Page 1: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

Govt. Of Jammu & Kashmir

Ladakh Autonomous Hill Dev. Council, Leh

District Irrigation Plan Under

Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)

Tashi Tsetan Chief Agriculture Officer

Member Secretary PMKSY Leh

Email:[email protected] Ph.01982252028

Page 2: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

MESSAGE

It is my proud privilege to express my deep sense of gratitude and heartfelt thanks to

Hon’ble President of India who in his address to the joint session of parliament of 16

Lok Sabha indicated that each drop of water is precious. As the Government of India

has launch Pradhan Mantri Krishi Senchai Yojna (PMKSY) with the moto of “Har Khet

Ko Pani”. The scheme is launched to achieve convergence of investments in irrigation

and enhance the physical access of water on the farm and expand cultivable area

under assured irrigation.

District Leh with unique topography for growing a variety of cereal crops,

fodder, cultivation of flowers ,fruits and vegetables etc but the economic condition

of the farmer in general is poor and call for judicious exploitation of natural

resources of the district for which assured irrigation remain an unaddressed issue.

The ladakh region is depend fully on glacier melt water and with the

introduction of Hi tech irrigation system can bring more area under cultivation with

judicious use of water, which will help to boost the economic condition of the

farmers.

The contribution made by team members of departments of Agriculture,

Horticulture, Irrigation and flood control, Rural Development, Forest, IWMP, Soil

Conservation, Command Area Development department will help in achieving the

desired goal “Har Khet Ko Pani” and “ Per Drop More Crop” for the upliftment of

farming community.

-sd- Showkat Ahmed Beigh

Director Agriculture Kashmir

Page 3: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

Acknowledgement

No doubt Indian Agriculture has to overcome some of the major challenges

like growing demand of grains, oilseeds, pulses, vegetables, fruits, milk, poultry and

meat as well as cash crop. Let us not forget that our existing food security has been

mainly brought about by the increase in irrigated Agriculture and introduction of high

yielding varieties of crops. Of course, today agriculture such as improved seeds

(HYV’s), irrigation and chemical fertilizers and improved machinery etc have played

an important role in agriculture Development..

Pradhan Mantri of India has launched PMKSY to bridge the gap between

present status of irrigated area through the concept of HAR KHET KO PANI. In order

to achieve this goal let us go back to 1951-52 when only 17.6% total area of net sown

area was under assured irrigation which has now reached to a level of 45% upto

2008-09. The water use efficiency in our country is estimated to about 38-40% of the

canal irrigation and about 60% of the ground water irrigation. Agriculture, being a

major water user, its share in the total demand is bound to water user; its share in

the total demand is found to be decrease due to competing demand from other

sectors. Due to Introduction of PMKSY scheme which provides avenues to the

increased area under assured irrigation through surface/ground water/In situ

moisture conservation.

-sd- Chief Agriculture Officer

Leh-Ladakh

Page 4: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

FOREWORD

It is great pleasure for me in bringing to foreword the District Irrigation Plan of

district Leh as a Chairman of the district level implementing committee under “Pradhan

Mantri Krishi Sinchayee Yojna” PMKSY. The objective of the PMKSY is to bring more area

under cultivation by improving the system of water management at field level, and to

provide irrigation with the moto (HAR KHET KO PANI) and to improve water use efficiency

and thereby enhance production and productivity (PER DROP MORE CROP). Water is an

essential as air is required to human and living being, without water life is not possible in

this universe.

A yield production of 40qtls/Hac in Ladakh condition where assured irrigation is

possible, without applying irrigation water no single blade of leaf is possible. As Ladakh

being a cold Arid region settled on a large area, all villages and irrigated fields are situated at

the foot hill of mountain region where irrigation facilities are not developed at its maximum.

There is adversely affected productivity of the crop if irrigation facilities are hampered.

After implementation and completion of the project which extend 5-6 years and by

the convergence of all implementing agencies the productivity can be enhance by 35-40%.

The project DIP being beneficial for increasing the production at field level, due to which

income of the farmers shall be increased. About 57% of the population of district is under

below poverty and about 85% of the population is dependent on Agricultural farming.

I am highly grateful of the team in connection with DIP (PMKSY), Leh.

-sd- R. Prasana Swamy G (IAS)

Deputy Commissioner/CEO LAHDC, Leh.

Page 5: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

1

PROJECT SUMMARY

Name of the Organization and Status Ladakh Autonomous Hill Development

Council Leh (Jammu and Kashmir)

Project Title District Irrigation Plan

Project Location Ditt. Leh (Jammu & Kashmir)

Project Context Development of Infrastructure/Capacity

Building

Project Budget 56184.16

DETAILED PROPOSAL

PROJECT BACKGROUND:

Title of the Project Strengthening of Irrigation in Leh

Project Location Distt. Leh

Project Context (Describing the situation or

problem the project seeks to address

Development of Infrastructure/Capacity

Building

ORGANIZATIONAL INFORMATION:

Name of the organization Ladakh Autonomous Hill Development

Council Leh (Jammu and Kashmir)

Contract details and primary contact person District Administration complex

Shri. Prasana Swami G

Deputy Commissioner/Chief Executive

Officer, LAHDC, Leh

Goal and mandate of the organization Development of Infrastructure and progress

for prosperity in Leh

Technical/managerial staff strength Technical staff of all line departments.

Page 6: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

1

INDEX

DESCRIPTION Page

EXECUTIVE SUMMARY

1. Introduction

1-6

2. Back ground

3. Need for Convergence

4. SWOT Analysis

5. Objectives

6. Vision

GENERAL INFORMATION OF THE DISTRICT

7. District Water Profile

7-20

8. The Block Wise Population

9. Biomass and Live stock

10. Land Use Pattern

11 Status of Crop Varities & Their Cropping Patern

12. Crop Water Requirement (Present Land Use

13. Crop Water Requirement (Proposed Land Use)

14 Major Cropping Pattern

15. Different source of Irrigation

16. Status of Ground water availabity

17. Tentative water Availability of Different Blocks

18. Water Demand of different Blocks

19 Water Budget

Page 7: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

2

STRATEGIC ACTION PLAN

20 Strategic Action Plan For Irrigation of Different Department in District

Leh

21-24

21 Strategic Action Plan Agriculture department 25-28

22 Strategic Action Plan for

Soil & Water Conservation

29-33

23 Strategic Irrigation plan Command Area Development 34-38

24 Strategic Action Plan Forest Department 39-51

25 Strategic Action Plan Horticulutre 52-55

26 Strategic Irrigation Plan IWMP 56-62

27 Strategic Irrigation Plan Irrigation Department 63-71

28 Strategic Irrigation Plan Soil Conservation (Forest) 72-77

29 Strategic Irrigation Plan Rural Department 78-179

30 Maps 180-185

Page 8: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

1

EXECUTIVE SUMMARY

INTRODUCTION

(PMKSY) -

PMKSY has been approved on 11th July 2015 by Govt. Of India for the period of five

years to ensure access to some means of protective irrigation to all agricultural farms (Har

Khet Ko Pani) in the country, to produce „per drop more crop‟, thus bringing much desired

rural prosperity. The programme is an amalgamation of on-going schemes of Ministry of

Water Resources, River Development and Ganga Rejuvenation, Ministry of Agriculture &

Cooperation and Ministry of Rural Development.

Components of PMKSY

AIBP

Medium & Major Projects

National Projects

PMKSY (Har Khet ko Pani)

Surface Minor Irrigation

Command Area Distribution

Water Diversion System

Lift Irrigation, Ground water development

Traditional Water harvesting,

RRR of water bodies

PMKSY ( Per drop More Crop)

On farm water management

Precision irrigation

Distt/State irrigation. Plan

Extension Activities

Coordination & Monitoring

PMKSY (Watershed)

Soil & Moisture Conservation

Rain water harvesting

Runoff Mgmt& Treatment

Livelihood support activities

Page 9: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

2

BACKGROUND

Leh District is situated between 32 to 36 degree North latitude and 75 to 80 degree

east longitude and at an altitude ranging from 2900 M to 5900M, it is scattered on an area of

82665 Sq.Kms. ( includes 37555 Sq.Km under illegal occupation of China) makes it the

largest District in the country is having 112 inhibited and one is un inhabited villages with a

population of 147104 souls as per 2011 census with a Buddhist as the biggest ethnic group

followed by Muslim. Leh District in the East, Himachal Pradesh in the South and Pakistan in

the North-West.

Although, Leh District is one of the largest Districts of the country in terms of area, it

has the lowest population density across the entire country. The district borders Pakistan

occupied Kashmir and Chinese occupied Ladakh in the North and Northwest respectively,

Tibet in the east ad Lahoul-Spiti area of Himachal Pradesh in the South. The District of Leh

forms the Northern tip of the Indian Sub-Continent. According to the Geographical experts,

the District has several other features, which make it unique when compared with other parts

of the Indian Union. The District is the coldest and most elevated inhabited region in the

country with altitude ranging from 2300 meters to 5000 meters. As a result of its high altitude

locations, annual rainfall is extremely low. This low status of precipitation has resulted in

scanty vegetation, low organic content in the soil and loose structure in the cold desert. But

large-scale plantation has been going in the district since 1955 and this state of affairs if

likely to change.

The ancient inhabitants of Ladakh were Dards, an Indo Aryan race. Immigrants of

Tibet, Skardo and nearby parts like Purang, Guge settled in Ladakh, whose racial characters

and cultures were in consonance with early settlers. Buddhism traveled from central India to

Tibet via Ladakh leaving its imprint in Ladakh. Islamic missionaries also made a peaceful

penetration of Islam in the early 16th

century. German Moravian Missionaries having

cognizance of East India Company also made inroads towards conversion but with little

success.

In the 10th

century AD, Skit Lde Nemagon, the ruler of Tibet, invaded Ladakh where

there was no central authority. The lands divided in small principalities were at war with each

other. Nemagon defeated them one by on and established a strong kingdom at Shey, 15 kms

from Leh, as its capital. Ladakh was an independent country since the middle of the 10th

century.

Page 10: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

3

King Singge Namgyal had consolidated the Ladakhi Empire into a strong kingdom.

He was not only as s trong monarch but a statesman, a diplomat and a builder. He built the

historic 9-story Leh palace and made the other neighboring countries envy of such and

elegant palace. He also promoted horse polo in Ladakh.

Leh (Ladakh) was known in the past by different names. It was called Maryul or low

land by some Kha-chumpa by others. Fa-Hein referred to it as Kia-Chha and Hiuen Tsang as

Ma-Lo-Pho. It is said that the first emigrants to this land appears to have been the Brokpas

From Dadarstan who ihabited the lower reaches of the Indus Valley popularly known as

Sham. Another wave of emigrants who came from Karja(Kulu)were the Mons an Aryan type

who first settled in Gya and spread to Rong,Shayok,Sakti Tangtse and Durbuk, the area

extending from Martselng to Khaltsi. Gia was the seat of Government of the first Mon ruler

having been elected ty the whole tribe.

His kingdom included the villages mentioned above, all of which was inhabited by the Mons

people. He was known by the title Gyapacho, derived from his being the master of Gia.

In the District there are three Sub. Division viz Nubra ,Changthang and Khaltsi

headed by the Sub Divisional Magistrate under the over all control of the Deputy

Commissioner/Chief Executive Officer but it consist three Tehsil with its headquarter at Leh,

Khaltsi and Sumoor(Nubra). The Tehsil of Khaltsi ad Sumoor created during 2005-06 and

now start functioning by posting of Tehsildar at both the newly created Tehsil.

The District Leh consists of six Sub-Division i.e Nyoma, Nubra, Khaltsi, Durbuk, Kharu,

Likir and eight Tehsils i.e Leh, Khaltsi, Sumoor, Nyoma, Durbuk, Kharu, Diskit, Saspol and

sixteen Blocks namely Leh, Diskit, Nyoma, Durbuk, Kharu, Chuchot, Khaltsi, Panamic,

Saspol, Thiksay, Turtuk, Nimoo, Skurbuchan, Singay-Lalok HQ at Wanla, Rupshow HQ at

Puga and Rong Churgut HQ at Chumathag

Page 11: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

4

NEED FOR CONVERGENCE

• Water Sources

• Distribution

• Management

• For achieving the goal of bringing irrigation water to every farm, there is need to

converge all on-going efforts and to bridge the gaps through location specific

interventions.

Strategy

Increase gross irrigated area

Bridging the gap between irrigation potential & utilisation

Creating/Strengthening Water distribution network

Enhance water use efficiency & Management

Outcome

More crop per drop

Enhanced Farm productivity

Rural Prosperity

Focus: End to End Solution to Irrigation Supply Chain

Water Sources

• Rain water harvesting /Micro storage e.g. ponds/tanks.

• Community water tanks/check dams.

• Secondary storage structures

• Groundwater sources-Dug wells/Tube wells

• River lift irrigation

• Cement Nala Bund,

Distribution

• Command Area Development

• Underground pipe conveyance system

Water Use Efficiency

• Drip & Sprinkler System;

• Cropping alignment, on-farm development

Page 12: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

5

SWOT Analysis

The role of SWOT analysis is to take the information from the concerned agencies for

the formation of Project and departments to make a viable time bound implementation

schedule so that the fixed targets are achieved in full.Some of the highlights of strengths,

weaknesses, opportunities and threats are to be analysed so that we are clear in our goal.

Strengths

• Suitable agro-climatic conditions for cultivation of cereal crops, vegetable crops, fruit

crops and rearing of animals etc.

• Largely light soils are to be cultivated.

• Soil fertility is good and be helpful in increasing the income of farmers if irrigation is

made available.

Weaknesses

• Rainfall with erratic distribution.

• Canal water available only for limited area.

• Soil health deteriorating due to erosion and runoff in sloppy fields having less humus

cover.

• Light textured soils have poor water and nutrients retention capacity.

• More than 75% of the area is rainfed.

• In rainfed (Kandi areas) moisture stress resulting in lower yields.

• Lack of water harvesting and management practices.

• Insufficient financial infrastructure.

Opportunities

• Rainfed horticulture plantation with less irrigation requirement in comparison to Cereal

crops

• Good scope for water conservation technology adoption.

• Good scope for adoption of micro irrigation system in horticultural and vegetable crops.

• More areas can be brought under assured irrigation for floriculture, vegetables and other

allied sectors.

Threats

• Non judicious use of water leading to water bankruptcy supply.

• Lack of adoption of recommended technology e.g. drip irrigation, sprinkle irrigation.

• Non- availability of green fodder leads to poor health of animals.

• Fragmented holdings.

Page 13: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

6

OBJECTIVES

The main objectives of PMKSY are:

• Preparation of District level plan based on the plans to be prepared at block level for

irrigation i.e. (DIP).

• Extend cultivable area under assured irrigation (HarKhetkoPanni).

• Integration of water sources, distribution and its efficient use, to make best use of water

through appropriate technologies and practices.

• To improve the measures to reduce wastage of water and increase availability both in

duration and extent.

• More crop per drop to enhance the adoption of precision irrigation and other water

saving technologies.

• Regeneration of ground water, arresting, runoff, integrated development of rainfed areas

using the watershed approach towards soil and water conservation.

• Recharging of the ground water by appropriate technologies and practices.

• Exploration of private investment in irrigation

VISION

1. Creation of new water sources:

a. Repair, restoration and renovation of defunct water sources.

b. Construction of water harvesting structures, secondary and micro storage.

c. Ground water development

d. Enhancing potential of traditional water bodies at village level.

2. Distribution network development of irrigation sources (both assured and protective).

3. Promotion of Scientific moisture conservation and reduce runoff to improve ground water

recharge.

4. Promotion of underground piping system, drip and sprinklers and other application

devices.

5. Promotion of community irrigation through registered users groups / Farm producer

organizations / NGOs

Page 14: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

7

GENERAL INFORMATION ON AGRICULTURE IN LEH DISTRICT.

Ladakh as a whole occupies 2/3 geographical area of Jammu & Kashmir state. Leh

district alone is extended over a geographical area of around 45,100 sq. km, out of which

around 11,000 hects are under cultivation of different crops .It is in fact, is the largest district

in the country as far as the geographical area is concerned. Entire Ladakh lies on the range

shadow side of the great Himalayas. Which makes it a cold and dry rocky desert. The annual

precipitation is extremely low (i.e. around 10 cms per annum), that too more in the form of

snow. This low precipitation has resulted in scant vegetations, low organic matter content in

the soil and its loose structure .There is wide ranging fluctuation in the day and night

temperatures. During summer when mean maximum temperature is around 28o C (July–

August), the sun can be scorching hot in its intensity. The nights remain cool throughout the

year.

In Ladakh, soils range from sandy loams on the alluvial fans to sandy and silty clay

loams on the flood plains of Indus. The soils are characterized by low organic matter content

and poor water retention capacity. The pH of soil ranges from 7.4 to 9.5 .There is a potential

problem of salinization especially on the flood plains of Indus.A number of saline plains are

seen in valley of Indus, Nubra and Shayok Rivers.The variety of soils in association with

elevation moisture availability (i.e. irrigation), suggest the need for agro-eco system based

diversified approach to commercial and high value cash crop.

Moisture scarcity is key feature of an arid region .hence in an arid area, such as

Ladakh, irrigation is the most crucial factor for expanding extent cropped area and for

enhancing both crop production and productivity. In Ladakh irrigation also constitute the

resource with vast underutilized potential.

Cultivation is normally found in valleys on alluvial fans and flood plains with

sufficient water for irrigation nearly all irrigation systems are gravity reliant. Most of the

irrigation is being done by canals. Presently, unavailability of irrigation, water is the major

factor limiting the area that can be cultivated.

Due to extreme and long winter, the agriculture season is short and extends from

April-September depending upon the altitudes. Because of the limited growing period most

of the agriculture area is monocropped. Double cropping is practiced only in a few villages in

Khaltsi block in the khaltsi- Dha belt and in Nobra block in the Bogdang- Turtuk belt.

The major crops grown in the district leh are Grim or Naked Barley (4488 hects.),

Wheat (2595 hects.) &Alfalfa (1991 hects.) ,collectively these three crops occupy about 83%

Page 15: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

8

of the total cropped area, and in fact, form a major cropping patterns. Among other crops

grown are vegetables including potato, oilseeds, pulses and others (710 hect).

Despite not very favourable environment, agriculture has been the mainstay of the

99% of the people living in Ladakh and still continues to be the main occupation for about a

70% of the population in the district. The farmers have adapted to the bio-physical

circumstances through evolving diversified farming systems.

Traditional farming systems in Ladakh are complex. Their productivity is influenced

by combination of bio-physical, religious & socio-economic factors. Crop production and

animal husbandry are very much dependent on each other. Farmers depend largely on Dzo (

A male offspring of cross Yak & Cow), Donkeys and other animals for tillage, threshing and

transportation of manure, farm produce etc. The live-stock production system is dependent

upon crop residues and fodder grass production.

The uniqueness of traditional agriculture in Ladakh is cooperative/community approach

in performing manual field operations. The whole community in the villages joins hands to

perform agriculture operations of the community members. Before sowing of crops one

member from each family participates in cleaning, maintenance and construction of irrigation

canals and water reservoirs .the group works under the guidance of “Churpon” , a village

,man selected every year to look after proper functioning of the irrigation system.

Page 16: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

9

District Water Profile

BLOCK WISE EXISTING IRRIGATION STATUS BEFORE DIP PROJECT IS DISTT LEH S.NO Name of Block TOTAL AREA (IN HA)

Irrigated Rainfed Total

1 LEH / CHUCHOT/THIKSAY/KHARU/NIMOO 5301 0 5301

2 KHALTSI/SASPOL /SKURBUCHAN/SINGAY LAOK 2221 0 2221

3 NUBRA/DISKIT/PANAMIK/TURTUK 2019 0 2019

4 NYOMA/DURBUK/RONG-CHUMATHANG/RUPSHO-PUGA 1058 0 1058

GRAND TOTAL 10599 0 10599

Page 17: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

10

THE BLOCK WISE POPULATION BREAK UP IS GIVEN AS UNDER

S.NO Name of Block Block wise Populations

Units Nos of Panchayat Census -2011

1 LEH / CHUCHOT/THIKSAY/KHARU/NIMOO Nos 33 85457

2 KHALTSI/SASPOL /SKURBUCHAN/SINGAY LAOK Nos 20 23382

3 NUBRA/DISKIT/PANAMIK/TURTUK Nos 20 21568

4 NYOMA/DURBUK/RONG-CHUMATHANG/RUPSHO-

PUGA Nos 20 16697

Page 18: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

11

Biomass and livestock of District Leh

Small Animals Large Animals Equine

Polutry (Nos)

Goats (Nos)

Sheep (Nos) Indigenous cow (Nos) Hybrid Cow (Nos) Yak and its Hybrid (Nos)

2089 252546 105241 12977 34174 18877 11266

Page 19: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

12

LAND USE PATTERN OF DISTRICT LEH

No of the Gram

Panchayat No.of

Villages

Total Geographical

Area

Area Under Agriculture ( in Ha)

Area under Forest ( in

Ha)

Area under Waste

land ( in Ha)

Area under other uses ( in Ha) Total cultivable area

Net sown area

Area sown more than once

Cropping Intensity %

93 112 45110 10599 10193 406% 111% 63 26590 2621

Page 20: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

13

STATUS OF ALL CROP VARITIES AND THEIR CROPPING PATTERN BEFOR E AND AFTER PROJECT PMKSY IN RESPECT OF DISTRICT LEH (AREA IN HEC)

S.No

Name of Crop Existing Irrigated Existing un-irrgated Total Existing Area

Irrigated area after project proposal

Un-irriaged area after prject proposal

Total proposed area after project

1 Wheat (Kharif) 2968 0 2968 646.1 0 3614.1

2 Barley (kahrif) 4452 0 4452 2048 0 6500

3 Pulses (Kharif) 286 0 286 264 0 550

4 Fodder (Kharif) 2089 0 2089 11599.44 0 13688.44

5 Vegetable (Kharif) 352 0 352 1048 0 1400

6 Others (Kharif) 359 0 359 3191 0 3550

Page 21: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

14

CROP WATER REQUIREMENT (PRESENT LAND USE) OF DISTRICT LEH

S.No Crop Area Sown(ha) Gross Irrigated area(Ha)

Crop water demand(mm)

Water potentials required(BCM)

Existing potential(BCM)

Water potential to be created (BCM)

1 Wheat 2968 2968 260 0.0077168 0.0077168 For additional Expansion area only

2 Barley 4452 4452 260 0.0115752 0.0115752 -do-

3. Fodder 2089 2089 500 0.010445 0.010445 -do-

4. Pulses 286 286 67 0.00019162 0.00019162 -do-

5. Vegetables 352 352 500 0.00176 0.00176 -do-

6. Others 359 359 140 0.0005026 0.0005026 -do-

Page 22: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

15

CROP WATER REQUIREMENT (PROPSED LAND USE) OF DISTRICT LEH

S.No Crop Area Sown(ha) Gross Irrigated area(Ha)

Crop water demand(mm)

Water potentials required(BCM)

Existing potential(BCM)

Water potential to be created (BCM)

1 Wheat 3614.1 3614.1 260 0.00939666 0.0077168 0.00167986

2 Barley 6500 6500 260 0.0169 0.0115752 0.006455

3 Fodder 13688.44 13688.44 500 0.0684422 0.010445 0.0579972

4 Pulses 550 550 67 0.0003685 0.0001916 0.0001769

5 Vegetables 1400 1400 500 0.007 0.00176 0.00524

6 Others 3550 3550 140 0.00497 0.0005026 0.0044674

Page 23: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

16

MAJOR CROPPING PATTERN OF DISTRICT LEH.

S.No Pattern

1 Barley /Wheat

2 Barley/Wheat

3 Oats/Barley

4 Potato/Peas-Turnip

VEGETABLE CROPS

a. Onion .Tomato, Cabbage, Cauliflower, Radish, Turnip, Carrot,knol-Khol, sweede Local , cucumber, pumpkin, Bottlegourd,Lettuce,Corriander , Garlic.

Page 24: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

17

DIFFERENT SOURCE OF IRRIGATION IN DISTRICT LEH

Department wise before project S.No Source of irrigation Name of Deptt. Net Irrigation Area (in Ha)

1 Canals Irrigation Division Leh 7200

2 Water bodies/ khuls Rural Dev.Deptt Leh 3500

STATUS OF GROUND WATER AVAILABILITY

Status of District as per central ground water Ground water BCM notification

Critical Semi-critical Safe Draft Recharge Gap

Not available

Not available Not available Not available

Critical level-3000 gallons/hr Semi Critical level-2500 gallons/hr Safe level -2000 gallons/hr Draft-Gross Ground water draft for all uses Recharge-Total Annual Ground water Recharge.

Page 25: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

18

Tentative water availability of different blocks of Leh District

S.NO Name of BlocksGround water availability (inBCM) Under ground water availability ( BCM)

Leh 0.00000000312 0.00008125

Chuchot 0.00000000405 0.00009130

Saspol 0.00000000232 0.00007250

Khaltsi 0.00000000370 0.00008200

Nyoma 0.00000000218 0.00007350

Kharu 0.00000000480 0.00009915

Durbuk 0.00000000310 0.00008511

Deskit 0.00000000350 0.00008850

Panamik 0.00000000320 0.00008750

Nimoo 0.00000000213 0.00007531

Skurbuchan 0.00000000322 0.00007621

Sinaylalok 0.00000000310 0.00008523

Thiksey 0.00000000350 0.00008653

Rong-Changthang 0.00000000300 0.00008250

Rupsho-Puga 0.00000000200 0.00006670

Turtuk 0.00000000308 0.00006671

TOTAL 0.00000005 0.00130

Page 26: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

19

Water demand of different blocks of Leh District S.NO Name of

BlocksGround water availability (inBCM)

Under ground water availability

(BCM)

Total ( BCM) Water Demand (BCM) Water Gap (BCM)

Present Project (2020) Present Project (2020)

Leh 0.00000000312 0.00008125 0.00008125 0.0160828376 0.0763152984 0.00008125 0.01600158448

Chuchot 0.00000000405 0.00009130 0.00009130 0.0049485654 0.0234816303 0.00009130 0.00485726135

Saspol 0.00000000232 0.00007250 0.00007250 0.0049485654 0.0234816500 0.00007250 0.00487606308

Khaltsi 0.00000000370 0.00008200 0.00008200 0.0173199790 0.0821857060 0.00008200 0.0172379753

Nyoma 0.00000000218 0.00007350 0.00007350 0.0061857067 0.0293520378 0.00007350 0.00611220452

Kharu 0.00000000480 0.00009915 0.00009915 0.0074228481 0.0352224454 0.00009915 0.00732369330

Durbuk 0.00000000310 0.00008511 0.00008511 0.0074228481 0.0352225080 0.00008511 0.00733773500

Deskit 0.00000000350 0.00008850 0.00008850 0.01237141425 0.0587040757 0.00008850 0.01228291075

Panamik 0.00000000320 0.00008750 0.00008750 0.0061857067 0.0293521572 0.00008750 0.00609820350

Nimoo 0.00000000213 0.00007531 0.00007531 0.0024742827 0.0117408151 0.00007531 0.00239897057

Skurbuchan 0.00000000322 0.00007621 0.00007621 0.0098971308 0.0469632606 0.00007621 0.00982091758

Sinaylalok 0.00000000310 0.00008523 0.00008523 0.0037114240 0.0176112227 0.00008523 0.00362619090

Thiksey 0.00000000350 0.00008653 0.00008653 0.0037114240 0.0176112598 0.00008653 0.00362489050

Rong-Changthang 0.00000000300 0.00008250 0.00008250 0.0049485654 0.0239586514 0.00008250 0.00486606240

Rupsho-Puga 0.00000000200 0.00006670 0.00006670 0.0049485654 0.0237863490 0.00006670 0.00488186340

Turtuk 0.00000000308 0.00006671 0.00006671 0.0111342722 0.0520516901 0.00006671 0.01106755912

TOTAL 0.00000005 0.00130 0.00130005 0.12371413575 0.5870407575 0.00130005 0.5857402527

Page 27: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

20

WATER BUDGET

S.No Existing availability (BCM) Total (BCM) Water Demand (BCM) Water Gap (BCM)

Surface water Ground water Present Project (2020) Present Projected(2020)

1 0.00000005 0.00130 0.0013005 0.12371413575 0.5870407575 0.00130005 0.5857402527

Page 28: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

21

Strategic Action Plan for Irrigation in District under PMKSY

STRAGETIC ACTION PLAN FOR IRRIGATION OF

DIFFERENT DEPARTMENT IN DISTRICT LEH.

S.NO Name of Deptt. Financial proposal

(Rs in Lacs) for five

years

1 IRRIGATION DIVISION 23728.24

2 SOIL CONSERVATION (FOREST) 268.5

3 HORTICULTURE 192.5

4 AGRICULTURE 548.00

5 COMMAND AREA DEVELOPMENT

LEH

8772.26

6 FOREST DEPTT. 1642.00

7 IWMP 4670.00

8 COMMAND AREA DEVELOPMENT

Soil &WATER CONSERVATION

6672.73

9 ASSISTANT COMMISSIONER

DEVELOPMENT LEH

8053.5

TOTAL 54547.73

MISCELLANEOUS EXPENDITURE

3% OF THE PROJECT COST

1636.43

GRAND TOTAL :- 56184.16

Page 29: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

22

Year/ Department wise District Leh plan under PMSKY

S.NO

Name of Department Budget

Required ( in Lakhs)

Budget Required ( in Lakhs)

Grand Total ( in Lakhs)

1st Year (5%)

2nd Year (25%)

3rd Year (25%)

4th Year (25%)

5th Year (20%)

1 Agriculture Production Deptt. a) Agriculture 548 27.40 137.00 137.00 137.00 109.6 548

b) Development of Cultivable land (Command Area Development ) 8772.26 438.61 2193.07 2193.07 2193.07 1754.45 8772.26

c) Horticulture 192.5 9.625 48.125 48.125 48.125 38.5 192.5

d) Command Area Development water conservation D 6672.73 333.64 1668.18 1668.18 1668.18 1334.55 6672.73

Total-1 16185.49 809.2745 4046.37 4046.37 4046.37 3237.10 16185.49

2 Irrigation Deptt Leh 23728.24 1186.41 5932.06 5932.06 5932.06 4745.65 23728.24

3 Rural Development 8053.5 402.68 2013.38 2013.38 2013.38 1610.7 8053.5

4 Soil Conservation 268.5 13.425 67.125 67.125 67.125 53.7 268.5

5 IWMP 4670 233.50 1167.50 1167.50 1167.50 934.00 4670

6 Forest 1642 82.1 410.5 410.5 410.5 328.4 1642

Total (2-6) 38362.24 1918.11 9590.56 9590.56 9590.56 7672.45 38362.24

SUM Total (1to 6) 54547.73 2727.39 13636.933 13636.93 13636.933 10909.546 54547.73

1% contigency + 1% adminstrative + 1%

monitoring charges 1636.43 81.82 409.11 409.11 409.11 327.29 1636.43

GRAND TOTAL 56184.16 2809.21 14046.04 14046.04 14046.04 11236.83 56184.16

Page 30: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

23

Department / Component-wise District Irrigation Plan under PMSKY District Leh

S.N

O Name of Department AIBP

Programme Component Budget

Required PMKSY(Her

Khat Ko Pani)

PMSKY ( Per

Drop More Crop)

PMSKY (

Watershed) MGNREGA

1 Agriculture Production

Deptt.

a) Agriculture 0.00 0.00 548 0.00 0.00 548

b) Development of Cultivable

land (Command Area

Development)

0.00 8772.26 0.00 0.00 8772.26

c) Horticulture 0.00 0.00 192.5 0.00 0.00 192.5

d) Command Area Development

Soil &water conservation

0.00 6672.73 0.00 0.00 0.00 6672.73

Total-1 0.00 6672.73 9512.76 0.00 0.00 16185.49

2 Irrigation Deptt Leh 23728.2 0.00 0.00 0.00 0.00 23728.24

3 Rural Development 0.00 0.00 0.00 0.00 8053.50 8053.50

4 Soil Conservation 0.00 0.00 0.00 268.5 268.5

5 IWMP 0.00 0.00 0.00 4670.00 0.00 4670.00

6 Forest 0.00 0.00 0.00 1642.00 0.00 1642

Total (2-6) 23728.2 0.00 0.00 6580.5 8053.50 38362.24

SUM Total (1to 6) 23728.24 6672.73 9512.76 6580.50 8053.50 54547.73

1% contingency + 1%

administrative + 1%

monitoring charges

711.847 200.18 285.38 197.415 241.61 1636.43

GRAND TOTAL 24440.09 6872.91 9798.14 6777.92 8295.11 56184.16

Page 31: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

24

COMPLIED STRATEGIC ACTION PLAN FOR IRRIGATION IN DISTRICT UNDER

PMSKY

S.NO Concerned Ministry Component

Estimated cost( in

Rs)

1 Ministry of water resources (MOWR) AIBP 24440.09

2 Ministry of water resources (MOWR) Har Khet ko Paani 6872.91

3 Deptt. Of Rural Development Ministry of

rural (DORD-MORD

Convergence with

MNREGA 8295.1

4

PMSKY

Watershed 6777.92

5

Ministry of Agriculture & Farmer welfare-

Deptt. Of Agriculture, C0-operative and

farmer welfare (MOA&FW-DAC&FW) Per drop more crop 9695.64

6 MAO& FW-Dac & FW Capacity Building 102.5

7 Miscellaneous Expenditure -

Total 56184.16

Page 32: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

25

STRATEGIC IRRIGATION PLAN

AGRICULTURE DEPARTMENT

Page 33: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

26

District Irrigation Plan of Agriculture sector under Pradhan Mantri Krishi Sinchayee youjna (PMKSY) Distt. Leh Component wise

Concerned Ministry

/Deptt

Programme

component Acivity

Sub.

Component Unit

Target in

Nos

Proposed

area

Coverage (in hac.)

Unit cost /

hac.

Estimated cost

(Rs. In lac)

Total

Amount

Budget requirement (in. lac)

G. Total (Rs. In

lac)

Ist year

(2016-

17)

2nd Year

(2017-

18)

3rd year 4th

year `

5th year

MOA &

FW-DAC

&FW

Per drop

more

crop(Micro

Irrigation

DPAP Drip Drip

Irrigation

Hac. 75 30 0.80 60.00 60.00 3.00 15.00 15.0 15.00 12.00 60.00

MOA &

FW-DAC

&FW

DPAP Drip Sprinkler

irrigation

sets

Hac. 120 10 0.70 84.00 84.00 4.20 21.00 21.00 21.00 16.00 84.00

MOA &

FW-DAC

&FW

Non DPAP

Drip

Diesel

power

operated

pump set

Hac. 500 500 0.50 250.00 250.00 24.00 56.50 56.50 56.50 56.50 250.00

MOA &

FW-DAC

&FW

Non DPAP

Sprinkler

Rain Guns Hac. 16 6.4 4.00 64.00 64.00 3.20 16.0 16 16 12.8 64

MOA &

FW-DAC

&FW

Capacity

Building:-

Training of

farmers/Offi

cer/Officials

exposure

tour within

and out side

District/state

.Kissan mela

and Ghosties

Nos 180 0.5 90.00 90.00 18.00 18.00 18.00 18.00 18.00 18.00 90.00

891 548.00

Page 34: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

27

District Irrigation Plan of Agriculture sector under Pradhan Mantri Krishi Sinchayee youjna (PMKSY) Distt. Leh Component wise

S.No Con

cern

ed

Min

istr

y

/Dep

tt

Pro

gra

mm

e

com

po

nen

t

Acivity Sub.

Component

Leh

Chu

cho

t

Sas

po

l

Kh

alts

i

Ny

om

a

Kh

aroo

Du

rbu

k

Pan

amik

Nim

oo

Dis

kit

Sk

urb

uch

an

Sin

gay

lok

Th

iksa

y

Rong

Chu

mat

han

g

Rup

sho p

ug

a

Tu

rtuk

unit

Tar

get

Pro

po

sed

are

a

cov

erag

e

unit

co

st/h

ac.

Est

inat

ed c

ost

(in

lac

)

1 MO

A &

FW

-

DA

C &

FW

Per

d

rop

mo

re

crop

(Mic

ro

Irri

gat

ion

DPAP Drip

Drip

Irrigation 6 5 4 5 4 3 3 5 3 3 4 2 4 4 2 3 Nos 75 30 0.80 60.00

2 DPAP Drip

Sprinkler irrigation sets 7 6 5 5 5 5 5 5 5 6 6 4 6 5 4 5 Nos 120 10 0.70 84.00

3

Non

DPAP

Drip

Diesel power

operated

pump set 20 19 15 16 16 16 15 15 15 15 15 15 15 14 14 15 Nos 500 500 0.50 250.00

4

Non DPAP

Sprinkler Rain Guns 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 Nos 16 6.4 4.0 64.00

5

Capacity

Building:-

Training of farmers/Offic

er/Officials exposure tour

within and

out side District/state

.Kissan mela

and Ghosties 8 7 7 8 5 4 4 5 4 8 5 5 5 5 5 5 180 - 0.5 90.00

Total:- 548.00

Page 35: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

28

District Irrigation Plan of Agriculture sector under Pradhan Mantri Krishi Sinchayee youjna (PMKSY) Distt. Leh Component wise

S.No Concerned Ministry /Deptt

Programme component

Acivity Sub. Component Unit Target in Nos

Proposed area

Coverage (in hac.)

Unit cost / hac.

Estimated cost (Rs.

In lac)

Total Amount

1 MOA & FW-DAC

&FW

Per drop more

crop(Micro Irrigation

DPAP Drip

Drip Irrigation Hac. 75.00 30.00 0.80 0.60 60.00

2 DPAP Drip

Sprinkler irrigation sets Hac. 120.00 10.00 0.70 84.00 84.00

3 Non DPAP Drip

Diesel power operated pump set

Hac. 500 500 0.50 250.00 250.00

4 Non DPAP

Sprinkler

Rain Guns Hac. 16 6.40 4.00 64.00 64.00

5 Capacity Building:- Training of farmers/Officer/Officials

exposure tour within and out side District/state .Kissan mela

and Ghosties

Nos 180 - 0.50 90.00 90.00

Total:- 891 548

Page 36: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

29

STRATEGIC IRRIGATION PLAN

SOIL & WATER CONSERVATION

(CAD)

Page 37: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

30

Block wise D.I.P of Command Area Dev. Sector under "Pradhan Mantri Krishi Sichayee Yojana" (PMKSY) Distt Leh- Ladakh (J&K)

S.N

O

Co

ncer

n

Min

istr

y

Dep

tt

Prog

ram

me

Co

mp

on

en

t

Acti

vit

y

Sub Component

LE

H

CH

UC

HO

T

KH

AL

TS

I

SA

SP

OL

DIS

KIT

PA

NA

MIK

NY

OM

A

DU

RB

UK

KH

AR

U

TO

TA

L R

s

in l

acs

UN

IT

Target

in

No

/Ha

Un

it C

ost

/

HA

Est

ima

ted

Co

st i

n R

s

lacs

Per

dro

p m

ore

cro

p (

su

pp

lem

enta

ry w

ater

man

agem

ent

acti

vit

ies

Drought 1 W.H.T 4.00 4.00 6.00 4.00 7.00 5.00 4.00 4.00 4.00 42.00 Ha 105 0.40 42.00

1

MOA &

FW proofing 2 Check Dam 40.00 20.00 70.00 30.00 60.00 70.00 25.00 40.00 15.00 370 Ha 1480 0.25 370.00

DAC &

FW through 3 Diversion Drains 10.00 30.00 20.00 15.00 20.00 18.00 10.00 20.00 10.00 153.00 Ha 546.5 0.28 153.0

check dams 4 Gully plug 25.00 30.00 80.00 50.00 80.00 90.00 70.00 40.00 30.00 495.00 Ha 1980 0.25 495.00

water 5 Contour Bund 10.00 15.00 30.00 15.00 35.00 25.00 15.00 15.00 10.00 170.00 Ha 680 0.25 170.00

harvesting 6 Bench Terracing 100.00 200.00 300.20 200.00 300.00 300.00 200.00 150.00 150.00 1900.20 Ha 1152 1.65 1900.2

structure 7 NBEC 50.00 60.00 400.00 50.00 110.00 150.00 110.00 100.00 70.00 1100.00 Ha 4400 0.25 1100.00

8 Chain-link fencing 50.00 35.00 40.00 50.00 50.00 50.00 50.00 40.00 35.00 400.00 Ha 160 2.50 400.00

2

MOA &

FW

Secondary storage

structure 1

Community tank, farm pounds

/Reservoirs

20.00 15.00 40.00 15.00 30.00 25.00 15.00 15.00 10.00 185.00

Ha

185 1.00 185.00

DAC & FW 2 Bore well 17.5 35 42 24.5 52.5 52.5 59.5 35.00 35.00 353.5 Ha 101 3.50 353.50

On

far

m d

evel

op

men

t (d

istr

ibuti

on

pip

es /

fiel

d

bund

ing a

nd

fu

rro

w s

yst

em e

tc

1

Pipe water

conveyance system 2.00 4.00 5.00 3.00 6.00 6.00 8.00 4.00 4.00 42.00 210 0.20 42.00

3

MOA &

FW 2

Distribution of

water through pipes 80.00 90.00 100.00 100.00 100.00 100.00 80.00 80.00 70.00 800.00 Ha 400 2.00 800.00

DAC & FW 3 Disilting of F/C 4.00 3.00 5.00 3.00 5.00 5.00 5.00 5.00 3.00 38.00 Ha 190 0.20 38.00

4 Disilting of W.H.T 6.00 3.00 10.00 5.00 5.00 6.00 7.00 4.00 4.00 50.00 Ha 250 0.20 50.00

5

Capacity building/

training / exposure

visit 4.00 3.00 4.00 2.00 4.00 4.00 4.00 4.00 2.20 31.20 No 78 0.40 31.20

6

Training on water conservation

awareness

4.00 4.00 5.00 3.00 4.00 3.00 3.00 3.00 3.00 32.00 No 640 0.05 32.00

7

Repair / Renovation of existing

infrastructure

50.00 40.00 55.00 35.00 50.00 45.00 40.00 35.00 30.00 380.00 Ha 1357 0.28 380.00

Page 38: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

31

Total 476.50 591.00

1212.2

0 604.50 918.50 954.50 705.50 594.00 485.20 6541.90 6541.90

4 2% Survey Planning & Designing of OFD 9.53 11.82 24.24 12.09 18.37 19.09 14.11 11.88 9.70 130.83 130.83

GRAND TOTAL 486.03 602.82

1236.4

4 616.59 936.87 973.59 719.61 605.88 494.90 6672.73 6672.73

Page 39: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

32

Block wise D.I.P Command Area Dev. Sector under" Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) in respect of Distt. Leh- Ladakh (J&K)

S.N

O

Blo

ck

Con

ern

ed M

inis

try /

Dep

tt.

pro

pose

d o

f

com

pon

ent

Est

imate

d c

ost

in

lacs

Bu

dget

Req

uir

ed

in L

acs

)

in 5

yea

rs

G.t

ota

l (i

n l

acs

)

1st

yea

r

10%

2n

d y

ear

25%

3rd

yea

r

25%

4th

yea

r

25%

5th

yea

r

15%

1 LEH MOWR H

ar

Kh

et K

o P

an

i

Fie

ld C

han

nel

/

F.d

rain

s &

oth

er s

oil

con

serv

ati

on

work

s /

aci

tivit

es

476.5 47.65 119.125 119.125 119.125 71.475 476.50

2 CHUCHOT MOWR 591 59.10 147.75 147.75 147.75 88.65 591.00

3 KHALTSI MOWR 1212.2 121.22 303.05 303.05 303.05 181.83 1212.20

4 SASPOL MOWR 604.5 60.45 151.13 151.13 151.13 90.67 604.50

5 DISKET MOWR 918.5 91.85 229.625 229.625 229.625 137.78 918.50

6 PANAMIK MOWR 954.5 95.45 238.625 238.625 238.625 143.18 954.50

7 NYOMA MOWR 705.5 70.55 176.375 176.375 176.375 105.83 705.5

Page 40: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

33

8 DURBUK MOWR 594 59.4 148.5 148.5 148.5 89.10 594.00

9 KHARU MOWR 485.2 48.52 121.3 121.3 121.3 72.78 485.20

TOTAL 6541.900 654.190 1635.475 1635.475 1635.475 981.28 6541.90

11 2% Survey Planning and desigh

OFD

130.838 13.0838 32.7095 32.7095 32.7095 19.6256 130.838

32.7095 19.6256

GRAND TOTAL RS 6672.73

Page 41: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

34

STRATEGIC IRRIGATION PLAN

COMMAND AREA DEVELOPMENT

Page 42: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

35

D.I.P of Command Area Dev. Sector (C.C.A) under" Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) in respect of Distt. Leh-

Ladakh (J&K)

S.NO Block

Concerned

Ministry /

Deptt.

proposed

of

component

Estimated

cost in

lacs Budget Required in Lacs ) in 5 years

G.Total

(in lacs)

1 LEH

Chuchot

and Kharu

MOWR

1st year

10%

2nd year

25%

3rd year

25%

4th year

25%

5th

year

15%

H

ar

Kh

et K

o P

an

i

Fie

ld C

han

nel

/

Dra

ins&

oth

er s

oil

con

serv

ati

on

work

s /

act

ivate

s

5207.25 520.725 1301.8125 1301.8125 1301.8125 781.0875 5207.25

2

KHALTSI

MOWR 878.50 87.850 219.63 219.63 219.63 131.78 878.50

&

Saspol

3

Diskit

MOWR

2180

218

545

545

545

327.00

2180

Page 43: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

36

&

Panamik

4

NYOMA

MOWR 334.5 33.45 83.625 83.625 83.625 50.18 334.5 &

DURRBUK

TOTAL 8600.25 860.025 2150.06 2150.06 2150.06 1290.04 8600.25

5 2 % Survery planning and designing

of OFD 172.01 17.20 43.00 43.00 43.00 25.80

172.01

GRAND TOTAL RS 8772.255 877.2255 2193.06 2193.06 2193.06 1315.84 8772.26

Page 44: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

37

D.I.P OF COMMAND AREA DEV. SECTOR (C.C.A) UNDER" PRADHAN MANTRI KRISHI SINCHAYEE YOJANA" (PMKSY) IN RESPECT OF DISTT. LEH- LADAKH

(J&K)

S.NO Block Name of Command Area

proposed

of

component

Gross

C.A (

Ha)

Total

C.C.A (

Ha)

Items of works Total

area unit

Target in

Ha

Unit

cost per

Ha

Estimate cost

in lacs

1 Leh Igoo-Phey (C.A)

Ha

r K

het

Ko P

an

i

Fie

ld C

ha

nn

el

/ F

.dra

ins

& o

ther

so

il c

on

serv

ati

on

wo

rks

/ a

citi

vit

es

4873 3043 1 cost of F/C 3043 ha 3043 0.50 1521.5

& 3043 2 land levelling 3043 ha 3043 0.25 760.75

Chuchot 3 Drain/Path 760 ha 760 0.5 380.00

4 WHT 3043 nos 60 1.00 60.00

5 Borewell 3043 nos 30 2.00 60.00

6 NBEC/Gully plug 3043 ha 700 0.25 175.00

7 Chainlink fencing 900 ha 900 2.50 2250.00

8

Survey Planning &

Designing of OFD 104.15

Total 5311.395

2 KHALTSI Dha (C.A) 1180 980 1 cost of F/C 980 ha 980 0.50 490.00

& Gonpathang (C.A) 2 land levelling 780 ha 780 0.25 195.00

Saspol (Skurbuchan) 3 Drain/Path 280 ha 280 0.50 140.00

Garathang (C.A) 4 WHT 6 nos 6 1.00 6.00

Shuktsarthang (C.A) 5 Borewell 4 nos 4 2.5 10.00

(Wanla) 6 NBEC/Gully plug 150 nos 150 0.25 37.50

Survey Planning &

Designing of OFD 17.57

Total 896.07

3 Diskit Tsogstoto (C.A) 2600 2200 1 cost of F/C 2200 ha 2200 0.50 1100.00

& (Diskit) 2 land levelling 1500 ha 1500 0.25 375.00

Panamik Summur/Lakjung (C.A) 3 Drain/Path 600 ha 600 0.50 300.00

Khardong/Rongjuk (C.A) 4 WHT 15 nos 15 1.00 15.00

Page 45: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

38

sasoma (C.A) 5 Borewell 15 nos 15 1.00 15.00

6 NBEC/Gully plug 150 nos 150 2.50 375.00

Survey Planning &

Designing of OFD 43.60

Total 2223.60

4 NYOMA Durbuk (C.A) 350 250 1 cost of F/C 200 ha 200 0.50 100.00

& Sangrak Analy (C.A) 2 land levelling 200 ha 200 0.25 50.00

DURRBUK Shachukul (C.A) 3 Drain/Path 50 ha 50 0.50 25.00

4 WHT 2 nos 2 1.00 2.00

5 Borewell 3 nos 3 2.50 7.50

6 NBEC/Gully plug 100 ha 100 0.25 25.00

7 Chainlink fencing 50 ha 50 2.50 125.00

Survey Planning &

Designing of OFD 6.69

Total 341.19

GRAND TOTAL 8772.26

Page 46: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

39

STRATEGIC IRRIGATION PLAN

FOREST DEPARTMENT

Page 47: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

40

Block wise DIP of Forest Department under "Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) District Leh

S.No Block/ Range

Concerned Ministry /

Departments

Programme Component

Activity Sub Component Number Unit Cost (In Lacs)

Area Covered (

Ha.)

Amount Involved

1 Leh DoLR-MoRD PMKSY Watershed

Other Ground Water

Recharge Structure

Soil Mositure Conservation

Creates 100 cum. 0.17 100 17.00

Water Harvesting/Storage Tank

1)Restoration of khul 40000 cum 0.00155 80 62.00

2)Constt. of water reservior 25 nos. 5.00 100.00 125.00

Plantation and Fencing 70000 nos. 0.0094 28.00 65.80

Gulley plugging 2000 cum 0. 01030 827.60 20.60

Check Dams 3689 cum 0. 01030 1526.4 37.99

Total 2662.00 328.39

2 Nubra DoLR-MoRD PMKSY Watershed

Other Ground Water

Recharge Structure

Soil Mositure Conservation

Creates 100 0.17 100 17.00

Water Harvesting/Storage Tank

1)Restoration of khul 40000 cum 0.00155 80 62.00

2)Constt. of water reservior 25 nos. 5.00 100.00 125.00

Plantation and Fencing 70000 nos. 0.0094 28.00 65.80

Gulley plugging 2000 cum 0. 01030 827.60 20.60

Check Dams 3689 cum 0. 01030 1526.4 37.99

Total 2662.00 328.39

Page 48: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

41

3 Nyoma

DoLR-MoRD PMKSY Watershed

Other Ground Water

Recharge Structure

Soil Mositure Conservation

Creates 100 0.17 100 17.00

Water Harvesting/Storage Tank

1)Restoration of khul 40000 cum 0.00155 80 62.00

2)Constt. of water reservior 25 nos. 5.00 100.00 125.00

Plantation & fencing 70000 nos. 0.0094 28.00 65.80

Gulley plugging 2000 cum 0. 01030 827.60 20.60

Check Dams 3689 cum 0. 01030 1526.4 37.99

Total 2662.00 328.39

4 Durbuk DoLR-MoRD PMKSY Watershed Other Ground

Water Recharge Structure

Soil Mositure Conservation

Creates 100 0.17 100 17.00

Water Harvesting/Storage Tank

1)Restoration of khul 40000 cum 0.00155 80 62.00

2)Constt. of water reservior 25 nos. 5.00 100.00 125.00

Plantation and Fencing 70000 nos. 0.0094 28.00 65.80

Gulley plugging 2000 cum 0. 01030 827.60 20.60

Check Dams 3689 cum 0. 01030 1526.4 37.99

Total 2662.00 328.39

5 Khaltsi DoLR-MoRD PMKSY Watershed

Other Ground Water

Recharge Structure

Soil Mositure Conservation

Creates 100 0.17 100 17.00

Water Harvesting/Storage Tank

1)Restoration of khul 40000 cum 0.00155 80 62.00

Page 49: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

42

2)Constt. of water reservior 25 nos. 5.00 100.00 125.00

Plantation and Fencing 70000 nos. 0.0094 28.00 65.80

Gulley plugging 2000 cum 0. 01030 827.60 20.60

Check Dams 3689 cum 0. 01030 1526.4 37.99

Total 2662.00 328.39

G.Total:- 13300.00 1642.00

Page 50: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

43

Location wise DIP of Forest Department under “Pradhan Mantri Krishi Sinchayee Yojana” (PMKSY) District Leh

S.No. Name of the work Name of the area Area

covered

1st year 2

nd year 3

rd year 4

th year 5

th year

A) Leh Range

1. Soil Moisture

Conservation

Ney - 25 nos. - - - -

Gai - - 25 nos. - - -

Meru - - - 25 nos. - -

Nimoo - - - - 25 nos. -

Taru - - - - - 25 nos.

2. Water Harvesting/

Structure/

Restoration of khul

Thiksay, Shey, Rambirpur - 8000 cum. - - - -

Chuchot, Gongma, Yokma, Palam - - 8000 cum. - - -

Choglamsar, Nimoo, Basgo - - - 8000 cum. - -

Spituk, Taru, Umla - - - - 8000 cum. -

Gai, Meru, Sakti, Chamday - - - - - 8000 cum.

3. Construction of

Water Reservation

Tank

Ney, Basgo,Nimoo,Taru, Umla - 5 nos. - - - -

Phyang, Phey, Stok, Matho, Changa - - 5 nos. - - -

Gai, Meru, Shara, Sakti, Chamday - - - 5 nos. - -

Gyamtsa, Gonpa, Ganglas, Horze, Saboo - - - - 5 nos. -

Liker, Palam, Kharu, Martselang - - - - - 5 nos.

4. Plantation &

Fencing

Thiksay, Shey, Chuchot, Taru - 14 000 nos. - - - -

Shey, Rampur, Palam - - 14000 nos. - - -

Choglamsar, Nimoo, Basgo - - - 14000 nos. - -

Spituk, Taru, Umla - - - - 14000 nos. -

Gai, Meru, Sakti, Chamday - - - - - 14000 nos.

5. Gulley plugging Stok, Matho, Gai, Meru - 400 cum. - - - -

Shara, Sharnos, Puktse - - 400 cum. - - -

Basgo, Ney, Nimoo - - - 400 cum. - -

Liker, Changa, Hemis - - - - 400 cum. -

Kharu, Sakti, Chamday - - - - - 400 cum.

6. Check Dam Leh, Shara, Puktse - 738 cum. - - - -

Basgo, Ney, Nimoo - - 738 cum. - - -

Liker, Taru, Umla - - - 738 cum. - -

Sakti, Chamday, Kharu - - - - 738 cum. -

Gai, Meru, Upshi

- - - - - 738 cum.

B) Nubra Range

Page 51: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

44

1. Soil Moisture

Conservation

Tongstay - 10 nos. - - - -

Khami - - 20 nos. - - -

Aranoo - - - 15 nos. - -

Taksha - - - - 15 nos. -

Youlkam - - - - - 20 nos.

Hunder - - - - 20 nos.

2. Water Harvesting

structures/restoration

of khul

Rongdoo,Rongjuk,Akgyam,Tangyar,

Udmaroo

- 5 no. - - - -

Tarchey,Skuru,Hundri,Skampuk,Parta - - 5 no. - - -

Digger,Khama,Khalsar,Tiger,Youlkam - - - 5 no. - -

Trith,Panamik,Trachay,Sumoor,

Panchimik

- - - - 5 no. -

Khardong,Parka,Youl,Rasarmo,Taksha - - - - - 5 no.

3. Restoration of khul Hunder, Disket 8000 cum. - - - -

Sumoor, Lakjung, Trith - - 8000 cum. - - -

Tigger Chamshan, Charasa - - - 8000 cum. - -

Terchey, Skuru, Udmaru - - - - 8000 cum. -

Hundri, Largab, Pachathang - - - - - 8000 cum.

4. Plantation &

Fencing

Hunder, Disket 20 hec. 14000 nos. - - - -

Sumoor, Lakjung, Trith 20 hec. - 14000 nos. - - -

Tigger, Chamshan, Charasa 20 hec. - - 14000 nos. - -

Terchey, Skuru, Udmaru 20 hec. - - - 14000 nos. -

Hundri, Largab, Pachathang 20 hec. - - - - 14000 nos.

5. Gulley plugging Hunder, Disket - 400 cum. - - - -

Sumoor, Lakjung, Trith - - 400 cum. - - -

Tigger, Chamshan, Charasa - - - 400 cum. - -

Tarchey, Skuru, Udmaru - - - - 400 cum. -

6. Check Dam Khama, Khungroo, Digger - 737.80cum. - - - -

Akgyam, Tangyar, Rongjuk - - 737.80cum. - - -

Hunder dhok, Hunder - - - 737.80cum. - -

Bogdang, Turtuk - - - - 737.80cum. -

Taksha, Thang - - - - - 737.80cum.

C) Durbuk Range

1. Soil Moisture

Conservation

Sato kargam - 20 nos. - - - -

Barma - - 20 nos. - - -

Khera pullu - - - 20 nos. - -

Page 52: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

45

Chushul - - - - 20 nos. -

Maan - - - - - 20 nos.

2. Restoration of khul Satto - 8000 nos. - - - -

Barma - - 8000 nos. - - -

Khera pullu - - - 8000 nos. - -

Chailam - - - - 8000 nos. -

Shayok farka - - - - - 8000 nos.

3. Gulley plugging Merak - 400 nos. - - - -

Barma - - 400 nos. - - -

Maan - - - 400 nos. - -

Durbuk - - - - 400 nos. -

Relly Eaching - - - - - 400 nos.

4. Constt. of water

reservoir

Shayok - 4 nos. - - - -

Maan - - 3 nos. - - -

Shachukul - - - 7 nos. - -

Chushul - - - - 7 nos. -

Tharuk - - - - - 4 nos.

5. Check Dam Shayok - 1500 nos. - - - -

Maan - - 1500 nos. - - -

Shachukul - - - 1500 nos. - -

Chushul - - - - 1500 nos. -

Tharuk - - - - - 1500 nos.

6. Plantation fencing Khera pullu - 14000 nos. - - - -

Barma - - 14000 nos. - - -

Satto - - - 14000 nos. - -

Shayok farka - - - - 14000 nos. -

Chailam - - - - - 14000 nos.

D) Nyoma Range

1. Soil Moisture

Conservation

Anlay taksa - 15 nos. - - - -

Nyoma - - 10 nos. - - -

Muth village - - - 5 nos. - -

Kuyul - - - 10 nos. - -

Page 53: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

46

Anlay shado - - - - 10 nos. -

Terri phu - - - - - 20 nos.

2. Constt. of water

reservoir

Muth - 3 nos. - - - -

Rongo - - 3 nos. - - -

Nider - - - 7 nos. - -

Mahey - - - - 5 nos. -

Nyoma - - - - - 7 nos.

3. Restoration khul Chumathang - 2000 cum. - - - -

Anlay gonpa - - 8000 cum. - - -

Anlay village - - - 8000 cum. - -

Muth village - - - 8000 cum. - -

Nyoma - 8000 nos. - - - -

Nidder - - - - - 6000 cum.

4. Plantation & fencing Chumathang - 5000 nos. - - - -

Anlay gonpa - 8000 nos. - - - -

Anlay village - 10000 nos. - - - -

Kuyul/Demjok - - 20000 nos. - - -

Muth - - - 8000 nos. - -

Nider youl - - - 14000 nos. - -

Skitmang - - - - 5000 nos. -

5. Gulley plugging Nyoma - 400 cum. - - - -

Mahy/Tikur - - 400 cum. - - -

Hamya - - - 400 cum. - -

Tukla/Fulak - - - - 800 cum. -

6. Check Dam Shochen nallah Rongo - 738 cum. - - - -

Rongo - - 738 cum. - - -

Nyoma - - - 738 cum. - -

Terri phu - - - - 738 cum. -

Kuyul - - - - - 738 cum.

D) Khaltsi Range

1. Soil Moisture

Conservation

Wanla/Trans Singay lalok - 5 nos. 5 nos. 5 nos. 5 nos. 5 nos.

Skurbuchan/Achinathang - 5 nos. 5 nos. 5 nos. - -

Tia/Temisgam/Nurla - - 5 nos. 5 nos. 5 nos. -

Domkhar - - 5 nos. 5 nos. - -

Dha Bima/Hanu yokma/Gongma - 5 nos. 5 nos. - - -

Khaltsi/Skingang - - 5 nos. - - 5 nos.

Alchi/Saspol/Yangthang - - - - - 5 nos.

Page 54: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

47

Hemis shukpachan - - - - 5 nos. -

Rezong/Uley tokpo/Mangu - - - - 5 nos. -

2. Water Harvesting

structures/restoration

of khul

Wanla/Singay lalok - 1000 cum. 1000 cum. 1000 cum. 1500 cum. 1000 cum.

Skurbuchan/Achinathang - 1000 cum. 1000 cum. 1000 cum. 1000 cum. 1000 cum.

Tai/Temisgam/Nurla - 1000 cum. 1000 cum. 1000 cum. 800 cum. 500 cum.

Domkhar - 1000 cum. 1000 cum. 1000 cum. 1000 cum. 1000 cum.

Dha Bema/Hanu Yokma/Gongma - 1500 cum. 1000 cum. 1000 cum. 1000 cum. 500 cum.

Mangue/Alchi - 800 cum. 800 cum. 500 cum. 500 cum. 500 cum.

Khaltsi/Skindyang - 500 cum. 500 cum. 800 cum. 800 cum. 150 cum.

Hemis/Rezdong/Uley - 500 cum. 500 cum. 500 cum. 500 cum. 150 cum.

Saspol/Yangthang - 500 cum. 500 cum. 500 cum. - 500 cum.

Takmachik/Urbis - 200 cum. 700 cum. 500 cum. 500 cum. 500 cum.

Lahdo/Lardo - - - 200 cum. 100 cum. 500 cum.

3. Constt. of water

R/Tank

Wanla/Singay lalok - 1 no. 1 no. 1 no. 1 no. 1 no.

Skurbuchan/Achinathang - 1 no. 1 no. 1 no. 1 no.

Tai/Temisgam/Nurla - 1 no. 1 no. - -

Domkhar - 1 no. 1 no. 1 no. - -

Dha Bema/Hanu Yokma/Gongma - 1 no. 1 no. - -

Mangue/Alchi - 1 no. 1 no. - - -

Khaltsi/Skindyang - - 1 no. - - -

Hemis/Rezdong/Uley - - - - 1 no.

Saspol/Yangthang - - - 1 no. - -

Takmachik/Urbis - - 1 no. 1 no. - -

Lahdo/Lardo - - - 1 no. 1 no. -

4. Plantation &

Fencing

Wanla/Singay lalok - 3000 nos. 3000 nos. 2000 nos. 2000 nos. 1000 nos.

Skurbuchan/Achinathang - 2000 nos. 2000 nos. 1500 nos. 1000 nos. 1000 nos.

Tai/Temisgam/Nurla - 3000 nos. 2000 nos. 2000 nos. 2000 nos. 1000 nos.

Domkhar - 3000 nos. 2000 nos. 3000 nos. 2000 nos. 1000 nos.

Dha Bema/Hanu - 2000 nos. 2000 nos. 2000 nos. 1500 nos. 1000 nos.

Mangue/Yangthang - 2000 nos. 1000 nos. 1000 nos. 500 nos. -

Khaltsi/Skindyang - 1000 nos. 1000 nos. 1000 nos. 1000 nos. -

Hemis/Rezdong/Uley - 1000 nos. 1000 nos. 1000 nos. 500 nos. -

Saspol/Alchi - 1000 nos. 1000 nos. 1000 nos. 500 nos. -

Takmachik - 1000 nos. 1000 nos. 500 nos. 500 nos. -

Lahdo/Urbis - 1000 nos. 1000 nos. 1000 nos. 1000 nos. -

5. Gulley plugging Wanla/Singey lalok - 100 cum. 100 cum. 100 cum. 100 cum. 100 cum.

Page 55: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

48

Skurbuchan/Achinathang - 100 cum. 100 cum. 100 cum. 100 cum. -

Tai/Temisgam - 100 cum. 100 cum. 100 cum. 100 cum. -

Dhomkhar - 100 cum. 100 cum. 100 cum. 100 cum. -

Takmachik - 100 cum. 100 cum. 100 cum. - -

6. Check Dam Wanla/Singey lalok - 150 cum. 150 cum. 150 cum. 150 cum. 150 cum.

Skurbuchan/Achinathang - 150 cum. 150 cum. 150 cum. 150 cum. 150 cum.

Tai/Temisgam - 150 cum. 150 cum. 150 cum. 150 cum. 150 cum.

Dhomkhar - 150 cum. 150 cum. 150 cum. 150 cum. 150 cum.

Takmachik - 150 cum. 150 cum. 150 cum. 150 cum. 150 cum.

Page 56: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

49

DIP OF FOREST DEPARTMENT UNDER "PRADHAN MANTRI KRISHI SINCHAYEE YOJANA" (PMKSY) DISTRICT LEH

(YEAR-WISE) S

.No

Co

ncer

ned

Min

istr

y /

Dep

artm

en

ts

Prog

ram

me

Co

mp

on

en

t

Acti

vit

y

Su

b C

om

po

nen

t

Nu

mb

er

Un

it C

ost

(In

Lacs)

Area

Co

vered

(h

a)

Am

ou

nt

Inv

olv

ed

Budget Requirement ( In Lakhs)

G.T

ota

l

( In

La

kh

s)

1st year

(20%)

2nd year

(20%)

3rd year

(20%)

4th year

(20%)

5th Year

(20%)

1 DoLR-

MoRD

PMKSY

Watershed

Oth

er G

rou

nd

Wat

er

Rec

har

ge

Str

uct

ure

Soil Moisture Conservation

Creates 500 0.17 500 85.00 17.00 17.00 17.00 17.00 17.00 85.00

Water

Harvesting/Storage Tank

200000

cum. 0.00155 400 310.00 62.00 62.00 62.00 62.00 62.00 310.00

1)Restoration of khul

2)Construction of water

reservoir tanks

125

nos 5.00 500 625.00 125.00 125.00 125.00 125.00 125.00 625.00

Plantation and Fencing 350000

nos 0. 0094 318 329.00 65.80 65.80 65.80 65.80 65.80 329.00

Gully plugging 10000

cum 0. 01030 4138 103.00 20.60 20.60 20.60 20.60 20.60 103.00

Check Dams 18446 cum

0. 01030 7632 190.00 38.00 38.00 38.00 38.00 38.00 190.00

Total 5.03 13488 1642.0 328.40 328.40 328.40 328.40 328.40 1642.00

Page 57: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

50

DIP OF FOREST DEPARTMENT UNDER "PRADHAN MANTRI KRISHI SINCHAYEE YOJANA" (PMKSY) DISTRICT LEH

(COMPONENT-WISE)

S.No

Concerned

Ministry /

Departments

Programme

Component

Activity Sub Component Number/

CUM.

Unit Cost

(In Lacs)

Area

Covered

Amount

Involved

Total

1 DoLR-MoRD PMKSY

Watershed

Other

Ground

Water

Recharge

Structure

Soil Mositure

Conservation

1642.00

Creates 500 0.17 500 85.00

Water

Harvesting/Storage Tank

0.00155 400 310.00

1)Restoration of khul 200000

cum.

2)Constt. of water

reservior tanks 125 nos. 5.00 500 625.00

Plantation and

Fencing/Irrigation

350000

nos. 0. 0094 140 329.00

Gulley Plugging 10000 cum 0. 0103 4138 103.00

Check Dams 18446 cum 0. 01030 7632 190.00

Total 13310 1642.00

Page 58: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

51

DIP of Forest Department under "Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) District Leh (Year-wise)

S.No Concerned Ministry /

Departments

Programme Component

Activity Sub Component Number Unit Cost

(In Lacs)

Area Covered

(ha)

Amount Involved

Budget Requirement ( In Lakhs)

G.Total ( In Lakhs) 1st year

(20%) 2nd year

(20%)

3rd year

(20%)

4th year

(20%)

5th Year

(20%)

1 DoLR-MoRD PMKSY

Watershed

Other Ground Water

Recharge Structure

Soil Mositure Conservation

Creates 500 0.17 500 85.00 17.00 17.00 17.00 17.00 17.00 85.00

Water Harvesting/Storage Tank

200000 cum. 0.00155 400 310.00 62.00 62.00 62.00 62.00 62.00 310.00

1)Restoration of khul

2)Construction of water reservior tanks

125 nos 5.00 500 625.00 125.00 125.00 125.00 125.00 125.00 625.00

Plantation and Fencing 350000

nos 0. 0094 318 329.00 65.80 65.80 65.80 65.80 65.80 329.00

Gully plugging 10000 cum

0. 01030 4138 103.00 20.60 20.60 20.60 20.60 20.60 103.00

Check Dams 18446 cum

0. 01030 7632 190.00 38.00 38.00 38.00 38.00 38.00 190.00

Total 5.03 13488 1642.00 328.40 328.40 328.40 328.40 328.40 1642.00

Page 59: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

52

STRATEGIC IRRIGATION PLAN

HORTICULTURE

Page 60: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

53

Department / Component wise Irrigation Plan Horticulture Sector under "Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) District Leh

S. No Name of the Department AIBP

Budget Requirement (In Lakhs)

PMKSY (Her

PMKSY (Per drop more

crop) (Rs. In lacs) PMKSY

(Watershed) MGNREGA Budget requirement

(Rs in lakhs)

1 HORTICULTURE 192.50 192.50

Total:- 192.50 192.50

Page 61: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

54

DIP of Horticulture Sector under "Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) District Leh(Component - wise)

S. No

Name of the Block

Concerned Ministry/

Department

Programme Component

Activity Sub.Com-

ponent

Area (in

Hect.)

E.Cost per

hect. (Rs in Lacs)

Total cost

(Rs in Lacs)

Activity wise area

Budget Requirement (In Lakhs) G.

Total (In

Lakhs)

Ist Year (5%)

2nd Year (25%)

3rd Year (25%)

4th Year (25%)

5th Year (20%)

1 Skurbuchan

HORTICULTURE

Per drop more crop(supplimentry

water management

activities)

Drought proofing through

check dams/ water

harvesting structure

Water harvesting tank/Dug well/bore

well/submersible pump/irrigation

cannals

10 2.00 20.00 1.00 5.00 5.00 5.00 4.00 20.00

2 Khaltsi 10 2.00 20.00 1.00 5.00 5.00 5.00 4.00 20.00

3 Singay-Lalok 10 2.00 20.00 1.00 5.00 5.00 5.00 4.00 20.00

4 Saspol 5 2.00 10.00 0.50 2.50 2.50 2.50 2.00 10.00

5 Leh 15 2.00 30.00 1.50 7.50 7.50 7.50 6.00 30.00

6 Chuchot 10 2.00 20.00 1.00 5.00 5.00 5.00 4.00 20.00

7 Thiksay 5 2.00 10.00 0.50 2.50 2.50 2.50 2.00 10.00

8 Nimoo 5 2.00 10.00 0.50 2.50 2.50 2.50 2.00 10.00

9 Diskit 5 2.00 10.00 0.50 2.50 2.50 2.50 2.00 10.00

10 Panamik 5 2.00 10.00 0.50 2.50 2.50 2.50 2.00 10.00

11 Turtuk 5 2.00 10.00 0.50 2.50 2.50 2.50 2.00 10.00

12 Kharu 5 2.00 10.00 0.50 2.50 2.50 2.50 2.00 10.00

13 Nyoma 0 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

14 Durbuk 0 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

15 Rupshow 0 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

16 Rong- Churgut 0 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total:- 90 2.00 180.00 9.00 45.00 45.00 45.00 36.00 180.00

17 Capacity building,trainings etc.

12.50 2.50 2.50 2.50 2.50 2.50 12.50

G.Total:- 90 2.00 192.50 11.50 47.50 47.50 47.50 38.50 192.50

Page 62: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

55

Year/Department wise District Irrigation Plan Horticulture Sector under "Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) District Leh

S. No

Name of the Department Budget requirement

(Rs in lakhs)

Budget Requirement (In Lakhs) G. Total

(In Lakhs) Ist Year

(5%) 2nd Year

(25%) 3rd Year (25%) 4th Year

(25%) 5th Year

(20%)

1 HORTICULTURE 192.50 11.50 47.50 47.50 47.50 38.50 192.50

Total:- 192.50 11.50 47.50 47.50 47.50 38.50 192.50

Year/Department wise District Irrigation Paln Horticulture Sector under "Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) District Leh

S. No

Name of the Department Budget requirement

(Rs in lakhs)

Budget Requirement (In Lakhs) G. Total

(In Lakhs) Ist Year

(5%) 2nd Year (25%) 3rd Year (25%) 4th Year

(25%) 5th Year

(20%)

1 HORTICULTURE 180.00 9.00 45.00 45.00 45.00 36.00 180.00

2 Capacity building, trainings etc. 12.50 2.50 2.50 2.50 2.50 2.50 12.50

Total:- 192.50 11.50 47.50 47.50 47.50 38.50 192.50

Page 63: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

56

STRATEGIC IRRIGATION PLAN

IWMP

Page 64: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

57

YEAR/DEPARTMENT WISE DISTRICT PLAN OF INTEGRATED WATERSHED MANAGEMENT PROGRAM UNDER (PMKSY) DISTRICT LEH

S.No Name of the

Block

Budget Requirement

in (lacs)

Budget Requirement (In Lakhs) G. Total

(In Lakhs)

Ist Year (5%) 2nd Year (25%) 3rd Year (25%) 4th Year (25%) 5th Year (20%)

1 PANAMIC 1458 72.9 364.5 364.5 364.5 291.6 1458

2 DURBUK 1661 83.05 415.25 415.25 415.25 332.2 1661

3 CHUMATHANG 647 32.35 161.75 161.75 161.75 129.4 647

4 NYOMA 904 45.2 226 226 226 180 904

TOTAL 4670 233.5 1167.5 1167.5 1167.5 933.2 4670

Page 65: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

58

BLOCK WISE DIP OF IWMP WATERSHRD UNDER "PRADAN MANTRI KRISHI SINCHAYEE YOJNA" (PMKSY) LEH DISTRICT.

S.No Name of the

Block

Concerned

Ministry/

Department

Programme

Component

Activity Total

No/Capacity(CUM)

Command

area/Irrigation

potential

(in HA)

Period of

Implement

(5-7yrs)

E.Cost of

Scheme in

(Rs in Lacs)

1

PA

NA

MIC

K

DO

LR

-MO

Rd

PM

KS

Y W

AT

ER

SH

ED

FARM POND _ _ _ 0

CHECK DAM 10 30 5-7YRS 60

NALLAH BUNDS 10 100 5-7YRS 30

PERCOLATION TANKS _ _ _ _

OTHER GROUND

WATERRECHARGE

STRUCTURE

_ _ _ _

IRRIGATION CANALS 17 7 5-7YRS 170

WATER EXISTING STRUCTURE _ _ _ _

LAND DEVELOPMENT 12 275 5-7YRS 468

OTHER 22 846 5-7YRS 675

RENOVATED WHS

CO

NV

ER

GE

NC

E W

ITH

MG

NR

EG

A

FARM POND _ _ _ _

CHECK DAM _ _ _

NALLAH BUNDS _ _ _ _

PERCOLATION TANKS _ _ _ _

OTHER GROUND WATER

RECHARGE STRUCTURE

_ _ _ _

IRRIGATION CANALS 1 5 5-7YRS 20

OTHER 3 5.55 5-7YRS 35

NEWLY CREATED _ _ _

WATER CONSERVATION _ _ _ _

WATER HARVESTING _ _ _ _

CREATION OF IRRIGATION

CANALS & DAMS

_ _ _ _

PROVIDING INFRASTRUCTURE

FOR IRRIGATION

_ _ _ _

Page 66: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

59

LAND DEVELOPMENT _ _ _ _

RENOVATION

RENOVATION OF WATER

BODIES INCL. DESILTING

_ _ _

RENOVATION &

MAINTENANCE OF CANALS

&DAMS

_ _ _

TOTAL= 1458

2

DU

RB

UK

DO

LR

-MO

Rd

PM

KS

Y W

AT

ER

SH

ED

FARM POND _ _ _ 0

CHECK DAM 18 1340 5-7YRS 45

NALLAH BUNDS 57 5-7YRS 37

PERCOLATION TANKS _ _ _ _

OTHER GROUND

WATERRECHARGE

STRUCTURE

_ _ _ _

IRRIGATION CANALS 24 19200 5-7YRS 255

WATER EXISTING STRUCTURE _ _ _ _

LAND DEVELOPMENT 22 2899 5-7YRS 842

OTHER 36 25 5-7YRS 482

RENOVATED WHS

CO

NV

ER

GE

NC

E W

ITH

MG

NR

EG

A

FARM POND _ _ _ _

CHECK DAM _ _ _

NALLAH BUNDS _ _ _ _

PERCOLATION TANKS _ _ _ _

OTHER GROUND WATER

RECHARGE STRUCTURE

_ _ _ _

IRRIGATION CANALS _ _ _ _

OTHER _ _ _ _

NEWLY CREATED _ _ _

WATER CONSERVATION _ _ _ _

WATER HARVESTING _ _ _ _

Page 67: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

60

CREATION OF IRRIGATION

CANALS & DAMS

_ _ _ _

PROVIDING INFRASTRUCTURE

FOR IRRIGATION

_ _ _ _

LAND DEVELOPMENT _ _ _ _

RENOVATION

RENOVATION OF WATER

BODIES INCL. DESILTING

_ _ _

RENOVATION &

MAINTENANCE OF CANALS

&DAMS

_ _ _

TOTAL= 1661

3

CH

UM

AT

HA

NG

DO

LR

-MO

Rd

PM

KS

Y W

AT

ER

SH

ED

FARM POND _ _ _ _

CHECK DAM _ _ _ _

NALLAH BUNDS _ _ _

PERCOLATION TANKS _ _ _ _

OTHER GROUND

WATERRECHARGE

STRUCTURE

_ _ _ _

IRRIGATION CANALS 3 37.5 5-7YRS 142

WATER EXISTING STRUCTURE _ _ _ _

LAND DEVELOPMENT 7 20.5 5-7YRS 160

OTHER 8 105.5 5-7YRS 345

RENOVATED WHS

CO

NV

ER

GE

N

CE

WIT

H

MG

NR

EG

A FARM POND _ _ _ _

CHECK DAM _ _ _

NALLAH BUNDS _ _ _ _

PERCOLATION TANKS _ _ _ _

Page 68: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

61

OTHER GROUND WATER

RECHARGE STRUCTURE

_ _ _ _

IRRIGATION CANALS _ _ _ _

OTHER _ _ _ _

NEWLY CREATED _ _ _

WATER CONSERVATION _ _ _ _

WATER HARVESTING _ _ _ _

CREATION OF IRRIGATION

CANALS & DAMS

_ _ _ _

PROVIDING INFRASTRUCTURE

FOR IRRIGATION

_ _ _ _

LAND DEVELOPMENT _ _ _ _

RENOVATION

RENOVATION OF WATER

BODIES INCL. DESILTING

_ _ _

RENOVATION &

MAINTENANCE OF CANALS

&DAMS

_ _ _

TOTAL= 647

4

NY

OM

A(T

SA

GA

& N

YO

MA

)

DO

LR

-MO

Rd

PM

KS

Y W

AT

ER

SH

ED

FARM POND _ _ _ 0

CHECK DAM 3 _ 5-7YRS 80

NALLAH BUNDS 7 _ 5-7YRS 100

PERCOLATION TANKS _ _ _ _

OTHER GROUND

WATERRECHARGE

STRUCTURE

_ _ _ _

IRRIGATION CANALS 3 37.5 5-7YRS 100

WATER EXISTING STRUCTURE _ _ _ _

LAND DEVELOPMENT 3 20.5 5-7YRS 90

OTHER 36 25 5-7YRS 534

Page 69: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

62

RENOVATED WHS

CO

NV

ER

GE

NC

E W

ITH

MG

NR

EG

A

FARM POND _ _ _ _

CHECK DAM _ _ _

NALLAH BUNDS _ _ _ _

PERCOLATION TANKS _ _ _ _

OTHER GROUND WATER

RECHARGE STRUCTURE

_ _ _ _

IRRIGATION CANALS _ _ _ _

OTHER _ _ _ _

NEWLY CREATED _ _ _

WATER CONSERVATION _ _ _ _

WATER HARVESTING _ _ _ _

CREATION OF IRRIGATION

CANALS & DAMS

_ _ _ _

PROVIDING INFRASTRUCTURE

FOR IRRIGATION

_ _ _ _

LAND DEVELOPMENT _ _ _ _

RENOVATION

RENOVATION OF WATER

BODIES INCL. DESILTING

_ _ _

RENOVATION &

MAINTENANCE OF CANALS

&DAMS

_ _ _

TOTAL= 904

Page 70: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

63

STRATEGIC IRRIGATION PLAN

IRRIGATION DEPARTMENT

Page 71: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

64

YEAR / DEPARTMENT WISE DISTRICT IRRIGATION PLAN UNDER PMKSY DISTRICT LEH.

IRRIGATION AND FLOOD CONTROL DIVISION LEH.

S.No Name of the Department Budget

Req. (In lakhs)

Budget Requirement (In Lakhs) G. Total

(In Lakhs) Ist Year 2nd Year

3rd Year 4th Year 5th Year

I. Irrigation Department

1 Minor irrigation Scheme (on-going)

1448.68 943.15 468.19 37.34 - - 1448.68

S.No Name of the Department Budget

Req. (In lakhs)

Budget Requirement (In Lakhs) G. Total

(In Lakhs) Ist Year (5%)

2nd Year (25%)

3rd Year (25%)

4th Year (25%)

5th Year (20%)

1 Minor irrigation Scheme (New scheme)

22279.56 1113.98 5569.89 5569.89 5569.89 4455.91 22279.56

G. Total 23728.24 2057.13 6038.08 5607.23 5569.89 4455.91 23728.24

Page 72: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

65

DIP OF IRRIGATION SECTOR UNDER "PRADHAN MANTRI KRISHI SINCHAYEE YOJANA" (PMKSY) DISTRICT LEH (YEAR - WISE) I&FC

DIVISION LEH

(ONGOING SCHEME)

S.

No

Name of the

Block

Concern

Ministry

/ Deptt.

Programme

Component Activity

Command

area

(in acres)

CCA

Discharge

(in cusecs)

E.Cost of

Scheme

in (Rs in

Lacs)

Comm.

Expdt.

Up to

03/2016

Balance

Estt. Cost

up to

03/2016

Budget Requirement (In Lakhs) G.

Total

(In

Lakhs) Ha

Ist

Year

2nd

Year

3rd

Year

4th

Year

5th

Year

1

Const &

Improvement of Abi Canal Leh

MO

WR

AIB

P

Min

or

irri

gat

ion

1605.5 650.00 49.00 815.00 576.95 166.04 84.54 81.5 - - - 166.04

2

Const &

Improvement of Upshi Canal Leh

864.5 350 20 407 328.15 61.31 61.31 - - - - 61.31

3

Const of

Irrigation canal

at Demjok

Nyoma

617.5 250 24 331.71 234.02 68.02 68.02 - - - - 68.02

4

Const of

Irrigation canal from Changla to

Thangnak at Durbuk P-II

469.3 190 11 283.14 199.79 58.04 58.04 - - - - 58.04

5

Construction of

Chesgon irrigation canal

Diskit Nobra

2346.50 950.00 51.45 1452.00 981.54 320.84 175.64 145.20 - - - 320.84

6

Construction of

irrigation canal at Partapur

Nobra

568.10 230.00 20.00 327.54 237.64 61.57 61.57 - - - - 61.57

Page 73: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

66

7

Agyamthang irrigation canal

617.50 250.00 24.00 373.45 60.00 223.45 100.00 86.11 37.34 - - 223.45

8

Rongjuk irrigation canal

at Pachathang

Dho 301.34 122.00 12.00 218.43 55.00 83.43 61.59 21.84 - - - 83.43

9

Construction of

irrigation canal at Achinathang

Gongma (Khalsi

Block)

432.50 175.00 16.00 219.37 55.00 104.37 82.44 21.93 - - - 104.37

10

Construction of

irrigation canal

at Achinathang

Yokma (Khalsi)

494.00 200.00 18.00 257.69 55.00 142.69 90 52.69 - - - 142.69

11

Construction of

irrigation canal at Skurbuchan

(Khalsi Block)

543.40 220.00 21.00 272.8 73.88 158.92 100 58.92 - - - 158.92

Total 8860.14 3587.00 266.45 4958.13 2856.97 1448.68 943.15 468.19 37.34 0.00 0.00 1448.68

Page 74: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

67

DIP OF IRRIGATION SECTOR UNDER "PRADHAN MANTRI KRISHI SINCHAYEE YOJANA" (PMKSY) DISTRICT LEH (YEAR - WISE)

IRRIGATION LEH (NEW SCHEMES)

S.No Name of the Block

Co

nce

rn

ed

Min

istr

y/

Dep

art

men

t

Pro

gra

mm

e

Co

mp

on

ent

Act

ivit

y

Co

mm

an

d

are

a

(in

acr

es)

CC

A i

n H

a

E.C

ost

of

Sch

eme

in (

Rs

in L

acs

) Bu

d

get

Req

uir

e

men

t (I

n

La

k

hs)

G.

To

tal

(In

La

kh

s)

Ist

Yea

r

(5%

)

2n

d

Yea

r

(25

%)

3rd

Yea

r

(25

%)

4th

Yea

r

(25

%)

5th

Yea

r

(20

%)

A Durbuk Block

1 improvement/ Strengthening

of Irrigation Canal Durbuk

MO

WR

AIB

P

Min

or

irri

gat

ion

518.70 150.00 130.00 6.50 32.50 32.50 32.50 26.00 130.00

2 Improvement/

Strengthening of Irrigation

Canal Serthokthang

Shachukul

679.25 200.00 120.00 6.00 30.00 30.00 30.00 24.00 120.00

B Nyoma Block

1 Contruction of Irrigation

Canal at Anlay Phase-II

615.50 250.00 625.53 31.27 156.38 156.38 156.38 125.10 625.53

2 Construction of irrigation

canal from Zara nallah to

Yagang & pingonago (

Samadrokchan) Nyoma

494.00 200.00 362.74 18.13 90.68 90.68 90.68 72.54 362.74

C Chumathang Block

1 Improvement/

Strengthening and

Extension of Irrigation

Canal Chumathang

370.50 140.00 140.00 7.00 35.00 35.00 35.00 28.00 140.00

D Skurbuchan Block

Page 75: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

68

1 construction of irrigation

canal Beema left side at

Beema

400.00 161.94 450.00 22.50 112.50 112.50 112.50 90.00 450.00

2 construction of irrigation

canal Beema Right side at

Beema

MO

WR

AIB

P

Min

or

irri

gat

ion

345.00 121.45 400.00 20.00 100.00 100.00 100.00 80.00 400.00

3 Remodelling of irrigation

canal Gonpathang at

Skurbuchan

703.95 285.00 713.28 35.66 178.32 178.32 178.32 142.66 713.28

4 Remodelling of irrigation

canal Hanuthang

375.00 150.00 336.00 16.80 84.00 84.00 84.00 67.20 336.00

E Khaltse Block

1 Strengthening and extension

of irrigation canal

Shuksherthang Fanjila

(Khalsi Block)

475.00 190.00 476.00 23.80 119.00 119.00 119.00 95.20 476.00

2 Remodeling of irrigation

canal Tar (Khalsi Block)

167.50 67.00 400.00 20.00 100.00 100.00 100.00 80.00 400.00

3 Construction of irrigation

canal at Phothoksar (Khaltse

block)

212.50 85.00 300.00 15.00 75.00 75.00 75.00 60.00 300.00

4 Completion of balance work

of irrigation canal

Takmachik

2175.0

0

870.00 2167.00 108.35 541.75 541.75 541.75 433.40 2167.00

F Saspol Block

Page 76: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

69

1 Improvement/

Strengthening of irrigation

canal at Ulleytokpo

162.50 65.00 161.00 8.05 40.25 40.25 40.25 32.20 161.00

2 Improvement/

Strengthening of Khantsey

irrigation canal at Mangue

175.00 70.00 174.00 8.70 43.50 43.50 43.50 34.80 174.00

3 Improvement/

Strengthening of

Dakpathang irrigation canal

at Hemishukpachan M

OW

R

AIB

P

Min

or

irri

gat

ion

425.00 190.00 474.00 23.70 118.50 118.50 118.50 94.80 474.00

4 construction of irrigation

canal at Saspol

350.00 140.00 567.00 28.35 141.75 141.75 141.75 113.40 567.00

G Panamik Block

1 Construction of irrigation

canal at Yarma Gombo

123.50 50.00 640.00 32.00 160.00 160.00 160.00 128.00 640.00

2 Construction of irrigation

canal at Charasa.

864.50 350.00 853.52 42.68 213.38 213.38 213.38 170.70 853.52

H Diskit Block

1 Construction of irrigation

canal at Hunder

1158.4

3

469.00 1097.20 54.86 274.30 274.30 274.30 219.44 1097.20

2 Construction of irrigation

canal at Skampuk

988.00 400.00 988.10 49.41 247.03 247.03 247.03 197.62 988.10

Page 77: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

70

3 Construction of irrigation

canal at Udmaru

429.41 173.85 430.06 21.50 107.52 107.52 107.52 86.01 430.06

4 Construction of irrigation

canal Changmar

617.50 250.00 599.54 29.98 149.89 149.89 149.89 119.91 599.54

5 Construction of Irrigation

canal Bikudho Waris

296.40 120.00 650.00 32.50 162.50 162.50 162.50 130.00 650.00

6 Construction of irrigation

canal Largyab Gongma

197.60 80.00 580.00 29.00 145.00 145.00 145.00 116.00 580.00

7 Construction of irrigation

canal Hundri M

OW

R

AIB

P

Min

or

irri

gat

ion

234.65 95.00 910.00 45.50 227.50 227.50 227.50 182.00 910.00

8 Construction of irrigation

canal Terchey

494.00 200.00 1500.00 75.00 375.00 375.00 375.00 300.00 1500.00

9 Construction of irrigation

canal at Parathang Skampuk

456.95 185.00 1100.00 55.00 275.00 275.00 275.00 220.00 1100.00

I Turtuk Block

1 Krishthang Irrigation canal 620.46 251.20 610.40 30.52 152.60 152.60 152.60 122.08 610.40

2 Lift irrigation canal Tyakshi 370.50 150.00 376.00 18.80 94.00 94.00 94.00 75.20 376.00

3 Brayachanthang irrigation

canal Bogdang

370.50 150.00 850.00 42.50 212.50 212.50 212.50 170.00 850.00

4 Balance work of

Phadathang irrigation canal

Tyakshi

535.99 217.00 250.00 12.50 62.50 62.50 62.50 50.00 250.00

K Nimo Block

Page 78: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

71

1 Improvement/Strengthening

of Guntsesthang Canal

Nimo Phase-II

1605.5

0

650.00 590.15 29.50 147.53 147.53 147.53 118.03 590.15

2 Construction of Lift

Irrigation Scheme at

Chilingthang Nimo

1309.1

0

530.00 587.00 29.35 146.75 146.75 146.75 117.40 587.00

3 Construction of Lift

Irrigation Scheme at

Chilingthang Lower Basgo

1482.0

0

600.00 620.00 31.00 150.00 150.00 150.00 124.00 620.00

J Leh Block

1 Lift irrigation Scheme at

Phey

382.85 155.00 190.74 9.54 47.61 47.61 47.61 38.09 190.74

2 Improvement of Sumdo

Chenmo irrigation canal

damaged in flash flood.

37.05 15.00 90.00 4.50 22.50 22.50 22.50 18.00 90.00

3 Improvement / restoration

of distributries and main Igo

Phey irrigation canal

MO

WR

Har

Kh

et K

o

Pan

i

Min

or

irri

gat

ion

2593.5

0

1050.0

0

270.30 13.52 67.58 67.58 67.58 54.06 270.30

K Kharu Block

1 Diversion of water from

Changla to Sakti

MO

WR

Har

Kh

et K

o

Pan

i

Min

or

irri

gat

ion 938.60 380.00 250.00 12.50 62.50 62.50 62.50 50.00 250.00

2 Diversion of water from

Warila to Sakti

1111.5

0

450.00 250.00 12.50 62.50 62.50 62.50 50.00 250.00

Total 25862.89 10306.44 22279.56 1113.96 5564.80 5564.80 5564.80 4455.84 22279.56

Page 79: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

72

STRATEGIC IRRIGATION PLAN

SOIL CONSERVATION (FOREST)

Page 80: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

73

DIP of Soil Conservation Forest under “ Pradhan Mantri Krishi Sinchayee Yojana” ( PMKSY) District Leh ( Component- wise)

S. No Concerned Minister Departments

Component Activity Type of Works Units Area in Hectares

Cost in Lakh Total

1

DOLR-MORD

As per Department of soil & Water conservation norms .

a). Restoration of irrigation Khul and H/W b). Nallah Bank Erosion Control to protect precious Agriculture Lands

i) Laying of crates structures, Costt. Of DRSM Works , Earth Work & Cement concrete works etc i) Laying of crates structures, DRSM & Earth Work etc.

52 510

158 420

166.40 102.10

166.40 102.10

Total 578 268.50 268.50

DIP of Soil Conservation Forest under “ Pradhan Mantri Krishi Sinchayee Yojana” ( PMKSY) District Leh ( Year- wise)

Page 81: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

74

S.No

Concerned Minister Departments

Component Activity Type of Works Units Area in Hectares

Cost in Lakh

Budget Requirement ( in Lakhs) G Total

1st

Year (5%)

2nd

Year (25%)

3rd

Year (25%)

4th

Year (25%)

5th

Year (20%)

1

DOLR-MORD

As per Department of soil & Water conservation norms .

a). Restoration of irrigation Khul and H/W b). Nallah Bank Erosion Control to protect precious Agriculture Lands

i) Laying of crates structures, Costt. Of DRSM Works , Earth Work & Cement concrete works etc . i) Laying of crates structures, DRSM & Earth Work etc.

52 510

158 420

166.40 102.10

8.32 5.105

41.60 25.525

41.60 25.525

41.60 25.525

33.28 20.42

166.40 102.10

268.50 13.425 67.125 67.125 67.125 53.70 268.50

Block wise DIP of Soil Conservation Forest under “Pradhan Mantri Krishi Sinchayee Yojana” (PMKSY) District Leh

S. No Block Concerned Minister Component Activity Type of Works Units Area in Cost in Total

Page 82: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

75

Departments Hectares Lakh

1 Leh DOLR-MORD As per

Department

of soil &

Water

conservation

norms .

a). Restoration of

irrigation Khul and H/W

b). Nallah Bank Erosion

Control to protect

precious Agriculture

Lands

i) Laying of crates structures, Costt.

Of DRSM Works , Earth Work &

Cement concrete works etc .

i) Laying of crates structures, DRSM

& Earth Work etc.

06

90

20

65

19.50

13.50

19.50

13.50

Total 85 33.00 33.00

2 Saspol DOLR-MORD As per

Department

of soil &

Water

conservation

norms .

a). Restoration of

irrigation Khul and H/W

b). Nallah Bank Erosion

Control to protect

precious Agriculture

Lands

i) Laying of crates structures, Costt.

Of DRSM Works , Earth Work &

Cement concrete works etc .

i) Laying of crates structures, DRSM

& Earth Work etc.

07

40

25

38

22.00

11.50

22.00

11.50

Total 63 33.50 33.50

3 Diskit DOLR-MORD As per

Department

of soil &

Water

conservation

norms .

a). Restoration of

irrigation Khul and H/W

b). Nallah Bank Erosion

Control to protect

precious Agriculture

Lands

i) Laying of crates structures, Costt.

Of DRSM Works , Earth Work &

Cement concrete works etc .

i) Laying of crates structures, DRSM

& Earth Work etc.

06

60

18

55

19.20

13.10

19.20

13.10

Total 73 32.30 32.30

4 Turtuk DOLR-MORD As per

Department

of soil &

Water

a). Restoration of

irrigation Khul and H/W

i) Laying of crates structures, Costt.

Of DRSM Works ,Earth Work &

Cement concrete works etc .

05

12

16.00

16.00

Page 83: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

76

conservation

norms .

b). Nallah Bank Erosion

Control to protect

precious Agriculture

Lands

i) Laying of crates structures, DRSM

& Earth Work etc.

80 75 14.50 14.50

Total 87 30.50 30.50

5 Kharu DOLR-MORD As per

Department

of soil &

Water

conservation

norms .

a). Restoration of

irrigation Khul and H/W

b). Nallah Bank Erosion

Control to protect

precious Agriculture

Lands

i) Laying of crates structures, Costt.

Of DRSM Works ,Earth Work &

Cement concrete works etc .

i) Laying of crates structures, DRSM

& Earth Work etc.

10

80

30

62

32.10

15.00

32.10

15.00

Total 92 47.10 47.10

6 Rong DOLR-MORD As per

Department

of soil &

Water

conservation

norms.

a). Restoration of

irrigation Khul and H/W

b). Nallah Bank Erosion

Control to protect

precious Agriculture

Lands

i) Laying of crates structures, Costt.

Of DRSM Works , Earth Work &

Cement concrete works etc .

i) Laying of crates structures, DRSM

& Earth Work etc.

09

70

26

55

28.80

15.50

28.80

15.50

Total 81 44.30 44.30

7 Nyoma DOLR-MORD As per

Department

of soil &

Water

conservation

norms.

a). Restoration of

irrigation Khul and H/W

b). Nallah Bank Erosion

Control to protect

precious Agriculture

Lands

i) Laying of crates structures, Costt.

of DRSM Works , Earth Work &

Cement concrete works etc .

i) Laying of crates structures, DRSM

& Earth Work etc.

05

50

15

40

16.00

10.00

16.00

10.00

Total 55 26.00 26.00

Page 84: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

77

8 Durbuk DOLR-MORD As per

Department

of soil &

Water

conservation

norms.

a). Restoration of

irrigation Khul and H/W

b). Nallah Bank Erosion

Control to protect

precious Agriculture

Lands

i) Laying of crates structures, Costt.

of DRSM Works , Earth Work &

Cement concrete works etc .

i) Laying of crates structures, DRSM

& Earth Work etc.

04

40

12

30

12.80

9.00

12.80

9.00

Total 42 21.80 21.80

G. Total 578 268.50 268.50

Page 85: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

78

STRATEGIC IRRIGATION PLAN

RURAL DEVELOPMENT

Page 86: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

79

YEAR/DEPARTMENT WISE DISTRICT IRRIGATION PLAN UNDER PMKSY RURAL DEVELOPMENT DEPARTMENT DISTRICT LEH.

S.No Name of the Block Budget

Requirement (in Lakhs)

Budget Requirement (in Lakhs) G.Total (in

Lakhs) Ist Year (5%) 2nd Year (25%) 3rd Year 25% 4th Year 25%

5th Year 25%

1 2 3 4 5 6 7 8 9

1 Leh 602.00 30.10 150.50 150.50 150.50 120.40 602.00

2 Nimoo 637.50 31.875 159.375 159.375 159.375 127.500 637.50

3 Saspol 306.50 15.325 76.625 76.625 76.625 61.300 306.500

4 Khaltsi 579.00 28.95 144.75 144.75 144.75 115.80 579.00

5 Skurbuchan 1208.500 60.425 302.125 302.125 302.125 241.700 1208.500

6 Singaylalok 352.70 17.635 88.175 88.175 88.175 70.540 352.700

7 Chuchot 819.50 40.975 204.875 204.875 204.875 163.900 819.500

8 Thiksay 654.50 32.725 163.625 163.625 163.625 130.900 654.500

9 Kharu 305.00 15.25 76.25 76.25 76.25 61.00 305.00

10 Rong-Chumathang 270.00 13.50 67.50 67.50 67.50 54.00 270.00

11 Nyoma 174.00 8.70 43.50 43.50 43.50 34.80 174.00

12 Puga 110.00 5.50 27.50 27.50 27.50 22.00 110.00

13 Durbuk 270.00 13.50 67.50 67.50 67.50 54.00 270.00

14 Deskit 676.30 33.815 169.075 169.075 169.075 135.260 676.300

15 Panamik 758.00 37.90 189.50 189.50 189.50 151.60 758.00

16 Tutrtuk 330.00 16.50 82.50 82.50 82.50 66.00 330.00

G.Total 8053.50 402.675 2013.375 2013.375 2013.375 1610.700 8053.500

Page 87: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

80

BLOCK WISE DIP OF RURAL DEVELOPMENT DEPARTMENT UNDER '' PRADHAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY) DISTRICT LEH.

S.NO Name of the Block Concerned Ministery/Departments

Component Activity Total No/Capacity (cum)

Command Area/Irrigation Potentional (Ha)

Period of Implements (5/7 Yrs)

Estimated Cost (Rs.in Lacs)

1 Leh

DOLF MORD MGNREGA Water

Conservation

8 5 Years 39.00

2 Nimoo 34 5 Years 159.00

3 Saspol 26 5 Years 37.00

4 Khaltsi 34 5 Years 145.00

5 Skurbuchan 24 5 Years 143.50

6 Singaylalok 0.00 0.00

7 Chuchot 5 5 Years 75.00

8 Thiksay 9 5 Years 137.00

9 Kharu 20 5 Years 108.00

10 Rong-Chumathang 9 5 Years 70.00

11 Nyoma 5 5 Years 28.00

12 Puga 5 5 Years 5.00

13 Durbuk 30 5 Years 69.00

14 Deskit 15 5 Years 68.80

15 Panamik 26 5 Years 122.00

16 Tutrtuk 4 5 Years 17.00

128.00 0.00 0.00 1223.30

Page 88: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

81

BLOCK WISE DIP OF RURAL DEVELOPMENT DEPARTMENT UNDER '' PRADHAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY) DISTRICT LEH.

S.NO Name of the Block Concerned Ministery/ Departments

Component Activity Total No/Capacity (cum)

Command Area/Irrigation Potentional (Ha)

Period of Implements (5/7 Yrs)

Estimated Cost (Rs.in Lacs)

1 Leh

DOLR-MORD MGNREGA Water

Harvesting

16 5 years 25.00

2 Nimoo 3 do 3.00

3 Saspol _ do _

4 Khaltsi _ do _

5 Skurbuchan _ do _

6 Singaylalok _ do _

7 Chuchot 16 do 85.50

8 Thiksay 7 do 40.00

9 Kharu 10 do _

10 Rong-Chumathang 12 do _

11 Nyoma 10 do _

12 Puga _ do _

13 Durbuk _ do _

14 Deskit 29 do _

15 Panamik 85 do _

16 Tutrtuk 19 do _

total 207 153.50

Page 89: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

82

BLOCK WISE DIP OF RURAL DEVELOPMENT DEPARTMENT UNDER '' PRADHAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY) DISTRICT LEH.

S.NO Name of the Block

Concerned Ministery/ Departments

Component Activity

Total No/ Capacity (cum)

Command Area/ Irrigation Potentional (Ha)

Period of Implements (5/7 Yrs)

Estimated Cost (Rs.in Lacs)

1 Leh

DO

LR-M

OR

D

MG

NR

EGA

Cre

atio

n o

f ir

riga

tio

n C

anal

s an

d D

rain

s

19 0.00 5 Years 110.00

2 Nimoo 23 0.00 5 Years 100.00

3 Saspol 0.00 0.00 0.00 0.00

4 Khaltsi 0.00 0.00 0.00 0.00

5 Skurbuchan 0.00 0.00 0.00 0.00

6 Singaylalok 0.00 0.00 0.00 0.00

7 Chuchot 9 0.00 5 Years 45.00

8 Thiksay 14 0.00 5 Years 173.00

9 Kharu 12 0.00 5 Years 27.00

10 Rong-Chumathang

3 0.00 5 Years 50.00

11 Nyoma 4 0.00 5 Years 22.00

12 Puga 9 0.00 5 Years 43.00

13 Durbuk 0.00 0.00 0.00 0.00

14 Deskit 12 0.00 5 Years 106.00

15 Panamik 25 0.00 5 Years 158.00

16 Tutrtuk 2 0.00 5 Years 19.00

132 853.00

BLOCK WISE DIP OF RURAL DEVELOPMENT DEPARTMENT UNDER '' PRADHAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY) DISTRICT LEH.

Page 90: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

83

S.NO

Name of the Block

Concerned Ministery/Departments

Component

Activity Total

No/Capacity (cum)

Command Area/Irrigation

Potentional (Ha)

Period of Implements (5/7 Yrs)

Estimated Cost (Rs.in Lacs)

1 Leh

DOLR-MORD MGNREGA Providing

infrastucture for Irrigation

10 5 Years 43.00

2 Nimoo 3 5 Years 17.00

3 Saspol 0.00 0.00 0.00

4 Khaltsi 0.00 0.00 0.00

5 Skurbuchan 0.00 0.00 0.00

6 Singaylalok 0.00 0.00 0.00

7 Chuchot 9 0.00 5 Years 85.00

8 Thiksay 5 0.00 5 Years 80.00

9 Kharu 0.00 0.00 0.00

10 Rong-Chumathang

0.00 0.00 0.00

11 Nyoma 0.00 0.00 0.00

12 Puga 0.00 0.00 0.00

13 Durbuk 0.00 0.00 0.00

14 Deskit 0.00 0.00 0.00

15 Panamik 0.00 0.00 0.00

16 Tutrtuk 0.00 0.00 0.00

27 225.00

BLOCK WISE DIP OF RURAL DEVELOPMENT DEPARTMENT UNDER '' PRADHAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY) DISTRICT LEH.

Page 91: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

84

S.NO Name of the Block

Concerned Ministery/

Departments

Component Activity Total No/Capacity

(cum)

Command Area/ Irrigation Potentional

(Ha)

Period of Implements

(5/7 Yrs)

Estimated Cost (Rs.in

Lacs)

1 Leh

DOLR-MORD MGNREGA Land

Development

15 5 Years 156.00

2 Nimoo 83 5 Years 290.50

3 Saspol 0.00 0.00 0.00

4 Khaltsi 35 5 Years 142.00

5 Skurbuchan 20 5 Years 198.00

6 Singaylalok 39 5 Years 180.02

7 Chuchot 9 5 Years 390.00

8 Thiksay 0.00 0.00 0.00

9 Kharu 1 5 Years 59.00

10 Rong-Chumathang

4 5 Years 32.00

11 Nyoma 14 5 Years 108.00

12 Puga 5 5 Years 52.00

13 Durbuk 1 5 Years 105.00

14 Deskit 1 5 Years 293.00

15 Panamik 26 5 Years 149.00

16 Tutrtuk 1 5 Years 190.00

254 2344.52

BLOCK WISE DIP OF RURAL DEVELOPMENT DEPARTMENT UNDER '' PRADHAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY) DISTRICT LEH.

Page 92: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

85

S.NO Name of the Block Concerned Minister/ Departments

Component Activity Total No/Capacity (cum)

Command Area/ Irrigation Potentional (Ha)

Period of Implements (5/7 Yrs)

Estimated Cost (Rs.in Lacs)

1 Leh

DO

LR-M

OR

D

MG

NR

EGA

Ren

ova

tio

n &

Mai

nte

nan

ce o

f Ir

riga

tio

n C

anal

s &

Dra

ins

18 5 Years 189.00

2 Nimoo 15 5 Years 64.00

3 Saspol 101 5 Years 269.50

4 Khaltsi 0 0 0 0

5 Skurbuchan 55 5 Years 867.00

6 Singaylalok 0 0 0 0

7 Chuchot 9 5 Years 78.00

8 Thiksay 7 5 Years 181.00

9 Kharu 35 5 Years 97.00

10 Rong-Chumathang 9 5 Years 118.00

11 Nyoma 4 5 Years 16.00

12 Puga 1 5 Years 10.00

13 Durbuk 25 5 Years 96.00

14 Deskit 30 5 Years 183.50

15 Panamik 25 5 Years 329.50

16 Tutrtuk 20 5 Years 104.00

354 2602.50

BLOCK WISE DIP OF RURAL DEVELOPMENT DEPARTMENT UNDER '' PRADHAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY) DISTRICT LEH.

Page 93: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

86

S.NO Name of the Block

Concerned Ministery/ Departments

Component

Activity Total No/Capacity (cum)

Command Area/Irrigation Potentional (Ha)

Period of Implements (5/7 Yrs)

Estimated Cost (Rs.in Lacs)

1 Leh

DOLR-MORD

MGNREGA

Renovation of water bodies

including desilting

16 0.00 5 Years 40.00

2 Nimoo 2 0.00 5 Years 4.00

3 Saspol 0.00 0.00 0.00 0.00

4 Khaltsi 59 0.00 5 Years 292.00

5 Skurbuchan 0 0.00 0.00 0.00

6 Singaylalok 41 0.00 5 Years 172.67

7 Chuchot 9 0.00 5 Years 61.00

8 Thiksay 12 0.00 5 Years 43.00

9 Kharu 8 0.00 5 Years 14.00

10 Rong-Chumathang 0.00 0.00 0.00 0.00

11 Nyoma 0.00 0.00 0.00 0.00

12 Puga 0.00 0.00 0.00 0.00

13 Durbuk 0.00 0.00 0.00 0.00

14 Deskit 7 0.00 5 Years 25.00

15 Panamik 0.00 0.00 0.00 0.00

16 Tutrtuk 0.00 0.00 0.00 0.00

154 651.67

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF DURBUK BLOCK

Page 94: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

87

S. No Block Panchaya

t

Name of the works Budget

req.

Budget requirement (Rs in lacs) Total

Ist year

(5%)

2nd

year

(25%)

3rd

year

(25%)

4th

year

(25%)

5th

year

(20%)

WaterConservation

1 Durbuk Chuchul

Construction of Water

Conservation at Tobo Chuchul.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

2 do do Buk. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

3 do do Tialing. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

4 do Maan-A Khalteth. 1.50 0.08 0.38 0.38 0.38 0.30 1.50

5 do do Merak. 1.50 0.08 0.38 0.38 0.38 0.30 1.50

6 do do Maan. 1.50 0.08 0.38 0.38 0.38 0.30 1.50

7 do do Spangmik. 1.50 0.08 0.38 0.38 0.38 0.30 1.50

8 do Maan-B Phobrang. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

9 do do Yurgo. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

10 do do Lukung. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

11 do Tangtse Muglab. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

12 do do Tharuk. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

13 do do Pholonglay. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

14 do do Chelam. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

15 do do Irath. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

Page 95: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

88

16 do do Arong. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

17 do Durbuk Punpun. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

18 do do Laga. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

19 do do Mode. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

20 do do Nimgo. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

21 do do Shayok. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

22 do do Rellay. 1.50 0.08 0.38 0.38 0.38 0.30 1.50

23 do Shachukul

Gyaptser. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

24 do do Stotkoor. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

25 do do Youl. 1.50 0.08 0.38 0.38 0.38 0.30 1.50

26 do do Farka. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

27 do Satoo

Kargyam Barma. 1.50 0.08 0.38 0.38 0.38 0.30 1.50

28 do do Satto. 1.50 0.08 0.38 0.38 0.38 0.30 1.50

29 do do Kherapullu. 1.50 0.08 0.38 0.38 0.38 0.30 1.50

30 do do Chibra. 1.50 0.08 0.38 0.38 0.38 0.30 1.50

Total : 69.00 3.45 17.25 17.25 17.25 13.80 69.00

Land Development

1 Durbuk Durbuk

block

Construction of Land

Development in Durbuk

block.

105.00 5.25 26.25 26.25 26.25 21.00 105.00

105.00 5.25 26.25 26.25 26.25 21.00 105.00

Page 96: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

89

Reno.of maintance ofI/Canal &drains

1 do Chuchul

Renovation of Maintenance

of main Irrigation Cannals

at Chuchul.

10.00 0.50 2.50 2.50 2.50 2.00 10.00

2 do Maan-A Main I/Cannal at Khakteth. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

3 do do Main I/Cannal at Maan. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

4 do do Main I/Cannal at Merak. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

5 do Maan-B Main I/Cannal at Phobrang. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

6 do do 2 Nos Main I/Cannal at

Yurgo. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

7 do do Main I/Cannal at Lukung. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

8 do Tangtse Main I/Cannal at Arong. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

9 do do Main I/Cannal at Earath. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

10 do do Main I/Cannal at Chelam. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

11 do do Main I/Cannal at Pholonglay.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

12 do do Main I/Cannal at Zotak. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

13 do do Main I/Cannal at Tagar. 1.00 0.05 0.25 0.25 0.25 0.20 1.00

14 do do Main I/Cannal at Tharuk. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

15 do do Main I/Cannal at Tangtse. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

16 do Durbuk Main I/Cannal at Laga. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

17 do do Main I/Cannal at Punpun. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

18 do do Main I/Cannal at Taknak. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

19 do do Main I/Cannal at Saser. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

Page 97: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

90

20 do do Main I/Cannal at Nimgo

Jachen. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

21 do do Main I/Cannal at Youl. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

22 do do Main I/Cannal at Shayok. 4.00 0.20 1.00 1.00 1.00 0.80 4.00

23 do Shachuku

l

Main I/Cannal at

Shachukul. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

24 do Satto Main I/Cannal at Satto. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

25 do do Main I/Cannal at

Kherapullu. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

Total : 96.00 4.80 24.00 24.00 24.00 19.20 96.00

G.Total Durbuk block : 270.00 13.50 67.50 67.50 67.50 54.00 270.00

Page 98: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

91

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF SKURBUCHAN BLOCK

S.No Name

of Block Panchayat Name of Works

Budget req.

Budget Requirement (Rs in lacs) G.Total (Rs in lacs) 1st

years 5%

2nd year 25%

3rd year 25%

4th year 25%

5th year 20%

Reno.and maintance of I/Canal and Drains

1 Skurbuchan

Skurbuchan

Renovation/Rest. Of I/khul Gyamipa Stambursdo(Gyalpo), Santikpa, Serupa Farka Skurbuchan

5.00 0.25 1.25 1.25 1.25 1.00 5.00

2 do do Renovation of I/Khul at Bethangpa to shuktatpa shakthang, Nutipa Lumbutse, tsetapa turnia Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

3 do do Renovation of I/Khul from power house to khatotpa tong,Mukpa oal, Laktukpa khangyokto lunguk khachethang.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

4 do do Renovation of I/Khul Zingyokma khachethang, Botopa (Tsering Angdu), Botopa (Tsering Dolkar)at Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

5 do do Renovation of I/Khul Gangsup pa khangba, Stotdi chulung khachethang, Gangsup pa khachethang at Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

6 do do Renovation of I/Khul Kaptan pa (Stanzin Dorjay), Khachey Tangyok Laktukpa, Olsar zomfailpa and Laktukpa at Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

7 do do Renovation of I/Khul Dam Jugiting, Rantak Yourba kharpon at Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

8 do do Renovation of I/Khul Stamburdho, Lumbutse and Khangral at Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

9 do do Renovation of I/Khul Shaskam, Turnia and Youl Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

10 do do Renovation of I/Khul khachethang, P-kok Lumbutse and Migthong at Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

11 do do Renovation of I/Khul Inamdho and Sastsi at Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Page 99: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

92

12 do do Renovation of I/Khul Warsu and Turnia lakshes (T.Tashi), Nutipa at Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 60.00 3.00 15.00 15.00 15.00 12.00 60.00

Land Development

13 Skurbuc

han Skurbucha

n Land Development Khacheythang 5.00 0.25 1.25 1.25 1.25 1.00 5.00

14 do do Land Development Chonakpa Satse, khangral Farka sesupa, Gyamipa Gongmathang, Tsetapa at Skurbuchan

4.00 0.20 1.00 1.00 1.00 0.80 4.00

15 do do

Land Development at M/School Khachethang, Satse Kaptanpa (T.D), Khachethang, Jugiting and Dogs khachethang, Tsering Angchok Largayand Tsewang Dolkar Gangsupa.

4.00 0.20 1.00 1.00 1.00 0.80 4.00

16 do do

Land Development Tashi Tundup Laktukpa and Morup Dorjay Largaypa, Aminpa and Rigzin Dolma Haldarpa, Tsering Norboo) khigupa, Reza pa, Migthong (M.N).

4.00 0.20 1.00 1.00 1.00 0.80 4.00

17 do do Land Development Shanku (Tsewmg Namgail), Khatotpa (Tsering Turnai), Bethang pa (Tsewang Rigzin) at Skurbuchan.

4.00 0.20 1.00 1.00 1.00 0.80 4.00

18 do do Land Development Gongpa at skurbuchan. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

19 do do Land Development thitkang pa at Skurbuchan. 1.00 0.05 0.25 0.25 0.25 0.20 1.00

Total 27.00 1.35 6.75 6.75 6.75 5.40 27.00

Water conservation

20 Skurbuc

han Skurbucha

n Const. of water storage tank satse kaptan Jigmat Dadul, Tashi Namgail Dogspa at skurbuchan

5.00 0.25 1.25 1.25 1.25 1.00 5.00

21 do do Const. Of water storage tank T Namgail Gangsupa, Dorjay Namgail Lakshespa and Tashi Tundup Makjung.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

22 do do Const. of water storage tank Warsun Botopa, Inamdho Bethangpa , Morup Namgail Migthongpa, Satse Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Page 100: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

93

23 do do Const. of water storage tank khacheythang, shakthang, Inamdho skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

24 do do Const. of water storage tank Gonpa skurbuchan, Hr. Sec. School Skurbuchan, Garbai zing youl and various places Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

25 do do Const. of Tashi Paskit chomikpa, Nawang Tashi Bethang, Dorjay Gyalson Bethang at Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

26 do do Const. of water Storage tank Tsewang Namgail Shankupa, Sonam Dorjay Shankupa and Gur Apitso at Skurbuchan.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 35.00 1.75 8.75 8.75 8.75 7.00 35.00

Reno.and maintance of I/Canal and Drains

27 Skurbuc

han Dha Repair/Renov. Of I/Khul nasthay. 20.00 1.00 5.00 5.00 5.00 4.00 20.00

28 do do Repair/Renov. Of I/Khul Nesgyab. 1.00 0.05 0.25 0.25 0.25 0.20 1.00

29 do do Repair/Renov. Of I/Khul dang gyab. 1.50 0.08 0.38 0.38 0.38 0.30 1.50

30 do do Repair/Renov. Of I/Khul chen gyab. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

31 do do Repair/Renov. Of I/Khul lundup gyab. 1.00 0.05 0.25 0.25 0.25 0.20 1.00

32 do do Repair/Renov. Of I/Khul barak gyab. 0.50 0.03 0.13 0.13 0.13 0.10 0.50

33 do do Repair/Renov. Of main I/Khul baldesh. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

34 do do Repair/Renov. Of main I/Khul duhi gyab. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

35 do do Repair/Renov. Of main I/Khul Pardus gyab. 1.50 0.08 0.38 0.38 0.38 0.30 1.50

36 do do Repair/Renov. Of main I/Khul Sanith (7 Nos) 20.00 1.00 5.00 5.00 5.00 4.00 20.00

37 do do Repair/Renov. Of main I/Khul Beema. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

38 do do Repair/Renov. Of main I/Khul Dus Gyab. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 101: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

94

39 do do Repair/Renov. Of main I/Khul thara Gyab. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

40 do do Repair/Renov. Of main I/Khul Jafindor duks gyab. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

41 do do Repair/Renov. Of main I/Khul Jung gyab. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

42 do do Repair/Renov. Of main I/Khul Dha. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

43 do do Diversion of canal from main I/Khul to individual household (22Nos).

20.00 1.00 5.00 5.00 5.00 4.00 20.00

44 do do Diversion of canal from main I/Khul Dha thang common Area.

50.00 2.50 12.50 12.50 12.50 10.00 50.00

45 do do Extension of main I/Khul Dha thang common Area. 50.00 2.50 12.50 12.50 12.50 10.00 50.00

Total 195.5

0 9.78 48.88 48.88 48.88 39.10 195.50

Water conservation

46 Skurbuc

han Dha Repair/ Renovation W/S tank at Baldesh zing. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

47 do do Const. of W/S tank at Baldesh . 10.00 0.50 2.50 2.50 2.50 2.00 10.00

48 do do Repair/Renov. Of Sanith zing (6Nos). 12.00 0.60 3.00 3.00 3.00 2.40 12.00

49 do do Const. of W/S tank at Sanith Mohalla 10.00 0.50 2.50 2.50 2.50 2.00 10.00

50 do do Repair/Renov. Of W/S tank at Lasthang 3Nos(Dang bari, Mayon thang bari and Regu dus bari).

10.00 0.50 2.50 2.50 2.50 2.00 10.00

51 do do Repair/Renov. Of W/S tank at Dha. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

52 do do Const. of W/S tank Dhathang (4Nos) 40.00 2.00 10.00 10.00 10.00 8.00 40.00

53 do do Repair of W/S tank at Ja phindor dus (1Nos). 2.00 0.10 0.50 0.50 0.50 0.40 2.00

Total 88.00 4.40 22.00 22.00 22.00 17.60 88.00

Land Development

Page 102: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

95

54 Skurbuc

han Dha Land Development 44 Nos at common area Pyt. Dha. 84.00 4.20 21.00 21.00 21.00 16.80 84.00

do do Total 84.00 4.20 21.00 21.00 21.00 16.80 84.00

55 Skurbuchan

Hanu Const. of I/Khul Dangal at Hanu 500.00 25.00 125.00 125.00 125.00 100.00 500.00

56 do do Repair /Renov. Of I/khuls at hanuthang 5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 505.0

0 25.25 126.25 126.25 126.25 101.00 505.00

Land Development

57 Skurbuc

han Hanu Land Development at various place at hanu. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

Total 10.00 0.50 2.50 2.50 2.50 2.00 10.00

Reno.and maintance of I/Canal and Drains

58 Skurbuchan

Achinathang

Const. of I/Khul lungba Gonpay thang. 15.00 0.75 3.75 3.75 3.75 3.00 15.00

59 do do Repair/Renov. Of I/khul at yokmathang. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 20.00 1.00 5.00 5.00 5.00 4.00 20.00

Land Development

60 Skurbuchan

Achinathang

Land Development at various place at Achinathang 10.00 0.50 2.50 2.50 2.50 2.00 10.00

61 do do Land Development at Bangthang kagan to Shagam. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

Total 20.00 1.00 5.00 5.00 5.00 4.00 20.00

62 Skurbuc

han Achinatha

ng Const. of W/S tank at yokmathang. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

63 do do Const. of W/S tank at Lambay. 1.00 0.05 0.25 0.25 0.25 0.20 1.00

Page 103: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

96

Total 4.00 0.20 1.00 1.00 1.00 0.80 4.00

Reno.and maintance of I/Canal and Drains

64 Skurbuc

han Domkhar

Repair/Renov. Of I/khul at various place at Domkhar Dho.(6Nos)

12.00 0.60 3.00 3.00 3.00 2.40 12.00

65 do do Repair/Renov. Of I/khul Yokyour farka Domkhar Dho.

2.00 0.10 0.50 0.50 0.50 0.40 2.00

66 do do Const. of I/Khul Churkortsy kyog to Faytagu Kurambik.

1.50 0.08 0.38 0.38 0.38 0.30 1.50

67 do do Repair/Renov. Of I/Khul khargok kurambik 1.00 0.05 0.25 0.25 0.25 0.20 1.00

68 do do Repair/Renov. Of I/Khul chulung Sta Domkhar gongma.

2.00 0.10 0.50 0.50 0.50 0.40 2.00

69 do do Repair/Renov. Of I/Khul Nyarmu Domkhar Gongma. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

70 do do Repair/ Renov. Of I/Khul Mayour Gongma Domkhar gongma.

4.00 0.20 1.00 1.00 1.00 0.80 4.00

71 do do Repair/Renov. Of I/Khul chumur lumbu Domkhar Gongma.

2.00 0.10 0.50 0.50 0.50 0.40 2.00

72 do do Const. of I/Khul Tsase nya Domkhar Gongma. 4.00 0.20 1.00 1.00 1.00 0.80 4.00

73 do do Const. of I/khul from porotsey chulungs to chhanchaks wa

6.00 0.30 1.50 1.50 1.50 1.20 6.00

74 do do Const. of I/khul from ration store to sharchhoks at youl gongma

6.50 0.33 1.63 1.63 1.63 1.30 6.50

75 do do Const. of I/khul from gonpa to ugpa tsangs at D-gongma

4.00 0.20 1.00 1.00 1.00 0.80 4.00

76 do do Repair/Renov. Of I/Khul at various points thongros(3Nos).

5.00 0.25 1.25 1.25 1.25 1.00 5.00

77 do do Repair/Renov. Of I/Khul olsoma thongros. 1.00 0.05 0.25 0.25 0.25 0.20 1.00

78 do do Const. of I/Khul Stambila Domkhar. 2.50 0.13 0.63 0.63 0.63 0.50 2.50

79 do do Repair/Renov. And extension of I/Khul konchok skit at thongros.

2.00 0.10 0.50 0.50 0.50 0.40 2.00

80 do do Const. of I/Khul from chungka lungba to thyak thyaktse at thongros Domkhar

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Page 104: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

97

81 do do Repair and extension of I/Khul zya to ldeb. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

82 do do Const. of I/Khul Ldeb to kaltak thongros 3.00 0.15 0.75 0.75 0.75 0.60 3.00

83 do do Const. of I/Khul from chopo danyok to sgang (Tsering Galtson) lamapa khangbu

5.00 0.25 1.25 1.25 1.25 1.00 5.00

84 do do Repair/reno. Of main I/khul Hal tsering to Kaltak 10.00 0.50 2.50 2.50 2.50 2.00 10.00

; Total 86.50 4.33 21.63 21.63 21.63 17.30 86.50

Water conservation

85 Skurbuc

han Domkhar Const. of 3nos WST at Dho 4.00 0.20 1.00 1.00 1.00 0.80 4.00

86 do do Const. of WST at yokma lungbu lungba pa D.gongma 1.50 0.08 0.38 0.38 0.38 0.30 1.50

87 do do Const. of WSt at Chanchaks Dho Rangthakpa 1.50 0.08 0.38 0.38 0.38 0.30 1.50

88 do do Const. of WST at Oltser apochopa 1.50 0.08 0.38 0.38 0.38 0.30 1.50

89 do do Const. of WST at Bikyok Gonpapa Khangbu 1.50 0.08 0.38 0.38 0.38 0.30 1.50

90 do do Const. of WST at Chanchaks Dho Chanchanks pa 1.50 0.08 0.38 0.38 0.38 0.30 1.50

91 do do Const. of WST at Thongros 5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 16.50 0.83 4.13 4.13 4.13 3.30 16.50

Land Development

92 Skurbuc

han Domkhar Land development at various place at Domkhar Dho 12.00 0.60 3.00 3.00 3.00 2.40 12.00

93 do do Land development at yokyour farka Domkhar Dho 2.00 0.10 0.50 0.50 0.50 0.40 2.00

94 do do Land development at Shali lungspo Domkhar Dho 3.00 0.15 0.75 0.75 0.75 0.60 3.00

95 do do Land development at various place Domkhar Burma 7.00 0.35 1.75 1.75 1.75 1.40 7.00

Page 105: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

98

96 do do Land development at Solar fixing Kurambik 1.00 0.05 0.25 0.25 0.25 0.20 1.00

97 do do land development 4nos at Chanchaks 4.00 0.20 1.00 1.00 1.00 0.80 4.00

98 do do land development 5nos at Chulungs 5.00 0.25 1.25 1.25 1.25 1.00 5.00

99 do do land development 5nos at oltser D.Gongma 5.00 0.25 1.25 1.25 1.25 1.00 5.00

100 do do land development 6nos at Thongros 18.00 0.90 4.50 4.50 4.50 3.60 18.00

Total 57.00 2.85 14.25 14.25 14.25 11.40 57.00

G Total of Block Skurbuchan 1208.

50 60.43 302.13 302.13 302.13 241.70 1208.50

Page 106: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

99

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF KHALYSI BLOCK

S.No Name

of Block Panchayat Name of Works

Estimated Cost (Rs. In Lacs)

Budget Requirement (Rs in lacs) G.Total (Rs in lacs) 1st years

5% 2nd year

25%

3rd year 25%

4th year 25%

5th year 20%

Land Development

1 Khaltsi Temisgam Land Developmet at various place Ang.

4.00 0.20 1.00 1.00 1.00 0.80 4.00

2 do do Land Developmet at various place at Warlax.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

3 do do Land Developmet at various place Gangyokma.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

4 do do Land Developmet at various place Larsa.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

5 do do Land Developmet at various place Tsaray.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

6 do do Land Developmet at various place Farka thang and Rongchung.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

7 do do Land Developmet at various place Nurla.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Total = 22.00 1.10 5.50 5.50 5.50 4.40 22.00

VI Reno. Of Traditional water bodies incl. desailting

8 Khaltsi Temisgam repair/reno. Of I/Khul kangyour at Ang

3.00 0.15 0.75 0.75 0.75 0.60 3.00

9 do do repair/reno. Of I/Khul Yokyour at Ang

3.00 0.15 0.75 0.75 0.75 0.60 3.00

10 do do repair/reno. Of I/Khul Demo at Ang

3.00 0.15 0.75 0.75 0.75 0.60 3.00

11 do do repair/reno. Of I/Khul Farka at Ang

3.00 0.15 0.75 0.75 0.75 0.60 3.00

12 do do repair/reno. Of I/Khul at Khangyour Warlax

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 107: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

100

13 do do repair/reno. Of I/Khul at Warlax 3.00 0.15 0.75 0.75 0.75 0.60 3.00

14 do do repair/reno. Of I/Khul Mayour at Gangyokma

3.00 0.15 0.75 0.75 0.75 0.60 3.00

15 do do repair/reno. Of I/Khul at Gangyokma

3.00 0.15 0.75 0.75 0.75 0.60 3.00

16 do do repair/reno. Of main I/Khul at Larsa

3.00 0.15 0.75 0.75 0.75 0.60 3.00

17 do do repair/reno. Of I/Khul at larsa 3.00 0.15 0.75 0.75 0.75 0.60 3.00

18 do do repair/reno. Of main I/Khul at Tsaray

3.00 0.15 0.75 0.75 0.75 0.60 3.00

19 do do repair/reno. Of I/Khul at Tsaray 3.00 0.15 0.75 0.75 0.75 0.60 3.00

20 do do repair/reno. Of main I/Khul at Farka thang

3.00 0.15 0.75 0.75 0.75 0.60 3.00

21 do do repair/reno. Of 2 nos I/Khul at Rangchung

3.00 0.15 0.75 0.75 0.75 0.60 3.00

22 do do repair/reno. Of I/Khul at Nurla 4.00 0.20 1.00 1.00 1.00 0.80 4.00

23 do do repair/reno. Of main I/Khul at Nurla

4.00 0.20 1.00 1.00 1.00 0.80 4.00

Total = 50.00 2.50 12.50 12.50 12.50 10.00 50.00

I Water Conservation

24 Khaltsi Temisgam Repair/reno. Of WST thaskarmo temsigam

3.00 0.15 0.75 0.75 0.75 0.60 3.00

25 do do Const. of WST Chora Spalchan at Ang

2.00 0.10 0.50 0.50 0.50 0.40 2.00

26 do do Const. of WST T.Rigzen kat pa at Nurla

2.00 0.10 0.50 0.50 0.50 0.40 2.00

27 do do Const. of WST Rangchung S.Dorjay Kutpa at Nurla

5.00 0.25 1.25 1.25 1.25 1.00 5.00

28 do do Repair/reno. Of WST at Nurla 5.00 0.25 1.25 1.25 1.25 1.00 5.00

Page 108: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

101

29 do do Repair/reno. Of WST Tsaray 3.00 0.15 0.75 0.75 0.75 0.60 3.00

30 do do Const. of WST at Skart pa 5.00 0.25 1.25 1.25 1.25 1.00 5.00

do do Total = 25.00 1.25 6.25 6.25 6.25 5.00 25.00

Land Development

31 Khaltsi Khaltsi Land Development at Skindeyang 30 Khumba.

7.00 0.35 1.75 1.75 1.75 1.40 7.00

32 do do Land Development at Khaltsi 65 Khumba.

11.00 0.55 2.75 2.75 2.75 2.20 11.00

33 do do Land Development at Assu of Khumba.

4.00 0.20 1.00 1.00 1.00 0.80 4.00

Total = 22.00 1.10 5.50 5.50 5.50 4.40 22.00

Renovation of water bodies inclu.desilting

34 Khaltsi Khaltsi Repair of I/Khul at Yokyur 7.00 0.35 1.75 1.75 1.75 1.40 7.00

35 do do repair of I/khul at thang Yourba 4.00 0.20 1.00 1.00 1.00 0.80 4.00

36 do do repair of I/khul at Narmo Gongma

4.00 0.20 1.00 1.00 1.00 0.80 4.00

37 do do repair of I/khul at Narmo Barma 4.00 0.20 1.00 1.00 1.00 0.80 4.00

38 do do repair of I/khul at Narmo 4.00 0.20 1.00 1.00 1.00 0.80 4.00

39 do do repair of i/Khul at Dho 4.00 0.20 1.00 1.00 1.00 0.80 4.00

40 do do repair of I/khul at Asu farka 5.00 0.25 1.25 1.25 1.25 1.00 5.00

41 do do repair of I/khul at Shagaran, Thayok at Skyanding.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

42 do do repair of I/khul at Stangs Yurba 10.00 0.50 2.50 2.50 2.50 2.00 10.00

43 do do Repair/reno. Of I/Khul Shangtse yurba

4.00 0.20 1.00 1.00 1.00 0.80 4.00

Page 109: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

102

44 do do Repair/Renov. Of I/Khul kagan to thur at skindiyang.

7.00 0.35 1.75 1.75 1.75 1.40 7.00

Total = 58.00 2.90 14.50 14.50 14.50 11.60 58.00

Water Conservation

45 Khaltsi Khaltsi Cosnt. Of WST at khaltsi villageC 5.00 0.25 1.25 1.25 1.25 1.00 5.00

46 do do Cosnt. Of WST at khaltsi Nyarmo Dho

5.00 0.25 1.25 1.25 1.25 1.00 5.00

47 do do repair/reno. Of WST Nyarmo Barma

4.00 0.20 1.00 1.00 1.00 0.80 4.00

48 do do repair/reno. Of WST Assu 5.00 0.25 1.25 1.25 1.25 1.00 5.00

49 do do Repair/reno. WST Skambur yokma

3.00 0.15 0.75 0.75 0.75 0.60 3.00

50 do do Repair/ reno. WST at Haritse 3.00 0.15 0.75 0.75 0.75 0.60 3.00

51 do do Repair/reno. 5 nos WST at Skindiyang

20.00 1.00 5.00 5.00 5.00 4.00 20.00

Total = 45.00 2.25 11.25 11.25 11.25 9.00 45.00

Renovation of water bodies inclu.desilting

51 Khaltsi Kanji Reno. Of 3 nos I/Khul at kanji village

14.00 0.70 3.50 3.50 3.50 2.80 14.00

52 do do reno. Of 3 nos I/Khul at latutsay kanji

6.00 0.30 1.50 1.50 1.50 1.20 6.00

53 do do reno. Of 3nos I/Khul at Angpottum

6.00 0.30 1.50 1.50 1.50 1.20 6.00

54 do do reno. Of 5 nos I/Khul ldumbur kanji

6.00 0.30 1.50 1.50 1.50 1.20 6.00

Total = 32.00 1.60 8.00 8.00 8.00 6.40 32.00

Land Development

55 Khaltsi Kanji Land Development at Shelaskyabi Kanji

2.50 0.13 0.63 0.63 0.63 0.50 2.50

Page 110: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

103

56 do do Land Development at latutsay Kanji

2.50 0.13 0.63 0.63 0.63 0.50 2.50

57 do do Land Development at Aoppotom Kanji

2.50 0.13 0.63 0.63 0.63 0.50 2.50

58 do do Land Development at Ldumbur Kanji

2.50 0.13 0.63 0.63 0.63 0.50 2.50

59 do do Land Development atchnndongtsey Kanji

1.00 0.05 0.25 0.25 0.25 0.20 1.00

60 do do Land Development at Deauluing Kanji

1.00 0.05 0.25 0.25 0.25 0.20 1.00

61 do do Land Development at Kanji village and Rong

12.00 0.60 3.00 3.00 3.00 2.40 12.00

Total = 24.00 1.20 6.00 6.00 6.00 4.80 24.00

Water Conservation

62 Khaltsi Kanji Cosnt. Of WST at Latutsay kanji 2.00 0.10 0.50 0.50 0.50 0.40 2.00

63 do do Cosnt. Of WST at Angpottum 2.00 0.10 0.50 0.50 0.50 0.40 2.00

64 do do Cosnt. Of WST at Ldumbur kanji 2.00 0.10 0.50 0.50 0.50 0.40 2.00

65 do do Cosnt. Of WST at Latutsay kanji 2.00 0.10 0.50 0.50 0.50 0.40 2.00

66 do do Cosnt. Of WST at kanji village 4.00 0.20 1.00 1.00 1.00 0.80 4.00

Total = 12.00 0.60 3.00 3.00 3.00 2.40 12.00

Land Development

67 Khaltsi Takmachik land development at various place at takmachik

10.00 0.50 2.50 2.50 2.50 2.00 10.00

68 do do Land development 25 nos at various place Lehdo

7.00 0.35 1.75 1.75 1.75 1.40 7.00

69 do do land development 20 nos at various place at Urbis

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total= 22.00 1.10 5.50 5.50 5.50 4.40 22.00

Page 111: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

104

Renovation of water bodies inclu.desilting

70 Khaltsi Takmachik repair/reno. Of 22 nos I/khul at Takmachik

30.00 1.50 7.50 7.50 7.50 6.00 30.00

71 do do repair/reno. Of 18 nos I/khul at Lehdo

15.00 0.75 3.75 3.75 3.75 3.00 15.00

72 do do Repair/reno. Of 10 nos I/khul at Urbis

10.00 0.50 2.50 2.50 2.50 2.00 10.00

Total = 55.00 2.75 13.75 13.75 13.75 11.00 55.00

Water Conservation

73 Khaltsi Takmachik Repair/reno. Of 3nos WST at Takmachik

5.00 0.25 1.25 1.25 1.25 1.00 5.00

74 do do Repair/reno. Of 7nos WST at Lehdo

5.00 0.25 1.25 1.25 1.25 1.00 5.00

75 do do Repair/reno. Of 3nos WST at Urbis

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Total = 13.00 0.65 3.25 3.25 3.25 2.60 13.00

Land Development

76 Khaltsi Tia land Development at sara Mollah

77 do do Land Development at lchangri 4.00 0.20 1.00 1.00 1.00 0.80 4.00

78 do do land development at khaling 4.00 0.20 1.00 1.00 1.00 0.80 4.00

79 do do land development at farka 4.00 0.20 1.00 1.00 1.00 0.80 4.00

80 do do land development at Charchar 4.00 0.20 1.00 1.00 1.00 0.80 4.00

81 do do land Development at sogra Mollah

4.00 0.20 1.00 1.00 1.00 0.80 4.00

82 do do land Development at Doma khaling

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total = 25.00 1.25 6.25 6.25 6.25 5.00 25.00

Page 112: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

105

Water Conservation

84 Khaltsi Tia repair/reno. Of 3nos WST at sara Mohalla

9.00 0.45 2.25 2.25 2.25 1.80 9.00

85 do do repair/reno. Of 2 nos WST at Lchangri

6.00 0.30 1.50 1.50 1.50 1.20 6.00

86 do do repair/reno. Of 2 nos WST at Charchar

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total = 20.00 1.00 5.00 5.00 5.00 4.00 20.00

Renovation of water bodies inclu.desilting

87 Khaltsi Tia repair/reno. Of I/khul at Sogra Tia

5.00 0.25 1.25 1.25 1.25 1.00 5.00

88 do do Cosnt. Of I/Khul from Stongs to thadpa

5.00 0.25 1.25 1.25 1.25 1.00 5.00

89 do do repair/reno. Of I/khul from Jagar to larjay Tia

6.00 0.30 1.50 1.50 1.50 1.20 6.00

90 do do repair of I/khul & H/w Paandal 8.00 0.40 2.00 2.00 2.00 1.60 8.00

91 do do repair of I/khul at Lchangri from Ringmo to Head/Work

9.00 0.45 2.25 2.25 2.25 1.80 9.00

92 do do repair I/khul Starga Khangbu, pali

5.00 0.25 1.25 1.25 1.25 1.00 5.00

93 do do repair/reno.at Farka Mohalla I/khul gangyour Zingzur to Youmo

6.00 0.30 1.50 1.50 1.50 1.20 6.00

94 do do Repairof I/khul from yokyour to charchar

6.00 0.30 1.50 1.50 1.50 1.20 6.00

Total = 50.00 2.50 12.50 12.50 12.50 10.00 50.00

Land Development

95 Khaltsi Lamayuru Land development Tsering Angdus kalkulpa Photolalok.

2.00 0.10 0.50 0.50 0.50 0.40 2.00

96 do do Land development of Demo Sharap

2.00 0.10 0.50 0.50 0.50 0.40 2.00

Page 113: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

106

97 do do Land Development at Digur Konchok

2.00 0.10 0.50 0.50 0.50 0.40 2.00

98 do do Land Development at Stanzin shotu

2.00 0.10 0.50 0.50 0.50 0.40 2.00

99 do do Land Development at Angchuk Demo pa

2.00 0.10 0.50 0.50 0.50 0.40 2.00

100 do do Land Development at konchok Nyaro pa at pump

2.00 0.10 0.50 0.50 0.50 0.40 2.00

101 do do Land Development at Samphel Nyaropa Spangotse

2.00 0.10 0.50 0.50 0.50 0.40 2.00

102 do do Land Development at kakapa Rigzen

2.00 0.10 0.50 0.50 0.50 0.40 2.00

103 do do Land Development of various parts of Lamayuru

6.00 0.30 1.50 1.50 1.50 1.20 6.00

Total 22.00 1.10 5.50 5.50 5.50 4.40 22.00

Renovation of water bodies inclu.desilting

104 Khaltsi Lamayuru Repair of I/Khul Farka Lamayuru 2.50 0.13 0.63 0.63 0.63 0.50 2.50

105 do do repair of I/Khul at photortse lalok Angchok

2.50 0.13 0.63 0.63 0.63 0.50 2.50

106 do do repair of I/khul at Skiupa Tashi Jigmet

2.50 0.13 0.63 0.63 0.63 0.50 2.50

107 do do repair of I/khul at Rong Irikpa 2.50 0.13 0.63 0.63 0.63 0.50 2.50

108 do do repair of I/khul at Stipkangchan Nawang

2.50 0.13 0.63 0.63 0.63 0.50 2.50

109 do do repair of I/khul of sonam Thinless Tasha

2.50 0.13 0.63 0.63 0.63 0.50 2.50

110 do do Repair of I/khul at pump joraphely Paldan Angchok

2.50 0.13 0.63 0.63 0.63 0.50 2.50

111 do do repair of i/khul at Photortse chemat Wangdan

2.50 0.13 0.63 0.63 0.63 0.50 2.50

112 do do repair of I/khul of Tsering Nurboo kalkul

2.50 0.13 0.63 0.63 0.63 0.50 2.50

113 do do repair of I/khul at changkar khakartse

2.50 0.13 0.63 0.63 0.63 0.50 2.50

Page 114: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

107

114 do do repair of I/Khul at Rigjung yokma

2.50 0.13 0.63 0.63 0.63 0.50 2.50

115 do do repair of I/khul at Rigjung Gongma

2.50 0.13 0.63 0.63 0.63 0.50 2.50

116 do do repair of I/Khul at Gyapak khangsar pa.

2.50 0.13 0.63 0.63 0.63 0.50 2.50

117 do do repair of I/khul at Shaingsher 2.50 0.13 0.63 0.63 0.63 0.50 2.50

118 do do repair of I/Khul at lartse Dongspon pa (sonam Pa)

2.50 0.13 0.63 0.63 0.63 0.50 2.50

119 do do repair of i/khul at Morup photolalok Skyalbu pa

2.50 0.13 0.63 0.63 0.63 0.50 2.50

120 do do repair of I/Khul at Various place Lamayuru

7.00 0.35 1.75 1.75 1.75 1.40 7.00

Total 47.00 2.35 11.75 11.75 11.75 9.40 47.00

Water Conservation

121 Khaltsi Lamayuru repair/reno. Of WST at Dorjey Jigmat lalokpa

2.00 0.10 0.50 0.50 0.50 0.40 2.00

122 do do repair/reno. Of WST at Pump Ishey Namgail

2.00 0.10 0.50 0.50 0.50 0.40 2.00

123 do do repair/reno. Of WST at Pump Palzom khatutse

2.00 0.10 0.50 0.50 0.50 0.40 2.00

124 do do Const. of 5nos of WST at various place at lamayuru

4.00 0.20 1.00 1.00 1.00 0.80 4.00

125 do do const. of 5nos of WST at various place in photoklalok

4.00 0.20 1.00 1.00 1.00 0.80 4.00

126 do do repair of WST at kalkul lamayuru 10.00 0.50 2.50 2.50 2.50 2.00 10.00

127 do do repair of WST at Lartsa Dongspon

2.00 0.10 0.50 0.50 0.50 0.40 2.00

128 do do repair of WST at Daknak Zago pa 2.00 0.10 0.50 0.50 0.50 0.40 2.00

129 do do repair of WST at Rongchu Lamayuru

2.00 0.10 0.50 0.50 0.50 0.40 2.00

Total 30.00 1.50 7.50 7.50 7.50 6.00 30.00

Page 115: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

108

G Total of Khaltsi Block 579.00 28.95 144.75 144.75 144.75 115.80 579.00

Page 116: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

109

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF THIKSAY BLOCK

S.No Name of

Block Panchayat Name of works

Budget req.

Budget requirement(Rs. In Lacs) Total

Ist year (5%)

2nd year (25%)

3rd year (25%)

4th year (25%)

5th year (20%)

Water Conservation

1 Thiksay Thiksay-I Repair /Renovation of water storage Tank at Thiksay-I

20.00 1.00 5.00 5.00 5.00 4.00 20.00

2 do Thiksay-II Comp . Of water storage Tank at Mohalla at Garatong

25.00 1.25 6.25 6.25 6.25 5.00 25.00

3 do do Const. of 03Nos water storage tank at stakmo

5.00 0.25 1.25 1.25 1.25 1.00 5.00

4 do do const of 01 nos water storage tank at Arzu

8.00 0.40 2.00 2.00 2.00 1.60 8.00

5 do Shey-I Const. of 01 nos water storage tank at Shey-I

4.00 0.20 1.00 1.00 1.00 0.80 4.00

6 do Shey-II Const of 01 nos of water storage tank at Shey-II

25.00 1.25 6.25 6.25 6.25 5.00 25.00

7 do Rambirpur Const. of water storage tank at Thang Rambirpur

25.00 1.25 6.25 6.25 6.25 5.00 25.00

8 do Nang Repair /Renovation of water storage Tank at Nang

25.00 1.25 6.25 6.25 6.25 5.00 25.00

9 do do Const. of water storage tank at Nang 0.50 0.03 0.13 0.13 0.13 0.10 0.50

Total 137.50 6.88 34.38 34.38 34.38 27.50 137.50

Water Harvesting

10 Thiksay Shey-I Const. of 2 Nos water Harvesting Pond at Shey-I

9.00 0.45 2.25 2.25 2.25 1.80 9.00

11 do Shey-II Const. of 2 nos water Harvesting Pond at Shey-II

9.00 0.45 2.25 2.25 2.25 1.80 9.00

12 do Rambirpur const. of water harvesting pond at Tokpo Rambirpur

9.00 0.45 2.25 2.25 2.25 1.80 9.00

Page 117: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

110

13 do do const. of water harvesting pond at Rambirpur

3.00 0.15 0.75 0.75 0.75 0.60 3.00

14 do Nang const. of Artifical Galisher at Pulu 3.00 0.15 0.75 0.75 0.75 0.60 3.00

15 do do const. of water harvesting pond at kongma Nang

5.00 0.25 1.25 1.25 1.25 1.00 5.00

16 do do const. ofwater harvesting pond at yokma Nang

2.00 0.10 0.50 0.50 0.50 0.40 2.00

Total 40.00 2.00 10.00 10.00 10.00 8.00 40.00

Creation of canal and drains

17 Thiksay Thiksay-I Const. of 4 Nos of I/khul at Thisay-I 7.00 0.35 1.75 1.75 1.75 1.40 7.00

18 do Thiksay-II Const. of H/Work /I.Khul phakyah House to Zar Kelibuk

32.00 1.60 8.00 8.00 8.00 6.40 32.00

19 do do const of I/Khul Zingjuk to Seti at Stakmo

4.00 0.20 1.00 1.00 1.00 0.80 4.00

20 do do Const. of I/Khul /H/work Betong to Kelibuk thiksay

4.00 0.20 1.00 1.00 1.00 0.80 4.00

21 do do const of I/khul Archery Hall to sata Garatong

2.00 0.10 0.50 0.50 0.50 0.40 2.00

22 do Shey Const. of Irrigation Khul 20.00 1.00 5.00 5.00 5.00 4.00 20.00

23 do Shey-I Const. of 4 Nos of I/khul at Shey-I 6.00 0.30 1.50 1.50 1.50 1.20 6.00

24 do Shey-II Const. of 4 Nos of I/Khul/Drains at Shey-II

28.00 1.40 7.00 7.00 7.00 5.60 28.00

25 do Rambirpur const. of I/Khul at Shinday Mode to Tebok

28.00 1.40 7.00 7.00 7.00 5.60 28.00

26 do do const of I/khul at Thang Mohalla-I 7.00 0.35 1.75 1.75 1.75 1.40 7.00

27 do do Const. of I/Khul at thang Mohalla-II 7.00 0.35 1.75 1.75 1.75 1.40 7.00

28 do do Const. of I/Khul at Idga 7.00 0.35 1.75 1.75 1.75 1.40 7.00

29 do Nang 2 Nos of I/Khul at Nang Kongma 7.00 0.35 1.75 1.75 1.75 1.40 7.00

Page 118: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

111

30 do do 2 Nos of I/Khul at Nang Yokma 14.00 0.70 3.50 3.50 3.50 2.80 14.00

Total 173.00 8.65 43.25 43.25 43.25 34.60 173.00

Reno.andmaintenanceof I/Canal and drains

31 Thiksay Thiksay-I Repair/renov. Of I/Khul at 25 various places at thiksay-I

25.00 1.25 6.25 6.25 6.25 5.00 25.00

32 do Thiksay-II Repair if I/Khul chokor ti poy at stakmo

50.00 2.50 12.50 12.50 12.50 10.00 50.00

33 do do Repair of Head work and I/Khul at Arzu Bagh

2.00 0.10 0.50 0.50 0.50 0.40 2.00

34 do Shey-i Repair/renov. Of25 Nos of I/Khul and drains at various places Shey-i

4.00 0.20 1.00 1.00 1.00 0.80 4.00

35 do Shey-II Repair/renov of 25 Nos of I/Khul at various place shey-ii

25.00 1.25 6.25 6.25 6.25 5.00 25.00

36 do Rambirpur Repair/Renov of 25 Nos of I/Khul at various place Rambirpur

25.00 1.25 6.25 6.25 6.25 5.00 25.00

37 do Nang Repair/Renov of 25 Nos of I/Khul at various place Nang

50.00 2.50 12.50 12.50 12.50 10.00 50.00

Total 181.00 9.05 45.25 45.25 45.25 36.20 181.00

Reno.of waterr bodies including desilting

38 Thiksay Thiksay-I Desilting of I/Khul 7 Nos at various places at Thiksay-I

4.00 0.20 1.00 1.00 1.00 0.80 4.00

39 do Thiksay-II Desilting of I/Khul at potand Gachu to Zarvia Takstot Mohalla Garatong

20.00 1.00 5.00 5.00 5.00 4.00 20.00

40 do do Desilting of I/Khul at Stakyur Near Parma Zing

4.00 0.20 1.00 1.00 1.00 0.80 4.00

41 do do Desilting of I/Khul Togar to Chakgang at Thiksay Garatog

4.00 0.20 1.00 1.00 1.00 0.80 4.00

42 do Rambirpur Desilting of I/Khul at shinday mode to ska sumrak at Rambirpur

2.00 0.10 0.50 0.50 0.50 0.40 2.00

43 do do Desilting of i/khul at Kongma to Gyagar Bumsten

2.00 0.10 0.50 0.50 0.50 0.40 2.00

44 do do Desilting of I/Khul ska sumrak to Bagh yokma

2.00 0.10 0.50 0.50 0.50 0.40 2.00

Page 119: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

112

45 do do Desilting of I/Khul at ska sumrak to Bagh Kongma

1.00 0.05 0.25 0.25 0.25 0.20 1.00

46 do do Desilting of I/Khul from Kongma to Takgyab

1.00 0.05 0.25 0.25 0.25 0.20 1.00

47 do do Desilting of i/khul from sasoma to Rambirpur

1.00 0.05 0.25 0.25 0.25 0.20 1.00

48 do do Desilting of I/Khul from shazing to Kalon Bagh

1.00 0.05 0.25 0.25 0.25 0.20 1.00

49 do Nang 7 no of renovation of water bodies including desilting

1.00 0.05 0.25 0.25 0.25 0.20 1.00

Total 43.00 2.15 10.75 10.75 10.75 8.60 43.00

Providing Infrastructure of irrigation

50 Thiksay Thiksay-I providing 4 Nos of infrastructure for irrigation at Thiksay-I

16.00 0.80 4.00 4.00 4.00 3.20 32.00

51 do Shey-1 4 Nos of infrastructure for irrigation at Shey-I

16.00 0.80 4.00 4.00 4.00 3.20 32.00

52 do Shey-II Providing 4 Nos of infrastructure for irrigation at Shey-II

16.00 0.80 4.00 4.00 4.00 3.20 32.00

53 do Rambirpur providing 4 Nos of infrastructure for irrigation at Rambirpur

16.00 0.80 4.00 4.00 4.00 3.20 32.00

54 do Nang providing 4 Nos of infrastructure for irrigation at Nang

16.00 0.80 4.00 4.00 4.00 3.20 32.00

Total 80.00 4.00 20.00 20.00 20.00 16.00 160.00

G.Total of Thiksay Block 654.500 32.725 163.625 163.625 163.625 130.900 654.500

Page 120: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

113

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF RONG BLOCK

S. No Block Panchayat Name of the works Budget

Req.

Budget requirement (Rs in lacs)

Total Ist year (5%)

2nd year

(25%)

3rd year (25%)

4th year (25%)

5th year (20%)

I Water Conservation :

1 Rong Kungyam Const. Of Water Tank Kungyam Tsesa Nallah Zamchung. 8.00 0.40 2.00 2.00 2.00 1.60 8.00

2 do Kungyam Const. Of Water Tank at Skudung Nallah. 7.00 0.35 1.75 1.75 1.75 1.40 7.00

3 do Kungyam Const. Of Water Storage Tank Teri Dho. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

4 do Skitmang Const. Of water Reservior Tank at Kairy. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

5 do Skitmang Remodaling of Water Storage Tank at Skitmang. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

6 do Skitmang Water Lifting System with Drain at Kairy. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

7 do Liktsey Repair/Desilting of Water Storage Tank at Liktsey. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

8 do Hemya Const. Of water Storage tank Khatpu Dho. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

9 do Chumathang Renovation and Desilting of Water Storage Tank at Chumathang (3 nos). 5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 70.00 3.50 17.50 17.50 17.50 14.00 70.00

II. Renovation and Maintenance of Irrigation Cannal and drains.

10 Rong Skidmang Remodelling and Strengthening of Irrigation Khul Changlung to Katpa Thonpo Kairy. 20.00 1.00 5.00 5.00 5.00 4.00 20.00

11 do Skidmang. Head work of Main I/Khul IKK. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

12 do Liktsey Remodelling of I/Khul at Chadung Tukla. 8.00 0.40 2.00 2.00 2.00 1.60 8.00

Page 121: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

114

13 do Kungyam Remodelling and Strengthening of main Irrigation Khul Kungyam including Tessa Irrigation Khul.

20.00 1.00 5.00 5.00 5.00 4.00 20.00

14 do Kungyam Repair of Main I/Khul Teri Phu. 6.00 0.30 1.50 1.50 1.50 1.20 6.00

15 do Kungyam Re-Const. Of I/Khul Gonpa Yok Kungyam. 9.00 0.45 2.25 2.25 2.25 1.80 9.00

16 do Liktsey Remodelling and Strengthening of main Irrigation Khul Kara Nallah Tukla. 30.00 1.50 7.50 7.50 7.50 6.00 30.00

17 do Liktsey Remodelling of Existing Zamindari Khul Yogyur Liktsey. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

18 do Hemya Remodaling of rrigation Khul Khatpu. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

Total 118.00 5.90 29.50 29.50 29.50 23.60 118.00

III. Land Development

19 Rong Liktsey Land Development including Irrigation Facility at Delchey Tukla Phulak. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

20 do Liktsey Land Development at Tukla. 8.00 0.40 2.00 2.00 2.00 1.60 8.00

21 do Kungyam Land Development at Kumdok. (6 nos) 6.00 0.30 1.50 1.50 1.50 1.20 6.00

22 do Kungyam Land Development at Kungyam To To Thang (8 nos). 8.00 0.40 2.00 2.00 2.00 1.60 8.00

Total 32.00 1.60 8.00 8.00 8.00 6.40 32.00

IV. Creation of Irrigation Canals

23 Rong Kungyam Const. Of I/Khul Kungyam at RCC Bridge to TOTO Thang. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

24 do Kungyam Const. Of I/Khul at Teri Dho Khampa Chaya to Sabgyat Rong. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

25 do Chumathang Const. Of Rantak Thang Canal at Chumathang P-II. 30.00 1.50 7.50 7.50 7.50 6.00 30.00

Total 50.00 2.50 12.50 12.50 12.50 10.00 50.00

Page 122: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

115

G. Total of Rong-Block 270.00 13.50 67.50 67.50 67.50 54.00 270.00

Page 123: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

116

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF NYOMA BLOCK

S. No Nyoma Panchayat Name of the works Budget

req.

Budget requirement (Rs in lacs)

Total Ist year (5%)

2nd year (25%)

3rd year (25%)

4th year

(25%)

5th year (20%)

I Water Conservation :

1 Nyoma Nyoma Const. of Water Storage tank at Nyoma. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

2 do do Const. of Water Storage tank at Mudhu. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

3 do Koyul Const. of Water Storage tank at koyul. 8.00 0.40 2.00 2.00 2.00 1.60 8.00

4 do do Const. of water storage tank at Demjok. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

5 do Tsaga Const. of water of Storage tank at Tsaga. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total : 28.00 1.40 7.00 7.00 7.00 5.60 28.00

II. Land Development :

1 Nyoma Anlay Land development at Ragarthang khaldo.

15.00 0.75 3.75 3.75 3.75 3.00 15.00

2 do do Land development at Pungog Anlay. 7.00 0.35 1.75 1.75 1.75 1.40 7.00

3 do do Land development at Shado Kanyok Anlay

5.00 0.25 1.25 1.25 1.25 1.00 5.00

4 do do Land development at Pungog Gonpa Anlay.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

5 do do Land development at Khaldo at Gonpa. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

6 do do Land development at Skang Rantak. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

7 do do Land development at Raque. 15.00 0.75 3.75 3.75 3.75 3.00 15.00

8 do Nyoma Land development at Nyoma. 7.00 0.35 1.75 1.75 1.75 1.40 7.00

Page 124: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

117

9 do do Land development at Mudh. 7.00 0.35 1.75 1.75 1.75 1.40 7.00

10 do do Land development at Nidder. 7.00 0.35 1.75 1.75 1.75 1.40 7.00

11 do Koyul Const. of 2 Nos Land Development at Koyul.

10.00 0.50 2.50 2.50 2.50 2.00 10.00

12 do do Const. of Land Development at Demjok. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

13 do Tsaga Const. of Land Development at Tsaga. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

14 do do Const. of Land Development at Rongo. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total : 108.00 5.40 27.00 27.00 27.00 21.60 108.00

III. Renovation of Maintenance of Irrigation Cannal and drains.

1 Nyoma Anlay Repair of main I/Khul at Lato Nurbu to Ragar Khaldo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

2 do do Reconstruction of I/khul Pangog Rantak to Khaldo at Buk Shado.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

3 do Nyoma Repair / Renovation of I/Khul Gongdup Nyoma.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

4 do do Repair / Renovation of I/Khul Nidder. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Total : 16.00 0.80 4.00 4.00 4.00 3.20 16.00

IV. Creation of Irrigation Cannal and drain

1 Nyoma Koyul Const. of 2 Nos of I/khul at Koyul. 7.00 0.35 1.75 1.75 1.75 1.40 7.00

2 do do Const. of I/khul at Demjok. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

3 do Tsaga Const. of I/Khul at Rongo. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

4 do do Const. of 3 Nos of I/Khul at Tsaga. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total : 22.00 1.10 5.50 5.50 5.50 4.40 22.00

Page 125: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

118

G.Total Nyoma block : 174.00 8.70 43.50 43.50 43.50 34.80 174.00

Page 126: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

119

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF PUGA BLOCK

S. No

Block Panchayat Name of the works Budget

req.

Budget requirement (Rs in lacs)

Total Ist year (5%)

2nd year

(25%)

3rd year

(25%)

4th year

(25%)

5th year

(20%)

I Water Conservation :

1 Puga Kharnak Const. of water storage at Yagnag Kharnak. 2.00 0.10 0.50 0.50 0.50 0.40 2.00

2 do do Const. of water storage at Dath Kharnak. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Total : 5.00 0.25 1.25 1.25 1.25 1.00 5.00

II. Land Development :

1 Puga Samad Const. of Land Development at Nurchang 4.00 0.20 1.00 1.00 1.00 0.80 4.00

2 do Chumur Const. of Land Development at Tarla 15.00 0.75 3.75 3.75 3.75 3.00 15.00

3 do do Const. of Land Development at Lanzam. 25.00 1.25 6.25 6.25 6.25 5.00 25.00

4 do Korzok Const. of Land Development at Zurley. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

5 do do Const. of Land Development at Phaylung yokma thang at Sumdo kongma.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total : 52.00 2.60 13.00 13.00 13.00 10.40 52.00

III. Creation of Irrigatation canal and drain.

1 Puga Kharnak Const. of I/Khul for Land Development at Kharnak. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

2 do Korzok Const. of I/Khul at Zurley Korzok. 3.00 0.15 0.75 0.75 0.75 0.60 3.00

3 do do Const. of Distributary canal at Phaylung yokma thang at Sumdo kongma.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Page 127: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

120

4 do do Const. of I/khul at Angkong to Gunlung at Anglang. 8.00 0.40 2.00 2.00 2.00 1.60 8.00

5 do Chumur Const. of I/khul at mane to Tarla Chumur. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

6 do do Const. of I/Khul Aerong to Lanzam. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

7 do Samad Const. of main I/Khul and distributary canals at Nurchan. 4.00 0.20 1.00 1.00 1.00 0.80 4.00

8 do do Const. of I/khul for Pastureland development at Norchen Samad. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

9 do do Const. of I/khul from Shangdong to Mangzul Samad. 5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total : 43.00 2.15 10.75 10.75 10.75 8.60 43.00

Renovation of Maintenance of Irrigation Cannal and drains.

1 Puga Korzok Repair and Renovation of main I/Khul at Korzok. 10.00 0.50 2.50 2.50 2.50 2.00 10.00

Total : 10.00 0.50 2.50 2.50 2.50 2.00 10.00

G.Total Rupsho block : 110.00 5.50 27.50 27.50 27.50 22.00 110.00

Page 128: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

121

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF TURTUK BLOCK

S. No

Block Panchayat Name of Works Budget req.

Budget Requirnment (Rs in Lacs)

Total 1st Year (5%)

2nd Year (25%)

3rd Year (25%)

4th Year (25%)

5th Year (25%)

WATER CONSERVATION

1 Turtuk Turtuk Youl Const. Of Water Reserviour Tank at Ramdan Nallah

5.00 0.25 1.25 1.25 1.25 1.00 5.00

2 do Turtuk Farool Const. Of Water Reserviour Tank at Tebhe Nallah 4.00 0.20 1.00 1.00 1.00 0.80 4.00

3 do Tyakshi Const. Of Water Reserviour Tank at Tyakshi 4.00 0.20 1.00 1.00 1.00 0.80 4.00

4 do Tyakshi Const. Of Water Reserviour Tank at Patchathang 4.00 0.20 1.00 1.00 1.00 0.80 4.00

Total 17.00 0.85 4.25 4.25 4.25 3.40 17.00

LAND DEVELOPMENT

1 Turtuk Turtuk Land Development at Various Places in Block Turtuk

190.00 9.50 47.50 47.50 47.50 38.00 190.00

Total 190.00 9.50 47.50 47.50 47.50 38.00 190.00

CREATION OF IRRIGATION CANALS AND DRAINS

1 Turtuk Turtuk Youl Const. Of I Cannal at Krishthang 15.00 0.75 3.75 3.75 3.75 3.00 15.00

2 do Turtuk Farool Const. Of I Cannal at Tebe Nallah 4.00 0.20 1.00 1.00 1.00 0.80 4.00

Total 19.00 0.95 4.75 4.75 4.75 3.80 19.00

RENNOVATION AND MAINTAINANCE OF IRRIGATION CANNALS AND DRAINS

Page 129: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

122

1 Turtuk Turtuk Farool Renovation and maintainance of I Cannal at Garadi

4.00 0.20 1.00 1.00 1.00 0.80 4.00

2 do Turtuk Farool Renovation and maintainance of I Cannal at Spitkarthnag

2.00 0.10 0.50 0.50 0.50 0.40 2.00

3 do Turtuk farool Renovation and Maintainance of I cannal at Turtuk Farool (3 Nos)

6.00 0.30 1.50 1.50 1.50 1.20 6.00

4 do Turtuk Youl Renovation and Maintainance of I Cannal at Turtuk Youl ( 5 Nos)

5.00 0.25 1.25 1.25 1.25 1.00 5.00

5 do Turtuk Youl Renovation and Maintainance of I cannal at Tebe Nallah (6 Nos)

7.00 0.35 1.75 1.75 1.75 1.40 7.00

6 do Turtuk Farool Renovation and Maintainance of I cannal at Ramdan Nallah (6 Nos)

8.00 0.40 2.00 2.00 2.00 1.60 8.00

7 do Bogdang A Renovation and Maintainance of I cannal at Bogdang Phoo Various Places

10.00 0.50 2.50 2.50 2.50 2.00 10.00

8 do Bogdang A Renovation and Maintainance of I cannal at Changmar

3.00 0.15 0.75 0.75 0.75 0,60 3.00

9 do Bogdang A Repair/ Maintainance of Side Drain at various Places at Bogdang

7.00 0.35 1.75 1.75 1.75 1.40 7.00

10 do Bogdang B Renovation and maintainance of I Cannal at main Gunesthang

4.00 0.20 1.00 1.00 1.00 0.80 4.00

11 do Bogdang B Renovation and Maintainance of I cannal at Various Places Bogdang B Shuphakhor

10.00 0.50 2.50 2.50 2.50 2.00 10.00

12 do Bogdang B Renovation and Maintainance of I cannal Nakpothang

2.00 0.10 0.50 0.50 0.50 0.40 2.00

13 do Bogdang B Renovation and Maintainance of I Cannal at Chulungkha ( 3 nos)

7.00 0.35 1.75 1.75 1.75 1.40 7.00

14 do Tyakshi Renovation and Maintainance of I Cannal at Tyakshi

4.00 0.20 1.00 1.00 1.00 0.80 4.00

15 do Tyakshi Renovation and Maintainance of I Cannal Patchathang

2.00 0.10 0.50 0.50 0.50 0.40 2.00

16 do Tyakshi Renovation and Maintainance of I Cannal at Mukurthang

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 130: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

123

17 do Tyakshi Renovation and Maintainance of I cannal at Kharpothang Yokma

5.00 0.25 1.25 1.25 1.25 1.00 5.00

18 do Tyakshi Renovation and Maintainance of I Cannal at Kharpothang Gongma

5.00 0.25 1.25 1.25 1.25 1.00 5.00

19 do Tyakshi Renovation and Maintainance of I Cannal at Thang Village

5.00 0.25 1.25 1.25 1.25 1.00 5.00

20 do Tyakshi Renovation and maintainance of I cannal at Mukurthnag Thang

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 104.00 5.20 26.00 26.00 26.00 20.80 104.00

G. Total 330.00 16.50 82.50 82.50 82.50 66.00 330.00

Page 131: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

124

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF DESKIT BLOCK

S. No

Block Panchayat Name of Works Budget

req.

Budget Requirnment (Rs in Lacs)

Total 1st

Year (5%)

2nd Year (25%)

3rd Year (25%)

4th Year (25%)

5th Year (20%)

WATER CONSERVATION

1 Deskit Digger Const. Of Water Reserviour Tank at Digger

4.50 0.225 1.125 1.125 1.125 0.90 4.50

2 do Digger Const. Of Water Reserviour Tank at Khungru

2.50 0.125 0.625 0.625 0.625 0.50 2.50

3 do Digger Const. Of Water Reserviour Tank at Khema

3.00 0.150 0.750 0.750 0.750 0.60 3.00

4 do khardong Const. Of Water Reserviour Tank at Khardong

7.00 0.350 1.750 1.750 1.750 1.40 7.00

5 do khardong Const. Of Water Reserviour Tank at Kharik Khardong

5.00 0.250 1.250 1.250 1.250 1.000 5.00

6 do Partapur Const. Of Water Reserviour Tank at Skampuk

8.00 0.400 2.00 2.00 2.00 1.60 8.00

7 do Partapur Const. Of Water Reserviour Tank at Hunder Dok

3.00 0.15 0.75 0.75 0.75 0.60 3.00

8 do Terchey Const. Of Water Reserviour Tank at Largyab Gongma

4.50 0.225 1.125 1.125 1.125 0.90 4.50

9 do Terchey Const. Of Water Reserviour Tank at Largyab Yokma

5.00 0.250 1.250 1.250 1.250 1.00 5.00

10 do Terchey Const. Of Water Reserviour Tank at Skuru

5.00 0.250 1.250 1.250 1.250 1.00 5.00

11 do Terchey Const. Of Water Reserviour Tank at Terchey

8.00 0.400 2.00 2.00 2.00 1.60 8.00

12 do Udmaroo Const. Of Water Reserviour Tank at Hunderi

3.00 0.15 0.75 0.75 0.75 0.60 3.00

13 do Udmaroo Const. Of Water Reserviour Tank at Udmaroo

5.00 0.250 1.250 1.250 1.250 1.00 5.00

14 do Udmaroo Const. Of Water Reserviour Tank at Horchorten

2.80 0.140 0.700 0.700 0.700 0.56 2.80

Page 132: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

125

15 do Waris Const. Of Water Reserviour Tank at Dompolas

2.50 0.125 0.625 0.625 0.625 0.50 2.50

TOTAL 68.80 3.44 17.20 17.20 17.20 13.76 68.80

LAND DEVELOPMENT

1 Deskit Diskit Land Development at various

Panchayats in Diskit Block 293.00 14.650 73.250 73.250 73.250 58.60 293.00

TOTAL 293.00 14.65

0 73.250 73.250 73.250 58.60 293.00

CREATION OF IRRIGATION CANALS AND DRAINS

1 Deskit Digger Const of I Cannal at Agyam New Plot 10.00 0.500 2.50 2.50 2.50 2.00 10.00

2 do Digger Const. Of I Cannal at Tangyar Ambri 8.00 0.400 2.00 2.00 2.00 1.60 8.00

3 do Hunder Const of Side Drain at Various Mohallah at Hunder

10.00 0.500 2.50 2.50 2.50 2.00 10.00

4 do Diskit Const. Of Side Drain at Various Places Diskit

15.00 0.750 3.750 3.750 3.750 3.00 15.00

5 do khardong Const. Of I Cannal at Khardong 15.00 0.750 3.750 3.750 3.750 3.00 15.00

6 do Lakjung Const. Of I Cannal at Tsati 5.00 0.250 1.250 1.250 1.250 1.00 5.00

7 do Partapur Const. Of I Cannal at Khushot Skampuk

5.00 0.250 1.250 1.250 1.250 1.00 5.00

8 do Partapur Const. Of I Cannal at Charithang Partapur

10.00 0.500 2.50 2.50 2.50 2.00 10.00

9 do Partapur Const. Of I Cannal at Onspung Skampuk

5.00 0.250 1.250 1.250 1.250 1.00 5.00

10 do Terchey Const. Of I Cannal at Nungthangsa Terchey

15.00 0.750 3.750 3.750 3.750 3.00 15.00

11 do Terchey Const. Of I Cannal at Patchathang 5.00 0.250 1.250 1.250 1.250 1.00 5.00

12 do Terchey Const. Of Side Drain at Terchey Village

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 133: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

126

TOTAL 106.00 5.30 26.50 26.50 26.50 21.20 106.00

RENNOVATION AND MAINTAINANCE OF IRRIGATION CANNALS AND DRAINS

1 Deskit Digger Repair and Renovation of main I Cannal Digger

5.00 0.250 1.250 1.250 1.250 1.00 5.00

2 do Digger Repair and Renovation of main I Cannal Khema and Khungru

5.00 0.250 1.250 1.250 1.250 1.00 5.00

3 do Digger Repair and Renovation of I Cannal at Labab Konto and Agyam

3.00 0.15 0.75 0.75 0.75 0.60 3.00

4 do Diskit Repair and Renovation of I Cannal at Diskit Nallah

7.00 0.350 1.750 1.750 1.750 1.40 7.00

5 do Diskit Repair and Renovation of I cannal at Various Mohallas at Diskit

10.00 0.500 2.50 2.50 2.50 2.00 10.00

6 do Hunder Repair and Renovation Of I cannal at Main Hunder, Abaksha, Methi and Choskor at Hunder

25.00 1.250 6.250 6.250 6.250 5.00 25.00

7 do Hunder Repair and Renovation of I Cannal Ombay Hunder

5.00 0.250 1.250 1.250 1.250 1.00 5.00

8 do khardong Repair and Renovation of I Cannal at Khardong 2 Nos.

5.00 0.250 1.250 1.250 1.250 1.00 5.00

9 do khardong Repair and Rennovation of 3 Nos I Cannal Rasermo

6.00 0.300 1.500 1.500 1.500 1.20 6.00

10 do khardong Repair and Rennovation of 2 Nos i Cannal at Farkha

5.00 0.250 1.250 1.250 1.250 1.00 5.00

11 do khardong Maintainance/Repair of Side Drains at Various Places Khardong

10.00 0.500 2.50 2.50 2.50 2.00 10.00

12 do Lakjung Maintainance/Repair of Side Drains at Tirith

3.00 0.15 0.75 0.75 0.75 0.60 3.00

13 do Lakjung Repair and Rennovation of I Cannal at Lakjung 3 Nos

6.00 0.300 1.500 1.500 1.500 1.20 6.00

14 do Lakjung Repair and Renovation of 3 Nos I Cannal at Tsati

4.00 0.200 1.000 1.000 1.000 0.80 4.00

15 do Lakjung Repair and Renovation of I Cannal at Tirith

2.00 0.100 0.500 0.500 0.500 0.40 2.00

Page 134: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

127

16 do Partapur Repair and Rennovation of I Cannal at Partapur (6 Nos)

10.00 0.500 2.50 2.50 2.50 2.00 10.00

17 do Partapur Repair and Renovation of I Cannal at Skampuk (5 Nos)

8.00 0.400 2.000 2.000 2.000 1.60 8.00

18 do Partapur Repair and Renovation of I Cannal at Wachan Hunder Dok

5.00 0.250 1.250 1.250 1.250 1.00 5.00

19 do Partapur Repair and Renovation of I cannal at Hunder Dok (3 Nos)

4.00 0.200 1.000 1.000 1.000 0.80 4.00

20 do Terchey Repair and Renovation of main i Cannal Terchey

3.00 0.15 0.75 0.75 0.75 0.60 3.00

21 do Terchey Repair and Renovation of I cannal at Skuru (3 Nos)

4.50 0.225 1.125 1.125 1.125 0.90 4.50

22 do Terchey Repair and renovation of 3 Nos I cannal at Patchathang

6.00 0.300 1.500 1.500 1.500 1.20 6.00

23 do Terchey Repair and Renovation of 3 Nos of I Cannal at Largyab Yokma

8.00 0.400 2.000 2.000 2.000 1.60 8.00

24 do Terchey Repair and Renovation of 4 Nos of I Cannal at Largyab Gongma

5.00 0.250 1.250 1.250 1.250 1.00 5.00

25 do Udmaroo Repair and Rennovation of 3 Nos I cannal at Udmaroo

8.00 0.400 2.000 2.000 2.000 1.60 8.00

26 do Udmaroo Repair and Rennovation of 3 Nos I Cannal at Hunderi

5.00 0.250 1.250 1.250 1.250 1.00 5.00

27 do Udmaroo Repair and Rennovation of 2 Nos i Cannal at Shukur

4.00 0.200 1.000 1.000 1.000 0.80 4.00

28 do Waris Repair and Rennovation of I Cannal at Waris Gongma

7.00 0.350 1.750 1.750 1.750 1.40 7.00

29 do Waris Repair and Renovation of 2 Nos I Cannal at Sunido

2.50 0.125 0.625 0.625 0.625 0.50 2.50

30 do Waris Repair and Renovation of 2 Nos I cannal at Waris Yokma

2.50 0.125 0.625 0.625 0.625 0.50 2.50

TOTAL 183.50 9.18 45.88 45.88 45.88 36.70 183.50

RENNOVATION OF WATER BODIES INCLUDING DESILTING

1 Deskit Digger Renovation of Desilting Tank at various Places Digger

5.00 0.250 1.250 1.250 1.250 1.00 5.00

Page 135: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

128

2 do Khardong Renovation and Desilting Tank at Various Places Khardong

4.00 0.200 1.000 1.000 1.000 0.80 4.00

3 do Lakjung Renovation and Desilting Tank at Various Places Lakjung

5.00 0.250 1.250 1.250 1.250 1.00 5.00

4 do Terchey Repair and Desilting Tank at Various Places Terchey

2.00 0.100 0.500 0.500 0.500 0.40 2.00

5 do Udmaroo Repair and Desilting Tank 4 Nos at Udmaroo

5.00 0.250 1.250 1.250 1.250 1.00 5.00

6 do Udmaroo Repair and Desilting Tank 3 Nos at Hunderi

2.00 0.100 0.500 0.500 0.500 0.40 2.00

7 do Udmaroo Repair and Desilting Tank 2 Nos at Shukur

2.00 0.100 0.500 0.500 0.500 0.40 2.00

TOTAL 25.00 1.25 6.25 6.25 6.25 5.00 25.00

G. TOTAL 676.30 33.815 169.075 169.075 169.075 135.260 676.30

Page 136: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

129

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF SASPOL BLOCK

S.No Block

Panchayat Name of Works Budget

req.

Budget Requirnment (Rs in Lacs)

Total

Water Conservation 1st Year

(5%) 2nd Year

(25%) 3rd Year

(25%) 4th Year

(25%) 5th Year

(20%)

1 Saspol Mangue Const. of water storage Tank at

Zoom Mangue. 0.80 0.04 0.20 0.20 0.20 0.16 0.80

2 do Const. of water storage Tank at

Sapta Mangue. 0.80 0.04 0.20 0.20 0.20 0.16 0.80

3 do Repair of Water Storage Tank at

Zinggongma Mangue. 0.50 0.05 0.13 0.13 0.13 0.10 0.50

4 do Repair of Water Storage Tank at

Zing Yokma Mangue. 0.80 0.04 0.20 0.20 0.20 0.16 0.80

5 do Repair of Water Storage Tank at

Farka 0.50 0.05 0.13 0.13 0.13 0.10 0.50

6 do Repair of Water Storage Tank at

Zinglow 0.50 0.05 0.13 0.13 0.13 0.10 0.50

7 do Const. of water storage Tank at

Khantsa Mangue. 0.50 0.05 0.13 0.13 0.13 0.10 0.50

8 do Const. of water storage Tank at

Machudho Mangue. 0.50 0.05 0.13 0.13 0.13 0.10 0.50

9 do Const. of water storage Tank at

Gaira Mangue. 0.50 0.05 0.13 0.13 0.13 0.10 0.50

10 do Const. of water storage Tank at

Thang kerker Mangue. 0.50 0.05 0.13 0.13 0.13 0.10 0.50

11 do Const. of water storage Tank at

Ulley Tokpo Mangue. 0.50 0.05 0.13 0.13 0.13 0.10 0.50

12 do Repair of Water Storage Tank at

Zing Hipti. 0.40 0.02 0.10 0.10 0.10 0.08 0.40

13 do Repair of Water Storage Tank at

Zing Hipti Sumdho. 0.40 0.02 0.10 0.10 0.10 0.08 0.40

14 do Const. of water storage Tank at

Hipti Dho. 0.60 0.03 0.15 0.15 0.15 0.12 0.60

15 do Const. of water storage Tank at

Tar Gomgma. 0.60 0.03 0.15 0.15 0.15 0.12 0.60

Page 137: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

130

16 do Const. of water storage Tank at

Tar Thang. 0.60 0.03 0.15 0.15 0.15 0.12 0.60

17 do Repair of Water Storage Tank at

Tar yul. 0.50 0.05 0.13 0.13 0.13 0.10 0.50

Total Pyt Mangu 9.50 0.70 2.42 2.42 2.42 1.90 9.50

1 Saspol Heshuk Repair of water storage Tank at

Lugutse and Fikar 4.00 0.20 1.00 1.00 1.00 0.80 4.00

2 do Repair of water storage Tank at

stamgo and Skongshat 4.00 0.20 1.00 1.00 1.00 0.80 4.00

3 do Repair of water storage tank at

Ulley 1.50 0.07 0.38 0.38 0.38 0.29 1.50

4 do Repair of water storage tank at

Yangthang 0.50 0.05 0.13 0.13 0.13 0.10 0.50

Total Heshuk: 10.00 0.52 2.51 2.51 2.51 1.99 10.00

1 Saspol Alchi Repair of Water Storage Tank at

Khal tak Alchi 1.50 0.07 0.38 0.38 0.38 0.29 1.5

Total Alchi: 1.5 0.07 0.38 0.38 0.38 0.29 1.5

1 Saspol Saspol Repair of water storage Tank at

Khaling & Gonpa 2.00 0.10 0.50 0.50 0.50 0.40 2.00

2 do Repair of 2 nos water storage

Tank at Kurpuk Zing 7.00 0.35 1.75 1.75 1.75 1.40 7.00

3 do Repair of 2 nos water storage

Tank at Youl 5.00 0.25 1.25 1.25 1.25 1.00 5.00

4 do Repair of water storage Tank at

Saspochey 2.00 0.10 0.50 0.50 0.50 0.40 2.00

Total Saspol: 16.00 0.80 4.00 4.00 4.00 3.20 16.00

RENNOVATION AND MAINTAINANCE OF IRRIGATION CANNALS AND DRAINS

1 Saspol Mangu Renovation of main I/Khul at

Zoom Gongma Mangu 0.800 0.040 0.200 0.200 0.200 0.160 0.80

2 do Renovation of main I/Khul at

Zoom Yokma Mangu 0.800 0.040 0.200 0.200 0.200 0.160 0.80

3 do Renovation of main I/Khul at

Sapta Mangu 0.800 0.040 0.200 0.200 0.200 0.160 0.80

Page 138: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

131

4 do Renovation of main I/Khul at

Farka Mangu 0.600 0.030 0.150 0.150 0.150 0.120 0.60

5 do Renovation of main I/Khul at

Zinlow Panakmo 0.300 0.015 0.075 0.075 0.075 0.060 0.30

6 do Renovation of main I/Khul at

khantse Mohhla 0.300 0.015 0.075 0.075 0.075 0.060 0.30

7 do Renovation of main I/Khul at

Machudo 1.000 0.050 0.250 0.250 0.250 0.200 1.00

8 do Renovation of main I/Khul at

Gaira Youl 0.600 0.030 0.150 0.150 0.150 0.120 0.60

9 do Renovation of main I/Khul at

Gaira Farka 0.400 0.020 0.100 0.100 0.100 0.080 0.4

10 do Renovation of main I/Khul at

Common area thang Kerker 3.000 0.150 0.750 0.750 0.750 0.600 3

11 do Renovation of main I/Khul at

Ulay Tokpo 0.400 0.020 0.100 0.100 0.100 0.080 0.4

12 do Renovation of main I/Khul at

Hipti Youl 0.400 0.020 0.100 0.100 0.100 0.080 0.4

13 do Renovation of main I/Khul at

Hipti Dho 0.400 0.020 0.100 0.100 0.100 0.080 0.4

14 do Renovation of main I/Khul at Tar

Youl 0.400 0.020 0.100 0.100 0.100 0.080 0.4

15 do Renovation of main I/Khul at Tar

Gongma 0.400 0.020 0.100 0.100 0.100 0.080 0.4

16 do Renovation of main I/Khul at Tar

commond area 2.000 0.100 0.500 0.500 0.500 0.400 2.00

17 do Renovation of main I/Khul at tar

Kuti and Khargok 0.500 0.025 0.125 0.125 0.125 0.100 0.50

18 do Renovation of main I/Khul at Tar

Yogma 0.500 0.025 0.125 0.125 0.125 0.100 0.50

19 do Renovation of main I/Khul at

Hepti Sumdo 0.500 0.025 0.125 0.125 0.125 0.100 0.50

20 do Renovation of main I/Khul at

Hipto Dho 0.500 0.025 0.125 0.125 0.125 0.100 0.50

21 do Renovation of main I/Khul at

Rong Gongma Mangue 0.500 0.025 0.125 0.125 0.125 0.100 0.50

22 do Renovation of main I/Khul at

Rong Numchung to 0.400 0.020 0.100 0.100 0.100 0.080 0.4

Page 139: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

132

23 do Renovation of main I/Khul at

Ulley tokpo 0.400 0.020 0.100 0.100 0.100 0.080 0.4

24 do Renovation of main I/Khul at

Dagchan oul Mangu 0.300 0.015 0.075 0.075 0.075 0.060 0.30

25 do Renovation of main I/Khul at

Rong Gongma Mangue 0.300 0.015 0.075 0.075 0.075 0.060 0.30

26 do Renovation of 2 nos of I/Khul at

Dakrong and Thongros 0.900 0.045 0.225 0.225 0.225 0.180 0.9

27 do Renovation of main I/Khul at

Khantse Yokma 0.400 0.020 0.100 0.100 0.100 0.080 0.4

28 do Renovation of main I/Khul at

Farka Pugu 0.300 0.015 0.075 0.075 0.075 0.060 0.30

29 do Renovation 2 nos I/Khul at

Changtikmo/Chutha 0.600 0.030 0.150 0.150 0.150 0.120 0.60

30 do Renovation of main I/Khul at

Maslong Yogma 0.400 0.020 0.100 0.100 0.100 0.080 0.4

31 do Renovation of main I/Khul at

Maslong Gongma 0.400 0.020 0.100 0.100 0.100 0.080 0.4

32 do Renovation of main I/Khul at

Manslong Sahops 0.300 0.015 0.075 0.075 0.075 0.060 0.30

33 do Renovation of main I/Khul at

Sapta Chuposa 0.300 0.015 0.075 0.075 0.075 0.060 0.30

34 do Renovation of main I/Khul at

Zoom Farka 0.300 0.015 0.075 0.075 0.075 0.060 0.30

35 do Renovation of main I/Khul at

Akshy 0.300 0.015 0.075 0.075 0.075 0.060 0.30

36 do Renovation of main I/Khul at

Tsegar 0.500 0.025 0.125 0.125 0.125 0.100 0.50

37 do Renovation of main I/Khul at

Tsota/ Sapta 0.400 0.020 0.100 0.100 0.100 0.080 0.4

38 do Renovation of main I/Khul at

Hepti tsamkha 0.400 0.020 0.100 0.100 0.100 0.080 0.4

39 do Renovation of main I/Khul at

Mangue 2.000 0.100 0.500 0.500 0.500 0.400 2.00

40 do Renovation of main I/Khul at Tar

dhoma 0.400 0.020 0.100 0.100 0.100 0.080 0.4

41 do Renovation of2 nos of I/Khul at

Farka and Spango 0.700 0.035 0.175 0.175 0.175 0.140 0.7

Page 140: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

133

42 do Renovation of main I/Khul at

Gaira Thakmaran 0.400 0.020 0.100 0.100 0.100 0.080 0.4

Total Mangu: 25.500 1.275 6.375 6.375 6.375 5.100 25.50

1 Saspol Saspol Repair and Renovation of I/Khul

at Khaling and Gonpa Mayour 7.000 0.350 1.750 1.750 1.750 1.400 7.00

2 do Repair and Renovation of I/Khul

Khurpuk to Madarase Mayour 10.000 0.500 2.500 2.500 2.500 2.000 10.00

3 do Repair and Renovation of I/Khul

at Sentsa Stakyur 10.000 0.500 2.500 2.500 2.500 2.000 10.00

4 do Repair and Renovation of I/Khul

at Sentsa Yokyur 10.000 0.500 2.500 2.500 2.500 2.000 10.00

5 do Repair and Renovation of I/Khul

at Youl Stakyur 10.000 0.500 2.500 2.500 2.500 2.000 10.00

6 do Repair and Renovation of I/Khul

at youl Yokyur 10.000 0.500 2.500 2.500 2.500 2.000 10.00

7 do Repair and Renovation of I/Khul

at Kagpa chenmo Kurpuk 3.000 0.150 0.750 0.750 0.750 0.600 3.00

8 do Repair and Renovation of I/Khul

at Kagpa Namgma Kurpuk 2.000 0.100 0.500 0.500 0.500 0.400 2.00

9 do Repair and Renovation of I/Khul

at Chotkay kakpa Kurpuk 1.000 0.050 0.250 0.250 0.250 0.200 1.00

10 do Repair and Renovation of I/Khul

at Gyalchang to tonglong Youl 2.000 0.100 0.500 0.500 0.500 0.400 2.00

11 do Repair and Renovation of I/Khul

at Chundu to Tamalung 2.500 0.125 0.625 0.625 0.625 0.500 2.50

12 do Repair and Renovation of I/Khul

at Lchangma yok to Chumeek 2.000 0.100 0.500 0.500 0.500 0.400 2.00

13 do

Repair and Renovation of I/Khul

at Pandelek to Olgok Shalma

youl

2.000 0.100 0.500 0.500 0.500 0.400 2.00

14 do

Repair and Renovation of I/Khul

at Lama zing to Shankar

Madarase

1.000 0.050 0.250 0.250 0.250 0.200 1.00

Page 141: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

134

15 do Repair and Renovation of I/Khul

at Khesuk to Moljoks Hatee 1.000 0.050 0.250 0.250 0.250 0.200 1.00

16 do Repair and Renovation of I/Khul

at Gongyour Saspochey 2.000 0.100 0.500 0.500 0.500 0.400 2.00

17 do

Repair and Renovation of I/Khul

at Tsamskhang to Lungpa

Saspochey

1.000 0.050 0.250 0.250 0.250 0.200 1.00

18 do Repair and Renovation of I/Khul

at Sumdo Saspochey 1.500 0.075 0.375 0.375 0.375 0.300 1.50

19 do

Repair and Renovation of I/Khul

at Lungpa to Remo youra

Saspochey

1.000 0.050 0.250 0.250 0.250 0.200 1.00

20 do Repair and Renovation of I/Khul

at Sumdo Yokma Saspochey 1.000 0.050 0.250 0.250 0.250 0.200 1.00

Saspol Pyt: 80.000 4.000 20.000 20.000 20.000 16.000 80.000

1 Saspol Heshuk Renovation of I/Khul Lugutse 3.000 0.150 0.750 0.750 0.750 0.600 3.00

2 do Renovation of I/Khul Tunglung 3.000 0.150 0.750 0.750 0.750 0.600 3.00

3 do Renovation of I/Khul Fikar

Gongma 3.000 0.150 0.750 0.750 0.750 0.600 3.00

4 do Renovation of I/Khul Fikar 3.000 0.150 0.750 0.750 0.750 0.600 3.00

5 do Renovation of I/Khul Nyangri

part III 3.000 0.150 0.750 0.750 0.750 0.600 3.00

6 do Renovation of I/Khul Stamgo 3.000 0.150 0.750 0.750 0.750 0.600 3.00

7 do Renovation of I/Khul Skongshat 8.000 0.400 2.000 2.000 2.000 1.600 8.00

8 do Renovation of I/Khul skongshat

Mayur 3.000 0.150 0.750 0.750 0.750 0.600 3.00

9 do Renovation of I/Khul Tokpo

Heshuk 10.000 0.500 2.500 2.500 2.500 2.000 10.00

10 do Renovation of I/Khul Tokpo

Yangthang 8.000 0.400 2.000 2.000 2.000 1.600 8.00

11 do Renovation of I/Khul mayur

Yangthang 2.000 0.100 0.500 0.500 0.500 0.400 2.00

Page 142: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

135

12 do Renovation of I/Khul Jung

Yangthang 2.000 0.100 0.500 0.500 0.500 0.400 2.00

13 do Renovation of I/Khul ulley main 3.000 0.150 0.750 0.750 0.750 0.600 3.00

14 do Renovation of I/Khul Ulley Jung 3.000 0.150 0.750 0.750 0.750 0.600 3.00

15 do Renovation of I/Khul ulley

Tokpo Rizong 3.000 0.150 0.750 0.750 0.750 0.600 3.00

16 do Reconstruction of I/Khul at

Chulichan 2.000 0.100 0.500 0.500 0.500 0.400 2.00

17 do Renovation and providing MS

pipe yangthang Rizong Nallah 2.000 0.100 0.500 0.500 0.500 0.400 2.00

18 do Rrenovation of Irrigation Cannal

at Dakppay Thang 70.000 3.500 17.500 17.500 17.500 14.000 70.00

Total Heshuk: 134.000 6.700 33.500 16.000 16.000 26.800 134.000

1 Saspol Alchi Repair and Renovation of I/Khul

at Tseta Serpa Shcngrong 1.000 0.050 0.250 0.250 0.250 0.200 1.00

2 do Repair and Renovation of I/Khul

at Ramtak to Latod pa 1.000 0.050 0.250 0.250 0.250 0.200 1.00

3 do Repair and Renovation of I/Khul

at Thang Rantak to Dukling tsas 1.500 0.075 0.375 0.375 0.375 0.300 1.50

4 do Repair and Renovation of I/Khul

at Lardo Gen 1.000 0.050 0.250 0.250 0.250 0.200 1.00

5 do Repair and Renovation of I/Khul

at Lardo Main I/khul 2.000 0.100 0.500 0.500 0.500 0.400 2.00

6 do Repair and Renovation of I/Khul

at Umlnung 2.000 0.100 0.500 0.500 0.500 0.400 2.00

7 do Repair and Renovation of I/Khul

at Tokpo to yarnam, 3.000 0.150 0.750 0.750 0.750 0.600 3.00

8 do Repair and Renovation of I/Khul

at Siachean to chubabs Alchi 1.500 0.075 0.375 0.375 0.375 0.300 1.50

9 do Repair and Renovation of I/Khul

at Karzoo Yokma to Tokpo 1.500 0.075 0.375 0.375 0.375 0.300 1.50

10 do Repair and Renovation of I/Khul

at Karzoo Gongma to Tokpo 1.500 0.075 0.375 0.375 0.375 0.300 1.50

12 do Repair and Renovation of I/Khul

at Gerges to Sarara 1.000 0.050 0.250 0.250 0.250 0.200 1.00

Page 143: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

136

13 do Repair and Renovation of I/Khul

at Gerges to Bilo 1.000 0.050 0.250 0.250 0.250 0.200 1.00

14 do Repair and Renovation of I/Khul

at Rantak to Chumla Rik 2.000 0.100 0.500 0.500 0.500 0.400 2.00

15 do Repair and Renovation of I/Khul

at Ragopa to Kushutse 1.500 0.075 0.375 0.375 0.375 0.300 1.50

16 do Repair and Renovation of I/Khul

at Dorjay pa to Karzo 1.500 0.075 0.375 0.375 0.375 0.300 1.50

17 do Repair and Renovation of I/Khul

at Alchi Choskor 1.500 0.075 0.375 0.375 0.375 0.300 1.50

18 do Repair and Renovation of I/Khul

at Choskor Stak 2.000 0.100 0.500 0.500 0.500 0.400 2.00

19 do Repair and Renovation at Alchi

Sergar Norboo 1.500 0.075 0.375 0.375 0.375 0.300 1.50

20 do Repair and Renovation at

Basyoul 1.000 0.050 0.250 0.250 0.250 0.200 1.00

21 do Repair and Renovation at Gozing

to Tsasyokma 1.000 0.050 0.250 0.250 0.250 0.200 1.00

Total Phy. Alchi: 30.000 1.500 7.500 7.500 7.500 6.000 30.000

G. Total Saspol Block: 306.500 15.325 76.625 76.625 76.625 61.300 306.500

Page 144: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

137

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF SINGLALOK BLOCK

S. No

Block Pyt. Name of works Budget

req.

Budget Requirement (Rs in lacs)

1st years (5%)

2nd year (25%)

3rd year (25%)

4th year (25%)

5th year (20%)

G.Total (Rs.in lacs)

Ren.of water bodies including desilting

1 Singaylalok Dipling Restoration of I/khul at youl Dipling 5.00 0.25 1.25 1.25 1.25 1.00 5.00

2 -do- -do- Restoration of I/khul at Nop chok Youl Dipling

5.00 0.25 1.25 1.25 1.25 1.00 5.00

3 -do- -do- Restorationof I/khul at Within Dipling Village

5.00 0.25 1.25 1.25 1.25 1.00 5.00

4 -do- -do- Restoratation of I/khul at Gogma Dipling

5.00 0.25 1.25 1.25 1.25 1.00 5.00

5 -do- -do- Restoration of I/khul at Lower village Dipling

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 25.00 1.25 6.25 6.25 6.25 5.00 25.00

Land Development

6 Singaylalok -do- Land development at Gonpa Dipling 5.00 0.25 1.25 1.25 1.25 1.00 5.00

7 -do- -do- Land development at Lower Dipling 5.00 0.25 1.25 1.25 1.25 1.00 5.00

8 -do- -do- Land development at Upper Dipling 5.00 0.25 1.25 1.25 1.25 1.00 5.00

9 -do- -do- Land Development at Within Dipling Village

5.00 0.25 1.25 1.25 1.25 1.00 5.00

10 -do- -do- Land development at Gogma Dipling 5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 25.00 1.25 6.25 6.25 6.25 5.00 25.00

Ren.of water bodies including desilting

Page 145: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

138

11 Singaylalok Lingshed Repair/ Restoration of I/khul at Gonpa Lingshed

5.00 0.25 1.25 1.25 1.25 1.00 5.00

12 -do- -do- Restoration of I/khul at Tagu Genkhor Lingshed

4.00 0.20 1.00 1.00 1.00 0.80 4.00

13 -do- -do- Repair/Restoration of I/khul at Sharchok Teling Lingshed

4.00 0.20 1.00 1.00 1.00 0.80 4.00

14 -do- -do- Restoration of I/khul at Shalang Khor Lingshed

3.80 0.19 0.95 0.95 0.95 0.76 3.80

15 -do- -do- Restoration of I/khul at Yogos Lingshed 3.00 0.15 0.75 0.75 0.75 0.60 3.00

16 -do- -do- Repair/Restoration of I/khul at Kartse Lingshed

3.80 0.19 0.95 0.95 0.95 0.76 3.80

17 -do- -do- Repair/Restoration of i/khul at Neyraks 4.00 0.20 1.00 1.00 1.00 0.80 4.00

18 -do- -do- Repair/restoration of I/khul at Gogma Skumpata

3.80 0.19 0.95 0.95 0.95 0.76 3.80

19 -do- -do- Repair /restoration of I/khul at Yokma Skumpata

3.80 0.19 0.95 0.95 0.95 0.76 3.80

20 -do- -do- Repair/ Restoration of I/khul at Chok tse rak khor Lingshed

3.80 0.19 0.95 0.95 0.95 0.76 3.80

21 -do- -do- Repair/ Restoration of I/khul at Zinchan Village

1.00 0.05 0.25 0.25 0.25 0.20 1.00

Total 40.00 2.00 10.00 10.00 10.00 8.00 40.00

Land Development

22 Singaylalok Lingshed land Development at Gonpa and Chomo Gonpa Lingshed

5.00 0.25 1.25 1.25 1.25 1.00 5.00

23 -do- -do- Land development at Gogma Skumpata 3.00 0.15 0.75 0.75 0.75 0.60 3.00

24 -do- -do- Land development at Choktserak Khor Lingshed

3.00 0.15 0.75 0.75 0.75 0.60 3.00

25 -do- -do- Land develoment at Tagu Lingshed 3.00 0.15 0.75 0.75 0.75 0.60 3.00

26 -do- -do- Land development at Genkhor Lingshed 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 146: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

139

27 -do- -do- Land development at Teling ber ber Lingshed

3.00 0.15 0.75 0.75 0.75 0.60 3.00

28 -do- -do- Land development at Neyraks 3.00 0.15 0.75 0.75 0.75 0.60 3.00

29 -do- -do- land Development at Youlchung 3.00 0.15 0.75 0.75 0.75 0.60 3.00

30 -do- -do- Land development at Yogos Lingshed 3.00 0.15 0.75 0.75 0.75 0.60 3.00

31 -do- -do- Land development at Shalang khor Lingshed

3.00 0.15 0.75 0.75 0.75 0.60 3.00

32 -do- -do- land development at Kartse Lingshed 3.00 0.15 0.75 0.75 0.75 0.60 3.00

33 -do- -do- land development at Skumpata Yokma 3.00 0.15 0.75 0.75 0.75 0.60 3.00

34 -do- -do- Land development at Zinchan 1.00 0.05 0.25 0.25 0.25 0.20 1.00

Total 39.00 1.95 9.75 9.75 9.75 7.80 39.00

Pyt. Total 79.00 3.95 19.75 19.75 19.75 15.80 79.00

Ren.of water bodies including desilting

35 -do- Fotokser Repair of I/khul at Shar Fotokser 5.70 0.29 1.43 1.43 1.43 1.14 5.70

36 -do- -do- Repair of I/khul at Dip Fotokser 5.70 0.29 1.43 1.43 1.43 1.14 5.70

37 -do- -do- Repair of I/khul at Machu Fotokser 5.70 0.29 1.43 1.43 1.43 1.14 5.70

38 -do- -do- Repair of I/khul at Askuta Fotoksar 5.70 0.29 1.43 1.43 1.43 1.14 5.70

39 -do- -do- Repair of 2 Nos I/khul youl Fotokser 6.40 0.32 1.60 1.60 1.60 1.28 6.40

40 -do- -do- Renovation of I/khul at Zungkhor Fotokser

5.00 0.25 1.25 1.25 1.25 1.00 5.00

41 -do- -do- Restoration of main i/khul at Farka Fotoksar

6.47 0.32 1.62 1.62 1.62 1.29 6.47

Total 40.67 2.03 10.17 10.17 10.17 8.13 40.67

Page 147: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

140

Land Development

42 -do- -do- Land development at Fotokser youl 7.02 0.35 1.76 1.76 1.76 1.40 7.02

43 -do- -do- Land development at stot Fotokser 6.00 0.30 1.50 1.50 1.50 1.20 6.00

44 -do- -do- Land development at Machu Fotokser 6.00 0.30 1.50 1.50 1.50 1.20 6.00

45 -do- -do- Land development at Shar Fotokser 6.00 0.30 1.50 1.50 1.50 1.20 6.00

46 -do- -do- Land development at Askuta Fotoksar 6.00 0.30 1.50 1.50 1.50 1.20 6.00

Total 31.02 1.55 7.76 7.76 7.76 6.20 31.02

Ren.of water bodies including desilting

47 Singaylalok Wanla-B Restoration of main i/khul at Hinju 8.00 0.40 2.00 2.00 2.00 1.60 8.00

48 -do- -do- Restoration of Main I/khul at Fanji La 8.00 0.40 2.00 2.00 2.00 1.60 8.00

49 -do- -do- Rstoration of I/khul at Hanupata 8.00 0.40 2.00 2.00 2.00 1.60 8.00

50 -do- -do- Restoration of Mauin I/khul at Sumdhoo

8.00 0.40 2.00 2.00 2.00 1.60 8.00

Total 32.00 1.60 8.00 8.00 8.00 6.40 32.00

Land Development

51 Singaylalok Ursi Land development at Ursi Thang 5.30 0.27 1.33 1.33 1.33 1.06 5.30

52 -do- -do- Land development at Hanupata 5.30 0.27 1.33 1.33 1.33 1.06 5.30

53 -do- -do- Land development at Hinju 5.30 0.27 1.33 1.33 1.33 1.06 5.30

54 -do- -do- Land development at Fanji La 5.30 0.27 1.33 1.33 1.33 1.06 5.30

55 -do- -do- Land development at Sumdhoo 5.30 0.27 1.33 1.33 1.33 1.06 5.30

Page 148: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

141

56 -do- -do- Land development at Solpon Dok 5.30 0.27 1.33 1.33 1.33 1.06 5.30

57 -do- -do- Land development at Fanji la Dho 5.20 0.26 1.30 1.30 1.30 1.04 5.20

58 -do- -do- Land development at Ursi Thang 5.30 0.27 1.33 1.33 1.33 1.06 5.30

59 -do- -do- Land development at Hanupata 5.30 0.27 1.33 1.33 1.33 1.06 5.30

60 -do- -do- Land development at Hinju 5.30 0.27 1.33 1.33 1.33 1.06 5.30

61 -do- -do- Land development at Fanji La 5.30 0.27 1.33 1.33 1.33 1.06 5.30

62 -do- -do- Land development at Sumdhoo 5.30 0.27 1.33 1.33 1.33 1.06 5.30

63 -do- -do- Land development at Solpon Dok 5.30 0.27 1.33 1.33 1.33 1.06 5.30

64 -do- -do- Land development at Fanji la Dho 5.20 0.26 1.30 1.30 1.30 1.04 5.20

Total 74.00 3.70 18.50 18.50 18.50 14.80 74.00

Ren.of water bodies including desilting

65 Singaylalok Wanla-A Const.of I/khul with cement concrete land pipes at Pamochay

4.00 0.20 1.00 1.00 1.00 0.80 4.00

66 -do- -do- Const. of H/work with cement concrete at Dipyura.

4.00 0.20 1.00 1.00 1.00 0.80 4.00

67 -do- -do- Desilting of I/khul at Zomal Wanla 2.50 0.13 0.63 0.63 0.63 0.50 2.50

68 -do- -do- Desilting of I/khul at Tarchit 2.50 0.13 0.63 0.63 0.63 0.50 2.50

69 -do- -do- Desilting of I/khul from Shaschoks wanla

2.50 0.13 0.63 0.63 0.63 0.50 2.50

70 -do- -do- Desilting of I/Khul at Namgail Tsering land wanla

2.00 0.10 0.50 0.50 0.50 0.40 2.00

71 -do- -do- Const.of I/khul with cement concrete at Bukbukza wanla

2.50 0.13 0.63 0.63 0.63 0.50 2.50

72 -do- -do- Desilting of I/khul at Skabgyat wanla 2.00 0.10 0.50 0.50 0.50 0.40 2.00

Page 149: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

142

73 -do- -do- Desilting of I/khul at Maneygo wanla 1.00 0.05 0.25 0.25 0.25 0.20 1.00

74 -do- -do- Desilting of I/khul at Pingkiti wanla 2.00 0.10 0.50 0.50 0.50 0.40 2.00

75 -do- -do- Desilting of I/khul at Chuletse Wanla 2.00 0.10 0.50 0.50 0.50 0.40 2.00

76 -do- -do- Desilting of I/khul at Lingthang Wanla 2.00 0.10 0.50 0.50 0.50 0.40 2.00

77 -do- -do- Desilting of I/khul at Kurkur wanla 1.00 0.05 0.25 0.25 0.25 0.20 1.00

78 -do- -do- Const.of walling for chabgyat I/Khul Wanla

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 35.00 1.75 8.75 8.75 8.75 7.00 35.00

Land Development

79 -do- -do- Land development at Bukbuksa 7.00 0.35 1.75 1.75 1.75 1.40 7.00

80 -do- -do- Land development at Skabgyat Wanla 4.00 0.20 1.00 1.00 1.00 0.80 4.00

Total 11.00 0.55 2.75 2.75 2.75 2.20 11.00

352.7

352.700 17.635 88.175 88.175 88.175 70.540 352.700

Page 150: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

143

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF CHUCHOT BLOCK

S.No Block Panchayat Name of works Bud.req.

Budget Requirement (Rs in lacs)

G.Total 1st year (5%)

2nd year (25%)

3rd year (25%)

4th year (25%)

5th year (20%)

I Water Conservation

1 Chuchot Chuchot Gongma-I Constt. Of W/S/Tank at Tochik 5.00 0.25 1.25 1.25 1.25 1.00 5.00

2 do Chuchot Gongma-II Constt. Of W/S/Tank at 2 Nos Tuchik

10.00 0.50 2.50 2.50 2.50 2.00 10.00

3 do Matho Const. of 5 nos of W/Storage trank at various location at Matho

25.00 1.25 6.25 6.25 6.25 5.00 25.00

4 do Stok Const of 6 nos water storage tank various places at stok

30.00 1.50 7.50 7.50 7.50 6.00 30.00

5 do Stakna Const of water storage tank at Stakna

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total:- 75.00 3.75 18.75 18.75 18.75 15.00 75.00

II Land Deverlopment

6 Chuchot Chuchot Gongma-I Land Dev. & Plantation at Igo Phey Command Area with Protection

45.00 2.25 11.25 11.25 11.25 9.00 45.00

7 do Chuchot Gongma-II Land Dev. & Plantation Protection Igoo Phey Canal Chuchot Gongma -II

45.00 2.25 11.25 11.25 11.25 9.00 45.00

8 do Chuchot Yokma-I Land Dev. & Plantation Igo Phey Command Area with Protection Chu. Yokma-I

45.00 2.25 11.25 11.25 11.25 9.00 45.00

9 do Chuchot Yokma-II Land Dev. & Plantation Igo Phey Command Area with Protection Chuchot Yokma -II

45.00 2.25 11.25 11.25 11.25 9.00 45.00

10 do Ch- Shamma II Land Dev. at various place & plantation at Chuchot Shamma Igo Phey Command Area (CAD)

45.00 2.25 11.25 11.25 11.25 9.00 45.00

Page 151: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

144

11 do Matho Land development and plantation with protection at Matho

45.00 2.25 11.25 11.25 11.25 9.00 45.00

12 do Ch-

Shamma-I

Land development and plantation with protection at Igoo phey command area chuchot shamma-i

45.00 2.25 11.25 11.25 11.25 9.00 45.00

13 do Stok Land development and plantation with protection at Stok

45.00 2.25 11.25 11.25 11.25 9.00 45.00

14 do Stakna Const of land development and plantation with protection at command area at stakna

30.00 1.50 7.50 7.50 7.50 6.00 30.00

Total:- 390.00 19.50 97.50 97.50 97.50 78.00 390.00

III Water Harvesting

15 Chuchot Chuchot Gongma-I Const. of W/S/Tank 2Nos at Igoo Phey Command Area at Chu. Gongma-I

10.000 0.500 2.500 2.500 2.500 2.000 10.000

16 do Chuchot Gongma-II Const. of 2 Nos W/S/Tank at Igoo Phey Command Area at Chu. Gongma-II

10.000 0.500 2.500 2.500 2.500 2.000 10.000

17 do Chuchot Yokma-I Const. of W/S/Tank at Chuchot Yokma-I at Igoo Phey Command Area

10.000 0.500 2.500 2.500 2.500 2.000 10.000

18 do Chuchot Yokma-II Const. of W/S/Tank at Chuchot Yokma II at Igoo Phey Command Area

10.000 0.500 2.500 2.500 2.500 2.000 10.000

19 do Ch- Shamma II Const of 2 No of W/S Tank at Chuchot Shamma II at Igo Phey(CA)

10.000 0.500 2.500 2.500 2.500 2.000 10.000

20 do Matho Rep/Reno. Of water storage tank Nelabuk Matho

3.000 0.150 0.750 0.750 0.750 0.600 3.000

21 do Matho Const of W/storage tank at Matho

5.000 0.250 1.250 1.250 1.250 1.000 5.000

22 do Ch-

Shamma-I

Const of 2 Nos of water storage tank at Igoo Phey common area at chuchot shamma-I

10.000 0.500 2.500 2.500 2.500 2.000 10.000

Page 152: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

145

23 do Stok Rep/Ren water harvesting tank at stok phoo

2.500 0.125 0.625 0.625 0.625 0.500 2.500

24 do Stok Const of harvesting tank 2 nos at stok

10.000 0.500 2.500 2.500 2.500 2.000 10.000

25 do Stakna Const of water storage tank at stakna

5.000 0.250 1.250 1.250 1.250 1.000 5.000

Total:- 85.500 4.275 21.375 21.375 21.375 17.100 85.500

IV Creation of Irrigation Canals and Drains

26 Chuchot Chuchot Gongma-I Const. of 3 Nos I/Khul for Cement concrete bodth side at various place at Igoo Phey

4.500 0.225 1.125 1.125 1.125 0.900 4.500

27 do Chuchot Gongma-II

Const. of 3 Nos I/Khul for Cement concrete bodth side at various place at Igoo Phey Command Area

4.500 0.225 1.125 1.125 1.125 0.900 4.500

28 do Chuchot Yokma-I

Const. of 4 Nos I/Khul With Cement concrete bodth side at various place at Igoo Phey Chuchot Yokma - I

6.000 0.300 1.500 1.500 1.500 1.200 6.000

29 do Chuchot Yokma-II

Const. of 4 Nos I/Khul With Cement concrete bodth side at various place at Igoo Phey Chuchot Yokma - II

6.000 0.300 1.500 1.500 1.500 1.200 6.000

30 do Ch- Shamma II

Const of 3 Nos of I/Khul and drains at various places at chuchot Shamma

4.50 0.225 1.125 1.125 1.125 0.90 4.50

31 do Matho Const of 4 nos I/khul & drains at different location at Matho (concrete)

6.00 0.30 1.50 1.50 1.50 1.20 6.00

32 do Ch-

Shamma-I

Const of 3nos I/Khul & drain at different places at Igoo phey chuchot shamma-I(Concrete)

4.50 0.225 1.125 1.125 1.125 0.90 4.50

33 do Stok Const of 4 nos I/khul at various places at stok

6.00 0.30 1.50 1.50 1.50 1.20 6.00

34 do Stakna Const of 2 nos I/khul at stakna 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 153: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

146

Total:- 45.000 2.250 11.250 11.250 11.250 9.000 45.000

V Renovation and Maintainance of Irrigation canal and drains

35 Chuchot Chuchot Gongma-I Renovation and Maintainance of I/Canal and drains 18 Nos at Chu. Gongma-I

9.000 0.450 2.250 2.250 2.250 1.800 9.000

36 do Chuchot Gongma-II Renovation and Maintainance of I/Canal and drains 18 Nos at Chu. Gongma-II

9.000 0.450 2.250 2.250 2.250 1.800 9.000

37 do Chuchot Yokma-I Renovation and Maintainance of 20 Nos of I/Canal and drains Chuchot Yokma - I

10.000 0.500 2.500 2.500 2.500 2.000 10.000

38 do Chuchot Yokma-II Renovation and Maintainance of 20 Nos of I/Canal and drains Chuchot Yokma

10.000 0.500 2.500 2.500 2.500 2.000 10.000

39 do Ch- Shamma II Renovation and maintance of irrigation canal 18 nos including head work

9.00 0.45 2.25 2.25 2.25 1.80 9.00

40 do Matho Renovation and maintainance of 20 nos I/khul & drain including head work at Matho

7.00 0.35 1.75 1.75 1.75 1.40 7.00

41 do Ch-

Shamma-I

Ren. and maintainance of 18 nos I/canal and drains at chuchot shamma-I including head work

9.00 0.45 2.25 2.25 2.25 1.80 9.00

42 do Stok Renovation and maintaince irrigation canal drain 20 nos at stok

10.00 0.50 2.50 2.50 2.50 2.00 10.00

43 do Stakna Renovation and maintance of 5 Nos I/khul at Stakna

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total:- 78.000 3.900 19.500 19.500 19.500 15.600 78.000

VI Renovation of water bodies including desilting

44 Chuchot Chuchot Gongma-I Renovation of water bodies including desilting 2 Nos at Main Mayour at Jabok

10.000 0.500 2.500 2.500 2.500 2.000 10.000

45 do Chuchot Gongma-II Renovation of water bodies including desilting Main Canal

5.000 0.250 1.250 1.250 1.250 1.000 5.000

Page 154: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

147

at Chu. Gongma

46 do Chuchot Yokma-I Renovation of water bodies including desilting at Chuchot Yokam-I

10.000 0.500 2.500 2.500 2.500 2.000 10.000

47 do Chuchot Yokma-II

Renovation of water bodies including desilting at Chu. Yokam II and Zamchung Chuchot Yokma

10.000 0.500 2.500 2.500 2.500 2.000 10.000

48 do Ch- Shamma II Renovation of 1 No of main khul at chuchot shamma-II

5.00 0.25 1.25 1.25 1.25 1.00 5.00

49 do Matho Reno of water bodies including desilting(main i/khul) at Matho

5.00 0.25 1.25 1.25 1.25 1.00 5.00

50 do Ch-

Shamma-I

Ren. of water bodies including desilting (main canal) at chuchot shamma-I

5.00 0.25 1.25 1.25 1.25 1.00 5.00

51 do Stok Renovation of water bodies including desilting stok main H/Work

6.00 0.30 1.50 1.50 1.50 1.20 6.00

52 do Stakna Renovation and desilting main I/khul at Stakna

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total:- 61.000 3.050 15.250 15.250 15.250 12.200 61.000

VIII Providing infrastruture for irrigation

53 Chuchot Chuchot Gongma-I Providing infrastructur for irrigtion at Chuchot Gongma_i H/Work /I/Khul

10.000 0.500 2.500 2.500 2.500 2.000 10.000

54 do Chuchot Gongma-II Providing infrastruture for irrigtion Khul and Const. of Head works etc.

10.000 0.500 2.500 2.500 2.500 2.000 10.000

55 do Chuchot Yokma-I Providing infrastructur for irrigtion Khul Head work at Chuchot Yokma-I

10.000 0.500 2.500 2.500 2.500 2.000 10.000

56 do Chuchot Yokma-II Providing infrastructur for irrigtion Khul Head work at Chuchot Yokma-II

10.000 0.500 2.500 2.500 2.500 2.000 10.000

57 do Ch- Shamma II Const of head work for I/Khul at Chuchot Shamma-II

10.00 0.50 2.50 2.50 2.50 2.00 10.00

Page 155: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

148

58 do Matho Const of H/W & I/khul at Matho 10.00 0.50 2.50 2.50 2.50 2.00 10.00

59 do Ch-

Shamma-I Const of H/W I/khul etc at chuchot shamma-I

10.00 0.50 2.50 2.50 2.50 2.00 10.00

60 do Stok Providing infrastructure for irrigation H/W I/Khul various places at stok

10.00 0.50 2.50 2.50 2.50 2.00 10.00

61 do Stakna Const of H/work main I/khul at Stakna

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total:- 85.000 4.250 21.250 21.250 21.250 17.000 85.000

G.Total Chuchot Gongma-I :- 819.500 40.975 204.875 204.875 204.875 163.900 819.500

Page 156: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

149

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF KHARU BLOCK

S. No Block Panchayat Name of the works Budget

req.

Budget requirement (Rs in lacs)

Total Ist year

(5%)

2nd

year

(25%)

3rd

year

(25%)

4th

year

(25%)

5th

year

(20%)

I Water Conservation :

1 Kharu Taknak

Construction of Water

Conservation at Taknak

Phoo

5.00 0.25 1.25 1.25 1.25 1.00 5.00

2 do do Degang Tsaktuk Zaruk 5.00 0.25 1.25 1.25 1.25 1.00 5.00

3 do do Farka Gongma (Kaney

Moting II) 5.00 0.25 1.25 1.25 1.25 1.00 5.00

4 do do Farrka Yokma 5.00 0.25 1.25 1.25 1.25 1.00 5.00

5 do do Hamil 5.00 0.25 1.25 1.25 1.25 1.00 5.00

6 do do Tukchu 5.00 0.25 1.25 1.25 1.25 1.00 5.00

5 do Tagar Kangkar

Gongma(Gogarkha) 7.00 0.35 1.75 1.75 1.75 1.40 7.00

8 do do Gogarkhay 8.00 0.40 2.00 2.00 2.00 1.60 8.00

9 do Chemday _ _ _ _ _ _ _ _

10 do shara Phukrsey 7.00 0.35 1.75 1.75 1.75 1.40 7.00

11 do do Shara 7.00 0.35 1.75 1.75 1.75 1.40 7.00

12 do do Sharnos 7.00 0.35 1.75 1.75 1.75 1.40 7.00

14 do Igoo Phuktsa 7.00 0.35 1.75 1.75 1.75 1.40 7.00

15 do do Langkor 7.00 0.35 1.75 1.75 1.75 1.40 7.00

Page 157: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

150

16 do do Naklay 7.00 0.35 1.75 1.75 1.75 1.40 7.00

17 do Gia Gia 7.00 0.35 1.75 1.75 1.75 1.40 7.00

18 do do Sasoma 7.00 0.35 1.75 1.75 1.75 1.40 7.00

19 do do Rumtse 7.00 0.35 1.75 1.75 1.75 1.40 7.00

20 108.00 5.40 27.00 27.00 27.00 21.60 108.00

II Land Development :

1 Kharu Kharu

Construction of Land

Development in Kharu

block.

59.000 2.950 14.750 14.750 14.750 11.800 59.000

59.000 2.950 14.750 14.750 14.750 11.800 59.000

III. Creation of irrigation canals and drains

1 Kharu Gia Creation of irrigation

canals and drains

2 do do Meru 2.000 0.100 0.500 0.500 0.500 0.400 2.000

3 do do Gia-Ist 2.000 0.100 0.500 0.500 0.500 0.400 2.000

4 do do Gia-II 2.000 0.100 0.500 0.500 0.500 0.400 2.000

5 do do Sasoma 2.000 0.100 0.500 0.500 0.500 0.400 2.000

6 do do Upshi 2.000 0.100 0.500 0.500 0.500 0.400 2.000

7 do Chemday Chemday 2.000 0.100 0.500 0.500 0.500 0.400 2.000

8 do do Chemday 2.000 0.100 0.500 0.500 0.500 0.400 2.000

8 do Martselang Hemis thang 7.000 0.350 1.750 1.750 1.750 1.400 7.000

9 do Tagar Dorjey

Chonpachonmo(kangkar) 1.000 0.050 0.250 0.250 0.250 0.200 1.000

Page 158: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

151

10 do do Khuk Tsewang 1.000 0.050 0.250 0.250 0.250 0.200 1.000

11 do do Payur Sharnos 2.000 0.100 0.500 0.500 0.500 0.400 2.000

12 do do Tagar 2.000 0.100 0.500 0.500 0.500 0.400 2.000

27.000 1.350 6.750 6.750 6.750 5.400 27.000

IV. Kharu Gia Renovation of water bodis

including desilting

1 do do Gia-I 1.000 0.050 0.250 0.250 0.250 0.200 1.000

2 do do Meru 1.000 0.050 0.250 0.250 0.250 0.200 1.000

3 do do Upshi 1.000 0.050 0.250 0.250 0.250 0.200 1.000

4 do do Sasoma 1.000 0.050 0.250 0.250 0.250 0.200 1.000

5 do Chemday Kangkar Yokma 2.000 0.100 0.500 0.500 0.500 0.400 2.000

6 do do Kayur ZingDho 2.000 0.100 0.500 0.500 0.500 0.400 2.000

7 do do Yoknos 4.000 0.200 1.000 1.000 1.000 0.800 4.000

8 do do Payur 2.000 0.100 0.500 0.500 0,50 0,40 2.000

14.000 0.700 3.500 3.500 3.000 2.400 14.000

V

Renovation and

maintenance of I/Canals

& Drains

1 Kharu Chemday Kongma Tharba to Lama

Zing 4.000 0.200 1.000 1.000 1.000 0.800 4.000

2 do do Yokma Shaga to Menay

Tseding 2.000 0.100 0.500 0.500 0.500 0.400 2.000

3 do do Kahgkar Yokma 2.000 0.100 0.500 0.500 0.500 0.400 2.000

4 do do Yokyur Dho 2.000 0.100 0.500 0.500 0.500 0.400 2.000

Page 159: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

152

5 do do Yokma Yoknos 2.000 0.100 0.500 0.500 0.500 0.400 2.000

6 do do Payur 1.000 0.050 0.250 0.250 0.250 0.200 1.000

7 do do Kituing from Gamath to

Thangpa 2.500 0.125 0.625 0.625 0.625 0.500 2.000

8 do do Mangla Zing to Pue

Gamath 2.500 0.125 0.625 0.625 0.625 0.500 2.000

9 do do Gia 1.000 0.050 0.250 0.250 0.250 0.200 1.000

10 do do Tuna 1.000 0.050 0.250 0.250 0.250 0.200 1.000

11 do do Rumtse 1.000 0.050 0.250 0.250 0.250 0.200 1.000

12 do Gia Gia-I 1.000 0.050 0.250 0.250 0.250 0.200 1.000

13 do do Meru 1.000 0.050 0.250 0.250 0.250 0.200 1.000

14 do Igoo s 3.000 0.150 0.750 0.750 0.750 0.600 3.000

15 do do Igoo-I 3.000 0.150 0.750 0.750 0.750 0.600 3.000

16 do do Igoo-II 3.000 0.150 0.750 0.750 0.750 0.600 3.000

17 do do Igoo Dho 3.000 0.150 0.750 0.750 0.750 0.600 3.000

18 do TAknak Taknak Pho 2.000 0.100 0.500 0.500 0.500 0.400 2.000

19 do do Farka Gongma (Kaney

Moting II) 2.000 0.100 0.500 0.500 0.500 0.400 2.000

20 do do Fzrka Yokma 2.000 0.100 0.500 0.500 0.500 0.400 2.000

21 do do Degang Tsaktuk Zaruk 2.000 0.100 0.500 0.500 0.500 0.400 2.000

22 do do Tukchu 2.000 0.100 0.500 0.500 0.500 0.400 2.000

23 do do Hamila 2.000 0.100 0.500 0.500 0.500 0.400 2.000

Page 160: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

153

24 do Martslang Hemis 3.000 0.150 0.750 0.750 0.750 0.600 3.000

25 do do Martselang (4 Nos) 14.000 0.700 3.500 3.500 3.500 2.800 14.000

26 do do Chokdo 4.000 0.200 1.000 1.000 1.000 0.800 4.000

27 do do Changa 7.000 0.350 1.750 1.750 1.750 1.400 7.000

28 do do Shang 3.000 0.150 0.750 0.750 0.750 0.600 3.000

29 do Gia Sasoma 1.000 0.050 0.250 0.250 0.250 0.200 1.000

30 do Tagar Tagar Gongma 3.000 0.150 0.750 0.750 0.750 0.600 3.000

31 do do Tagar Yokma 3.000 0.150 0.750 0.750 0.750 0.600 3.000

32 do do Sharnus Gongma 3.000 0.150 0.750 0.750 0.750 0.600 3.000

33 do do Sharnes Yokma 3.000 0.150 0.750 0.750 0.750 0.600 3.000

34 do do Kangkar Gongma 3.000 0.150 0.750 0.750 0.750 0.600 3.000

35 do do Kangkar Yokma 3.000 0.150 0.750 0.750 0.750 0.600 3.000

97.000 4.850 24.250 24.250 24.250 19.400 97.000

G.Total 305.000 15.250 76.250 76.250 75.250 60.600 305.000

Page 161: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

154

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF LEH BLOCK

S.No Block Panchayat Name of the Works

Budget req.

Budget Requirnment (Rs in Lacs)

Total 1st Year (5%)

2nd Year (25%)

3rd Year

(25%)

4th Year

(25%)

5th Year

(20%) I Water Conservation

1 Leh Phayang Cost. Of Artificial Glacier at Murodok P-I

3.00 0.15 0.75 0.75 0.75 0.60 3.00

2 do do Cost. Of Artificial Glacier at Sangam tokpo

3.00 0.15 0.75 0.75 0.75 0.60 3.00

3 do do Cost. Of Artificial Glacier at Murodok P-II

2.00 0.10 0.50 0.50 0.50 0.40 2.00

4 do Spituk Const. of WST at Farkha mohalla

5.00 0.25 1.25 1.25 1.25 1.00 5.00

5 do do Cons. Of 6 nos ofWST at Palam 6.00 0.30 1.50 1.50 1.50 1.20 6.00

6 do

Saboo

Const. of Water Storage Tank Zong, Saboo.

10.00 0.50 2.50 2.50 2.50 2.00 10.00

7 do Const. of Artificial Glacier at Spangpochey, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

8 do Const. of Artificial Glacier at Tarchit, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 39.00 1.95 9.75 9.75 9.75 7.80 39.00

do II Water Harvesting

1 do Phayang const. of Water Hervesting Tank at Changtsik Samgham Pulu

10.00 0.50 2.50 2.50 2.50 2.00 10.00

2 do Chok-II Const. Of Water storage Tank at Sonam Barmaling

3.00 0.15 0.75 0.75 0.75 0.60 3.00

3 do do Const. Of Water Storage Tank at T Thongsmom

3.00 0.15 0.75 0.75 0.75 0.60 3.00

4 do Saboo Cost. Of Artificial Glacier at Kok pulu, Saboo.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 162: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

155

5 do Cost. Of Artificial Glacier at Stamkar, Saboo.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

6 do Cost. Of Artificial Glacier at Chirkak, Saboo.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Total 25.00 1.25 6.25 6.25 6.25 5.00 25.00

III Providing Infrastructure for irrigation

1 Leh Phayang const. of H/work and Main I/Khul at phyang Tokpo

6.00 0.30 1.50 1.50 1.50 1.20 6.00

2 do do const. of H/work and Main I/Khul at Tsakma

5.00 0.25 1.25 1.25 1.25 1.00 5.00

3 do do const. of H/work and Main I/Khul at Lagang

3.00 0.15 0.75 0.75 0.75 0.60 3.00

4 do do const. of H/work and Main I/Khul at Balu Zabjas

2.00 0.10 0.50 0.50 0.50 0.40 2.00

5 do do const. of H/work and Main I/Khul at Stangyans yokma

2.00 0.10 0.50 0.50 0.50 0.40 2.00

6 do

Saboo

Const. of H/work of Yourgok I/Khul Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

7 do Const. of H/work of Zinglo I/Khul Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

8 do const. of H/work of Yoknos I/Khul, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

9 do const. of H/work of Yoknos I/Khul, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

10 do const. of H/work of Ayu I/Khul, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 43.00 2.15 10.75 10.75 10.75 8.60 43.00

IV Creation of I/Canal & Drains

1 Leh Phayang Const. of main I/Khul Thangnak 6.00 0.30 1.50 1.50 1.50 1.20 6.00

2 do do Const. of main I/Khul Mankhan 6.00 0.30 1.50 1.50 1.50 1.20 6.00

Page 163: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

156

3 do do Const. of main I/Khul Phulung 6.00 0.30 1.50 1.50 1.50 1.20 6.00

4 do do Const. of main I/Khul Phyang 6.00 0.30 1.50 1.50 1.50 1.20 6.00

5 do do Const. of main I/Khul Changmachan

6.00 0.30 1.50 1.50 1.50 1.20 6.00

6 do do Const. of main I/Khul Gyaoon 6.00 0.30 1.50 1.50 1.50 1.20 6.00

7 do Chok-II Const. Of I/Khul from Library to Abi canal

6.00 0.30 1.50 1.50 1.50 1.20 6.00

8 do do Const. Of Drain from Pyt Ghar to Abi Canal

8.00 0.40 2.00 2.00 2.00 1.60 8.00

9 do do Const. Of Drain from Sakrma Dorjay to Tsering Morup House

4.00 0.20 1.00 1.00 1.00 0.80 4.00

10 do do Const. Of Drain from Dolkar to Yourgal house Mollah-I

3.00 0.15 0.75 0.75 0.75 0.60 3.00

11 do do Const. Of Drain from Ayu road to Zanak Maney

10.00 0.50 2.50 2.50 2.50 2.00 10.00

12 do Spituk Const. of main I/Khul Gyanak Tar to Gogpo Spituk

6.00 0.30 1.50 1.50 1.50 1.20 6.00

13 do Spituk Const. of Dranage from Singaychan to main youra

7.00 0.35 1.75 1.75 1.75 1.40 7.00

14 do

Saboo

Const. of Irrigation Canal at Phoo, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

15 do Const. of Irrigation Canal at Meyak, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

16 do Const. of Irrigation Canal at Saboo Mohalla.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

17 do Const. of Irrigation Canal at Yoknos, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

18 do Const. of Irrigation Canal at Yoknos, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

19 do Const. of Irrigation Canal at Ayu, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 110.00 5.50 27.50 27.50 27.50 22.00 110.00

Page 164: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

157

V Land Development

1 Leh Phayang 20 nos Land Dev. at Phyang 80.00 4.00 20.00 20.00 20.00 16.00 80.00

2 do Chok-II Land development at Gathering hall

6.00 0.30 1.50 1.50 1.50 1.20 6.00

3 do Land development at Labrary hall

6.00 0.30 1.50 1.50 1.50 1.20 6.00

4 do Land development at Community Hall

6.00 0.30 1.50 1.50 1.50 1.20 6.00

5 do Spituk 20 nos Land Dev. at Phey 10.00 0.50 2.50 2.50 2.50 2.00 10.00

6 do do 10 nos Land Dev. at Palam 5.00 0.25 1.25 1.25 1.25 1.00 5.00

7 do do 12 nos Land Dev. at Spituk 6.00 0.30 1.50 1.50 1.50 1.20 6.00

8 do Chog-I Land Dev. at several Points at Choglamsar Village.

6.00 0.30 1.50 1.50 1.50 1.20 6.00

9 do do Land Dev. at Yultsa, Choglamsar.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

10 do Land Dev. at Lungphuk Gongma, Choglamsar.

3.00 0.15 0.75 0.75 0.75 0.60 3.00

11 do

Saboo

Land Dev. at Several Points Phoo Mohalla, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

12 do Land Dev. at Several Points Meyak Mohalla, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

13 do Land Dev. at Several Points Yoknos Mohalla, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

14 do Land Dev. at Several Points Ayu Mohalla, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

15 do Land Dev. at Several Points Saboo Mohalla, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 156.00 7.80 39.00 39.00 39.00 31.20 156.00

VI Reno. Of Traditional water bodies incl. desailting

Page 165: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

158

1 Leh Phayang Reno. Of WST at Zinglo 2.00 0.10 0.50 0.50 0.50 0.40 2.00

2 do do Reno. Of WST at Thangnak 2.00 0.10 0.50 0.50 0.50 0.40 2.00

3 do do Reno. Of WST at Zingok Bagah Tses

5.00 0.25 1.25 1.25 1.25 1.00 5.00

4 do do Reno. Of WST at Changma Dumdum

1.00 0.05 0.25 0.25 0.25 0.20 1.00

5 do do Reno. Of WST at Skilthang Phyang

1.00 0.05 0.25 0.25 0.25 0.20 1.00

6 do do Reno. Of WST at Tashi Dorje Galuma

1.00 0.05 0.25 0.25 0.25 0.20 1.00

7 do do Reno. Of WST at Mangkhan 1.00 0.05 0.25 0.25 0.25 0.20 1.00

8 do do Reno. Of WST at Stakpayzing Gompa

1.00 0.05 0.25 0.25 0.25 0.20 1.00

9 do do Reno. Of WST at Zinglo P-II 1.00 0.05 0.25 0.25 0.25 0.20 1.00

10 do do Reno. Of WST at Changma Dumdum P-II

1.00 0.05 0.25 0.25 0.25 0.20 1.00

11 do Spituk Repair/desailting Of WST at Youltsa Phey

5.00 0.25 1.25 1.25 1.25 1.00 5.00

12 do Chog-I Cost. Of Water Storage Tank at Choglamsar.

7.00 0.35 1.75 1.75 1.75 1.40 7.00

13 do

Saboo

Reno. Of WST at Yourgok Zing, Saboo

3.00 0.15 0.75 0.75 0.75 0.60 3.00

14 do Reno. Of WST at Zinglo Zing, Saboo

3.00 0.15 0.75 0.75 0.75 0.60 3.00

15 Reno. Of WST at Yoknos Zing, Saboo

3.00 0.15 0.75 0.75 0.75 0.60 3.00

16 do Reno. Of WST at Ayu Zing, Saboo

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Total 40.00 2.00 10.00 10.00 10.00 8.00 40.00

VII Reno & Maintenances of I/Canal & drains

Page 166: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

159

1 Leh Phayang Reno & Maintenances of 50 Nos I/Khuls at Phyang

20.00 1.00 5.00 5.00 5.00 4.00 20.00

2 do Spituk Reno & Maintenances of I/Khuls at Kongyour spituk

15.00 0.75 3.75 3.75 3.75 3.00 15.00

3 do do Reno & Maintenances of I/Khuls yourgo to Khacheypa Palam

15.00 0.75 3.75 3.75 3.75 3.00 15.00

4 do do Reno & Maintenances of I/Khuls Yourgo to Malakhang Farkha spituk

15.00 0.75 3.75 3.75 3.75 3.00 15.00

5 do do Reno.& Maintences of I/Khul at Phey

9.00 0.45 2.25 2.25 2.25 1.80 9.00

6 do do Reno & Maintenances of I/Khuls Pasta to Gornya Farkha

9.00 0.45 2.25 2.25 2.25 1.80 9.00

7 do do Reno & Maintenances of I/Khuls at Yokyour spituk

12.00 0.60 3.00 3.00 3.00 2.40 12.00

8 do do Reno & Maintenances of I/Khuls at Gophuks spituk

7.00 0.35 1.75 1.75 1.75 1.40 7.00

9 do do Reno & Maintenances of I/Khuls Bak to Leh Kartse spituk

7.00 0.35 1.75 1.75 1.75 1.40 7.00

10 do do Reno & Maintenances of 9 nosof I/Khuls at Palam

9.00 0.45 2.25 2.25 2.25 1.80 9.00

11 do do Reno & Maintenances of 6 nosof I/Khuls at Phey

6.00 0.30 1.50 1.50 1.50 1.20 6.00

12 do

Chog-I

Repair and Maintenance of I-Canal Kongyur, Choglamsar

15.00 0.75 3.75 3.75 3.75 3.00 15.00

13 do Repair and Maintenance of I-Canal Yokyur, Choglamsar

15.00 0.75 3.75 3.75 3.75 3.00 15.00

14 do Repair and Maintenance of 10 No's Canals at Choglamsar

15.00 0.75 3.75 3.75 3.75 3.00 15.00

15 do

Saboo

Reno. & Maintenances of Yourgok I/Khul, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

16 do Reno. & Maintenances of Zinglo I/Khul, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

17 do Reno. & Maintenances of Yoknos I/Khul, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Page 167: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

160

18 do Reno. & Maintenances of Ayu I/Khul, Saboo.

5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total 189.00 9.45 47.25 47.25 47.25 37.80 189.00

G.Total 602.00 30.10 150.50 150.50 150.50 120.40 602.00

Page 168: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

161

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF PANAMIK BLOCK

S. No Block Panchayat Name of Works Budget

req.

Budget Requirnment (Rs in Lacs)

Total 1st Year

(5%)

2nd Year

(25%)

3rd Year

(25%)

4th Year

(25%)

5th Year

(20%)

WATER CONSERVATION

1 Panamik sumoor const. of water reserviour tank at various places sumoor

40.00 2.00 10.00 10.00 10.00 8.00 40.00

2 do tiger Const. Of Water Reserviour Tank at tiger

10.00 0.50 2.50 2.50 2.50 2.00 10.00

3 do do Const. Of Water Reserviour Tank at pinchimik

5.00 0.25 1.25 1.25 1.25 1.00 5.00

4 do chamsen/charsa Const. Of Water Reserviour Tank at chamsen

6.00 0.30 1.50 1.50 1.50 1.20 6.00

5 do do Const. Of Water Reserviour Tank at youlkam

1.50 0.08 0.38 0.38 0.38 0.30 1.50

6 do do Const. Of Water Reserviour Tank at charsa

6.00 0.30 1.50 1.50 1.50 1.20 6.00

7 do do Const. Of Water Reserviour Tank at burma

1.50 0.08 0.38 0.38 0.38 0.30 1.50

8 do panamik Const. Of Water Reserviour Tank at panamiv yokma

3.00 0.15 0.75 0.75 0.75 0.60 3.00

9 do do const. of w/s/t atpanamic gongma

3.00 0.15 0.75 0.75 0.75 0.60 3.00

10 do do Const. Of Water Reserviour Tank at phuckpochey

2.00 0.10 0.50 0.50 0.50 0.40 2.00

11 do do Const. Of Water Reserviour Tank at hargam

2.00 0.10 0.50 0.50 0.50 0.40 2.00

12 do do Const. Of Water Reserviour Tank at taksha

4.00 0.20 1.00 1.00 1.00 0.80 4.00

13 do do Const. Of Water Reserviour Tank at sasoma

1.00 0.05 0.25 0.25 0.25 0.20 1.00

14 do do Const. Of Water Reserviour Tank at murgi

2.00 0.10 0.50 0.50 0.50 0.40 2.00

Page 169: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

162

15 do do Const. Of Water Reserviour Tank at kuri

3.00 0.15 0.75 0.75 0.75 0.60 3.00

16 do kubet Const. Of Water Reserviour Tank at kubet

4.50 0.23 1.13 1.13 1.13 0.90 4.50

17 do do Const. Of Water Reserviour Tank at ayee

3.50 0.18 0.88 0.88 0.88 0.70 3.50

18 do do Const. Of Water Reserviour Tank at arona gongma

5.00 0.25 1.25 1.25 1.25 1.00 5.00

19 do do Const. Of Water Reserviour Tank at arona yokma

5.00 0.25 1.25 1.25 1.25 1.00 5.00

20 do kheemi Const. of water Reserviour Tank at Khemi

2.50 0.13 0.63 0.63 0.63 0.50 2.50

21 do do Const. of water Reserviour Tank at Nungstat

2.50 0.13 0.63 0.63 0.63 0.50 2.50

22 do do Const. of water Reserviour Tank at Tongstat

3.00 0.15 0.75 0.75 0.75 0.60 3.00

23 do do Const. of water Reserviour Tank at Sangyar

1.50 0.08 0.38 0.38 0.38 0.30 1.50

24 do do Const. of water Reserviour Tank at Gonbo

1.50 0.08 0.38 0.38 0.38 0.30 1.50

25 do do Const. of water Reserviour Tank at Henachi

2.00 0.10 0.50 0.50 0.50 0.40 2.00

26 do do Const. of water Reserviour Tank at Changlung

1.00 0.05 0.25 0.25 0.25 0.20 1.00

Total 122.00 6.10 30.50 30.50 30.50 24.40 122.00

LAND DEVELOPMENT

1 Panamik sumoor Land development at Sumoor 30.00 1.50 7.50 7.50 7.50 6.00 30.00

2 do tiger Land Development at Tigar 15.00 0.75 3.75 3.75 3.75 3.00 15.00

3 do do Land Development at Pinchimik 10.00 0.50 2.50 2.50 2.50 2.00 10.00

4 do chamsen/charsa Land Development at chamsen 10.00 0.50 2.50 2.50 2.50 2.00 10.00

Page 170: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

163

5 do do Land Development at youlkam 2.50 0.13 0.63 0.63 0.63 0.50 2.50

6 do do Land Development at charasa 10.00 0.50 2.50 2.50 2.50 2.00 10.00

7 do do Land Development at Burma 2.50 0.13 0.63 0.63 0.63 0.50 2.50

8 do panamik Land Development at Panamik Yokma

4.00 0.20 1.00 1.00 1.00 0.80 4.00

9 do do Land Development at Panamik Gongma

4.00 0.20 1.00 1.00 1.00 0.80 4.00

10 do do Land Development at Popucha 3.00 0.15 0.75 0.75 0.75 0.60 3.00

11 do do Land Development at Hargam 3.50 0.18 0.88 0.88 0.88 0.70 3.50

12 do do Land Development Taksha 5.50 0.28 1.38 1.38 1.38 1.10 5.50

13 do do Land Development at Sasoma 1.50 0.08 0.38 0.38 0.38 0.30 1.50

14 do do Land Development at Murgi 3.50 0.18 0.88 0.88 0.88 0.70 3.50

15 do do Land Development at Kuri 3.50 0.18 0.88 0.88 0.88 0.70 3.50

16 do kubet Land Development at Kubet 5.50 0.28 1.38 1.38 1.38 1.10 5.50

17 do do Land Development at Ayee 4.50 0.23 1.13 1.13 1.13 0.90 4.50

18 do do Land Development at aArnu Gongma

5.00 0.25 1.25 1.25 1.25 1.00 5.00

19 do do Land Development at Arnu Yokma

5.00 0.25 1.25 1.25 1.25 1.00 5.00

20 do kheemi Land Development at Kheemi 3.50 0.18 0.88 0.88 0.88 0.70 3.50

21 do do Land Development at Nungstat 3.50 0.18 0.88 0.88 0.88 0.70 3.50

22 do do Land Development at Tongstat 5.00 0.25 1.25 1.25 1.25 1.00 5.00

23 do do Land Development at Sangyar 2.00 0.10 0.50 0.50 0.50 0.40 2.00

Page 171: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

164

24 do do Land Development at Gongbo 2.00 0.10 0.50 0.50 0.50 0.40 2.00

25 do do Land Development at Henachi 3.00 0.15 0.75 0.75 0.75 0.60 3.00

26 do Land Development at Changlung

1.50 0.08 0.38 0.38 0.38 0.30 1.50

Total 149.00 7.45 37.25 37.25 37.25 29.80 149.00

Creation of Irrigation Cannal and Drain

1 Panamik Sumoor Const of I Khul at Sumoor 35.00 1.75 8.75 8.75 8.75 7.00 35.00

2 do TIGER const.of i/khul at tiger 20.00 1.00 5.00 5.00 5.00 4.00 20.00

3 do do const.of i/khul at pinchimik 15.00 0.75 3.75 3.75 3.75 3.00 15.00

4 do Chemsen CONST.of i/khul at chamsen 8.00 0.40 2.00 2.00 2.00 1.60 8.00

5 do do CONST.of i/khul at youlkam 2.00 0.10 0.50 0.50 0.50 0.40 2.00

6 do do const.of i/khul at charasa 8.00 0.40 2.00 2.00 2.00 1.60 8.00

7 do do const. of i/khul at burma 2.00 0.10 0.50 0.50 0.50 0.40 2.00

8 do panamik const. of i/khul at panamik gongma

6.00 0.30 1.50 1.50 1.50 1.20 6.00

9 do do const of i/khul at panamik yokma

6.00 0.30 1.50 1.50 1.50 1.20 6.00

10 do do const.of i/khul at phuckpochey 3.50 0.18 0.88 0.88 0.88 0.70 3.50

11 do do const.of i/khul at hargam 3.50 0.18 0.88 0.88 0.88 0.70 3.50

12 do do const.of i/khul at taksha 8.00 0.40 2.00 2.00 2.00 1.60 8.00

13 do do const.of i/khul at sasoma 1.00 0.05 0.25 0.25 0.25 0.20 1.00

14 do do const.of i/khul at morgee 6.00 0.30 1.50 1.50 1.50 1.20 6.00

Page 172: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

165

15 do do const.of i/khul at kuri 6.00 0.30 1.50 1.50 1.50 1.20 6.00

16 do kubet const.of i/khul at kubet 5.00 0.25 1.25 1.25 1.25 1.00 5.00

17 do do const.of i/khul at ayee 2.00 0.10 0.50 0.50 0.50 0.40 2.00

18 do do const.of i/khul at aronu yokma 4.00 0.20 1.00 1.00 1.00 0.80 4.00

19 do do const.of i/khul at aronu gongma 4.00 0.20 1.00 1.00 1.00 0.80 4.00

20 do kheemi const.of i/khul at kheemi 3.00 0.15 0.75 0.75 0.75 0.60 3.00

21 do do const. of i/khul at nungstat 3.00 0.15 0.75 0.75 0.75 0.60 3.00

22 do do const. of i/khul at tongstat 3.00 0.15 0.75 0.75 0.75 0.60 3.00

23 do do const.of i/khul at gonbo 1.00 0.05 0.25 0.25 0.25 0.20 1.00

24 do do const. of i/khul at henachi 2.00 0.10 0.50 0.50 0.50 0.40 2.00

25 do do const of i/khul at changlung 1.00 0.05 0.25 0.25 0.25 0.20 1.00

Total 158.00 7.90 39.50 39.50 39.50 31.60 158.00

RENNOVATION AND MAINTAINANCE OF IRRIGATION CANNALS AND DRAINS

1 Panamik sumoor Repair and Renovation of i/khul at various places summoor

60.00 3.00 15.00 15.00 15.00 12.00 60.00

2 do tiger Repair and Renovation of i/khul at tiger

35.00 1.75 8.75 8.75 8.75 7.00 35.00

3 do do Repair and Renovation of I/khul at pinchimik

20.00 1.00 5.00 5.00 5.00 4.00 20.00

4 do chamsen/charsa Repair and Renovation of I/khul at chamsen

18.00 0.90 4.50 4.50 4.50 3.60 18.00

5 do do Repair and Renovation of I/khul at youlkam

8.00 0.40 2.00 2.00 2.00 1.60 8.00

6 do do Repair and Renovation Of I/khul at charsa

20.00 1.00 5.00 5.00 5.00 4.00 20.00

Page 173: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

166

7 do do Repair and Renovation of I/khul at burma

8.00 0.40 2.00 2.00 2.00 1.60 8.00

8 do panamic Repair and Renovation of I/khul at panamic gongma

10.00 0.50 2.50 2.50 2.50 2.00 10.00

9 do do Repair and Renovation of I/khul at panamic yokma

10.00 0.50 2.50 2.50 2.50 2.00 10.00

10 do do Repair and Renovation of I/khul at phukpocheu

8.00 0.40 2.00 2.00 2.00 1.60 8.00

11 do do Repair and Renovation of I/khul at hargam

8.00 0.40 2.00 2.00 2.00 1.60 8.00

12 do do Repair and Renovation of I/khul at taksha

15.00 0.75 3.75 3.75 3.75 3.00 15.00

13 do do Repair and Renovation of I/khul at sasoma

2.00 0.10 0.50 0.50 0.50 0.40 2.00

14 do do Repair and Renovation of I/khul at murgi

10.00 0.50 2.50 2.50 2.50 2.00 10.00

15 do do Repair and Renovation of I/khul at kuri

10.00 0.50 2.50 2.50 2.50 2.00 10.00

16 do kubet Repair and Renovation of I/khul at kubet

10.00 0.50 2.50 2.50 2.50 2.00 10.00

17 do do Repair and Renovation of I/khul at ayee

10.00 0.50 2.50 2.50 2.50 2.00 10.00

18 do do Repair and Renovation of I/khul at arona yokma

10.00 0.50 2.50 2.50 2.50 2.00 10.00

19 do do Repair and Renovation of I/khul at arona gongma

10.00 0.50 2.50 2.50 2.50 2.00 10.00

20 do kheemi Repair and Renovation of I/khul at kheemi

10.00 0.50 2.50 2.50 2.50 2.00 10.00

21 do do Repair and Renovation of I/khul at nunghat

10.00 0.50 2.50 2.50 2.50 2.00 10.00

22 do do Repair and Renovation of I/khul at sangyar

5.00 0.25 1.25 1.25 1.25 1.00 5.00

23 do do Repair and Renovation of I/khul at tangstat

10.00 0.50 2.50 2.50 2.50 2.00 10.00

24 do do Repair and Renovation of I/khul at henachi

10.00 0.50 2.50 2.50 2.50 2.00 10.00

Page 174: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

167

25 do do Repair and Renovation of I/khul at changlung

2.00 0.10 0.50 0.50 0.50 0.40 2.00

Total 329.00 16.45 82.25 82.25 82.25 65.80 329.00

G. Total 758.00 37.90 189.50 189.50 189.50 151.60 758.00

Page 175: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

168

FIVE YEAR IRRIGATION PLAN UNDER PRADHAN MANTERI KRISHI SINCHAYEE YOJANA (PMKSY) OF NIMOO BLOCK

S.No. Block Name of Halqa

Panchayat Name of works

Budget req.

1st year 5%

2nd year 25%

3rd year25%

4th year 25%

5th year 20%

Total

I. Renovation and maintainance of Irrigation Canal

1 Nimoo Nimoo Repair/Reno. of I/khul martse katpa yokma to Zing

2.00 0.10 0.50 0.50 0.50 0.40 2.00

2 do do Repair/Reno. Of I/khul from main Zampa tp Tas

2.00 0.10 0.50 0.50 0.50 0.40 2.00

3 do do Repair/Reno. Of I/khul Chenmo to Tung-tung

2.00 0.10 0.50 0.50 0.50 0.40 2.00

4 do do Repair/renovation of I/Khul from Pharkha Gongma to Masali Tsas

10.00 0.50 2.50 2.50 2.50 2.00 10.00

Total: 16.00 0.80 4.00 1.50 1.50 3.20 16.00

II. Repair of water Bodies including desilting

1 Nimoo do Repair/Reno. Of water storage tank at Chumkar Zing

3.00 0.15 0.75 0.75 0.75 0.60 3.00

2 do do Repair/Reno. Of water storage tank at Ronguk

1.00 0.05 0.25 0.25 0.25 0.20 1.00

do Total: 4.00 0.20 1.00 1.00 1.00 0.80 4.00

III. Water Conservation

1 Nimoo do Const. Of desilting tank at Ronguk 1.00 0.05 0.25 0.25 0.25 0.20 1.00

2 do do Const. Of 2 Nos og Gate wall for water storage tank at Tsuldung

1.00 0.05 0.25 0.25 0.25 0.20 1.00

3 do do Const. Of Artifical Glacier at Zungstey Nimoo

15.00 0.75 3.75 3.75 3.75 3.00 15.00

Total: 17.00 0.85 4.25 4.25 4.25 3.40 17.00

IV. Land Development

Page 176: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

169

1 Nimoo do Land development at community land Nimoo Gongma (Urgain Gonpa)

30.00 1.50 7.50 7.50 7.50 6.00 30.00

2 do do Land development at Kagan Mohallah 2.00 0.10 0.50 0.50 0.50 0.40 2.00

3 do do Land development at Mathang mohallah

2.00 0.10 0.50 0.50 0.50 0.40 2.00

4 do do Land development at Farka Gongma 2.00 0.10 0.50 0.50 0.50 0.40 2.00

5 do do Land deelopment at Farka Yokma 1.00 0.05 0.25 0.25 0.25 0.20 1.00

6 do do Land development at Raftan Nimoo 2.00 0.10 0.50 0.50 0.50 0.40 2.00

7 do do Land development at Tsaldung Mohallah

2.00 0.10 0.50 0.50 0.50 0.40 2.00

8 do do Land development at Nimoo Gongma 2.00 0.10 0.50 0.50 0.50 0.40 2.00

9 do do Land development at Chumkar mohallah

1.00 0.05 0.25 0.25 0.25 0.20 1.00

Total: 44.00 2.20 11.00 11.00 11.00 8.80 44.00

I. Water Conservation

1 Nimoo Ney Const. Of artifical Glacier at Umlung Gongma Ney

8.00 0.40 2.00 2.00 2.00 1.60 8.00

2 do do Const. Of artifical Glacier at Lding Ney 8.00 0.40 2.00 2.00 2.00 1.60 8.00

3 do do Const. Of artifical Glacier at Dhot-Dhot Ney

8.00 0.40 2.00 2.00 2.00 1.60 8.00

Total: 24.00 1.20 6.00 6.00 6.00 4.80 24.00

II. Renovation and Maintainance of I/khul

1 Nimoo Ney Reno./maintainance of Phoktsey Mayur Ney

7.00 0.35 1.75 1.75 1.75 1.40 7.00

2 do do Reno./maintainance of Three Mayur Ney

7.00 0.35 1.75 1.75 1.75 1.40 7.00

3 do do Reno./maintainance of makspon 7.00 0.35 1.75 1.75 1.75 1.40 7.00

Page 177: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

170

Mayur Ney

4 do do Reno./ maintainance of Khalung kha Ney

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Total: 24.00 1.20 6.00 6.00 6.00 4.80 24.00

III. Land Development

1 Nimoo Ney Land development at Tsering Dorjay Laging

3.00 0.15 0.75 0.75 0.75 0.60 3.00

2 do do Land development at Rinchen Tundup Laging

3.00 0.15 0.75 0.75 0.75 0.60 3.00

3 do do Land development at Tundup Dorjay Gongma

3.00 0.15 0.75 0.75 0.75 0.60 3.00

4 do do land development at Tsering chozang Laging

3.00 0.15 0.75 0.75 0.75 0.60 3.00

5 do do Land development at Tsewang Phunchok Laging

3.00 0.15 0.75 0.75 0.75 0.60 3.00

6 do do Land development at Tsering Nurbo Laging

3.00 0.15 0.75 0.75 0.75 0.60 3.00

7 do do Land development at Tsering Stobgais Tsemo

3.00 0.15 0.75 0.75 0.75 0.60 3.00

8 do do Land development at Tsering Murupkursey

3.00 0.15 0.75 0.75 0.75 0.60 3.00

9 do do Land development at Tsering Raftan Kursey Yokma

3.00 0.15 0.75 0.75 0.75 0.60 3.00

10 do do Land development at Tsering Tundup Kursey Khabgbu

3.00 0.15 0.75 0.75 0.75 0.60 3.00

11 do do land development at Tsering Namgail Laging

3.00 0.15 0.75 0.75 0.75 0.60 3.00

12 do do Land development at Sonam Rigzen Zen

3.00 0.15 0.75 0.75 0.75 0.60 3.00

13 do do land development at Tsering Angchuk Brigate

3.00 0.15 0.75 0.75 0.75 0.60 3.00

14 do do Land developmen at Tundup Tsa-taik 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 178: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

171

15 do do Land development at Tsewang Tundup Langang-Pa

3.00 0.15 0.75 0.75 0.75 0.60 3.00

16 do do Land development at Tsering Murup Phorok

3.00 0.15 0.75 0.75 0.75 0.60 3.00

17 do do Land development at Tsewang phuncho kDhakmalung

3.00 0.15 0.75 0.75 0.75 0.60 3.00

18 do do Land development at Tsewang Dolma Dhakma lung

3.00 0.15 0.75 0.75 0.75 0.60 3.00

19 do do Land development at Tsering Lundup korpon

3.00 0.15 0.75 0.75 0.75 0.60 3.00

20 do do Land development at Phunchok Barzi 3.00 0.15 0.75 0.75 0.75 0.60 3.00

21 do do Land development at Lobzang Gongma 3.00 0.15 0.75 0.75 0.75 0.60 3.00

22 do do Land development at phunchok Gyltson Guru

3.00 0.15 0.75 0.75 0.75 0.60 3.00

23 do do Land development at Twewang Dolma Chohjor

3.00 0.15 0.75 0.75 0.75 0.60 3.00

24 do do Land development at Tsering phunchok Cherpon

3.00 0.15 0.75 0.75 0.75 0.60 3.00

25 do do Land development at Rigzen Namgail Nerpapa

3.00 0.15 0.75 0.75 0.75 0.60 3.00

26 do do Land development at Tsering Murup Phakyoul

3.00 0.15 0.75 0.75 0.75 0.60 3.00

27 do do Land development at Mutup Spon 3.00 0.15 0.75 0.75 0.75 0.60 3.00

28 do do Land development at Tsering Phanka-Pa

3.00 0.15 0.75 0.75 0.75 0.60 3.00

29 do do Land development at Tsetan Dorjay Gabur

3.00 0.15 0.75 0.75 0.75 0.60 3.00

30 do do Land development at Tsewang Rinchen Philing

3.00 0.15 0.75 0.75 0.75 0.60 3.00

31 do do Land development at Sonam Dorjay Zhaatuk

3.00 0.15 0.75 0.75 0.75 0.60 3.00

32 do do Land development at Tsewang Phunchok Korpon

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 179: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

172

33 do do Land development at Yountan Rabgais Shayar

3.00 0.15 0.75 0.75 0.75 0.60 3.00

34 do so Land development at Chospail Phoo-Pa 3.00 0.15 0.75 0.75 0.75 0.60 3.00

35 do do Land development at Nurboo Zosheh 3.00 0.15 0.75 0.75 0.75 0.60 3.00

36 do do Land development at Tsering Mutup Zungstain

3.00 0.15 0.75 0.75 0.75 0.60 3.00

37 do do Land development at Sonam Tsering Nerpa-Pa

3.00 0.15 0.75 0.75 0.75 0.60 3.00

38 do do Land development at Tsering phunchok Zimkhang

3.00 0.15 0.75 0.75 0.75 0.60 3.00

39 do do land development at Lobzang Tsering Tingstot

3.00 0.15 0.75 0.75 0.75 0.60 3.00

40 do do Land development at Kunzang Dolma Latses

3.00 0.15 0.75 0.75 0.75 0.60 3.00

41 do do Land development at Tashi Gyalpo Rharuk

3.00 0.15 0.75 0.75 0.75 0.60 3.00

42 do do Land development at Sonam Gyaltson makspon

3.00 0.15 0.75 0.75 0.75 0.60 3.00

43 do do Land development at Tashi Tsomo Ritsa

3.00 0.15 0.75 0.75 0.75 0.60 3.00

44 do do land development at Rigzen Zoshes 3.00 0.15 0.75 0.75 0.75 0.60 3.00

45 do do Land development at Tsewang Yangjor Zoshes

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Total: 135.00 6.75 33.75 33.75 33.75 27.00 135.00

Water storage/conservation

1 Nimoo

Rumbak

const.of water storage tank at Hanker 4.00 0.20 1.00 1.00 1.00 0.80 4.00

2 do const. Of water storage tank at Shinggo

3.00 0.15 0.75 0.75 0.75 0.60 3.00

3 do const. Of water storage tank at Achirik 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 180: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

173

4 do const.of water storage tank at Markha 5.00 0.25 1.25 1.25 1.25 1.00 5.00

5 do const.of water storage tank at Tsogsti 3.00 0.15 0.75 0.75 0.75 0.60 3.00

6 do const. Of water storage tank at Rumbak

3.00 0.15 0.75 0.75 0.75 0.60 3.00

7 do const. Of water storage tank at chilling 3.00 0.15 0.75 0.75 0.75 0.60 3.00

8 do const.of water storage tank at Kaya 3.00 0.15 0.75 0.75 0.75 0.60 3.00

9 do const.of water storage tank at yourutse

3.00 0.15 0.75 0.75 0.75 0.60 3.00

10 do const.of water storage tank at Sumdha chung

3.00 0.15 0.75 0.75 0.75 0.60 3.00

total 33.00 1.65 8.25 8.25 8.25 6.60 33.00

Creation of I/Canal and drains

1 Nimoo

Rumbak

creation of I/khul at umlung kangna Yokma

3.00 0.15 0.75 0.75 0.75 0.60 3.00

2 do creation of I/khul at Yournoches Sumdha

20.00 1.00 5.00 5.00 5.00 4.00 20.00

3 do creation of I/khul Sku-Yokma to kaya 4.00 0.20 1.00 1.00 1.00 0.80 4.00

4 do creation of I/khul Sara Markha 3.00 0.15 0.75 0.75 0.75 0.60 3.00

5 do creation of i/khul chalack Markha 5.00 0.25 1.25 1.25 1.25 1.00 5.00

6 do creation o f I/khul Sumdhado /Pharka 3.00 0.15 0.75 0.75 0.75 0.60 3.00

7 do creation of I/khul at Kongma Sumdha do

3.00 0.15 0.75 0.75 0.75 0.60 3.00

8 do creation of I/khul at Tokpo to thagtok chilling

4.00 0.20 1.00 1.00 1.00 0.80 4.00

9 do creation of I/khul at Rumchey kongma & Yokma

4.00 0.20 1.00 1.00 1.00 0.80 4.00

10 do creation of I/khul at Sumdha chun 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 181: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

174

total 52.00 2.60 13.00 13.00 13.00 10.40 52.00

Land Development

1 Nimoo

Rumbak

Land Development at Rumbak 5.00 0.25 1.25 1.25 1.25 1.00 5.00

2 do land Dev.at Kaya 5.00 0.25 1.25 1.25 1.25 1.00 5.00

3 do Land Dev.at Markha 7.00 0.35 1.75 1.75 1.75 1.40 7.00

4 do Land Dev. At Shinggo 3.00 0.15 0.75 0.75 0.75 0.60 3.00

5 do Land Dev.at Tsogsti 4.00 0.20 1.00 1.00 1.00 0.80 4.00

6 do Land Dev.at Ezangs 3.00 0.15 0.75 0.75 0.75 0.60 3.00

7 do Land Dev.at Chilling 3.00 0.15 0.75 0.75 0.75 0.60 3.00

8 do Land Dev.at Sumdha-chung 3.00 0.15 0.75 0.75 0.75 0.60 3.00

9 do Land Dev.at Jingchan 3.00 0.15 0.75 0.75 0.75 0.60 3.00

10 do Land Dev.at Sku 4.00 0.20 1.00 1.00 1.00 0.80 4.00

Total:- 40.00 2.00 10.00 10.00 10.00 8.00 40.00

Water storage/conservation

1 Leh Taroo Const of water Storage tank at Thang bagh Hariyali Taroo

4.00 0.20 1.00 1.00 1.00 0.80 4.00

2 do do Const.of Zing at Gobji Umla 2.00 0.10 0.50 0.50 0.50 0.40 2.00

do do Total: 6.00 0.30 1.50 1.50 1.50 1.20 6.00

Land Development

1 Nimoo Taroo Land Dev. at Thang bahg Hariyali Taroo 2.00 0.10 0.50 0.50 0.50 0.40 2.00

Page 182: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

175

2 do do Land Dev. at Zingzos Umla 1.00 0.05 0.25 0.25 0.25 0.20 1.00

do Total: 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Water Harvesting

1 Nimoo Taroo Const of P/Bund at Lalungpa Nallha 1.00 0.05 0.25 0.25 0.25 0.20 1.00

2 do do Const of P/Bund at Lungmochay Nallha 1.00 0.05 0.25 0.25 0.25 0.20 1.00

3 do do Const of P/Bund at Olthnag lungba Taroo

1.00 0.05 0.25 0.25 0.25 0.20 1.00

Total: 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Creation of I/khul & drains

1 Nimoo Taroo Const .of Irr/Khul at Shangbagh Taroo 3.00 0.15 0.75 0.75 0.75 0.60 3.00

2 do do Const. Of side drain at Puluchan to Sakulung taroo

2.00 0.10 0.50 0.50 0.50 0.40 2.00

Total:- 5.00 0.25 1.25 1.25 1.25 1.00 5.00

I.Repair/Const. Of water I/khul

1 Nimoo Basgo Repair of I/khul at Shali Tunglung Basgo

3.00 0.15 0.75 0.75 0.75 0.60 3.00

2 do do Repair of I/khul Thangkob Your-go 7.00 0.35 1.75 1.75 1.75 1.40 7.00

3 do do Const. Of I/khul at Yokyour Zasa 5.00 0.25 1.25 1.25 1.25 1.00 5.00

4 do do Const. Of I/khul at Shunumunu at Dungang

5.00 0.25 1.25 1.25 1.25 1.00 5.00

5 do do Const. Of I/khul at Tsomo Tsas to Norzang Chumik

5.00 0.25 1.25 1.25 1.25 1.00 5.00

6 do do Repair of main I/khul at Tunglung 3.00 0.15 0.75 0.75 0.75 0.60 3.00

7 do do Repair of main I/khul at Daksna 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 183: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

176

8 do do Repair of main I/khul at Zamna Dungang

3.00 0.15 0.75 0.75 0.75 0.60 3.00

9 do do Repair of i/Khul at Thangkob 3.00 0.15 0.75 0.75 0.75 0.60 3.00

10 do do Repair ofmain I/khul at Zasa 3.00 0.15 0.75 0.75 0.75 0.60 3.00

11 do do Repair of main I/khul at YokYour Zasa 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Total: 43.00 2.15 10.75 10.75 10.75 8.60 43.00

II.Water storage/conservation

1 Nimoo Basgo Construction of water reserviour Tank at Tantse Basgo

7.00 0.35 1.75 1.75 1.75 1.40 7.00

2 do do Repair/disilting of water reserviour tank at Thangkob Nunam Basgo

5.00 0.25 1.25 1.25 1.25 1.00 5.00

3 do do Repair/Reno. Of water reserviour Tank at Tunglung Basgo

3.00 0.15 0.75 0.75 0.75 0.60 3.00

4 do do Const. Of water conservation at Tunglung

3.00 0.15 0.75 0.75 0.75 0.60 3.00

5 do do Repair/Reno of Zing at Tunglung Basgo 3.00 0.15 0.75 0.75 0.75 0.60 3.00

6 do do Repair/Reno of Zing at Thankob 3.00 0.15 0.75 0.75 0.75 0.60 3.00

do do Const. Of water Reserviour Tank at Tantse Basgo

3.00 0.15 0.75 0.75 0.75 0.60 3.00

5 do do Const. Of Water Reserviour Tank at Tunglung mohallah II

8.00 0.40 2.00 2.00 2.00 1.60 8.00

6 do do Const. Of water consdervation at Zasa 3.00 0.15 0.75 0.75 0.75 0.60 3.00

7 do do Const. Of water conservation at Thankob

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Total: 41.00 2.05 10.25 10.25 10.25 8.20 41.00

III.Land Development

1 Nimoo Basgo Land dev. At Shali (Karas) Thangkob 3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 184: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

177

Nunam

2 do do Land dev. At Khando Yokma Zamna Basgo

3.00 0.15 0.75 0.75 0.75 0.60 3.00

3 do do Land dev. At Tantse C/Land 15.00 0.75 3.75 3.75 3.75 3.00 15.00

4 do do Land dev. At Youl-Pay Bhag at Zasa 8.00 0.40 2.00 2.00 2.00 1.60 8.00

Total: 29.00 1.45 7.25 7.25 7.25 5.80 29.00

IV.Providing Infrastrucutre for irrigation

1 Nimoo Basgo Protection Bund at Zamna Angmo at Basgo

4.00 0.20 1.00 1.00 1.00 0.80 4.00

2 do do Protection Bund at khando KirKir Tsas 3.00 0.150 0.750 0.750 0.750 0.60 3.000

3 do do Providing/fixing of Chain link fencing at Tantse Basgo

10.00 0.50 2.50 2.50 2.50 2.00 10.00

Total: 17.00 0.85 4.25 4.25 4.25 3.40 17.00

I.Water conservation

1 Nimoo Likeer Const. Of Artifical Glacier at Yomar 10.00 0.50 2.50 2.50 2.50 2.00 10.00

2 do do Const. Of Artifical Glacier at Zangra 10.00 0.50 2.50 2.50 2.50 2.00 10.00

Total: 20.00 1.00 5.00 5.00 5.00 4.00 20.00

II. Renovation and Maintainance of I/khul

1 Nimoo Likeer Repair/Reno. Of I/khul at Dak Sarpey Youra at Lhung gongma

8.00 0.40 2.00 2.00 2.00 1.60 8.00

2 do do Repair/Reno. Of I/khul Lingstot /Lingsham

8.00 0.40 2.00 2.00 2.00 1.60 8.00

3 do do Repair/Reno. Of I/khul at Mayour Tarutse

8.00 0.40 2.00 2.00 2.00 1.60 8.00

4 do do Const. Of I/khul from Thangnag to Olgo Lungpa

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Page 185: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

178

5 do do Const. Of I/khul from Spangtat to Dakbago

3.00 0.15 0.75 0.75 0.75 0.60 3.00

6 do do Const. I/khul from Yourgo to Katpa Seru

3.00 0.15 0.75 0.75 0.75 0.60 3.00

7 do do Const. Of I/khul from Katyok to Dakney 3.00 0.15 0.75 0.75 0.75 0.60 3.00

8 do do Const. Of I/Khul from Lungo to Tsanay-Pa

3.00 0.15 0.75 0.75 0.75 0.60 3.00

9 do do Const. Of I/Khul at Youra Gongma Lartain to Ol Changmo

3.00 0.15 0.75 0.75 0.75 0.60 3.00

10 do do Const. Of I/Khul at Youra Yokma to Lungpa

3.00 0.15 0.75 0.75 0.75 0.60 3.00

11 do do Const. Of I/Khul at Chornes to Mazing Youra

3.00 0.15 0.75 0.75 0.75 0.60 3.00

Total: 48.00 2.40 12.00 12.00 12.00 9.60 48.00

III. Water Storage and Conservation

1 Nimoo Likeer Repair of water Reserviour Tank at Tongol Lung gongma

5.00 0.25 1.25 1.25 1.25 1.00 5.00

2 do do Repair of Water Reserviour Tank at Lingstot

5.00 0.25 1.2500 1.25 1.25 1.00 5.00

3 do do Repair of water Reserviour Tank at Tarutse

5.00 0.25 1.25 1.25 1.25 1.00 5.00

4 do do Repair of water Reserviour Tank at Phoo

3.00 0.25 0.75 0.75 0.75 0.60 3.00

Total: 18.00 1.00 4.50 4.50 4.50 3.60 18.00

Iv.Land Development

1 Nimoo Likeer Land dev. At Khachey Disket 0.50 0.025 0.125 0.125 0.125 0.10 0.50

2 do do Land dev. At Gonbo Dorjay 0.50 0.025 0.125 0.125 0.125 0.10 0.50

3 do do Land dev at Ser Tsering Namgail 0.50 0.025 0.125 0.125 0.125 0.10 0.50

Page 186: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

179

4 do do Land dev. At Ser Phunchok Dolma 0.50 0.025 0.125 0.125 0.125 0.10 0.50

5 do do Land dev. At Gen. Tsewang Tashi 0.50 0.025 0.125 0.125 0.125 0.10 0.50

6 do do Land dev at Konka Rong Tsewang Nurbo

0.50 0.025 0.125 0.125 0.125 0.10 0.50

7 do do Land dev. At Langang -Pa Phunchok Chosphel

0.50 0.025 0.125 0.125 0.125 0.10 0.50

8 do do Land dev. At Chortain pa Sonam Dolma 0.50 0.025 0.125 0.125 0.125 0.10 0.50

9 do do Land dev. At Konka Kahangbu Lundup Tsering

0.50 0.025 0.125 0.125 0.125 0.10 0.50

10 do do Land dev. At Sercif Rigzen Gurmet 0.50 0.025 0.125 0.125 0.125 0.10 0.50

11 do do Land dev. At Zing Ringmo Phunchok Tsering

0.50 0.025 0.125 0.125 0.125 0.10 0.50

12 do do Land dev at various places at Phoo Mohallah

5.00 0.25 1.25 1.25 1.25 1.00 5.00

13 do do Land deva at variour places at Tarutsey 5.00 0.25 1.25 1.25 1.25 1.00 5.00

Total: 15.500 0.775 3.875 3.875 3.875 3.100 15.500

GRAND TOTAL:- 637.500 31.875 159.375 159.375 159.375 127.500 637.500

Page 187: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

180

Page 188: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

181

Page 189: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

182

Page 190: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

183

Page 191: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

184

Page 192: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

185

Page 193: Govt. Of Jammu & Kashmir · Govt. Of Jammu & Kashmir Ladakh Autonomous Hill Dev. Council, Leh District Irrigation Plan ... (Jammu & Kashmir) Project Context Development of Infrastructure/Capacity

186