gpm pilot project csu-chill ops summary
DESCRIPTION
GPM Pilot Project CSU-CHILL Ops Summary. - PowerPoint PPT PresentationTRANSCRIPT
GPM Pilot ProjectCSU-CHILL Ops Summary
DateOps
Time
(MDT)
PLT BAO
CommentsTime Zh > 0 dBZ
(min)
Max Zh (dBZ)
Max Zdr (dB)
Max Kdp
(°/km)
Time Zh > 0 dBZ
(min)
Max Zh (dBZ)
Max Zdr (dB)
Max Kdp
(°/km)
5/15 14:42-16:14
0 - - - 18 34.8 1.24 0.73 Weak cell at BAO
5/17 16:40-17:14
0 - - - 0 - - - Weak cell near BAO
5/20 18:06-21:07
12 51.2 4.8 2.5 0 - - - Svr storm grazed PLT
5/22 11:55-18:36
92 47.9 2.2 0.71 52 51.3 1.59 2.18 Early PM conv, late shallow conv
5/24 16:00-17:10
23 37.2 1.8 1.46 64 53.0 .7 0.73 Svr storms grazed BAO/PLT
5/25 17:29-17:45
0 0 0 0 0 0 0 0 Ground clutter
5/29 12:05-18:01
208 55.4 3.08 1.53 62 34.7 0.72 - Long-lived C/S at PLT
6/4 14:30-17:30
0 - - - 0 - - - Broomfield gauge
Total 335 0 0 0 196 0 0 0 Broomfield gauge