/Brighouse Trunk Pressure Sewer Twinning Phase 2 Construction 500,000

LSA - Gilbert/Brighouse Trunk Pressure Sewer Twinning Phase 2 Design 1,400,000

FSA - Royal Ave. Sewer Pump Station (RYA) Building Expansion & Electrical Upgrade Det Des 100,000

FSA - WWTPs Electrical System Studies & Upgrades Detailed Design 385,000

FSA - NWL WWTP CDAC System Hardware Upgrade Detailed Design 300,000

FSA - Royal Ave. Sewer Pump Station (RYA) Building Expansion & Electrical Upgrade Constr 1,000,000

FSA - NWL WWTP 25 kV Substation Replacement Design Phase II 150,000

FSA - NWL WWTP CDAC System Hardware Upgrade Construction 300,000

FSA - Crescent Beach FM - Replacement Preliminary Design 200,000

FSA - North Surrey Interceptor Annieville Channel Crossing Scour Protection 300,000

FSA - Cloverdale PS VFD Replacement Construction 100,000

FSA - Cost Allocation Billing Network (Combined 96 F4) 50,000

FSA - Annacis Secondary Clarifier Corrosion Repair and Leveling Phase 2 Constr 1,840,000

FSA - Annacis Secondary Clarifier Corrosion Repair and Leveling Phase 2 Design & Prepurchase 330,000

FSA - Annacis Island WWTP - CDAC Component Replacement and Upgrade Program 700,000

FSA - Annacis MCC 80 051, 80 070, 80 071 Replacement 600,000

FSA - AIWWTP Station Battery Replacement - PHASE 1 Construction 200,000

FSA - AIWWTP Station Battery Replacement - PHASE 1 Detailed Design 18,000

FSA - AIWWTP Replacement of CDAC Equipment in Galleries Construction 800,000

FSA - AIWWTP Replacement of CDAC Equipment in Galleries Detailed Design 295,000

2017 - Approved Projects in Progress

FSA - AIWWTP Gravity Thickner and DAF Steel Repair and Recoating 350,000

SD Infrastructure Maintenance Capital

FSA - Annacis Stage 5 Expansion Phase 2a Construction 5,000,000

$27,600,000

FSA - Annacis Stage 5 Expansion Phase 2 Detailed Design 2,000,000

FSA - Annacis Stage 5 Expansion Phase 2 Pre Design 400,000

2017 - Approved Projects in Progress

FSA - Annacis Stage 5 Expansion Phase 1 T1 & T2 20,200,000

SD Infrastructure Growth: Annacis Stage 5 Expansion Capital

UC - 29

Page 30: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

B10 Attachment 6

PROJECT

LOCATION

TOTAL

PROJECT

COSTS

GREATER VANCOUVER SEWERAGE & DRAINAGE DISTRICT

CAPITAL PROGRAMS & PROJECT DETAILS

LIQUID WASTE SERVICES

2017 BUDGET

2017

CAPITAL

BUDGET

CAPITAL EXPENDITURES

Delta 350,000

Pitt Meadows 900,000

Surrey 750,000

Delta 1,000,000

Burnaby 550,000

Richmond 120,000

Richmond 120,000

West Vancouver 2,500,000

Vancouver 17,600,000

Vancouver 1,900,000

$187,702,000

Delta 500,000

Delta 34,600,000

Delta 9,000,000

Delta 30,000,000

Delta 2,800,000

Delta 2,000,000

Regional 1,500,000

Regional 400,000

New Westminster 4,680,000

New Westminster 702,000

Township of Langley 1,500,000

Surrey 403,000

Surrey/Delta 650,000

West Vancouver 2,150,000

West Vancouver 750,000

Vancouver 1,000,000

Vancouver 500,000

Vancouver 7,000,000

Vancouver 12,000,000

Richmond 780,000

Richmond 1,000,000

Vancouver/Burnaby 670,000

Vancouver 9,300,000

Vancouver/Burnaby 1,500,000

Vancouver/Burnaby 400,000

Delta 3,000,000

Maple Ridge 10,500,000

$139,285,000

Delta 600,000

Delta 2,500,000

Delta 595,000

Delta 1,275,000

Regional 2,200,000

FSA - AIWWTP Secondary Bypass Construction 475,000

FSA - All WWTPs Power Quality Monitoring & Outage Alarming Network Constr 500,000

FSA - AIWWTP Replacement of Protective Relays Construction 500,000

FSA - AIWWTP Replacement of Protective Relays Det Design & Equip PrePurchase 300,000

2017 - Approved Projects in Progress

FSA - AIWWTP Ammonia Removal Preliminary Design 250,000

SD Infrastructure Upgrade Capital

FSA - Golden Ears SSO Storage Detail Des & Property Acq 5,000,000

$29,680,000

2017 - New Projects

FSA - AIWWTP Automation of Influent Gates Construction 500,000

VSA - VSA Emergency Backup Power Detailed Design 800,000

VSA - VSA Emergency Backup Power Preliminary Design 100,000

VSA - VSA Easement Acquisition Program 100,000

VSA - VSA Emergency Backup Power Construction Phase 1 2,600,000

VSA - IIWWTP - Biogas Lines Relocation Detailed Design 350,000

VSA - IIWWTP Sedimentation Tank Effluent Gates Construction 100,000

VSA - Highbury Interceptor Air Treatment Facilities 1,000,000

VSA - Highbury Interceptor North Arm Crossing - Upgrade of Siphons Constr 1,500,000

VSA - 8th Avenue Interceptor Air Treatment Facilities Detailed Design 300,000

VSA - 8th Avenue Interceptor Air Treatment Facilities Prelim Design 150,000

NSA - Glen Eagles Forcemain Replacement Construction 950,000

NSA - Glen Eagles Forcemains Replacement Phase 2 Detailed Design 250,000

FSA - Ocean Park Trunk Crescent Section (OPC) Pipe Rehabilitation/Replacement Design 300,000

FSA - SSI Sulfide Odour and Corrosion Control Study Detailed Design 380,000

FSA - New Westminster Interceptor Repair Columbia St. Section Design 120,000

FSA - NLWWTP Outfall Relocation 200,000

FSA - FSA Sewer Seismic Upgrades Implementation Design 200,000

FSA - New Westminster Interceptor Repair Columbia St. Section Constr 180,000

FSA - AIWWTP SCL Flow Balancing Construction 200,000

FSA - FSA Easement Acquisition 150,000

FSA - AIWWTP Cogeneration Backup Power Prepurchase 7,000,000

FSA - AIWWTP PST Area Walkway & Column Remediation Construction 500,000

FSA - AIWWTP Cogeneration Backup Power Construction 5,000,000

FSA - AIWWTP Cogeneration Backup Power Predesign & Detail Design 1,500,000

2017 - Approved Projects in Progress

FSA - AIWWTP Automation of Influent Gates Design 250,000

SD Infrastructure Resilience Capital

VSA - Harbour West & East Interceptors Reloc & Protect Detailed Design 1,900,000

$24,513,000

NSA - Glen Eagles Pump Stations Phase 1 Detailed Design 1,500,000

VSA - Harbour West & East Interceptors Reloc & Protect Construction 1,000,000

LSA - LIWWTP CDAC Component Upgrade Detailed Design 40,000

LSA - LIWWTP Fibre Optic Infrastructure Detailed Design 100,000

FSA - NWI - Annacis Section 2 Improvement Preliminary Design 50,000

FSA - Westridge FM Replacement Preliminary Design 50,000

FSA - Baynes Road PS VFD Replacement Construction 800,000

FSA - NSI Rehab or Replacement - Phase 1 Detailed Design 50,000

2017 - New Projects

FSA - AIWWTP Fibre Optic Infrastructure Detailed Design 250,000

UC - 30

Page 31: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

B11 Attachment 6

PROJECT

LOCATION

TOTAL

PROJECT

COSTS

GREATER VANCOUVER SEWERAGE & DRAINAGE DISTRICT

CAPITAL PROGRAMS & PROJECT DETAILS

LIQUID WASTE SERVICES

2017 BUDGET

2017

CAPITAL

BUDGET

CAPITAL EXPENDITURES

Regional 140,000

Regional 500,000

Burnaby/Richmond/Delta 180,000

Regional 600,000

Maple Ridge 650,000

Township of Langley 250,000

Township of Langley 300,000

Burnaby 7,000,000

Delta 2,600,000

Delta 185,000

Delta 135,000

Burnaby 240,000

Richmond 300,000

West Vancouver 3,380,000

North Shore 300,000

Richmond 800,000

Richmond 10,300,000

Richmond 1,610,000

Richmond 630,000

Delta 985,000

Burnaby 560,000

Richmond 900,000

Richmond 5,500,000

Vancouver/Burnaby 150,000

$45,365,000

District of North Vancouver 79,000,000

Richmond 16,500,000

District of North Vancouver 670,700,000

$766,200,000

Delta 1,050,000

Delta 870,000

Regional 1,200,000

Surrey 100,000

Richmond 10,400,000

Richmond 1,000,000

Delta 255,000

Delta 50,000

Delta 1,050,000

Delta 1,000,000

$16,975,000

$1,923,763,000TOTAL CAPITAL EXPENDITURES $163,675,000

$5,280,000

FSA - AIWWTP IPS VFD Replacement (Pumps 1 to 3) Construction 850,000

FSA - AIWWTP TF VFD Replacement (Pumps 1 to 4) Construction 800,000

FSA - AIWWTP Hydrothermal Processing Pilot Detailed Design 255,000

FSA - AIWWTP Hydrothermal Processing Pilot Preliminary Design 50,000

LSA - Lulu Island Sewerage Area Integrated Resource Recovery (IRR) Study 125,000

2017 - New Projects

FSA - North Surrey Interceptor - Port Mann Section - Odour Control Preliminary Design 50,000

LSA - LIWWTP Biogas Clean-up Project 2,000,000

FSA - AIWWTP TF VFD Replacement (Pumps 1 to 4) 450,000

FSA - Fraser Sewerage Area Integrated Resource Recovery (IRR) Study 200,000

2017 - Approved Projects in Progress

FSA - AIWWTP IPS VFD Replacement (Pumps 1 to 3) 500,000

SD Opportunity Capital

NSA - Lions Gate Secondary Wastewater Treatment Plant Construction 1,000,000

$13,000,000

VSA - Iona Secondary Treatment Upgrade Project Definition 4,000,000

2017 - New Projects

2017 - Approved Projects in Progress

NSA - Lions Gate Secondary Wastewater Treatment Plant Design 8,000,000

SD Infrastructure Upgrade: Secondary Treatment Capital

VSA - VSA Wastewater Meter Upgrades Detailed Design 50,000

$12,855,000

LSA - LIWWTP Power Reliability Detailed Design 900,000

VSA - IIWWTP Biosolids Dewatering Facility Design Build Phase 1 2,750,000

FSA - Purchase of a High Performance Liquid Chromatography - Mass Spectrometer 585,000

FSA - Westridge PS 1 & 2 Upgrades Detailed Design 180,000

VSA - IIWWTP Provision of a Redundant 12.5 kV Feeder to Switch House Constr 230,000

2017 - New Projects

VSA - IIWWTP Digester 4 Roof Replacement & Mixing Upgrade Construction 500,000

VSA - IIWWTP Grit Channel Effluent Gates and PA Influent Channel Gates Construction 85,000

NSA - NSSA Wastewater Meter Upgrades 50,000

VSA - IIWWTP Biosolids Dewatering Facility Preliminary Design 500,000

LSA - LIWWTP Power Reliability Preliminary Design 150,000

NSA - Lions Gate Sludge Thickener No. 2 945,000

FSA - SSI Influent Control Chamber Repair and Replace Gates Design 135,000

FSA - Westridge PS 1 & 2 Upgrades Preliminary Design 100,000

FSA - SSI Delta Section Rehabilitation from River Road to Fraser River Construction 1,500,000

FSA - SSI Delta Section Rehabilitation from River Road to Fraser River Design 50,000

FSA - NWL Outfall Conceptual Design 150,000

FSA - Sperling Pump Station Upgrade Constr 900,000

FSA - Katzie SSO Treatment 300,000

FSA - NWL Disinfection System Design 250,000

FSA - Big Bend Forcemain - Gate Replacement Preliminary Design 80,000

FSA - FSA Wastewater Meter Upgrades 100,000

FSA - All WWTPs Power Quality Monitoring & Outage Alarming Network Detail Design 140,000

FSA - All WWTPs Power Quality Monitoring & Outage Alarming Network Prepurchase 200,000

UC - 31

Page 32: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

 

5.3 

To:  Utilities Committee  From:  Mike  Mayers,  Superintendent  Environmental  Management  and  Lower  Seymour 

Conservation Reserve  Date:  January 5, 2017  Meeting Date:  January 19, 2017  Subject:  Fisherman’s Trail/Riverside Drive Bridges ‐ Status Update  

 RECOMMENDATION That  the  Utilities  Committee  receive  for  information  the  report  dated  January  5,  2017,  titled “Fisherman’s Trail/Riverside Drive Bridges ‐ Status Update”.  

 PURPOSE   To provide the Committee with an update on the replacement of bridges at Fisherman’s Trail and Riverside Drive.  BACKGROUND  On December 7, 2014 a rockslide occurred in the Seymour River Canyon within the Lower Seymour Conservation Reserve  (LSCR).   The  rockslide, estimated at 30,000  ‐ 50,000 cubic metres, partially blocked the Seymour River causing an impoundment of water extending approximately 800 metres upstream of  the slide  location. Adjacent  forest was  flooded as was  the LSCR’s Twin Bridge, a key recreational and water utility access point. The bridge was  removed  for public  safety  reasons as floodwaters  put  the  bridge  structure  in  jeopardy.  Approximately  400  metres  of  the  popular Fisherman’s Trail was also closed because of risks to public safety from flooding and dying trees.  The rockslide currently blocks migrating salmon and steelhead from moving up and down the river.    In order to facilitate a long term solution, the Seymour Salmonid Society retained geotechnical and hydrological expertise and has initiated a multi‐year project to re‐establish fish passage past the slide.  While this work is ultimately expected to reinstate fish passage, it is not expected to return river levels upstream of the slide location to the levels seen prior to the 2014 rockslide in the foreseeable future.  This  report  is  being  brought  forward  to  provide  an  update  on  the  replacement  of  both  the Fisherman’s Trail and Riverside Drive bridges, following public engagement and the completion of conceptual design.  BRIDGE REPLACEMENT Management activities in the LSCR are guided by the LSCR Management Plan. This Plan specifies key objectives for the LSCR including the integration of water utility operations and the provision of high quality public recreation opportunities over the LSCR’s 5,668 hectares of GVWD lands.  Prior to the slide, trails and water infrastructure on the east side of the Seymour River were accessed by a drivable bridge at the Twin Bridge site and a narrow pedestrian/cyclist bridge at the north end 

UC - 32

Page 33: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

19735846 

of  Riverside Drive  (see  Attachment  1).  Continued  vehicle  and  recreation  access  are  required  to maintain water utility operations and public recreation opportunities.   Associated Engineering (AE) was retained in July 2016, to develop an overall access plan for the area. Initial  investigations  looked  at  options  for  a  single  bridge,  accommodating  both  vehicles  and recreational users, constructed at the location of the former Twin Bridge. However, AE determined that due to the changed hydraulics and water levels of the Seymour River a significantly higher and longer  span  crossing  would  be  required.    The  environmental  impacts  and  construction  costs associated with the large span were prohibitive. As a result, AE was instructed to investigate other options.   As shown on Attachments 2 and 3, the preferred and most economical option consists of a pedestrian bridge over the Seymour River immediately downstream of the former Twin Bridge location and a vehicular bridge  at  the north end of Riverside Drive. Attachment 4 provides examples of  similar pedestrian  bridges.    The  proposal  for  both  a  pedestrian  bridge  and  new  vehicle  bridge  can  be accommodated within the project budget.  This option meets recreational access needs, allows for vehicle access  to existing water utility  infrastructure, provides minimal disruption  to  recreational users and has the lowest environmental impact of the various options considered.   PUBLIC ENGAGEMENT Two public engagement meetings, the  first  in June 2015 and the second  in September 2016 have been held  to provide  information on  the  rockslide  and  gather  feedback on  the proposed bridge replacement options. This public input was helpful in not only confirming the need for restoration of a Seymour River crossing  but also in developing the criteria for bridge designs. Metro Vancouver staff have  discussed  the  options  with  District  of  North  Vancouver  staff  and  further  meetings  with stakeholders  and  local  residents  in  regard  to  construction  activities will  be  held  as  the  project proceeds.     ALTERNATIVES This is an information report. No alternatives are presented.   FINANCIAL IMPLICATIONS Funding in the amount of $2.3 million has been included in the 2017 GVWD capital budget, under the Infrastructure Maintenance program.  These funds will provide for bridge crossing construction and associated trail improvements. The preliminary cost estimate for the preferred option is within the approved budget.  SUMMARY / CONCLUSION The  2014  Seymour  River  rockslide  was  a  significant,  natural  event  within  the  Lower  Seymour Conservation Reserve (LSCR) which required removal of Twin Bridge and the closure of sections of the  Fisherman’s  Trail  to  address  public  safety  concerns.  The  development  of  conceptual  design options for replacement crossings at the former bridge site and at the north end of Riverside Drive was completed in 2016. Funding for construction has been included in the 2017 GVWD capital budget.  The re‐establishment of pedestrian access at Twin Bridge and vehicular access at the north end of Riverside Drive was selected as the preferred option to maintain water utility operations and public recreation opportunities in the LSCR.       

UC - 33

Page 34: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

19735846 

Attachments  1.  Location Map  2.  Pedestrian Bridge Conceptual Design ‐ Fisherman’s Trail  3.  Vehicular Bridge Conceptual Design ‐ Riverside Drive  

4.  Fisherman’s Trail Site – Examples of Similar Pedestrian Bridge Designs   

UC - 34

Page 35: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Attachment 1

Seymour Canyon

Rockslide

N

Pedestrian Bridge at former

Twin Bridge Site

Vehicular Bridge at North

end of Riverside Drive

Seymour Capilano

Filtration Plant

0 500m

Lower Seymour

Conservation

Reserve

Location Map

UC - 35

Page 36: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

UC - 36

N

~ I

SCALE: N.T.S.

Attachment 2

West Approach-Rice Lake 75.0m

East Approach-Riverside Drive

---

End View Seymour River

PEDESTRIAN BRIDGE CONCEPTUAL DESIGN - FISHERMAN•S TRAIL JKC/12/16 SK. 1/DFN

Page 37: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

UC - 37

South Approach-Riverside Drive

End View

4.0m

SCALE: N.T.S.

30. 0m

Canyon Creek

GVWD Watermains

North Approach-Fisherman•s Trail

GVWD Watermains

GVWD Valve Chamber

VEHICULAR BRIDGE CONCEPTUAL DESIGN - RIVERSIDE DRIVE

Attachment 3

JKC/12/16 SK. 2/DFN

Page 38: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Attachment 4

Fisherman’s Trail Site - Examples of Similar Pedestrian Bridge Designs

UC - 38

Page 39: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

  5.4 

To:  Utilities Committee  From:  Tracey S. Husoy, Division Manager, Purchasing and Risk Management, 

Financial Services    Colin B. Meldrum, Division Manager, Collection System, Project Delivery,  

Liquid Waste Services  Date:  December 15, 2016   Meeting Date: January 19, 2017  Subject:  Award  of  Phase  B,  Construction  Engineering  Services  for  the  Sapperton  Pump 

Station Replacement Project 

 RECOMMENDATION That the GVS&DD Board authorize: a) Award of Phase B, Construction Engineering Services, in the amount of $4,372,585 (exclusive of 

taxes)  to  the  Phase  A  consultant,  AECOM  Canada  Ltd.  for  the  Sapperton  Pump  Station Replacement Project; and 

b) The Commissioner and the Corporate Officer to execute the required documentation.  

 PURPOSE   This  report  is  to  request  authorization  by  the GVS&DD  Board  to  award  Phase  B  –  Construction Engineering Services to the Phase A consultant, AECOM Canada Ltd., for the Sapperton Pump Station Replacement Project in the amount of $4,372,585 (exclusive of taxes).  BACKGROUND Pursuant to the GVS&DD Officers and Delegation Bylaw No. 284, 2014 (Bylaw) and the Procurement and Real Property Contracting Authority Policy (Policy), procurement contracts which exceed a value of $5 million require the approval of the GVS&DD Board of Directors. For multi‐phase consultancy contracts,  the Policy provides  that  the value of  the  contract  is  the anticipated  total value of  the services to be provided over all phases, exclusive of taxes.  The contract was initially awarded in 2012, prior to the current Bylaw and Policy, and therefore, did not require GVS&DD Board approval.  This report is being brought forward to the Utilities Committee to consider a recommendation to the GVS&DD Board  to authorize award of Phase B, Construction Engineering Services  to  the Phase A contractor, AECOM Canada Ltd. in order to continue with the engineering services for the Sapperton Pump Station Replacement Project.   PROJECT DESCRIPTION The Sapperton Pump Station Replacement Project will replace the existing Sapperton Pump Station, built  in 1976, which has reached the end of  its useful  life and  is  in need of capacity upgrade. The station pumps wastewater from the Cities of Burnaby, New Westminster, Coquitlam, Port Coquitlam and Port Moody to the Annacis Island Wastewater Treatment Plant.   

 

UC - 39

Page 40: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Award of Phase B, Construction Engineering Services for the Sapperton Pump Station Replacement Project Utilities Committee Meeting Date: January 19, 2017 

Page 2 of 3 The new pump station will continue to be Metro Vancouver’s largest sewage pump station delivering up to 6,500 L/s of wastewater to the Annacis Island WWTP, which represents about one third of the total flow at the plant.  The new pump station will be constructed on an industrial site immediately adjacent to the existing pump station, at the confluence of the Brunette and Fraser Rivers. The site is also on the Brunette Fraser Greenway, and working with GVRD Parks and the City of New Westminster the site will include public parking, a paved walking path, landscaping, and riverbank ecological restoration to Fisheries and Oceans Canada (DFO) requirements. To enhance the Parks function, public washrooms and office space for GVRD Park staff have been included as part of the project.  A Request for Proposal (RFP No. 12‐136) was publicly advertised on Metro Vancouver’s and BC Bid websites. The RFP closed on September 6, 2012 and five firms responded. AECOM Canada Ltd. was identified as offering the highest‐ranked proposal. Following negotiations, AECOM Canada Ltd. was awarded Phase A, Detailed Design Services for $2,405,971 (exclusive of taxes). At the time of award of Phase A the anticipated value of the contract over all phases of the work was $3,146,888 and this amount was reported to the Finance Committee in May 2013. Subsequently, a contract amendment was reported to the Performance and Audit Committee in October 2016. Currently, the value of this contract is $4,625,971.  On December 9, 2016 AECOM Canada Ltd. provided an estimated cost  for Phase B,  construction engineering  services  totaling  $4,372,585.  This  amount  is  higher  than  initially  anticipated  due  to change  in  scope  from  the  original  project  concept,  including  factors  such  as  contaminated  site remediation, inclusion of MV Parks facilities, a larger and more complex facility due to revised growth and flow projections and site access improvements. This amount is considered sufficient to manage and inspect the construction of this project, which is expected to take three years to complete.   ALTERNATIVES 1) That the GVS&DD Board authorize: 

a) Award of Phase B, Construction Engineering Services, in the amount of $4,372,585 (exclusive of  taxes)  to  the Phase A consultant, AECOM Canada Ltd.  for  the Sapperton Pump Station Replacement Project; and; and 

b) The Commissioner and the Corporate Officer to execute the required documentation.  

2) That the GVS&DD Board terminate the contract with AECOM Canada Ltd. resulting from RFP No. 12‐136: Consulting Engineering Services  for Sapperton Pump Station Replacement Project and direct staff to report back to the GVS&DD Board with options for an alternate course of action. 

 FINANCIAL IMPLICATIONS If  the GVS&DD Board  approve Alternative 1,  construction engineering  services  in  the  amount of $4,372,585 will be added to the contract with AECOM Canada Ltd. resulting  in an overall contract value of up to $8,998,556. Phase B was contemplated in the RFP and the amount will remain within the $76.4 million equipment purchase and construction budget allocated for the project.     

UC - 40

Page 41: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Award of Phase B, Construction Engineering Services for the Sapperton Pump Station Replacement Project Utilities Committee Meeting Date: January 19, 2017 

Page 3 of 3  The GVS&DD Board has the choice not to proceed with Alternative 1 but staff would need further directions in relations to the project. Alternative 2 will result in a delay to the project schedule. The construction contract has been awarded, and the contractor is about to mobilize. If AECOM’s contract is terminated, then construction will be delayed, resulting in potentially significant cost charges and delay claims.  SUMMARY / CONCLUSION An RFP was issued for engineering consulting services for the Sapperton Pump Station Replacement Project. The contract was initially awarded in 2012 to AECOM Canada Ltd., prior to the current Bylaw and Policy, and therefore, did not require GVS&DD Board approval. As Phase A nears completion, staff have  identified that the total anticipated value of the contract,  including Phase B will exceed     $5 million.  This  is  the  result  of  additional  efforts  required  for  addressing  a  contaminated  site, incorporating Metro Vancouver Parks  facilities, building a  larger and more complex pump station than originally anticipated and site access improvements. The contract value of all phases of the work is  $8,998,556.  It  is  recommended  that  the  GVS&DD  Board  authorize  the  award  of  Phase  B, construction  engineering  services  to  AECOM  Canada  Ltd.  in  the  amount  of  $4,372,585  and  to authorize the Commissioner and Corporate Officer to execute the required documentation.  20076555 

UC - 41

Page 42: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

To:    Utilities Committee 

 From:  Tim Jervis, General Manager ‐ Water Services 

Simon So, General Manager ‐ Liquid Waste Services      Date:  January 10, 2017  Meeting Date:  January 19, 2017  Subject:  Managers’ Report 

 RECOMMENDATION That the Utilities Committee receive for information the “Managers’ Report”, dated January 10, 2017.  

 1. Capilano Watershed Boundary Maintenance – Tim Jervis  Capilano Watershed  boundary maintenance work  is  scheduled  to  occur  during  late winter  over  a three‐week  period.  As  shown  on  Attachment  1,  the  project  area  includes  residential  and  parkland interface  in the District of West Vancouver and forested watershed  lands within the District of North Vancouver.  The primary objectives of this work are to assess and remove hazardous trees, complete forest fire fuel reduction and carry out fence line repairs along 1800 metres of the Capilano Watershed boundary.  Contract arborists have completed the required tree risk assessments, and determined that 72 trees require  removal  for  this  portion  of  the  project.    Fire  fuels management  reports  recommend  tree pruning  and  brush  removal  treatments  be  conducted  in  the  residential  interface  area.    Risk assessments and fuel management reports have been shared with both municipalities, and staff have worked together through the review and permitting process. The Water Services Public  Involvement Division is developing public communications material in consultation with District of West Vancouver communications  staff.    This  information  will  be  shared  with  the  public  prior  to  the  project commencing.  2. Attendance at 2017 Standing Committee Events – Tim Jervis/Simon So 

 Participation  at  external  events  provides  important  learning  and  networking  opportunities.  The following  events  that  fall  under  the  purview  of  the Utilities Committee were  included  in  the  2017 Leadership and Engagement budget:  • Event:   American Water Works Association Annual 2017 Conference and Exposition 

Date and Place:  June 11‐14, 2017; Philadelphia, Pennsylvania Number of attendee(s): 1 The  American  Water  Works  Association  (AWWA)  Annual  Conference  and  Exposition  is  the foremost drinking water industry conference in the world.  A large trade show highlights the latest water technology, and a multitude of professional theme sessions deliver education concurrently throughout  the week.   Tours of  local water  supply and  treatment  facilities are also available,  if desired. The conference also includes networking opportunities for elected officials.  

   

5.5

UC - 42

Page 43: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

• Event:  Water Environment Federation Technical Exhibition & Conference 2017 Date and Place: September 30 – October 4, 2017; Chicago, Illinois Number of attendee(s): 1 The Water  Environment  Federation  (WEF) Technical  Exhibition  and Conference  (WEFTEC)  is  the largest conference of its kind in North America and offers water and wastewater professionals and public  officials  from  around  the world with  excellent water  quality  education  and  training.  In addition to offering access to the most cutting‐edge technologies in the field, the conference also serves as a forum  for peer‐to‐peer networking among professionals and public officials on water and wastewater issues and solutions.  

Please  notify  the  Committee  Chair  or  Committee Manager  as  soon  as  possible,  but  no  later  than February 17, 2017, if you are interested in attending any of the above‐noted events. Funding for these events  is  budgeted  in  General  Government,  administered  by  the  Finance  and  Intergovernment Committee.  Final approval on attendance rests with the Board Chair.    Attachment:  1.  Capilano Watershed Boundary Maintenance – Location Map 

UC - 43

Page 44: GREATER VANCOUVER REGIONAL DISTRICT …...January 18, 2017 GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE REGULAR MEETING Thursday, January 19, 2017 9:00 am 2nd Floor Boardroom,

Attachment 1  

Capilano Watershed Boundary Maintenance – Location Map 

 

 

UC - 44