grand concourse, 138 st to 158 st 2016 corridor safety ... · haven campus franz sigel park...
TRANSCRIPT
![Page 1: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/1.jpg)
New York City Department of Transportation Presented by the Pedestrian Projects Group on March 14, 2016
to Bronx Community Board 1 Municipal Services Committee
Grand Concourse, 138th St to 158th St Corridor Safety Improvements
2016
![Page 2: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/2.jpg)
2
Project Area Yankee
Stadium
Bronx
County
Courthouse
Cardinal Hayes
High School
Concourse
Plaza
Bronx
Terminal
Market
Finca Del
Sur Farm
Hostos
Community
College
N
Post
Office
![Page 3: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/3.jpg)
• Capital Projects – 161st St to 166th St completed
– 166th St to 171st St under construction
– 171st St to 175th St in planning
• Safety Projects – 2009 – Safe routes to school pedestrian
improvements
– 2009 - Service Road Bike Lanes b/n 166th St
and Mosholu Parkway
– 2013 – 204th St to Mosholu Pkwy
– 2014 – Grand Concourse Arterial Slow Zone
(25 mph)
– 2015 – Intersection improvements at 165th St
• Section south of 158th St is the only area
that has not yet been redesigned
Timeline: Grand Concourse Redesign
3
Grand Concourse and E 162 St
Grand Concourse and Mosholu Parkway
![Page 4: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/4.jpg)
4
Grand Concourse Geometry
Main Line Service Road Service Road
![Page 5: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/5.jpg)
Existing Issues: Injuries
5
Total
Injuries
2010-2014
3
8
2
2
37
53
35
14
5
17
14
2
2
1
Killed or
Severely
Injured
(KSI)
2010-2014
5
1
1
N
149th St is a Vision Zero
priority intersection
13 Pedestrian Injuries (2 Fatalities)
(2010-2014)
26 2
![Page 6: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/6.jpg)
Existing Issues: Speeding
6
• Approximately 1,100-1,200 vehicles in
the peak hour in the peak direction
• North of 161st St, this volume is
accommodated by 2 lanes with left turn
bays
• Excess lanes and roadway space south
of 161st St encourages speeding
2 lanes in each
direction with left
turn bays on the
main line
3 southbound
lanes, 4-5
northbound lanes
Street
Percent of
Vehicles
Speeding
85th
Percentile
Speed
153 St –
156 St
Northbound 82% 40 mph
Southbound 53% 32 mph
144 St –
149 St
Northbound 79% 34 mph
Southbound 72% 37 mph
N
*Study conducted December 30, 2015
6
3 lanes in each
direction without
left turn bays
Cardinal Hayes
High School
Mott Haven Campus
IS 151 / PS 31 /
PS 359 / PS 385
Hostos
Community
College
![Page 7: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/7.jpg)
• Issues identified by community members
on Vision Zero map:
– Speeding
– Long crossing distances
– Not enough time to cross
– Long wait to cross
– Failure to yield
Existing Issues: Community Concerns
7 Source: http://www.nyc.gov/html/visionzero/pages/dialogue/map.html
![Page 8: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/8.jpg)
Existing Conditions
8
Inadequate refuge and
not ADA accessible
144TH St
Signal pole in middle of
pedestrian crossing
No left turn bay
Long crossing distances
Street width varies from 80’ to 120’
![Page 9: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/9.jpg)
Existing Conditions
9
144TH ST
Few turning lanes:
Left turning cars
obstruct traffic flow
![Page 10: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/10.jpg)
Existing Conditions
10 No pedestrian refuge
149th St
![Page 11: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/11.jpg)
11
Existing Conditions 151ST ST
Cut-back median allows for
fast, uncontrolled turns that
conflict with pedestrians
![Page 12: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/12.jpg)
12
Rapid Response Toolkit
Grand Concourse and Mosholu Parkway
Painted and gravel
pedestrian spaces
Tremont Ave and Silver Ave
Concrete median tip
extensions and
pedestrian islands
Pavement markings
New signage
Flexible delineators
Forsyth St
![Page 13: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/13.jpg)
13
Proposed Plans: Typical
Install left turn
bays at
intersections
Reduce to 5 lanes
(2 moving lanes in each direction
+ 1 left turning lane)
Upgrade crosswalks to
high visibility
Stripe parking lanes
and bus stops
Pennsylvania Avenue, Brooklyn 13
Install concrete or painted
median tip extensions at
intersections
![Page 14: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/14.jpg)
14
140th St – 151st St, 156th St - 158th St: Typical
N
Install 2 painted median
tip extensions
Construct 10 concrete
median tip extensions Post
Office
Hostos
Hostos
Cardinal
Hayes
HS
Mott
Haven
Campus
Franz
Sigel
Park
Existing
Proposed
![Page 15: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/15.jpg)
15
153rd St – 156th St: Operational Changes
Franz
Sigel
Park
Cardinal
Hayes
HS
N
Implement safety improvements at
intersections with complicated geometry
Concrete median tip
extensions and
pedestrian islands
Concrete island extensions
Painted pedestrian spaces Wide parking lanes
![Page 16: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/16.jpg)
153rd St: Existing Issues
16
Long crossing distances
Excess road capacity
4 northbound moving lanes,
4-5 southbound moving lanes
53’
50’
![Page 17: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/17.jpg)
17
153rd St: Existing Issues
Significant pedestrian
activity, particularly
before and after school Yield-controlled
westbound
right slip lane
![Page 18: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/18.jpg)
18
153rd St: Existing Conditions
Narrow median
on north side
does not provide
sufficient refuge
for pedestrians
N
Cardinal Hayes High School
Franz Sigel Park
Bus stops in crosswalks
(Bx1, Bx2)
Slip lane with
yield control
53’
50’
25’
Long, three
part crossing
![Page 19: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/19.jpg)
19
153rd St: Proposed Plans
Close slip lane outside
Cardinal Hayes High School
and create pedestrian space Expanded concrete triangle
and lengthen bus stop
Expanded concrete
triangle with paint
and add parking
Add parking along
south triangle
Concrete
median tip
extensions with
trees
Shift southbound
bus stop out of the
crosswalk area
N
No loss to parking Cardinal Hayes High School
Franz
Sigel
Park
Upgrade slip
lane to Stop
control
Expanded sidewalk
with paint
Wide
parking
lanes
27’
35’
![Page 20: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/20.jpg)
Existing Issues: 156th St
20
Long crossing distances
43’ 65’
Excess road capacity
4 northbound thru lanes + 1
northbound turn bay
![Page 21: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/21.jpg)
Existing Issues: 156th St
21
Bx1/2 buses have difficulty
pulling all the way into stop 21
![Page 22: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/22.jpg)
Existing Conditions: 156th St
Excessively wide roadway
(3-5 lanes in each direction)
Long crossing
distances with
insufficient refuge
N
22
Bus cannot
pull all the
way to
sidewalk
Shared thru
and left turn
lane blocks
thru traffic
Franz Sigel
Park
65’
43’ 55’
43’
![Page 23: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/23.jpg)
Proposed Plans: 156th St
Pedestrian island
with trees
Exclusive
left turn lane
Concrete curb
extension
Concrete median
tip extensions
with trees
N
23
Franz Sigel
Park
Wide parking
lanes
28’
35’ 37’
41’
22’
![Page 24: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/24.jpg)
24
Bike facilities are not feasible
between 138th St and 158th St on
the Grand Concourse due to
constrained geometry, however
wide sections between 153rd St and
156th St allow for 13’ parking lanes
that accommodate bicyclists
Future capital plans would
incorporate bicycle facilities on this
section of the Grand Concourse
Upgraded bicycle facilities are in
planning for all sections of the
Grand Concourse north of 162nd St
Bike Enhancements
Existing Bicycle Facility
Proposed Bicycle Facility
Legend
N
Existing North-South
bicycle connections
on Gerard Ave and
Walton Ave between
138th St and 167th St
East-West bicycle
connections on 167th St
and 165th St
![Page 25: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/25.jpg)
25
Simpler, safer intersections
Reduced speeding and weaving
Safer, shorter pedestrian crossings
Better refuge for pedestrians
Improved pedestrian visibility
Clarified vehicular movements
Parking maintained
Traffic flow maintained
Project Benefits
Similar treatments have
improved safety
Adam Clayton Powell Jr Blvd, 133 St – 153 St, Manhattan (3 year averages)
• 26% reduction in total injuries
• 37% reduction in pedestrian injuries
4th Avenue, 15 St – 65 St, Brooklyn (2 year averages)
• 17% reduction in total injuries
• 34% reduction in pedestrian injuries
Pennsylvania Ave, Brooklyn (2 year averages)
• 12% reduction in total injuries
• 29% reduction in pedestrian injuries
![Page 26: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/26.jpg)
26
1. Reduce the number of moving lanes from 6 to 5, including a left turn lanes
where needed
2. Install 14 concrete and 2 painted median tip extensions at intersections
along the corridor
3. Expand concrete triangles in paint/gravel (north side) and concrete (south
side) and close south slip lane with paint/gravel at 153rd St outside Cardinal
Hayes High School. Extend west sidewalk by Franz Sigel Park in
paint/gravel.
4. Install 1 concrete island and 1 concrete curb extension at 156th St
5. Install parking lanes and channelization to clarify traffic movements
6. Upgrade all crosswalks to high visibility crosswalks
7. Update markings on the corridor
8. Install pedestrian ramps along the corridor
Proposal Summary
![Page 27: Grand Concourse, 138 St to 158 St 2016 Corridor Safety ... · Haven Campus Franz Sigel Park Existing Proposed . 15 153rd St – 156th St: Operational Changes Franz Sigelpedestrian](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042d494eea5277c57586009/html5/thumbnails/27.jpg)
www.nyc.gov/dot Thank
You