![Page 1: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/1.jpg)
1
Greater Cleveland Regional Transit Authority
Joe Calabrese – General Manager
Greater Cleveland RTA Overview Service Area
59 municipalities
500 square miles
Population of 1.5 million
Customers Served
200,000 on a typical weekday
![Page 2: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/2.jpg)
2
RTA Overview
Services Modes
500 Buses
100 Paratransit Vans
20 Job Access Vans
60 Heavy Rail Vehicles
48 Light Rail Vehicles
24 RTV’s - (HealthLine BRT)
![Page 3: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/3.jpg)
3
RTA Fleet
![Page 4: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/4.jpg)
4
GCRTA HealthLineEuclid Avenue Transformation
Euclid Avenue History
![Page 5: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/5.jpg)
5
Euclid Avenue History
Euclid Avenue History Streetcars disappeared in 1954
# 6 Bus Route put in service
Great Service with Low Image
Alternative Analysis
Subway or Light Rail
Do Nothing (keep the #6 bus)
Bus Rapid Transit (BRT)
![Page 6: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/6.jpg)
6
Mode Selection Criteria Capacity (30,000 + daily customers)
Connectivity
Funding possibilities (FTA)
Cost
Capital
Operating
Economic development potential
Vision for the “Silver Line”
“Rail-Like” Image
Fast
Simple
Safe
First Class
Promote Economic Development
![Page 7: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/7.jpg)
7
Euclid Corridor Project – 9.38 Miles
36 stations
Travel time from 28 to 40 minutes
Building face to building face
Pedestrian friendly with bike lanes
Landscape/hardscape treatment
1,500 trees with irrigation
Integrated/stand-alone public art
![Page 8: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/8.jpg)
8
Ground Breaking October 2004
![Page 9: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/9.jpg)
9
Funding Pie Charts - $200 Million
2000
FTA80% ODOT
20%
2004
FTA50%
ODOT25%
CityMPO
RTA
Exclusive Right of Way
![Page 10: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/10.jpg)
10
![Page 11: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/11.jpg)
11
![Page 12: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/12.jpg)
12
“Rail-Like” Characteristics
Quicker Travel Times
Exclusive Right-of-Way
Higher Travel Speed Limit
Traffic Signal Prioritization
Precision Docking
Level Boarding “Stations”
Off Board Fare Collection
![Page 13: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/13.jpg)
13
“Rail-Like” Service and Image Hi-Frequency Service
24x7
Peak every 5 minutes
Off-Peak every 8 to 15 minutes
Rapid Transit Vehicles (RTV’s)
“Rail-Like” Horn
Use of latest technology
Real Time Information
Traffic Signal Prioritization
![Page 14: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/14.jpg)
14
Precision Docking Sensor
Precision Docking
![Page 15: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/15.jpg)
15
Precision Docking
Level Boarding
![Page 16: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/16.jpg)
16
Level Boarding Bridge-Plates
Off Board Fare Collection
![Page 17: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/17.jpg)
17
Fare Enforcement
Technology
Real time information displays
Emergency call boxes
Security cameras
Stations
Vehicles
![Page 18: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/18.jpg)
18
Real Time Information
Emergency Call Boxes
![Page 19: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/19.jpg)
19
Cameras at Stations
Cameras on Vehicles
![Page 20: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/20.jpg)
20
Downtown Station Design
Median Station Design
![Page 21: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/21.jpg)
21
Seattle Hybrid – Attempt # 4
New Vehicle Design
![Page 22: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/22.jpg)
22
New Vehicle Design
New Flyer Rapid Transit Vehicle“RTV”
![Page 23: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/23.jpg)
23
Landscaping and Public Art
Landscaping
![Page 24: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/24.jpg)
24
Integrated Public ArtWaste Receptacles• Evolution of “Euclid Avenue”
The Euclid Avenue of the Future is being described as “Cleveland’s SMART STREET.” With this notion as a starting point, Mark Howard uses the nearly ubiquitous computer-generate “trash”’ symbols as a decorative treatment to waste receptacles along the corridor. The “garbage” cans will appear along Euclid Avenue in the pedestrian areas. They will be laser cut stainless steel with a removable lid.
Branding of BRT “Better” Rapid Transit
Characteristics of rail
Permanence
Image
Service level
Characteristics of a bus
Flexibility
Lower costs
![Page 25: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/25.jpg)
25
Branding the HealthLine
Branding the HealthLine
![Page 26: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/26.jpg)
26
Branding the HealthLine
Branding the HealthLine
![Page 27: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/27.jpg)
27
Branding the HealthLine
Strong Community Support
More than just an RTA Project
Success was achieved by others leveraging RTA’s investment
![Page 28: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/28.jpg)
28
Economic Development
![Page 29: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/29.jpg)
29
The Rebirth
The Rebirth
![Page 30: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/30.jpg)
30
Tracey Nichols - Director
Department of Economic Development
City of Cleveland
![Page 31: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/31.jpg)
31
Downtown Economic Development
Redevelopment into apartments and retail
Downtown Economic Development
![Page 32: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/32.jpg)
32
Dick Pace - Principal
Cumberland Development LLC
![Page 33: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/33.jpg)
33
Geiss Building
Ari Maron - President
MRN & Associates
![Page 34: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/34.jpg)
34
Downtown Economic Development
![Page 35: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/35.jpg)
35
![Page 36: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/36.jpg)
36
University Circle Development
Branding - Naming Rights Agreement
![Page 37: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/37.jpg)
37
Ribbon Cutting October 2008
![Page 38: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/38.jpg)
38
Promoting the HealthLine
Year to Year Ridership Comparison
2,000,000
3,000,000
4,000,000
5,000,000
2008 2009 2010 2011 2012
Ridership has increased over 60%
![Page 39: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/39.jpg)
39
“HealthLine” Customer SurveyOn-time Performance
94% - Trip was On-Time
Travel Time
95% - Travel Time Reasonable
How else would you be taking this trip?
18% - By automobile
13% - RTA Rail Service (Red Line)
Overall Satisfaction with HealthLine
87% - Overall Satisfied
“HealthLine” Success
![Page 40: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/40.jpg)
40
“HealthLine” Success
2010 ACEC Award
American Council of Engineering Companies
2010 Grand Award
![Page 41: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/41.jpg)
41
Other HealthLine Award
Urban Land Institute
ULI 2011 Award for Excellence
Ari Maron - President
MRN & Associates
![Page 42: Greater Cleveland Regional Transit Authoritythegatewaycorridor.com/wp-content/uploads/2016/02/Development-Forum.pdfGreater Cleveland Regional Transit Authority Joe Calabrese – General](https://reader033.vdocuments.us/reader033/viewer/2022042019/5e76b090cceda76fe47c1d7b/html5/thumbnails/42.jpg)
42
Questions & Answers